KitLog pro

Powered By Kitlog Pro v2.0

PAUL'S WEB SITE
Work Logs Found: 109
Category Work Time: 476 Hours
 Date
Hours
Work Log Summary

Details

 11-21-2019
6.00
Glued cowl mounting blocks on
Details
       

 11-17-2019
4.00
fabricated rear firewall
Details
       

 11-16-2019
5.00
cut SS 0.018 cover for engine backer
Details
       

 11-14-2019
6.00
Fabricated front firewall
Details
       

 08-14-2019
8.00
fabricated tabs to weld to fuse
Details
       

 08-13-2019
6.00
Fuel Tank Fabricatio
Details
       

 03-27-2019
5.00
made fuel tank add on for extra capacity
Details
       

 03-26-2019
4.00
cut hole for filler and mocked up add on
Details
       

 03-23-2019
5.00
rewelding of engine mounting ring do to mistake
Details
       

 03-15-2019
5.00
fabrication of fire and instrument bulk heads
Details
       

 02-25-2019
4.00
base and top of fuel tank
Details
       

 02-19-2019
2.00
welded up the motor mount
Details
       

 02-19-2019
2.00
welded the brake transition to the bungee piece
Details
       

 02-18-2019
3.00
tail brace wire terminations
Details
       

 02-18-2019
2.00
instrument panel and fuel tank
Details
       

 02-17-2019
3.00
instrument panel
Details
       

 02-17-2019
3.00
finished landing/flying wires/cables
Details
       

 02-16-2019
6.00
finished fabricating flying/landing cables
Details
       

 02-15-2019
5.00
finished instrument panel and started onlanding/fl
Details
       

 02-14-2019
4.00
building up instrument and bulkhead
Details
       

 02-12-2019
2.00
drew out instrument panel front bulhead
Details
     

 02-09-2019
4.00
fabricated tabs for stabiliser wires
Details
       

 02-04-2019
5.00
built a jig for the engine mount
Details
       

 02-03-2019
4.00
got motor mount ready for mockup
Details
       

 02-02-2019
6.00
started the main fabrication of motor mount
Details
       

 02-01-2019
4.00
prepping for fabrication of motor mount
Details
       

 12-26-2018
3.00
mock up of fuel tank
Details
       

 12-05-2018
3.00
assembled engine stand and engine
Details
       

 12-04-2018
4.00
Fabricated axle guides and engine stand
Details
       

 12-03-2018
6.00
axle collars and engine stand
Details
       

 12-01-2018
3.00
instrument and forward bulkhead
Details
       

 11-28-2018
4.00
finalized brake
Details
       

 11-27-2018
5.00
suspension finaization
Details
       

 11-21-2018
3.00
Install upper wing and check incidence.
Details
       

 11-20-2018
3.00
starting reassembly to check wing rigging
Details
       

 11-07-2018
2.00
fixing stringer spacers
Details
       

 11-06-2018
4.00
Modify floorbds and modify attach point
Details
       

 11-05-2018
6.00
Completely disassemble to fix rear wing attach
Details
       

 02-19-2018
5.00
level and rigging basics
Details
       

 02-16-2018
5.00
fabrication of n-struts
Details
       

 02-13-2018
5.00
brake cable fitting mockup
Details
       

 02-12-2018
5.00
wing struts
Details
       

 02-07-2018
3.00
wing cabane mock-up
Details
       

 02-06-2018
5.00
reassemble gear and wings
Details
       

 02-05-2018
5.00
installation of wing and gear
Details
       

 02-04-2018
3.00
cockpit control cables
Details
       

 02-03-2018
3.00
installed rudder pedals
Details
       

 02-02-2018
5.00
cut and install floor boards
Details
       

 02-01-2018
5.00
continued on with flight controls
Details
       

 01-31-2018
5.00
putting back together
Details
       

 01-30-2018
6.00
finish installing stringers/formers
Details
       

 01-29-2018
6.00
final fitting of bottom former/stringer
Details
       

 01-28-2018
6.00
finished weldingof fuselage add-ons
Details

 01-25-2018
5.00
remove controls and start floor boards
Details
       

 01-19-2018
3.00
redo brake pedals
Details
       

 01-18-2018
5.00
toe brakes again
Details
       

 01-17-2018
5.00
toe brake ideas
Details
       

 01-15-2018
5.00
finished trim tab
Details
       

 01-13-2018
2.00
trim tab
Details
     

 01-10-2018
3.00
welded axle uprights in place
Details
       

 01-09-2018
3.00
tail brace wire brackets
Details
       

 01-08-2018
1.00
trim cable fairlead
Details
     

 01-06-2018
6.00
Making sure fuselage is square
Details
       

 01-04-2018
6.00
trim tab time
Details
       

 01-03-2018
5.00
right side upright slider
Details
       

 01-02-2018
5.00
axle sliders on landing gear
Details
       

 01-01-2018
4.50
anti-torque bungee collars
Details
       

 12-31-2017
6.00
brake anti-torque fittings
Details
       

 12-27-2017
4.00
setting up brakes
Details
       

 12-19-2017
4.00
Modified what I did yesturday
Details
       

 12-18-2017
5.00
axle anti-twist brackets
Details
       

 12-16-2017
3.00
whipped cable ends
Details
     

 12-14-2017
4.00
fabricated fuse rotators
Details
       

 12-13-2017
4.00
welded pulley brackets onto fuse
Details
       

 12-12-2017
5.00
remake of aileron pulley brackets
Details
       

 12-11-2017
3.00
new bolt order came
Details
       

 12-10-2017
6.00
ran balancing cable
Details
       

 12-09-2017
6.00
Balancing cable routing
Details
       

 12-07-2017
6.00
continuation of aileron cable routing
Details
       

 12-05-2017
5.00
figuring out the aileron control system
Details
       

 12-04-2017
5.00
Installed lower wing and other
Details
       

 12-01-2017
3.00
whipped cable ends
Details
     

 11-30-2017
5.00
cable antiabrasion and stops
Details
       

 11-29-2017
6.00
tying it together
Details
       

 11-28-2017
4.00
installed welded bellcrank
Details
       

 11-27-2017
4.00
welding elevator transition
Details
       

 11-21-2017
4.00
fairleads and bellcranks
Details
       

 11-16-2017
4.00
finalized cable runs
Details
       

 11-15-2017
3.00
moved 1st stringer station
Details
     

 11-08-2017
5.00
elevator work
Details
       

 11-06-2017
4.00
elevator and transition
Details
       

 11-04-2017
6.00
Rudder pedals and elevator transition brackets
Details
       

 11-03-2017
5.00
continuation of elevator control
Details
       

 11-02-2017
5.00
Control stick details
Details
       

 11-01-2017
5.00
Continuation of elevator mockup
Details
       

 10-31-2017
4.00
fabrication of control stick
Details
       

 10-28-2017
3.00
Remove lower formers
Details
       

 10-12-2017
6.00
tail dragger dragger
Details
       

 10-12-2017
5.00
Tail dragger dragger
Details
       

 10-11-2017
6.00
bad fit corrected
Details

 10-10-2017
4.00
refit horizontal stabs
Details
       

 09-28-2017
8.00
Independant elevators not good
Details
       

 09-15-2017
5.00
cockpit too small
Details
       

 09-14-2017
3.00
rudder bar
Details
       

 09-13-2017
3.00
stabilizers fit too tight
Details
       

 08-23-2017
4.00
fit elevators and rudder
Details
       

 08-19-2017
2.00
lower stringer fitting
Details
     

 08-18-2017
2.00
Pieces already fabricated
Details
     

 08-16-2017
2.00
Out of storage
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.