Powered By Kitlog Pro v2.0
BILL'S WEB SITE
Long EZ
All
Work Logs Found:
178
Category Work Time:
369 Hours
Date
Hours
Work Log Summary
Details
09-26-2019
1.00
Moving Log to EAA Builders Log site
Details
09-24-2019
2.00
Finish Shaping Fuselage Exterior
Details
09-23-2019
1.00
Step Reinforcement and Micro Fill
Details
09-22-2019
1.10
Sanded Trailing Edge Torsional Laminates
Details
09-22-2019
0.00
Drove to Prescott to Pick Up Baggage Pods
Details
09-21-2019
0.25
Trimmed First set of Torsional Laminates off the L
Details
09-21-2019
3.25
Landing Gear Bow Torsional Layups
Details
09-20-2019
2.00
Pre Cut the Uni Plys for Landing Gear Torsional Wr
Details
09-20-2019
1.25
Marked Up Landing Brake and Cut Step Reinforcement
Details
09-20-2019
1.00
Installed three of the seat belt fittings
Details
09-19-2019
0.75
Test Fit Seat Belt Fitting Hardware and Prep Sande
Details
09-17-2019
1.00
Alodine Seat Belt Fitting and Other Misc Part
Details
09-16-2019
1.00
Drilled seat belt fitting holes out to final size
Details
09-14-2019
2.00
Trimmed the Batwings! Fuselage Shaping
Details
09-14-2019
0.50
Trimmed Fuselage Stubs at Firewall
Details
09-14-2019
1.50
Sanded Fwd Fuselage into F22
Details
09-13-2019
2.50
Upper Fuselage Shaping
Details
09-08-2019
1.50
Prep Sanded Main Landing Gear Bow
Details
04-28-2019
3.50
Bottom Corner Shaping Continued
Details
04-26-2019
2.50
Fusleage Lower Corner Shaping
Details
04-23-2019
1.50
Fuselage Corner Sanding Blocks
Details
04-19-2019
2.00
Fabricated rotating stands for fuselage
Details
04-18-2019
0.25
Back drilled seat belt fitting holes
Details
04-17-2019
0.50
Sanding Blocks Continued
Details
04-13-2019
5.00
Seat Belt doubler Install and Layups
Details
04-12-2019
4.00
Seat Belt Fittings
Details
04-05-2019
1.00
General Clean Up
Details
04-05-2019
1.00
Cut Seat Belt Mount Doublers
Details
04-03-2019
1.00
F28 Wood Doubler Sealing Laminate
Details
04-01-2019
1.50
Pulled Peel Ply Tapes - Repair Bubble
Details
03-31-2019
3.75
Taped fuselage bottom joints
Details
03-29-2019
3.00
Prepped fuselage for bottom taping
Details
03-28-2019
0.25
Move Fuselage from saw horses to Table
Details
03-22-2019
3.50
Fuselage Bottom Bonding
Details
03-21-2019
1.50
Fuselage Bottom - Final Prep
Details
03-15-2019
1.00
Fuselage Bottom - Trim and Prep
Details
03-13-2019
0.75
Fuselage Bottom Layups - Clean up
Details
03-09-2019
6.00
Fuselage Floor Inside Layups
Details
03-08-2019
1.50
Clean Up and Fuselage Bottom Layup Prep
Details
08-10-2018
1.50
Fuselage Bottom Jig
Details
07-27-2018
1.75
Seat Bottom Shaping Continued
Details
07-15-2018
1.25
Seat Bottom Shaping Continued
Details
07-07-2018
2.50
Seat Bottom Pockets
Details
07-07-2018
1.75
Forward Footwell Pocket and FWD Storage Pocket Car
Details
07-06-2018
2.00
Forward Foot Well Layout and Carving
Details
07-04-2018
4.00
Fuselage Floor Carving
Details
07-03-2018
2.00
Fuselage Bottom Panel Layout
Details
07-02-2018
4.50
Bottom Panel Sizing and F28
Details
07-01-2018
3.50
Fuselage Clean Up and Bottom Foam Blank
Details
06-29-2018
3.25
FWD Seat Back Tapes - Bottom Foam Prep
Details
06-23-2018
2.00
F22 4 Ply Layups
Details
06-16-2018
2.00
Removed Peel Ply and Cleaned Up Yesterday's Tapes
Details
06-16-2018
1.00
Bulkhead Taping - Continued
Details
06-15-2018
3.50
Taped fuselage bulkheads - continued
Details
06-09-2018
4.00
Taped fuselage bulkheads
Details
06-01-2018
2.50
Fusleagle Assembly - Finally
Details
05-31-2018
1.00
Prep for Fusleage Assembly
Details
05-30-2018
2.00
Final - Final Adjustments for Bonding
Details
05-27-2018
2.00
Fuselage Final Fitting Before Assembly
Details
05-18-2018
4.00
Fusleage Assembly - New Clamps and Alignment
Details
02-04-2018
0.75
Installed Prop on Extension
Details
02-04-2018
1.00
Engine Mount - Priming
Details
01-30-2018
2.50
Fuselage Bulkheads - Sanded Micro Edge Fills
Details
01-28-2018
0.75
F22 Edge Fill Sanding
Details
01-27-2018
3.50
Fuselage Bulkheads - Micro Edge Fill
Details
01-21-2018
0.00
Prop Carving!
Details
01-20-2018
1.50
LH Side Rear Seatback Landing Gear Bolt Access Cut
Details
01-16-2018
1.00
Measuring and Marking
Details
01-07-2018
5.00
Fuselage Trial Assembly
Details
01-01-2018
1.50
Trimmed Bulkheads to clear Longerons
Details
12-27-2017
1.50
Sanded plugs to shape, started fitting rear seat b
Details
12-26-2017
2.00
Plugged Landing Gear Hardware Cut Outs
Details
12-13-2017
1.75
Bonded and Bolted Landing Gear Attach
Details
12-12-2017
0.75
Prepped Fusleage Sides and Landing Gear Brackets f
Details
12-11-2017
6.00
Nutplate Plates - Alodine and Fitting
Details
12-10-2017
4.75
Nutplate Plates - Landing Gear Attach Fittings
Details
12-09-2017
4.00
Fitting Landing Gear Brackets to Fuselage Sides
Details
12-08-2017
1.00
Packed and Shipped Cam and other steel parts for N
Details
12-08-2017
1.50
Landing Gear Attach Brackets - Alodine and Bushing
Details
12-07-2017
1.00
Landing Gear Attach Brackets - Hand Finishing
Details
12-06-2017
1.00
Landing Gear Attach Brackets - Counterbores
Details
12-04-2017
0.50
Landing Gear Attach Brackets - counterbores
Details
12-03-2017
6.50
Landing Gear Attach Brackets - Final Shaping
Details
12-01-2017
1.25
Landing Gear Attach Brackets - FWD
Details
11-29-2017
1.75
Landing Gear Attach Brackets
Details
11-28-2017
1.25
Landing Gear Attach Brackets
Details
11-26-2017
2.00
Landing Gear Attach Brackets
Details
11-25-2017
2.00
Landing Gear Attach Brackets
Details
11-25-2017
3.00
Landing Gear Attach Brackets
Details
11-04-2017
2.00
Fitting Firewall to Fuselage Side
Details
11-04-2017
1.00
Cut the large lightening hole opening in the
Details
11-03-2017
2.25
Firewall trimming
Details
11-02-2017
1.12
Firewall Inside Layup - Pulley Screw Install
Details
11-02-2017
1.13
Firewall - Aft Face BID layup
Details
11-01-2017
2.50
Firewall trimming and rudder pulley bracket holes
Details
10-30-2017
1.90
Trimming AFT LDG Gear Attach Pad to WL 12.35
Details
10-30-2017
2.50
Firewall Patterns, Lower Cowl Fit, Firewall Outsid
Details
10-30-2017
0.75
Firewall AFT side BID Ply
Details
10-30-2017
0.10
Additional Photos of BID Ply Trimming
10-29-2017
2.25
Lower Cowl Trim - Firewall Pattern
Details
10-29-2017
2.00
LH Fuselage Side Landing Gear Attachment Pad
Details
10-28-2017
1.75
FWD Landing Gear Attachement Pad Layups
Details
10-28-2017
1.50
AFT Landing Gear Bracket BID Ply Stack
Details
10-25-2017
1.75
Prepared for LG Extrusion 15 Ply Layups
Details
10-23-2017
0.75
Landing Gear Reinforcement Trimming
Details
10-22-2017
2.00
Fuselage Side Landing Gear Area Layups
Details
10-22-2017
2.00
Fuselage Side Landing Gear Area Layups
Details
10-21-2017
4.00
Cut LWX and LWY and bonded in position AGAIN!
Details
10-19-2017
2.25
Removed LWX and LWY!
Details
10-18-2017
0.50
FWD Landing Gear Extrusion CAD drawing
Details
10-17-2017
1.75
LH Fuselage Side final trimming and RH Fuselage Si
Details
10-16-2017
1.25
RH Fuselage Side -Trimmed Upper Longeron Layups
Details
10-15-2017
1.25
RH Fuselage Side LWX and LWY Bonding
Details
10-15-2017
0.75
RH Fuselage Side Aft Reinforcement Foam
Details
10-15-2017
3.00
RH Fuselage Side - Top Longeron Layups
Details
10-14-2017
1.50
RH Fuselage Side Lower Longeron and Landing Gear B
Details
10-14-2017
1.50
RH Fuselage Lower Longeron Doubler
Details
10-14-2017
1.50
RH Fusealge Side Lower Longeron Bonding
Details
10-13-2017
2.00
RH Fuselage Side Top Longeron Bonding
Details
10-12-2017
2.25
RH Fuselage Inside Skin Layup
Details
10-11-2017
1.50
RH Fuselage Inner Skin -Prep for layups
Details
10-09-2017
2.00
LH Fuselage Aft Landing Gear Foam and Cloth Cuttin
Details
10-08-2017
1.00
Upper RH longeron and doubler glue up
Details
10-08-2017
2.25
LH Fuselage Side - Aft Wood Support
Details
10-08-2017
1.00
LH Fuselage Aft Foam - Landing Gear Area - Continu
Details
10-08-2017
1.00
LH Fuselage Aft Foam - Landing Gear Area
Details
10-07-2017
2.25
LH Fuselage Side Lower Longeron Doubler
Details
10-06-2017
0.50
Upper LH Longeron Laminate Trim
Details
10-06-2017
1.75
LH Lower Longeron Bonding Continued -More Pics
Details
10-06-2017
1.75
LH Fuselage Lower Longeron Bonding
Details
10-05-2017
3.00
LH Fuselage Upper Longeron Reinforcement
Details
10-04-2017
1.50
Top Longeron LH Fuselage Side
Details
10-03-2017
1.25
LH Fuselage Side Inside Skin Trim
Details
10-02-2017
2.50
Fuselage LH side inside layup.
Details
10-01-2017
1.00
Prep for Fuselage Side Inside Layups
Details
09-30-2017
2.50
Front Seat and Rear Seat Bulkhead cutouts
Details
09-30-2017
1.50
Extended Work Table
Details
09-18-2017
1.00
Engine - Spit Crankcase
Details
09-17-2017
3.00
Engine Teardown Day 2
Details
09-16-2017
5.00
Engine Tear Down Day 1
Details
09-15-2017
1.00
Modified Engine Stand for Lycoming Crank
Details
09-03-2017
2.50
Fuselage Side Layout Lines and Aft Wood Reinforcem
Details
09-03-2017
2.50
Fuselage Side Layout Lines and Aft Wood Reinforcem
Details
08-16-2017
1.50
Carved forward control stick recess
Details
08-13-2017
4.00
Cutting Fuselage Longerons and other wood pieces
Details
08-12-2017
6.00
Shaped fuselage side foam pieces
Details
08-06-2017
1.00
Fuselage foam blank glue up - continued
Details
08-05-2017
3.00
Cut foam for fuselage sides - glued up blanks
Details
08-01-2017
1.50
Firewall Router Patten
Details
05-07-2017
6.00
CN2's and Canard Pins and Canopy Hardware
Details
05-06-2017
8.00
CS1A and CS1 Fabrication CN1
Details
04-26-2017
0.50
Finished trimming up the F22 bulkhead
Details
04-17-2017
0.50
F22 Trimming
Details
04-13-2017
1.50
F22 Bulkhead 9 ply Reinforcements
Details
04-12-2017
1.50
RH Side F22 Bulkead layups
Details
04-11-2017
1.00
Clean Up and Fabric Cutting
Details
03-26-2017
1.50
Router Shaping F22 bulkhead, general detailing
Details
03-25-2017
3.50
Routing Bulkheads to shape
Details
03-24-2017
2.00
Instrument Panel - aft layups (the side you see)
Details
03-23-2017
2.00
F22 Bulkhead Back Side Layup
Details
03-19-2017
3.00
Made a fabric cabinet
Details
03-12-2017
0.75
Instrument Panel repair
Details
03-11-2017
4.50
Bulkheads
Details
03-06-2017
2.00
Trimmed Seatbacks and Backside IP layups
Details
03-05-2017
6.00
Seat Back Backside layups
Details
03-04-2017
3.00
Seat Backs
Details
03-03-2017
2.00
Seat Backs
Details
03-02-2017
1.00
Set Up Epoxy Pump
Details
02-26-2017
4.00
Cut cloth and laid up seat backs
Details
02-25-2017
1.50
F22, F28 Templates
Details
02-25-2017
3.50
Cut out all the foam for fuselage bulkheads
Details
02-24-2017
2.00
Instrument Panel Router Template
Details
02-18-2017
5.00
LWA9 Wing Attach Bushings
Details
02-11-2017
3.00
CS1 and CS1A Pushrod End Inserts
Details
02-11-2017
2.00
Axle wheel spacers
Details
12-02-2016
0.50
NG6A Clean Up
Details
11-20-2016
2.00
Seat Belt Attach Angles
Details
11-19-2016
0.75
Canopy C8 Angles
SITE NAVIGATION
Contact Builder
Long EZ Home
Category
# Logs
# Hours
All
178
370
Baggage Pods
1
Carbon Fiber Parts
2
3
Chapter 4 - Fuselage
29
60
Chapter 5 - Fuselage
49
100
Chapter 6 - Fusleage
41
93
Chapter 7 Fuselage E
11
20
Chapter 8 - Seat Bel
7
14
Chapter 9 - Landing
5
8
Cowling
1
2
Engine
5
11
Fuselage
1
2
Landing Gear
2
2
Metal Parts
19
49
Miscellaneous
1
1
Prop
2
1
Shop Supplies
1
1
Tools
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.