KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 214
Category Work Time: 1004 Hours
 Date
Hours
Work Log Summary

Details

 11-02-2018
1.00
Second and third flight
Details
       

 11-01-2018
8.00
Strut covering, drain holes
Details

 10-31-2018
3.50
WIng Twist
Details
       

 10-27-2018
1.00
First Flight!
Details
       

 10-26-2018
2.00
Airworthiness Inspection
Details
     

 10-25-2018
5.00
Getting ready for inspection
Details

 10-23-2018
2.00
Tail cover panel
Details
     

 10-18-2018
3.00
Safety Prop
Details

 10-17-2018
4.00
Taxi 2, interior
Details
       

 10-16-2018
5.00
First Taxi
Details
       

 10-15-2018
5.00
Shim
Details
       

 10-11-2018
6.00
Start and run, turtledeck
Details
     

 10-10-2018
6.00
First start attempt
Details
       

 10-09-2018
5.00
LE Closeouts, turtledeck closeouts
Details
       

 10-05-2018
8.00
Fuel test
Details
       

 10-04-2018
6.00
Final control rigging, flaperons
Details
     

 10-03-2018
6.00
Turtle Deck, brakes
Details
       

 09-29-2018
6.00
Cowling, Weighing
Details
       

 09-28-2018
8.00
Flaperons, Turtledeck, brakes
Details
       

 09-27-2018
4.00
Flaperon hinges, scales
Details
     

 09-26-2018
6.50
Wire Clean up, Seats, Bag Compartment
Details
       

 09-25-2018
7.00
Wiring
Details
       

 09-24-2018
4.00
Wingtip, wiring
Details
     

 09-21-2018
4.50
Wing wiring, Fuel Placard
Details
       

 09-20-2018
6.00
Wings are on
Details
       

 09-19-2018
6.00
Struts, tail
Details
       

 09-15-2018
4.50
Strut Superfil, rudder install, Nav/strobe
Details
       

 09-12-2018
6.50
Strut fairings
Details
       

 09-05-2018
5.00
Painting wingtips and stripes
Details
       

 09-04-2018
6.00
Moving to hangar
Details
       

 09-03-2018
5.00
Tail Access Covers
Details
       

 09-02-2018
4.00
Glare shield
Details
       

 08-27-2018
5.00
Wire bundle tying
Details
       

 08-22-2018
5.00
Interior Covering
Details
       

 08-21-2018
6.00
Stickers
Details
       

 08-20-2018
5.00
EFIS fix, glare shield
Details
       

 08-19-2018
3.00
Wiring, EFIS programming
Details
       

 08-18-2018
5.00
EFIS Power Up
Details
       

 08-17-2018
8.00
Wiring Harnesses
Details
       

 08-16-2018
8.00
Electrical, VHF antenna
Details
       

 08-15-2018
4.00
Electrical
Details
       

 08-14-2018
4.00
Window bolts electrical
Details
       

 08-13-2018
6.00
Prop hub, Fuel Pressure, wiring
Details
       

 08-12-2018
5.00
Electrical
Details
       

 08-10-2018
5.00
Electrical
Details
     

 08-09-2018
4.00
Windshield trimming
Details
     

 08-08-2018
4.50
Blue Cowl and rudder paint
Details
     

 08-07-2018
8.00
Painting the cowlings
Details
       

 08-06-2018
8.00
WIndshield
Details
       

 08-05-2018
5.00
Butt ribs, wiring.
Details
       

 08-04-2018
2.00
Sanding cowling
Details

 08-03-2018
6.00
Fiberglass
Details
       

 07-30-2018
5.00
Finished cowling
Details
       

 07-25-2018
5.00
Camlocks
Details
       

 07-20-2018
5.00
Panel labeling
Details
       

 07-19-2018
5.00
Painting Panel
Details
       

 07-15-2018
4.00
Sanding cowling
Details
       

 07-13-2018
5.00
Cowling work
Details
       

 07-06-2018
5.00
Cowling cutting
Details
       

 07-05-2018
4.00
Cowling
Details
       

 07-04-2018
5.00
Prop Slipring, cowling
Details
       

 06-27-2018
2.00
Got the Prop, Master, ELT Speaker
Details
       

 06-26-2018
2.00
ANL Fuse install
Details
       

 06-25-2018
4.00
Layout
Details
       

 06-24-2018
5.00
Antennas
Details
       

 06-14-2018
1.00
Panel Stuff
Details
       

 06-12-2018
3.00
Wiring
Details
       

 06-07-2018
5.00
Pannel cutting
Details
       

 06-06-2018
4.00
Fuse Box, panel planning
Details

 06-05-2018
5.00
Instrument panel hinges
Details
       

 06-04-2018
5.00
ECU Install
Details
       

 05-30-2018
4.00
Fuel line finishing
Details
       

 05-29-2018
4.00
Fuel tubing
Details
     

 05-28-2018
4.00
Fuel lines and hoses
Details
       

 05-23-2018
5.00
Fuel lines, electrical
Details
       

 05-22-2018
6.00
Water and Oil Hoses
Details
       

 05-21-2018
5.00
Oil cooler
Details
       

 05-20-2018
4.00
Radiator
Details
     

 05-16-2018
5.00
Fitting Cowling
Details
       

 05-15-2018
5.00
Cowling
Details
     

 05-14-2018
2.00
Avionics tray
Details
       

 05-09-2018
2.50
Engine Fuse Box, Fuel pump
Details
       

 05-08-2018
6.00
Boot cowl, heater
Details
       

 05-07-2018
3.00
Brake lines, heater
Details
     

 05-06-2018
5.00
Brake Lines, Tail Beacon
Details
       

 05-05-2018
4.00
Brakes
Details
       

 04-28-2018
3.00
Cut panel, Oil tank
Details
       

 04-27-2018
5.00
Brrakes Engine Install
Details
       

 04-26-2018
4.00
Boot Cowl, Firewall, Engine Unpack
Details
       

 04-22-2018
2.00
Landing Gear and Firewall Forward
Details
       

 04-21-2018
5.00
Final Color Coats
Details
       

 04-20-2018
4.00
Final coat and landing gear polishing
Details
       

 04-19-2018
6.00
Sanding and painting
Details
     

 04-18-2018
6.00
Prepping and first coat fuselage
Details
       

 04-13-2018
4.50
Finished Tapes
Details
       

 04-12-2018
4.00
More Tapes
Details
     

 04-11-2018
6.00
Tapes
Details
       

 04-10-2018
5.00
Right Side and Top
Details
       

 04-06-2018
5.00
Covering the left side
Details
       

 04-05-2018
6.00
Bottom fuselage
Details
       

 04-04-2018
2.00
Getting fuselage ready
Details
       

 04-03-2018
4.00
Finish and move wings
Details
       

 04-02-2018
4.00
Fixing bad paint
Details
       

 03-31-2018
3.00
Finishing left wing.
Details
       

 03-30-2018
3.00
Starting left wing
Details
       

 03-29-2018
3.00
Final right wing coat
Details
       

 03-28-2018
5.00
Final tail coat, first wing coat.
Details
       

 03-27-2018
5.00
Second coat
Details
       

 03-26-2018
5.00
First coats of White Latex
Details
     

 03-21-2018
2.00
Getting ready to paint
Details
       

 03-20-2018
6.00
Heat smoothing tail
Details
       

 03-14-2018
5.00
Finished Tail Covering
Details
       

 03-13-2018
4.50
Polybrush on tail
Details
       

 03-12-2018
5.50
Covering the Tail
Details
       

 03-08-2018
5.00
Finish wing tapes cover stab
Details
       

 03-07-2018
4.50
Taping and heat smoothing
Details
       

 03-06-2018
4.50
Rt wing tapes
Details
     

 03-05-2018
5.50
Right wing rib stitching
Details
       

 03-04-2018
3.00
Second Coat of Polybrush
Details

 02-25-2018
3.00
Heat shrinking wing
Details

 02-24-2018
4.00
Closed up right wing
Details
     

 02-23-2018
5.00
Magnetometer And Bottom
Details
       

 02-22-2018
5.00
Heat smoothing L wing
Details
       

 02-21-2018
4.00
Finished tapes on L Wing
Details

 02-17-2018
5.00
Tapes
Details
       

 02-16-2018
4.50
Wing tapes
Details
       

 02-15-2018
5.00
Rib Stitching
Details
       

 02-08-2018
2.50
Rib Stitching
Details
       

 02-07-2018
5.00
Polybrush
Details
       

 02-06-2018
5.00
WIng Covered
Details
       

 02-05-2018
6.00
Bottom of left wing
Details
       

 02-04-2018
2.00
Setting up iron, sanding wing
Details
       

 02-03-2018
1.00
Second Coat of Varnish
Details
       

 02-02-2018
5.00
Pitot, wiring
Details
       

 02-01-2018
5.00
Torque, pitot tube mast
Details
       

 01-31-2018
4.00
Tail wire, torque
Details
       

 01-27-2018
4.50
Left Door
Details
       

 01-26-2018
4.00
Doors again
Details
       

 01-25-2018
5.00
Doors
Details
       

 01-24-2018
4.00
Flight control rigging
Details
       

 01-19-2018
6.00
Sanding, fitting
Details
       

 01-18-2018
5.00
Super Fil and Sanding
Details
       

 01-17-2018
5.00
Empenage Tips, sanding
Details
     

 01-16-2018
1.00
Rudder stops, super fill
Details

 01-12-2018
4.00
Door frame, rudder stops
Details
       

 01-11-2018
4.50
Hysol Door and Tail access
Details
       

 01-10-2018
6.00
Hysol Rudder Fairings.
Details
       

 01-06-2018
4.00
Rudder fairings.
Details
       

 01-05-2018
3.00
Rear baggage compartment
Details

 01-04-2018
4.00
Door angles, cargo compartment.
Details
       

 01-03-2018
4.00
Baggage compartment
Details
       

 01-02-2018
5.00
Cargo compartment sewing
Details
     

 01-01-2018
4.00
Baggage compartment
Details

 12-31-2017
1.00
Cargo compartment
Details
     

 12-29-2017
5.00
Varnish, cargo liner
Details
       

 12-28-2017
4.00
Varnish
Details

 12-27-2017
5.00
Horizontal Stab
Details
       

 12-26-2017
5.00
Fit and Hysoled Tail RIbs
Details
       

 12-22-2017
3.00
Reamed Elevator Bushings
Details
       

 12-21-2017
1.50
Sanded Rudder Ribs
Details
     

 12-13-2017
4.50
Door latches and hinges
Details
       

 12-12-2017
2.00
Longeron final installation
Details
       

 12-06-2017
5.00
Longerons, floor boards
Details
       

 12-05-2017
5.00
Seat pan trim, cable interference
Details
       

 12-04-2017
5.00
Console sides, seat pan
Details
       

 12-03-2017
3.50
Rudder cables complete
Details
       

 12-02-2017
3.00
Rudder cable fit and cut
Details

 12-01-2017
6.00
Rudder Install
Details
       

 11-30-2017
4.50
Rudder Pedals
Details
       

 11-29-2017
6.00
Rudder Pedals
Details
       

 11-23-2017
2.00
Dontrol column bearing
Details

 11-15-2017
3.50
Center Console, Floor Boards
Details
       

 11-14-2017
5.50
Rudder Pedal Detent
Details
       

 11-13-2017
3.00
Adjustable rudder pedals
Details
       

 11-06-2017
4.50
Floor Boards, Center Consol
Details
       

 11-05-2017
3.00
Flight controls, floor boards
Details
       

 11-04-2017
8.00
Aileron Elevator Controls
Details
       

 11-03-2017
3.00
Control stick mixer
Details
     

 11-02-2017
6.00
Flight controls.
Details
     

 11-01-2017
3.00
Wing Tip Nutplates, Tailwheel
Details
     

 10-27-2017
3.50
Landing gear
Details
       

 10-26-2017
5.50
Nutplates, primer
Details
       

 10-25-2017
5.00
Landing light lense fitting, fixing LLE bulges
Details
       

 10-24-2017
4.50
Lense Mounts, wingtip trailing edge
Details
       

 10-20-2017
6.00
Landing light lense, mounts. standoff
Details
       

 10-18-2017
3.00
Landing light mounting
Details
       

 10-17-2017
5.00
WIng tip cutting and fitting.
Details
     

 10-16-2017
2.00
Primer on Flaperon Hinge Attachments
Details
     

 10-12-2017
5.50
Varnishing Ribs
Details

 10-11-2017
5.00
WIngtip Mounts, Landing light mount
Details
       

 10-10-2017
2.00
Landing Light Mount
Details

 10-04-2017
7.50
Flaperon reinforcement, hinges
Details
       

 10-03-2017
6.00
Control Horns, balance tabs
Details
       

 10-02-2017
7.00
Flaperon Tips, rib
Details
       

 09-27-2017
7.00
Flaperon
Details
       

 09-26-2017
7.00
Installed Laker Leading Edge
Details
       

 09-25-2017
5.00
Epoxy Primer to wings
Details
       

 09-24-2017
3.50
Tank Hysol, wing corrosion proof
Details
       

 09-20-2017
5.00
Last false ribs, leading edge forms
Details
       

 09-19-2017
6.00
Tank Bottom False ribs
Details
       

 09-18-2017
7.50
Install tanks, fittings, sight gauge
Details
       

 09-13-2017
5.50
Varnish, glue false ribs, tank fit
Details
       

 09-12-2017
5.00
Jury strut brackets, varnish, false ribs
Details
       

 09-11-2017
5.00
Butt ribs and tanks
Details
       

 09-10-2017
10.00
Butt Ribs and Jury Struts
Details
       

 09-03-2017
6.50
Drilling fittings, attaching strut mount
Details
       

 09-02-2017
4.00
Bottom Spar Reinforcement
Details
       

 09-01-2017
7.00
Left wing strut attach and reinforcement
Details
     

 08-31-2017
8.00
Spar Attachments
Details
       

 08-30-2017
6.30
Spar reinforcement
Details
       

 08-29-2017
10.45
Rigging wings
Details
       

 08-28-2017
3.00
Wing strut attach prep
Details
       

 08-27-2017
10.00
inventory/Start Building
Details
       

 08-26-2017
5.30
Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.