Date
|
Hours
|
Work Log Summary
|
Details
|
06-03-2022
|
1.00
|
First flight
|
|
|
|
05-23-2022
|
4.00
|
Final prep for airworthiness inspection
|
|
|
|
05-23-2022
|
2.50
|
Airworthiness inspection by Stan Franz DAR. Passed
|
|
|
|
05-23-2022
|
4.00
|
Air worthiness inspection - passed!
|
|
|
|
05-22-2022
|
5.00
|
airworthiness inspection prep
|
|
|
|
05-20-2022
|
8.00
|
Getting final items ready for inspection
|
Details
|
|
|
05-19-2022
|
5.00
|
Repaired fuel leak around L fuel quantity sender.
|
|
|
|
05-19-2022
|
2.00
|
Installed fire extinguisher on rear of center cons
|
|
|
|
05-18-2022
|
5.00
|
Configuring G3x. Sealing fuel leak.
|
|
|
|
05-17-2022
|
0.50
|
Finishing Seat Belts
|
|
|
|
05-17-2022
|
2.50
|
Continue Engine tuning
|
|
|
|
05-16-2022
|
4.00
|
Gathering and loading data into the FFA
|
|
|
|
05-12-2022
|
6.00
|
Reassemble interior. Balance prop and fuel map
|
|
|
|
05-11-2022
|
2.00
|
Rewired the Alt switches so a not to drain the bat
|
|
|
|
05-11-2022
|
6.00
|
Found a leaking fuel fitting and replaced it.
|
|
|
|
05-10-2022
|
6.00
|
Testing and refining prop bslance, idle and alt wi
|
|
|
|
05-09-2022
|
5.50
|
Installing seat belts
|
|
|
|
05-09-2022
|
2.00
|
First engine start
|
|
|
|
05-09-2022
|
4.00
|
calibrate fuel gauges
|
|
|
|
05-06-2022
|
5.00
|
Finishing the pilot and copilot seats.
|
|
|
|
05-06-2022
|
4.00
|
added fuel and tested fuel pumps and set pressure
|
|
|
|
05-04-2022
|
4.00
|
Working on pilot and copilot interior
|
|
|
|
05-04-2022
|
4.00
|
Installing spark plug wires
|
|
|
|
05-03-2022
|
4.00
|
Weigh airplane and check w&b
|
|
|
|
05-03-2022
|
3.00
|
Start running spark plug wires
|
|
|
|
05-02-2022
|
8.50
|
Continue installing rear seating carpeting
|
|
|
|
04-29-2022
|
4.50
|
;glueing baggage compartment carpeting and seats
|
|
|
|
04-28-2022
|
4.00
|
Finished assemblying and riviting backseat backs
|
|
|
|
04-27-2022
|
8.50
|
Working on the backseat backs
|
|
|
|
04-26-2022
|
8.00
|
inspection by Phil. Install sun visors. Prop bal b
|
|
|
|
04-25-2022
|
6.00
|
|
|
|
|
04-22-2022
|
3.50
|
making and testing stands to level airplane
|
|
|
|
04-22-2022
|
3.00
|
adjusting control surfaces
|
|
|
|
04-21-2022
|
4.00
|
Install and adjust flalp. Adjust sticks and ailer
|
|
|
|
04-21-2022
|
4.00
|
Bundle the wireing
|
|
|
|
04-20-2022
|
8.00
|
tying down wireing
|
|
|
|
04-20-2022
|
5.00
|
Painting the flaps
|
|
|
|
04-19-2022
|
3.50
|
Paint flaps and install the Pitot assembly
|
|
|
|
04-18-2022
|
2.00
|
Prep and etch and prime flaps and wing farings
|
|
|
|
04-15-2022
|
6.00
|
Finished the R wing root farings
|
|
|
|
04-14-2022
|
0.45
|
R wing root faring
|
|
|
|
04-13-2022
|
3.50
|
L wing fairing
|
|
|
|
04-12-2022
|
1.00
|
L wing faring
|
|
|
|
04-11-2022
|
3.50
|
Working on the farings for the left wing
|
|
|
|
04-08-2022
|
5.00
|
L wing faring work
|
|
|
|
04-07-2022
|
5.00
|
R wing faring work
|
|
|
|
04-06-2022
|
7.00
|
working on the wing farings
|
|
|
|
04-05-2022
|
4.00
|
Start working on the wing farings
|
|
|
|
04-05-2022
|
4.00
|
Finished avionics for now
|
|
|
|
04-04-2022
|
8.00
|
Troubleshooting avionics
|
|
|
|
03-30-2022
|
8.50
|
center stack
|
|
|
|
03-29-2022
|
8.50
|
Finished installing and started configuring avioni
|
|
|
|
03-28-2022
|
10.00
|
Continue wireing the two ifr gps's
|
|
|
|
03-25-2022
|
7.00
|
Continue wireing both GPS's
|
|
|
|
03-24-2022
|
4.00
|
Continue wireing up the GPS's
|
|
|
|
03-23-2022
|
8.00
|
Wireing up the GTRN650xi
|
|
|
|
03-22-2022
|
3.00
|
Working on GPS install
|
|
|
|
03-22-2022
|
5.00
|
Finished Right flap
|
|
|
|
03-21-2022
|
8.00
|
Working on the Right flap.
|
|
|
|
03-18-2022
|
7.00
|
Finishing making the Left Flap
|
|
|
|
03-17-2022
|
5.50
|
Working on L flap
|
|
|
|
03-16-2022
|
7.50
|
Working on making the L flap
|
|
|
|
03-15-2022
|
3.50
|
Start on the flaps
|
|
|
|
03-15-2022
|
3.50
|
Install tail faring nutplates
|
|
|
|
03-15-2022
|
1.50
|
Install right wing tip
|
|
|
|
03-14-2022
|
3.00
|
Installed the L wing tip onto the wing
|
|
|
|
03-14-2022
|
2.00
|
Finished installing all the quarter turn fastners
|
|
|
|
03-14-2022
|
3.50
|
Charged the brakes
|
|
|
|
03-11-2022
|
4.50
|
Install R. aileron and adjust the linkeages for bo
|
|
|
|
03-11-2022
|
5.00
|
Buffing the painted items from yesterday
|
|
|
|
03-10-2022
|
2.00
|
Made lending connections for com and nav ant
|
|
|
|
03-10-2022
|
1.00
|
clear coated the tail fairings
|
|
|
|
03-10-2022
|
3.00
|
Clear coated engine cowl and wing tips
|
|
|
|
03-09-2022
|
5.00
|
Working on fixing the blemishes in the R wing tip
|
|
|
|
03-09-2022
|
3.00
|
Making the fuel connections fuselage to wing tanks
|
|
|
|
03-08-2022
|
8.00
|
Painting cowl,wing tips, and tail faring
|
|
|
|
03-07-2022
|
9.00
|
Painting
|
Details
|
|
|
03-04-2022
|
1.50
|
Start Prep the top cowl for repainting
|
|
|
|
03-04-2022
|
4.00
|
Fix the Brake fluid charging tool
|
|
|
|
03-03-2022
|
6.00
|
Installl and adjust cowl
|
|
|
|
03-03-2022
|
2.00
|
Install brake lines from fuselage to wheels
|
|
|
|
03-02-2022
|
7.00
|
Fitting out the engine cowl with quarter turns fas
|
|
|
|
03-01-2022
|
6.50
|
Fitting horz stab/vert stab faring
|
|
|
|
02-28-2022
|
8.00
|
Working on fitting the fiberglass faring
|
|
|
|
02-25-2022
|
9.00
|
Worked on troubleshooting the pitch trim. Fixed.
|
|
|
|
02-24-2022
|
7.50
|
Installing and adjusting rudder land horz stab.
|
|
|
|
02-23-2022
|
7.00
|
Working on installing the tail feathers
|
|
|
|
02-22-2022
|
9.00
|
Install labels and N Number. Started installing e
|
|
|
|
02-21-2022
|
1.50
|
sanding and buffing the elivator and the top cowl
|
|
|
|
02-21-2022
|
3.00
|
Install the second heat muff and tubes
|
|
|
|
02-21-2022
|
2.00
|
Inastall the Vertical stabalizer
|
|
|
|
02-21-2022
|
1.00
|
For wing install put on nuts and tourque
|
|
|
|
02-18-2022
|
5.00
|
Install wings with help from Wally, Allen, and Ron
|
|
|
|
02-18-2022
|
2.00
|
Buffed out runs in the cowling and ailerons
|
|
|
|
02-17-2022
|
4.00
|
Touchup, prep, and clear coat ailerons, cowl, etc
|
|
|
|
02-17-2022
|
2.00
|
Fit the two wing tip lenses
|
|
|
|
02-16-2022
|
6.50
|
Finish painting blue. Change over to white & paint
|
|
|
|
02-15-2022
|
5.00
|
Working on the fiberglass wingtips
|
|
|
|
02-15-2022
|
3.00
|
Continue painting and sanding
|
|
|
|
02-11-2022
|
3.00
|
continued paint and sand
|
|
|
|
02-10-2022
|
7.50
|
sanding, cleaning, masking, and paint blue
|
|
|
|
02-09-2022
|
7.00
|
priming, sanding, sanding, ckeaning
|
|
|
|
02-08-2022
|
9.50
|
Filling, sanding, priming cowl. Initial set of fu
|
|
|
|
02-07-2022
|
7.50
|
Working on the center stacjk
|
|
|
|
02-04-2022
|
3.00
|
Install AOA display
|
|
|
|
02-03-2022
|
4.00
|
Installed PFD, Finished hidden Battery and VPS con
|
|
|
|
02-03-2022
|
3.00
|
Filling, Sanding,Painting undercoat
|
|
|
|
02-02-2022
|
3.00
|
Undercoat cowl and ailerons
|
|
|
|
02-02-2022
|
5.00
|
Create and install battery charge and VPX portals
|
|
|
|
02-01-2022
|
5.00
|
Prepping to paint cowl and ailerons
|
|
|
|
02-01-2022
|
3.00
|
Finished installing windshield deice
|
|
|
|
01-31-2022
|
9.00
|
All day working on the windshield deice
|
|
|
|
01-30-2022
|
2.00
|
Finished installing the baggage light system
|
|
|
|
01-30-2022
|
1.50
|
Engine Alt Air switches
|
|
|
|
01-28-2022
|
9.00
|
Wireinfg Engine alt air and thebaggage lights
|
|
|
|
01-27-2022
|
2.50
|
Installedl the linear actuator and fiberglassed br
|
|
|
|
01-26-2022
|
3.00
|
Working on Engine Alt Air Door
|
|
|
|
01-26-2022
|
4.00
|
Creating Baggage area Dome light activation
|
|
|
|
01-25-2022
|
6.00
|
Built and fiberglassed in the alt engine air door.
|
|
|
|
01-24-2022
|
1.50
|
Finished the R aileron
|
|
|
|
01-24-2022
|
7.00
|
Designing an alternate air door
|
|
|
|
01-21-2022
|
3.50
|
Continue with R aileron. Making jig to rivit stra
|
|
|
|
01-20-2022
|
8.00
|
Working on R aileron
|
|
|
|
01-19-2022
|
6.00
|
Almost finished the baffling around the prop gov
|
|
|
|
01-18-2022
|
6.00
|
Installed ooil door latch and baffeling.
|
Details
|
|
|
01-17-2022
|
4.50
|
Made the oil door
|
|
|
|
01-17-2022
|
4.50
|
Completed the prop control connection to the gov
|
|
|
|
01-14-2022
|
2.00
|
Working on redoing the front end of the prop contr
|
|
|
|
01-14-2022
|
3.00
|
Repositioned the heat pull knobsd
|
|
|
|
01-14-2022
|
5.00
|
Reinstalled throttle and prop controles
|
|
|
|
01-13-2022
|
4.00
|
Testing stick throws.
|
Details
|
|
|
01-13-2022
|
4.00
|
Filling and sanding cowling and air intakes
|
|
|
|
01-12-2022
|
7.00
|
Still working on the air intakes
|
|
|
|
01-11-2022
|
5.00
|
Worked on aileron deflection and stick clearance
|
|
|
|
01-11-2022
|
4.00
|
Continuing adjusting and fiberglassing air intakes
|
|
|
|
01-10-2022
|
3.00
|
worked on cowl air intak fiberglassing
|
|
|
|
01-07-2022
|
6.00
|
l eft aileron
|
|
|
|
01-06-2022
|
7.00
|
Made L and R aileron skins
|
|
|
|
01-05-2022
|
4.00
|
Started asembling the Left aileron
|
|
|
|
01-04-2022
|
8.00
|
Got the air ducts lined up enough to glue
|
|
|
|
01-03-2022
|
7.50
|
Still working on the air inlets
|
|
|
|
01-03-2022
|
5.00
|
Finished left aileron and temp installed L wing
|
|
|
|
12-31-2021
|
6.50
|
Continue wowrking on left air intake and baffling
|
|
|
|
12-30-2021
|
1.50
|
Working on L air intake
|
|
|
|
12-24-2021
|
8.00
|
Rightg air intake configured. Starting on the left
|
|
|
|
12-23-2021
|
8.00
|
Almost got the baffling around the right air inlet
|
|
|
|
12-22-2021
|
5.00
|
fiberglass top cowl pieces. Rivet baffling.
|
|
|
|
12-21-2021
|
5.00
|
Baffles and replaced the crossover fuel line
|
|
|
|
12-20-2021
|
7.50
|
Continue working on baffeling in the front opening
|
|
|
|
12-17-2021
|
6.50
|
Worked on fitting the air intake tubes
|
|
|
|
12-16-2021
|
5.50
|
Messing with baffeling and fitting the air scoops
|
|
|
|
12-15-2021
|
5.00
|
Installing rubber baffle material
|
|
|
|
12-14-2021
|
4.00
|
sealing, wireing, and connecting GPS antennas
|
|
|
|
12-14-2021
|
3.00
|
Make and install directions label
|
|
|
|
12-13-2021
|
3.00
|
air induction
|
|
|
|
12-09-2021
|
7.00
|
Finished nose gear fairing. Startedcowl front fas
|
|
|
|
12-08-2021
|
9.00
|
cowl
|
Details
|
|
|
12-07-2021
|
7.00
|
All day fitting the nose strut surround
|
|
|
|
12-06-2021
|
9.00
|
Finished cowling and started on nose gear cowl par
|
|
|
|
12-03-2021
|
6.00
|
More work on the 1/4 turn fastners on the sides
|
|
|
|
12-03-2021
|
7.00
|
more cowl work
|
|
|
|
12-02-2021
|
6.50
|
Installing quarter turn fasteners on the cowl side
|
|
|
|
12-01-2021
|
7.50
|
Fitting the bottom cowl
|
|
|
|
11-30-2021
|
8.00
|
Fit the lower cowl and installed the quarter turn
|
|
|
|
11-29-2021
|
7.50
|
Wprked on fitting the upper cowl
|
|
|
|
11-23-2021
|
7.50
|
|
Details
|
|
|
11-22-2021
|
6.00
|
Interior detail work
|
|
|
|
11-22-2021
|
3.00
|
Got the prop. Unboxed it and installed
|
|
|
|
11-19-2021
|
5.00
|
|
Details
|
|
|
11-18-2021
|
9.00
|
Continued Interior work
|
Details
|
|
|
11-17-2021
|
5.00
|
Installed bottom of door opening leather and gaske
|
|
|
|
11-16-2021
|
6.50
|
Continued glueing in the interior
|
|
|
|
11-15-2021
|
8.00
|
Glueing in the rear overhead covering
|
|
|
|
11-12-2021
|
5.00
|
Finished window surrounds and glued.
|
Details
|
|
|
11-11-2021
|
4.00
|
Cleaned around rear windows and made the surround
|
|
|
|
11-10-2021
|
3.00
|
Trimmed glue from inside of pilot and copilot wind
|
|
|
|
11-09-2021
|
2.00
|
Install and connect the Oil Temp Probe.
|
|
|
|
11-08-2021
|
9.00
|
Installed CHT and EGT probes and wireing
|
|
|
|
11-05-2021
|
3.00
|
Installed left exhaust. Installed insullated clam
|
|
|
|
11-02-2021
|
8.00
|
|
Details
|
|
|
11-01-2021
|
3.00
|
Finishing left fron baffles
|
|
|
|
10-27-2021
|
2.00
|
Finished attaching prop control bracket and cable
|
|
|
|
10-26-2021
|
8.00
|
|
Details
|
|
|
10-20-2021
|
8.00
|
Completed designing the master air control
|
|
|
|
10-19-2021
|
5.00
|
Designing holders, brackets,etc for 3nd heater box
|
|
|
|
10-14-2021
|
8.00
|
|
Details
|
|
|
10-13-2021
|
7.00
|
Insulated wires.Installed exhaust support.heating.
|
|
|
|
10-12-2021
|
4.00
|
Working on the R front baffle to make it fit bette
|
|
|
|
10-11-2021
|
3.00
|
Installed spark plug leads thru the baffling
|
|
|
|
09-10-2021
|
7.50
|
Insulating wires near engine. Installed engine tmp
|
|
|
|
09-09-2021
|
6.00
|
Got all but the left front baffling installed
|
|
|
|
09-08-2021
|
7.00
|
CVontinue making baffeling
|
|
|
|
09-07-2021
|
7.00
|
|
Details
|
|
|
09-03-2021
|
7.00
|
Installed MAP sensors and Fuel pressor sensor
|
|
|
|
09-02-2021
|
3.00
|
Worked on how the cowling should fit.
|
|
|
|
08-31-2021
|
2.00
|
Mounted the prop
|
|
|
|
08-31-2021
|
4.00
|
|
Details
|
|
|
08-30-2021
|
6.50
|
Installed oil pressure transducer. Ordered Fuel se
|
|
|
|
08-27-2021
|
7.50
|
|
Details
|
|
|
08-26-2021
|
9.00
|
|
Details
|
|
|
08-25-2021
|
3.50
|
|
Details
|
|
|
08-23-2021
|
7.50
|
|
Details
|
|
|
08-20-2021
|
8.00
|
|
Details
|
|
|
08-19-2021
|
9.00
|
Engine stuff
|
Details
|
|
|
08-18-2021
|
5.50
|
Mounted BC Alternator. Worked onl EFII mounting
|
|
|
|
08-13-2021
|
8.00
|
Slip ring and EFII pickup
|
Details
|
|
|
07-26-2021
|
3.00
|
Mounted the engine
|
|
|
|
07-23-2021
|
8.00
|
Installed the overhead console
|
|
|
|
07-22-2021
|
5.00
|
Lots of small jobs
|
|
|
|
07-21-2021
|
7.00
|
Got both doors installed with struts
|
|
|
|
07-20-2021
|
8.50
|
Installing doors on fuselage.
|
|
|
|
07-19-2021
|
7.00
|
Repainting Doors
|
|
|
|
07-16-2021
|
5.00
|
Started installing engine but removed it.
|
Details
|
|
|
07-16-2021
|
4.00
|
Set up doors for painting. Some buffing on fusela
|
|
|
|
07-13-2021
|
7.00
|
Insrtalled the front wheel mount and wheel.
|
|
|
|
07-12-2021
|
7.50
|
Got the plane on the main Berringer gear.
|
|
|
|
07-09-2021
|
6.00
|
Start installing main wheels
|
|
|
|
07-09-2021
|
3.00
|
Buffing fuselage
|
|
|
|
07-08-2021
|
4.00
|
More rubbing compound and buffing
|
|
|
|
07-07-2021
|
6.00
|
Sanding Runs
|
|
|
|
07-01-2021
|
5.50
|
Finish fouchups and clear coat the fuselage
|
|
|
|
06-30-2021
|
8.00
|
Finished painting and pulled the tape. Needs touch
|
|
|
|
06-29-2021
|
10.50
|
Got as much fuselage masking and painting as pos
|
|
|
|
06-28-2021
|
5.00
|
Sanding primer. cleaning and prepping for white
|
|
|
|
06-26-2021
|
2.00
|
Reprepped and sprayed newly purchased primer.
|
|
|
|
06-25-2021
|
3.50
|
Prepped and sprayed primer. Ran out of parimer.
|
|
|
|
06-25-2021
|
6.00
|
Preping for next layer of prime
|
|
|
|
06-24-2021
|
7.00
|
Paint prep and high build lundercoat
|
|
|
|
06-23-2021
|
8.00
|
Prep and first cost of primer
|
|
|
|
06-22-2021
|
3.00
|
Continuing paint prep
|
|
|
|
06-21-2021
|
9.00
|
Prepping for painting
|
|
|
|
06-18-2021
|
2.00
|
More sanding around doors and windows
|
|
|
|
06-18-2021
|
2.00
|
Finished the passenger boarding ladder
|
|
|
|
06-17-2021
|
8.00
|
Continued designing and making entry steps
|
|
|
|
06-16-2021
|
6.00
|
Designing and building an entering step stool
|
|
|
|
06-16-2021
|
2.00
|
Continue filling and sanding around windows
|
|
|
|
06-15-2021
|
2.00
|
Sanding and prepping front windows
|
|
|
|
06-14-2021
|
7.00
|
Cleaning and finished setting up the rotisery
|
|
|
|
06-11-2021
|
5.00
|
Sanding and installing on rotissary
|
|
|
|
06-10-2021
|
7.00
|
Installl engine mount. Wireing fuses. Fit doora
|
|
|
|
06-09-2021
|
4.00
|
Wiring door close sensors. Wireing Alternator fuse
|
|
|
|
06-08-2021
|
4.00
|
Installed door lock magnets. Installed door window
|
|
|
|
06-07-2021
|
2.00
|
Got the rotiserry set up ready to accept the fusle
|
|
|
|
06-07-2021
|
5.00
|
Got the front and rear door latch holes installed
|
|
|
|
06-07-2021
|
2.00
|
Got the doors runs sanded and buffed out
|
|
|
|
06-04-2021
|
5.00
|
More door sanding, filling, and repainting
|
|
|
|
06-04-2021
|
2.00
|
Making painting rotessiary for fuselage
|
|
|
|
06-03-2021
|
5.50
|
Prepped and clear coated doors. Sanded on Fusleag
|
|
|
|
06-02-2021
|
7.00
|
Finished prepping doors. Painted inside of doors
|
|
|
|
06-01-2021
|
1.50
|
Prep for door painting
|
|
|
|
05-28-2021
|
7.00
|
Fitted the door transparencies and prepped for pai
|
|
|
|
05-27-2021
|
8.00
|
Completed the door side of latcing
|
|
|
|
05-26-2021
|
9.00
|
Got the R door so it could be set on fuselage
|
|
|
|
05-25-2021
|
7.50
|
Finally got both door's latching mechanism working
|
|
|
|
05-24-2021
|
8.50
|
Finished L door and moved on to R door
|
|
|
|
05-21-2021
|
9.00
|
Another day working on the door latching
|
|
|
|
05-20-2021
|
8.00
|
Continue wortking on door latching system
|
|
|
|
05-19-2021
|
8.00
|
Fitting door hinges and starting on door locking
|
|
|
|
05-18-2021
|
9.00
|
Cut and trimmed the Right door to fit
|
|
|
|
05-17-2021
|
9.00
|
Cut and sanded left door to fit
|
|
|
|
05-14-2021
|
4.00
|
Epoxy'd both doors together and put on fuselage
|
|
|
|
05-12-2021
|
3.00
|
Fit the right door. Epoxied gas strut brace on bot
|
|
|
|
05-11-2021
|
7.00
|
Sanding windscreen and fitting doors
|
|
|
|
05-10-2021
|
8.00
|
Fill and Sand transparenciers
|
|
|
|
05-07-2021
|
6.50
|
Epoxied with bead powder and sanded plexiglass
|
|
|
|
05-06-2021
|
3.00
|
Applied multiple fiberglass strips to windshield
|
|
|
|
05-05-2021
|
5.00
|
Glued and preped the windshield
|
|
|
|
05-04-2021
|
4.00
|
Prepped and installed the frosnt windshield
|
|
|
|
05-03-2021
|
3.00
|
prepped land installed rear windows
|
|
|
|
04-29-2021
|
1.50
|
Fitting the windshield
|
|
|
|
04-28-2021
|
4.00
|
Cutting and fitting the windows and windshield
|
|
|
|
04-26-2021
|
5.00
|
Finished installing 1/4 turn fastners and side hin
|
|
|
|
04-23-2021
|
8.00
|
Finished riveting on the front upper cowl.
|
Details
|
|
|
04-22-2021
|
8.00
|
Installed the cowl skybolt tabs.
|
Details
|
|
|
04-21-2021
|
5.00
|
Started installing the bases for the Skybolt faste
|
|
|
|
04-20-2021
|
8.00
|
Finished riveting the top fuselage forward tailcon
|
|
|
|
04-19-2021
|
3.00
|
Started riveting on the top skin behind baggage
|
|
|
|
04-15-2021
|
4.00
|
plated over, bondoed, & sanded forward naca vents
|
|
|
|
04-14-2021
|
4.00
|
Buffing and riveting
|
Details
|
|
|
04-13-2021
|
4.00
|
Made Naca vents and install bracket for vent fans.
|
|
|
|
04-13-2021
|
2.50
|
Create GPS antennal backing plates
|
|
|
|
04-12-2021
|
8.00
|
Preped, painted, and clear coated the Left Wing
|
|
|
|
04-09-2021
|
4.00
|
Wired up the Overhead ventalation fans
|
|
|
|
04-08-2021
|
8.00
|
Continue worsking on ventalation fan enclosure
|
|
|
|
04-07-2021
|
4.00
|
Making the overhead fan enclosure
|
|
|
|
04-06-2021
|
6.00
|
Make mock up of overhead air distrib. fan ducts
|
|
|
|
04-02-2021
|
3.00
|
Priming and sanding R wing
|
|
|
|
04-01-2021
|
8.50
|
Preped and started priming the R wing
|
|
|
|
03-31-2021
|
9.00
|
R wing
|
Details
|
|
|
03-30-2021
|
4.50
|
Finished riveting on the bottom skin of R wing
|
|
|
|
03-29-2021
|
7.00
|
Continue riviting on bottom skin
|
|
|
|
03-26-2021
|
9.00
|
Install fuel tank. Prep and start installing botto
|
|
|
|
03-25-2021
|
7.00
|
Ran wiring lfor the R wing.
|
|
|
|
03-24-2021
|
6.50
|
Install roll servo. Wire wing lights.
|
|
|
|
03-23-2021
|
6.00
|
R wing work
|
Details
|
|
|
03-22-2021
|
3.00
|
Started riveting the forward outboard piece to the
|
|
|
|
03-22-2021
|
5.00
|
Deice test
|
Details
|
|
|
03-19-2021
|
5.00
|
Get deice actuators ready for install in R tank
|
|
|
|
03-19-2021
|
4.50
|
Fuel tank install of deice leading edge skin
|
|
|
|
03-18-2021
|
6.00
|
Making the deice leadfing edge shapped
|
|
|
|
03-16-2021
|
5.00
|
Cet the skin off over the R tank deice channel
|
|
|
|
03-15-2021
|
9.00
|
Finished tank sealing and riveting the R fuel tank
|
|
|
|
03-12-2021
|
8.00
|
Continued riviting with tank sealer. Messy job!
|
|
|
|
03-11-2021
|
5.00
|
R wing tank
|
Details
|
|
|
03-10-2021
|
8.00
|
Riviting and sealing the R wing tank
|
|
|
|
03-08-2021
|
5.00
|
Riveted the deice "trough" to the tank skin
|
|
|
|
03-05-2021
|
6.50
|
Preping the R wing tank parts for assembly
|
|
|
|
03-04-2021
|
2.00
|
Riveted the two halfs of the deice channel
|
Details
|
|
|
03-03-2021
|
3.50
|
Made the channel to hold ther deice actuators
|
|
|
|
03-02-2021
|
7.50
|
R wing outboard leading edge
|
Details
|
|
|
03-02-2021
|
1.50
|
Assembling, cutting, deburring parts for R fuel ta
|
|
|
|
03-01-2021
|
7.00
|
see details
|
Details
|
|
|
02-26-2021
|
7.50
|
Deice install
|
Details
|
|
|
02-25-2021
|
8.50
|
Finished riveting on the top skin of R wing
|
Details
|
|
|
02-24-2021
|
7.50
|
Wing top skin and outboard leading edge
|
Details
|
|
|
02-23-2021
|
8.00
|
Preped the R top wing skin and started riveting
|
|
|
|
02-22-2021
|
8.50
|
Attached rear spar to the R eing
|
|
|
|
02-19-2021
|
6.00
|
Testing the deice system with repaired tail contro
|
Details
|
|
|
02-19-2021
|
2.00
|
Finished riveting land bolting on the R wing aft r
|
|
|
|
02-18-2021
|
8.50
|
Ready and install the R wing aft ribs
|
|
|
|
02-17-2021
|
7.00
|
Continue working on right wing
|
|
|
|
02-16-2021
|
5.00
|
Started working on tghe right wing
|
|
|
|
02-15-2021
|
8.00
|
Installed vor ant in left wing tip and installed n
|
|
|
|
02-12-2021
|
4.00
|
Trimming and start nutplating the L wing tip
|
|
|
|
02-12-2021
|
4.00
|
sanding, buffing, touchuo, clear coating
|
|
|
|
02-11-2021
|
8.00
|
Removing runs in the rudder
|
|
|
|
02-10-2021
|
3.00
|
Painting L wing inspection covers
|
|
|
|
02-09-2021
|
3.00
|
Rewiring the tail with larger plugs
|
|
|
|
02-09-2021
|
3.00
|
Final clear on Overhead console and rudder
|
|
|
|
02-08-2021
|
5.00
|
Prep and base coat the rudder and overhead cons
|
|
|
|
02-05-2021
|
4.50
|
Wireing the System 32
|
|
|
|
02-04-2021
|
7.00
|
Prep, spray one coat of white then spray clear coa
|
|
|
|
02-03-2021
|
6.00
|
Prepping, cleaning, and applying white basecoat
|
|
|
|
02-03-2021
|
2.00
|
CVontionue wiring in the System 32 EFII
|
|
|
|
02-02-2021
|
5.00
|
Sand and prime L wing and rudder
|
|
|
|
02-02-2021
|
3.00
|
Install System 32 dual ECU's and start wireing
|
|
|
|
02-01-2021
|
8.00
|
Paint prep and prime L wing
|
|
|
|
01-28-2021
|
5.00
|
Wrapped and wired up the overhead console inset
|
|
|
|
01-27-2021
|
8.00
|
Third time trying to wrap center console is a char
|
|
|
|
01-26-2021
|
5.00
|
Worked on wrapping (3 times) the center console
|
|
|
|
01-26-2021
|
3.00
|
Worked on prepping the left wing for paint
|
|
|
|
01-25-2021
|
4.00
|
Worked on wrapping the center console
|
|
|
|
01-25-2021
|
4.00
|
Installed fuel selector extender
|
|
|
|
01-22-2021
|
7.00
|
fInvetoried the interior kit and worked on ekectru
|
|
|
|
01-21-2021
|
5.00
|
Wire up fuel tank capacitive probs
|
|
|
|
01-20-2021
|
5.00
|
Made the aileron actuators and installed on L wing
|
|
|
|
01-19-2021
|
7.00
|
Finished riviting the left wing
|
|
|
|
01-18-2021
|
7.00
|
continue riviting bottom skins on left wing
|
|
|
|
01-15-2021
|
9.00
|
L wing bottom skin. Finished prepping and start r
|
|
|
|
01-14-2021
|
5.00
|
Finished prepping the bottom outboard wing skin
|
Details
|
|
|
01-13-2021
|
7.00
|
Preped the L outboard bottom skin
|
Details
|
|
|
01-12-2021
|
8.00
|
Finished Rewiring Deice CAN cables and testing
|
|
|
|
01-11-2021
|
4.00
|
Started rewiring the Deice CAN cables for 18 Ga
|
|
|
|
01-08-2021
|
9.00
|
Deice testing and rewire
|
Details
|
|
|
01-07-2021
|
8.00
|
Full system test. Tail quit working in the morni
|
|
|
|
01-06-2021
|
9.00
|
Finished running wires and making plugs
|
|
|
|
01-05-2021
|
6.00
|
Install deice actuator status display
|
|
|
|
01-05-2021
|
2.00
|
Continue pulling wire
|
|
|
|
01-04-2021
|
9.00
|
Install Pitot tude support and plan wire runs
|
|
|
|
01-01-2021
|
6.00
|
Installed deice unit on the L tank and tank on win
|
|
|
|
12-31-2020
|
7.00
|
Prepping the fuel tank for the deice equipment
|
|
|
|
12-30-2020
|
3.00
|
Started installing the fuel tank deice parts
|
|
|
|
12-30-2020
|
4.00
|
Made a new magnetometer base and installed
|
|
|
|
12-29-2020
|
7.00
|
Unpacking and inventorying the Finish Kit
|
|
|
|
12-28-2020
|
9.00
|
Making Aileron push rods for both wings
|
|
|
|
12-22-2020
|
6.00
|
Installed the wireing for the OATs and Magnetomete
|
|
|
|
12-21-2020
|
1.50
|
Wiring up the two Magnetometers
|
|
|
|
12-21-2020
|
6.00
|
Finished sealing the left fuel tank
|
|
|
|
12-18-2020
|
9.00
|
Continuing sealing and riviting the left tank
|
|
|
|
12-17-2020
|
7.00
|
Making and installing Magnetometer bracket
|
|
|
|
12-15-2020
|
1.50
|
Figuring out mounting for the two Magnetometers
|
|
|
|
12-15-2020
|
2.00
|
Deice Electrical out to the wings
|
|
|
|
12-14-2020
|
5.50
|
sealing, riviting, and cleaning up L tank sealent
|
|
|
|
12-11-2020
|
6.00
|
Continue riveting and tank sealing the L fuel tank
|
|
|
|
12-10-2020
|
5.00
|
tank sealed and riveted the trough in place
|
|
|
|
12-09-2020
|
9.00
|
Finish getting the fuel take ready to rivet
|
|
|
|
12-08-2020
|
8.00
|
Fabricated and installed the trough bulkhead seals
|
|
|
|
12-07-2020
|
5.00
|
Made a new trough that is 0.8" deep
|
|
|
|
12-04-2020
|
9.00
|
Got the deice actuator trough fitted inside the ta
|
|
|
|
12-03-2020
|
7.00
|
Backup power
|
Details
|
|
|
12-02-2020
|
8.00
|
Installing trough on left fuel tank
|
|
|
|
12-01-2020
|
5.00
|
Finished actuator fixtures. Started the trough.
|
|
|
|
11-30-2020
|
7.00
|
Making wing tank deice parts
|
Details
|
|
|
11-27-2020
|
4.00
|
Clekod the left fuel tank together
|
|
|
|
11-25-2020
|
7.00
|
Drill, DEbure, dimple Left fuel tank parts
|
|
|
|
11-24-2020
|
7.00
|
Designing and testing different fuel tank fixtures
|
|
|
|
11-23-2020
|
3.00
|
Prep parts for left fuel tank
|
|
|
|
11-23-2020
|
2.00
|
Make fuel tank deice fixture and test. Tested OK
|
|
|
|
11-20-2020
|
5.00
|
Finished wiring and testing the new deice controls
|
|
|
|
11-19-2020
|
6.00
|
See details
|
Details
|
|
|
11-17-2020
|
7.50
|
Worked on forming tghe fuel tank outer skins
|
|
|
|
11-16-2020
|
6.00
|
Second skin fixture
|
Details
|
|
|
11-13-2020
|
6.00
|
Tested Deice. Worked OK. Finished L forward wing
|
|
|
|
11-12-2020
|
8.00
|
Redid to tight brackets and installed actuators
|
|
|
|
11-10-2020
|
8.00
|
Installed the actuator brackets in the L nose
|
|
|
|
11-09-2020
|
7.00
|
Making controller door. Made target and attach br
|
|
|
|
11-06-2020
|
7.00
|
Designing and making controller mounting brackets
|
|
|
|
10-23-2020
|
3.00
|
Clekod the L forward skin
|
|
|
|
10-15-2020
|
7.00
|
Finished riveting the top wing skin
|
|
|
|
10-14-2020
|
2.00
|
Started riveting the top L wing skin on
|
|
|
|
10-14-2020
|
6.00
|
Making a mock up of the fuel tank deice constructi
|
|
|
|
06-16-2020
|
6.00
|
Finished all connections to transponder except ant
|
|
|
|
06-15-2020
|
5.00
|
See Detailed
|
Details
|
|
|
06-12-2020
|
7.00
|
Side panels
|
|
|
|
06-11-2020
|
5.00
|
Continue installing side panels
|
|
|
|
06-10-2020
|
6.00
|
Installed the right passenger seat cover panel
|
|
|
|
06-09-2020
|
5.00
|
Finished wiring all that I could and started on pa
|
|
|
|
06-08-2020
|
6.00
|
Ordering parts and continuing wireing
|
|
|
|
06-05-2020
|
6.00
|
Wireing RS232 connections
|
|
|
|
06-04-2020
|
6.00
|
Continue wiring CAN buss
|
|
|
|
06-02-2020
|
3.00
|
Finish installing the wiring from the sticks
|
|
|
|
06-01-2020
|
5.00
|
Made a wire loom for Pilot and Co Pilot sticks
|
|
|
|
05-26-2020
|
8.00
|
FWF wires
|
Details
|
|
|
05-22-2020
|
5.00
|
Continue wiring up switches
|
|
|
|
05-21-2020
|
8.00
|
|
Details
|
|
|
05-20-2020
|
9.00
|
See full description
|
Details
|
|
|
05-19-2020
|
2.00
|
Worked on trying to connect VPN. Didn't work.
|
|
|
|
05-18-2020
|
9.00
|
See detailed description
|
Details
|
|
|
05-15-2020
|
9.00
|
continued avionics wiring
|
|
|
|
05-13-2020
|
9.00
|
Wireing Alternator and Bus manager
|
|
|
|
05-12-2020
|
5.00
|
Installed a firewall pass thru plus
|
Details
|
|
|
05-11-2020
|
7.00
|
Finished fuel pump wireing
|
|
|
|
05-08-2020
|
6.00
|
Started working on fuel pump wireing
|
|
|
|
05-05-2020
|
3.00
|
Connect flaps power and position sensor
|
|
|
|
05-04-2020
|
3.00
|
Install and seal the oil cooler holder on the fire
|
|
|
|
05-01-2020
|
8.00
|
Installed Rudder tPanel uprim actuator wiring.
|
|
|
|
04-30-2020
|
8.00
|
Continue wiring panel
|
|
|
|
04-29-2020
|
7.00
|
Wired up contactors. Installed master and Bat sel
|
|
|
|
04-28-2020
|
4.00
|
installed VPX. Installed panel.
|
|
|
|
04-27-2020
|
8.00
|
panel work
|
Details
|
|
|
04-24-2020
|
4.00
|
Tested alternative panel labeling options
|
|
|
|
04-23-2020
|
8.00
|
Labeled most of the items on the panel
|
|
|
|
04-22-2020
|
6.00
|
Got panel ready for covering and mostly covered
|
|
|
|
04-21-2020
|
6.00
|
Continue laying out and drilling holes in the pane
|
|
|
|
04-20-2020
|
8.00
|
Layi0ut and cut holes for switches and EFII displa
|
|
|
|
04-17-2020
|
6.00
|
Made and tapped a ground plate. Painted subpanel
|
|
|
|
04-15-2020
|
8.00
|
EIS, backplates, and relay holder
|
Details
|
|
|
04-14-2020
|
2.50
|
Started designing a holder for the EIS box
|
|
|
|
04-13-2020
|
2.50
|
Installed flap position sensor
|
|
|
|
04-10-2020
|
6.00
|
Install flap system
|
|
|
|
04-08-2020
|
8.00
|
Worked on installing controll tubes and stick
|
|
|
|
04-07-2020
|
8.00
|
Baggage door
|
Details
|
|
|
04-03-2020
|
4.00
|
Riveted half lthe baggage door
|
|
|
|
04-02-2020
|
8.00
|
Buss Mgr bracket. Switch layout. Start baggage Dr.
|
|
|
|
03-31-2020
|
4.00
|
Wrapping center dadio stack
|
|
|
|
03-31-2020
|
3.00
|
Modified and wrapped Throttle and Prop brackerts
|
|
|
|
03-30-2020
|
8.00
|
Riveted covering and cut out openings
|
|
|
|
03-28-2020
|
2.50
|
covering the center c onsole radio stack
|
|
|
|
03-27-2020
|
8.00
|
Continue working on makinmg the radio stack
|
|
|
|
03-25-2020
|
8.00
|
Continue working on the radio stack center console
|
|
|
|
03-24-2020
|
8.00
|
Framework of center console radio rack
|
|
|
|
03-18-2020
|
4.00
|
Transponder rack
|
Details
|
|
|
03-17-2020
|
6.00
|
Developing and making transsponder brackets
|
|
|
|
03-16-2020
|
4.00
|
Finished cutting out the G3X panel openings
|
|
|
|
03-15-2020
|
8.00
|
Making land installing structural supports in Pane
|
|
|
|
03-10-2020
|
7.00
|
Worked on stiffening the fold down instrument pane
|
|
|
|
03-09-2020
|
8.00
|
Installed battery contactors plus work on panel
|
Details
|
|
|
03-06-2020
|
8.00
|
Deice controller install
|
Details
|
|
|
02-19-2020
|
4.00
|
Installed fuel lines from tunnel to aircraft skin
|
|
|
|
02-18-2020
|
5.00
|
Installed a new parking brake acuator and pumps
|
|
|
|
02-17-2020
|
4.00
|
Installed battery cables thru firewall
|
|
|
|
02-14-2020
|
2.00
|
Install AHRS bracket
|
|
|
|
02-04-2020
|
9.00
|
Rudder peddles and the remaining brake lines.
|
|
|
|
02-03-2020
|
3.00
|
dudder peddles and brake lines
|
|
|
|
01-31-2020
|
8.00
|
Brake and fuel lines instulation.
|
|
|
|
01-30-2020
|
4.00
|
Continued working on the parking brake and rack
|
|
|
|
01-29-2020
|
8.00
|
See details
|
Details
|
|
|
01-28-2020
|
3.00
|
Started testing electric parking brake actuator
|
|
|
|
01-27-2020
|
9.00
|
Making new fuel lines. Didn't like Fridays attemp
|
|
|
|
01-24-2020
|
8.00
|
Continue working on fuel lines
|
|
|
|
01-23-2020
|
3.00
|
Designing the fuel pumps and filters layout
|
|
|
|
01-22-2020
|
4.00
|
Brake lines and fuel selector
|
Details
|
|
|
01-21-2020
|
6.00
|
Rudder peddles install and start brake lines
|
|
|
|
01-14-2020
|
3.00
|
Finished adjusting and installing the bsaggage bac
|
|
|
|
01-13-2020
|
3.00
|
Finished the other half of the back baggage wall
|
|
|
|
01-10-2020
|
9.00
|
Installing skybolt quarter turn fasteners
|
Details
|
|
|
01-07-2020
|
6.00
|
Continue working on the forward skin and panel
|
|
|
|
01-06-2020
|
9.00
|
Made panel attachments
|
Details
|
|
|
01-02-2020
|
3.50
|
Aligning and riviting baggage and rear seat panels
|
|
|
|
12-26-2019
|
6.00
|
Continued with the rear seat and baggage floors
|
|
|
|
12-23-2019
|
8.00
|
Baggage floor and rear seat cover ready to rivet
|
|
|
|
12-20-2019
|
6.00
|
Continue working on baggage floor, rear seat floor
|
|
|
|
12-19-2019
|
3.00
|
Preping passenger seat bottoms
|
|
|
|
12-13-2019
|
5.50
|
Riveted the passenger floor plans down
|
|
|
|
12-11-2019
|
5.00
|
Prep and start installing passenger floor pan
|
|
|
|
12-06-2019
|
7.50
|
Install smuft tubes and start back seat floor
|
|
|
|
11-23-2019
|
3.00
|
Finished riviting the horz stab back together
|
|
|
|
11-22-2019
|
5.00
|
Riveting L horz stab back together
|
|
|
|
11-21-2019
|
6.00
|
Preping L horz stab for riveting back together
|
|
|
|
11-20-2019
|
5.00
|
|
Details
|
|
|
11-15-2019
|
8.00
|
Finished prep for R Horz stab and installed. Prep
|
|
|
|
11-14-2019
|
2.00
|
Preped parts for R Horz stab install
|
|
|
|
11-13-2019
|
2.00
|
Drilled out half of horz stab to install deice
|
|
|
|
09-26-2019
|
3.00
|
drilling pattern for brackets and target
|
|
|
|
09-25-2019
|
2.00
|
started installing on vertical tail
|
|
|
|
09-24-2019
|
2.00
|
Continue riviting the tail cone to the forward fus
|
|
|
|
09-23-2019
|
2.00
|
Continue riviting the tail cone to the forward fus
|
|
|
|
09-20-2019
|
2.00
|
Riveting the tail cone to thefuselage
|
|
|
|
09-16-2019
|
7.00
|
Connect tail cone to fuselage
|
|
|
|
09-12-2019
|
7.00
|
Installed fire protective blanket
|
|
|
|
09-11-2019
|
8.00
|
Finishing the hinged panel
|
|
|
|
09-10-2019
|
4.00
|
Working on making a hinged fold down panel
|
|
|
|
08-21-2019
|
5.00
|
assermble the upper fuselage assembly
|
|
|
|
08-19-2019
|
4.00
|
Rear air vents
|
Details
|
|
|
08-16-2019
|
2.00
|
Started on upper forward fuselage assembly
|
|
|
|
08-15-2019
|
5.00
|
Installed L and R steps
|
|
|
|
08-14-2019
|
3.00
|
Installed the passenger fresh air vents
|
|
|
|
08-12-2019
|
5.00
|
installed the landing gear brackets
|
|
|
|
08-12-2019
|
3.00
|
Get stainless steel bung welded into the exhaust
|
|
|
|
08-09-2019
|
8.00
|
Put in copilots floor and started on L gear suppor
|
|
|
|
08-08-2019
|
5.00
|
Finish riveting sides. Install Pilot floorboard
|
|
|
|
08-07-2019
|
6.00
|
Continue riveting side skins
|
|
|
|
08-05-2019
|
8.00
|
Continue riveting forward and mid side skins
|
|
|
|
08-02-2019
|
7.00
|
Installed side skins and started riveting
|
|
|
|
08-01-2019
|
3.00
|
Continue riveting the forwerd longerons
|
|
|
|
07-31-2019
|
3.00
|
start fiveting longerons to the firewall
|
|
|
|
07-16-2019
|
7.50
|
dimpling tghe side skins and finish counterrtsinki
|
|
|
|
07-12-2019
|
6.00
|
More drilling and countersinking
|
|
|
|
07-11-2019
|
6.00
|
Install and match drill the forward side skin
|
|
|
|
07-10-2019
|
6.50
|
Attached mid skins and match drilled
|
|
|
|
07-09-2019
|
7.00
|
Install the rear seatback and the Mid cabin decks
|
|
|
|
06-28-2019
|
9.00
|
Curved the 4 side skins bottoms
|
|
|
|
06-27-2019
|
6.00
|
Shaping the mid and forward Longeroons
|
|
|
|
06-26-2019
|
6.00
|
Riviting Mid and Fwd sections and Longerons
|
Details
|
|
|
06-25-2019
|
1.50
|
Completed drilling for the Right main gear
|
|
|
|
06-21-2019
|
4.50
|
mid seat supports and L main gear support
|
Details
|
|
|
06-20-2019
|
7.50
|
Seat pans and side structure
|
|
|
|
06-19-2019
|
7.00
|
Mated fwd land mid fuselage
|
|
|
|
06-18-2019
|
7.00
|
Continue riviting
|
|
|
|
06-17-2019
|
9.00
|
Riviting forward fuselage
|
Details
|
|
|
06-14-2019
|
8.00
|
Rivit forward bottom skin
|
Details
|
|
|
06-13-2019
|
5.00
|
Firewall cleko'd to forward bottom skin
|
Details
|
|
|
06-12-2019
|
2.00
|
Fwd Fusalage Floor- set parts and start match dril
|
|
|
|
01-02-2019
|
2.00
|
Continue working on the fwd fuselage bulkhead asm
|
|
|
|
01-01-2019
|
1.50
|
Continue working on the fwd fuselage bulkhead asm
|
|
|
|
12-28-2018
|
7.50
|
Fwd Fugelage bulkhead sub assembly
|
|
|
|
12-11-2018
|
3.00
|
Finished riveting the Firewall section 27
|
|
|
|
11-30-2018
|
2.00
|
Rivet in the Nose Gear Tension Fittings
|
|
|
|
11-28-2018
|
3.00
|
Continue riviting onfirewall parts
|
|
|
|
10-22-2018
|
2.00
|
Start firewall aft attachments
|
|
|
|
10-19-2018
|
2.00
|
Finish riveting firewall
|
|
|
|
10-16-2018
|
4.00
|
Riveting firewall
|
|
|
|
10-09-2018
|
3.50
|
Finish countersinking and reassemble
|
|
|
|
10-08-2018
|
3.00
|
Further prep on firewall. dimpling and countersink
|
|
|
|
10-05-2018
|
3.00
|
Readying parts for firewall
|
|
|
|
08-24-2018
|
2.00
|
lContinue riveting lower aft fuselage
|
|
|
|
08-22-2018
|
5.00
|
Riveting Aft fuselage bottom skins on
|
|
|
|
08-21-2018
|
5.00
|
Finished DCrilling, deburring, and dimpling bottom
|
|
|
|
08-20-2018
|
6.00
|
Aligning and clekoing and match driling bottom ski
|
|
|
|
08-17-2018
|
5.50
|
Riveting the last part of the aft lower fuselage
|
|
|
|
08-16-2018
|
4.00
|
Started riveting aft of midsection
|
|
|
|
08-15-2018
|
4.00
|
More mid fuselage assembly
|
|
|
|
08-14-2018
|
8.00
|
Still working on mid fuselage
|
|
|
|
08-13-2018
|
9.00
|
|
|
|
|
08-10-2018
|
8.00
|
Completed the mid fuselage bulkheads
|
|
|
|
08-09-2018
|
5.00
|
Working on the Mid section aft spar
|
|
|
|
08-08-2018
|
6.00
|
Finished the forward mid fuselage bulkhead.
|
|
|
|
08-07-2018
|
7.00
|
Added gear legs and began riviting spar
|
|
|
|
08-06-2018
|
6.00
|
Assemble the Mid Fuselage Spar
|
|
|
|
08-02-2018
|
5.00
|
Finished inventorying
|
|
|
|
08-01-2018
|
6.00
|
Inventorying parts
|
|
|
|
07-19-2018
|
2.00
|
Begin unpacking and inventorying
|
|
|
|
05-03-2018
|
4.00
|
mak elevator push tube, and finish horz stab parts
|
|
|
|
05-01-2018
|
3.00
|
Finish riveting the top middle section of rear fus
|
|
|
|
04-27-2018
|
2.00
|
More riviting on the top
|
|
|
|
04-26-2018
|
3.00
|
Begin riveting the top on the rear fuselage.
|
|
|
|
04-19-2018
|
2.00
|
start riveting the rest of the horz stab together
|
|
|
|
04-18-2018
|
2.00
|
Make and install 6ga cables in the horz stab
|
|
|
|
04-16-2018
|
4.00
|
Installing pitch trim
|
|
|
|
04-04-2018
|
2.00
|
Riveting rear deck
|
|
|
|
03-30-2018
|
6.00
|
Design and mfg a bracket for the rear deice module
|
|
|
|
03-29-2018
|
2.50
|
Mfg studs and installing same
|
|
|
|
03-27-2018
|
3.00
|
Working on assembling the elevator trim assembly
|
|
|
|
03-27-2018
|
2.00
|
Finish making three more stude
|
|
|
|
03-23-2018
|
5.00
|
Completed and installed one deice atud
|
|
|
|
03-22-2018
|
6.00
|
Making parts for deice connector studs
|
|
|
|
03-21-2018
|
6.00
|
Continue making deice studs
|
|
|
|
03-20-2018
|
3.00
|
Work on making wing studs
|
|
|
|
03-16-2018
|
3.00
|
Finished riveting the side skins on
|
|
|
|
03-14-2018
|
1.50
|
Continue riveting Right side
|
|
|
|
03-09-2018
|
1.50
|
Began riveting the right side of the rear fuselage
|
|
|
|
03-02-2018
|
6.00
|
Continue riveting the left side
|
|
|
|
03-01-2018
|
1.00
|
Continue riveting
|
|
|
|
02-28-2018
|
6.50
|
Continue riveting
|
|
|
|
02-27-2018
|
1.50
|
Begin riveting it all together
|
|
|
|
02-16-2018
|
3.00
|
Start reassembling and riviting
|
|
|
|
02-14-2018
|
3.00
|
Finish dimpling and start reassembly
|
|
|
|
02-13-2018
|
2.00
|
continue disassemble, deburr, and dimple
|
|
|
|
02-12-2018
|
1.50
|
continued deburr and dimple
|
|
|
|
02-10-2018
|
2.50
|
Continue deburr, and dimple
|
|
|
|
02-09-2018
|
6.00
|
disassemble, deburr, and dimple
|
|
|
|
02-08-2018
|
8.00
|
Stringeers and upper skin
|
|
|
|
02-07-2018
|
4.00
|
Installed new longerons and match drilled holes
|
|
|
|
02-01-2018
|
6.00
|
Completed rudder trim rear fuselage parts
|
|
|
|
01-30-2018
|
6.00
|
Worked on the rudder trim system
|
|
|
|
01-19-2018
|
3.50
|
Completed the rudder trim actuator install
|
|
|
|
01-18-2018
|
4.00
|
Designing Rudder Trim Bracket
|
|
|
|
01-17-2018
|
3.00
|
completed the elevator bell crank and battery box
|
|
|
|
01-16-2018
|
4.00
|
converted battery box from Concord to dual EarthX
|
|
|
|
01-09-2018
|
5.00
|
Match drilling rear fuselage
|
|
|
|
01-08-2018
|
3.00
|
Finished installing back and front ribs
|
|
|
|
01-05-2018
|
6.00
|
Begin clecoing together the rear fuselage
|
|
|
|
01-04-2018
|
1.50
|
Longeron for rear fuselage
|
|
|
|
12-22-2017
|
9.00
|
Begin making the ribs for the rear fuselage
|
|
|
|
12-21-2017
|
6.00
|
Finish riveting the horz stab ribs and the rear sp
|
|
|
|
12-20-2017
|
7.00
|
Continue riveting the Horz stab.
|
|
|
|
12-19-2017
|
6.00
|
Begin riveting the Horz Stab
|
|
|
|
12-18-2017
|
8.00
|
Countersink horz stab spars and begin riveting
|
|
|
|
12-08-2017
|
4.00
|
Horz stab - finish dimpling skins and ribs
|
|
|
|
12-07-2017
|
1.00
|
Started dimpling the Horz stab skins
|
|
|
|
12-06-2017
|
6.00
|
Match drilling horz stab holes. make position for
|
|
|
|
12-01-2017
|
6.50
|
Horz stab cleko'd together
|
|
|
|
11-22-2017
|
3.00
|
Horz stab forward spar partially riveted
|
|
|
|
11-20-2017
|
3.00
|
Working on the horz stab front spar.
|
|
|
|
11-17-2017
|
5.00
|
Begin assembling parts for the horz stab
|
|
|
|
11-14-2017
|
4.00
|
Installed trim tabs on both elevators
|
|
|
|
11-08-2017
|
1.50
|
Finished dimpling, and using tank sealing on tabs
|
|
|
|
11-07-2017
|
3.00
|
Elevator trim tabs. Flattening and start riveting
|
|
|
|
11-06-2017
|
2.00
|
Finished Riveting the trailing edge of the L eleva
|
|
|
|
11-02-2017
|
8.00
|
Finished riveting the R elevator
|
|
|
|
11-01-2017
|
8.00
|
Working on the L elevator
|
|
|
|
10-31-2017
|
1.50
|
Finish riveting the R elevator except for the trim
|
|
|
|
10-30-2017
|
3.00
|
Finished riveting the Right elevator
|
|
|
|
10-27-2017
|
3.50
|
Almost finished riveting the right elevator
|
|
|
|
10-26-2017
|
4.00
|
Still riveting right elevator
|
|
|
|
10-25-2017
|
7.00
|
Riveting R Horz. stabalator
|
|
|
|
10-24-2017
|
2.00
|
Continue dimpling and countersinking R. elevator.
|
|
|
|
10-23-2017
|
4.50
|
Dimpling and match drilling
|
|
|
|
10-20-2017
|
2.50
|
continue match drilling elevators
|
|
|
|
10-18-2017
|
0.50
|
Partial drilling of skin holes to size #40.
|
|
|
|
10-11-2017
|
2.00
|
Pput skin and horns on both elevators
|
|
|
|
10-10-2017
|
1.00
|
Continue assemb;ing the elevators
|
|
|
|
10-02-2017
|
6.00
|
Assemblying parts for the elevators
|
|
|
|
09-28-2017
|
1.00
|
deburring and prep for elevator ribs
|
|
|
|
09-22-2017
|
1.00
|
Fiberglassing rudder top cap
|
|
|
|
09-20-2017
|
4.00
|
Rudder bottom cap
|
Details
|
|
|
09-19-2017
|
3.00
|
Rudder cap
|
Details
|
|
|
09-18-2017
|
4.00
|
Finished rudder
|
Details
|
|
|
09-14-2017
|
4.50
|
Rudder
|
Details
|
|
|
09-13-2017
|
3.00
|
riveted the two sides of the rudder together
|
Details
|
|
|
09-12-2017
|
6.00
|
Riveted rudder skins to the ribs
|
|
|
|
09-11-2017
|
7.00
|
Rudder prep
|
Details
|
|
|
09-08-2017
|
3.50
|
Finished vert stab
|
Details
|
|
|
09-07-2017
|
3.00
|
Cutting and deburring parts for the rudder
|
|
|
|
09-06-2017
|
6.00
|
Skin almost ready to install
|
Details
|
|
|
09-05-2017
|
3.00
|
working on vertical stabalizer
|
|
|
|
09-01-2017
|
3.00
|
Wsork on vert stab spar
|
|
|
|
08-31-2017
|
4.00
|
Finished inventorying all the tail kit contents
|
|
|
|
08-24-2017
|
2.00
|
Received tail kit box from Vans
|
|
|