KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
Work Logs Found: 178
Category Work Time: 369 Hours
 Date
Hours
Work Log Summary

Details

 09-26-2019
1.00
Moving Log to EAA Builders Log site
Details

 09-24-2019
2.00
Finish Shaping Fuselage Exterior
Details
       

 09-23-2019
1.00
Step Reinforcement and Micro Fill
Details
       

 09-22-2019
1.10
Sanded Trailing Edge Torsional Laminates
Details
       

 09-22-2019
0.00
Drove to Prescott to Pick Up Baggage Pods
Details
     

 09-21-2019
0.25
Trimmed First set of Torsional Laminates off the L
Details

 09-21-2019
3.25
Landing Gear Bow Torsional Layups
Details
       

 09-20-2019
2.00
Pre Cut the Uni Plys for Landing Gear Torsional Wr
Details
     

 09-20-2019
1.25
Marked Up Landing Brake and Cut Step Reinforcement
Details
       

 09-20-2019
1.00
Installed three of the seat belt fittings
Details
       

 09-19-2019
0.75
Test Fit Seat Belt Fitting Hardware and Prep Sande
Details
     

 09-17-2019
1.00
Alodine Seat Belt Fitting and Other Misc Part
Details
     

 09-16-2019
1.00
Drilled seat belt fitting holes out to final size
Details
       

 09-14-2019
2.00
Trimmed the Batwings! Fuselage Shaping
Details
       

 09-14-2019
0.50
Trimmed Fuselage Stubs at Firewall
Details
     

 09-14-2019
1.50
Sanded Fwd Fuselage into F22
Details
       

 09-13-2019
2.50
Upper Fuselage Shaping
Details
       

 09-08-2019
1.50
Prep Sanded Main Landing Gear Bow
Details
     

 04-28-2019
3.50
Bottom Corner Shaping Continued
Details
       

 04-26-2019
2.50
Fusleage Lower Corner Shaping
Details
     

 04-23-2019
1.50
Fuselage Corner Sanding Blocks
Details
       

 04-19-2019
2.00
Fabricated rotating stands for fuselage
Details
     

 04-18-2019
0.25
Back drilled seat belt fitting holes
Details
     

 04-17-2019
0.50
Sanding Blocks Continued
Details

 04-13-2019
5.00
Seat Belt doubler Install and Layups
Details
       

 04-12-2019
4.00
Seat Belt Fittings
Details
       

 04-05-2019
1.00
General Clean Up
Details

 04-05-2019
1.00
Cut Seat Belt Mount Doublers
Details
       

 04-03-2019
1.00
F28 Wood Doubler Sealing Laminate
Details
       

 04-01-2019
1.50
Pulled Peel Ply Tapes - Repair Bubble
Details
       

 03-31-2019
3.75
Taped fuselage bottom joints
Details

 03-29-2019
3.00
Prepped fuselage for bottom taping
Details
       

 03-28-2019
0.25
Move Fuselage from saw horses to Table
Details
     

 03-22-2019
3.50
Fuselage Bottom Bonding
Details
       

 03-21-2019
1.50
Fuselage Bottom - Final Prep
Details
       

 03-15-2019
1.00
Fuselage Bottom - Trim and Prep
Details

 03-13-2019
0.75
Fuselage Bottom Layups - Clean up
Details

 03-09-2019
6.00
Fuselage Floor Inside Layups
Details

 03-08-2019
1.50
Clean Up and Fuselage Bottom Layup Prep
Details

 08-10-2018
1.50
Fuselage Bottom Jig
Details
       

 07-27-2018
1.75
Seat Bottom Shaping Continued
Details
       

 07-15-2018
1.25
Seat Bottom Shaping Continued
Details
     

 07-07-2018
2.50
Seat Bottom Pockets
Details
       

 07-07-2018
1.75
Forward Footwell Pocket and FWD Storage Pocket Car
Details

 07-06-2018
2.00
Forward Foot Well Layout and Carving
Details

 07-04-2018
4.00
Fuselage Floor Carving
Details
       

 07-03-2018
2.00
Fuselage Bottom Panel Layout
Details
       

 07-02-2018
4.50
Bottom Panel Sizing and F28
Details
       

 07-01-2018
3.50
Fuselage Clean Up and Bottom Foam Blank
Details
     

 06-29-2018
3.25
FWD Seat Back Tapes - Bottom Foam Prep
Details
       

 06-23-2018
2.00
F22 4 Ply Layups
Details
       

 06-16-2018
2.00
Removed Peel Ply and Cleaned Up Yesterday's Tapes
Details
       

 06-16-2018
1.00
Bulkhead Taping - Continued
Details
       

 06-15-2018
3.50
Taped fuselage bulkheads - continued
Details
       

 06-09-2018
4.00
Taped fuselage bulkheads
Details

 06-01-2018
2.50
Fusleagle Assembly - Finally
Details

 05-31-2018
1.00
Prep for Fusleage Assembly
Details
       

 05-30-2018
2.00
Final - Final Adjustments for Bonding
Details

 05-27-2018
2.00
Fuselage Final Fitting Before Assembly
Details
       

 05-18-2018
4.00
Fusleage Assembly - New Clamps and Alignment
Details

 02-04-2018
0.75
Installed Prop on Extension
Details
     

 02-04-2018
1.00
Engine Mount - Priming
Details
       

 01-30-2018
2.50
Fuselage Bulkheads - Sanded Micro Edge Fills
Details

 01-28-2018
0.75
F22 Edge Fill Sanding
Details

 01-27-2018
3.50
Fuselage Bulkheads - Micro Edge Fill
Details
       

 01-21-2018
0.00
Prop Carving!
Details
       

 01-20-2018
1.50
LH Side Rear Seatback Landing Gear Bolt Access Cut
Details
       

 01-16-2018
1.00
Measuring and Marking
Details
     

 01-07-2018
5.00
Fuselage Trial Assembly
Details
       

 01-01-2018
1.50
Trimmed Bulkheads to clear Longerons
Details
       

 12-27-2017
1.50
Sanded plugs to shape, started fitting rear seat b
Details
     

 12-26-2017
2.00
Plugged Landing Gear Hardware Cut Outs
Details
       

 12-13-2017
1.75
Bonded and Bolted Landing Gear Attach
Details
       

 12-12-2017
0.75
Prepped Fusleage Sides and Landing Gear Brackets f
Details
       

 12-11-2017
6.00
Nutplate Plates - Alodine and Fitting
Details
       

 12-10-2017
4.75
Nutplate Plates - Landing Gear Attach Fittings
Details
       

 12-09-2017
4.00
Fitting Landing Gear Brackets to Fuselage Sides
Details
       

 12-08-2017
1.00
Packed and Shipped Cam and other steel parts for N
Details

 12-08-2017
1.50
Landing Gear Attach Brackets - Alodine and Bushing
Details
     

 12-07-2017
1.00
Landing Gear Attach Brackets - Hand Finishing
Details
     

 12-06-2017
1.00
Landing Gear Attach Brackets - Counterbores
Details
       

 12-04-2017
0.50
Landing Gear Attach Brackets - counterbores
Details
       

 12-03-2017
6.50
Landing Gear Attach Brackets - Final Shaping
Details
       

 12-01-2017
1.25
Landing Gear Attach Brackets - FWD
Details
       

 11-29-2017
1.75
Landing Gear Attach Brackets
Details
       

 11-28-2017
1.25
Landing Gear Attach Brackets
Details
     

 11-26-2017
2.00
Landing Gear Attach Brackets
Details
       

 11-25-2017
2.00
Landing Gear Attach Brackets
Details
       

 11-25-2017
3.00
Landing Gear Attach Brackets
Details
       

 11-04-2017
2.00
Fitting Firewall to Fuselage Side
Details
       

 11-04-2017
1.00
Cut the large lightening hole opening in the
Details
       

 11-03-2017
2.25
Firewall trimming
Details
       

 11-02-2017
1.12
Firewall Inside Layup - Pulley Screw Install
Details
       

 11-02-2017
1.13
Firewall - Aft Face BID layup
Details
       

 11-01-2017
2.50
Firewall trimming and rudder pulley bracket holes
Details
       

 10-30-2017
1.90
Trimming AFT LDG Gear Attach Pad to WL 12.35
Details
       

 10-30-2017
2.50
Firewall Patterns, Lower Cowl Fit, Firewall Outsid
Details
       

 10-30-2017
0.75
Firewall AFT side BID Ply
Details
       

 10-30-2017
0.10
Additional Photos of BID Ply Trimming
       

 10-29-2017
2.25
Lower Cowl Trim - Firewall Pattern
Details

 10-29-2017
2.00
LH Fuselage Side Landing Gear Attachment Pad
Details
       

 10-28-2017
1.75
FWD Landing Gear Attachement Pad Layups
Details
       

 10-28-2017
1.50
AFT Landing Gear Bracket BID Ply Stack
Details
       

 10-25-2017
1.75
Prepared for LG Extrusion 15 Ply Layups
Details
       

 10-23-2017
0.75
Landing Gear Reinforcement Trimming
Details
       

 10-22-2017
2.00
Fuselage Side Landing Gear Area Layups
Details
       

 10-22-2017
2.00
Fuselage Side Landing Gear Area Layups
Details
     

 10-21-2017
4.00
Cut LWX and LWY and bonded in position AGAIN!
Details
       

 10-19-2017
2.25
Removed LWX and LWY!
Details
       

 10-18-2017
0.50
FWD Landing Gear Extrusion CAD drawing
Details
     

 10-17-2017
1.75
LH Fuselage Side final trimming and RH Fuselage Si
Details
       

 10-16-2017
1.25
RH Fuselage Side -Trimmed Upper Longeron Layups
Details
       

 10-15-2017
1.25
RH Fuselage Side LWX and LWY Bonding
Details
       

 10-15-2017
0.75
RH Fuselage Side Aft Reinforcement Foam
Details
       

 10-15-2017
3.00
RH Fuselage Side - Top Longeron Layups
Details
       

 10-14-2017
1.50
RH Fuselage Side Lower Longeron and Landing Gear B
Details
       

 10-14-2017
1.50
RH Fuselage Lower Longeron Doubler
Details
       

 10-14-2017
1.50
RH Fusealge Side Lower Longeron Bonding
Details

 10-13-2017
2.00
RH Fuselage Side Top Longeron Bonding
Details
       

 10-12-2017
2.25
RH Fuselage Inside Skin Layup
Details
       

 10-11-2017
1.50
RH Fuselage Inner Skin -Prep for layups
Details
     

 10-09-2017
2.00
LH Fuselage Aft Landing Gear Foam and Cloth Cuttin
Details
       

 10-08-2017
1.00
Upper RH longeron and doubler glue up
Details
       

 10-08-2017
2.25
LH Fuselage Side - Aft Wood Support
Details
       

 10-08-2017
1.00
LH Fuselage Aft Foam - Landing Gear Area - Continu
Details
       

 10-08-2017
1.00
LH Fuselage Aft Foam - Landing Gear Area
Details
       

 10-07-2017
2.25
LH Fuselage Side Lower Longeron Doubler
Details
       

 10-06-2017
0.50
Upper LH Longeron Laminate Trim
Details
       

 10-06-2017
1.75
LH Lower Longeron Bonding Continued -More Pics
Details
       

 10-06-2017
1.75
LH Fuselage Lower Longeron Bonding
Details
       

 10-05-2017
3.00
LH Fuselage Upper Longeron Reinforcement
Details
       

 10-04-2017
1.50
Top Longeron LH Fuselage Side
Details
       

 10-03-2017
1.25
LH Fuselage Side Inside Skin Trim
Details
       

 10-02-2017
2.50
Fuselage LH side inside layup.
Details
       

 10-01-2017
1.00
Prep for Fuselage Side Inside Layups
Details

 09-30-2017
2.50
Front Seat and Rear Seat Bulkhead cutouts
Details
       

 09-30-2017
1.50
Extended Work Table
Details

 09-18-2017
1.00
Engine - Spit Crankcase
Details
     

 09-17-2017
3.00
Engine Teardown Day 2
Details
       

 09-16-2017
5.00
Engine Tear Down Day 1
Details
       

 09-15-2017
1.00
Modified Engine Stand for Lycoming Crank
Details
     

 09-03-2017
2.50
Fuselage Side Layout Lines and Aft Wood Reinforcem
Details
       

 09-03-2017
2.50
Fuselage Side Layout Lines and Aft Wood Reinforcem
Details
       

 08-16-2017
1.50
Carved forward control stick recess
Details
       

 08-13-2017
4.00
Cutting Fuselage Longerons and other wood pieces
Details

 08-12-2017
6.00
Shaped fuselage side foam pieces
Details
     

 08-06-2017
1.00
Fuselage foam blank glue up - continued
Details

 08-05-2017
3.00
Cut foam for fuselage sides - glued up blanks
Details

 08-01-2017
1.50
Firewall Router Patten
Details

 05-07-2017
6.00
CN2's and Canard Pins and Canopy Hardware
Details
       

 05-06-2017
8.00
CS1A and CS1 Fabrication CN1
Details
       

 04-26-2017
0.50
Finished trimming up the F22 bulkhead
Details

 04-17-2017
0.50
F22 Trimming
Details

 04-13-2017
1.50
F22 Bulkhead 9 ply Reinforcements
Details

 04-12-2017
1.50
RH Side F22 Bulkead layups
Details

 04-11-2017
1.00
Clean Up and Fabric Cutting
Details

 03-26-2017
1.50
Router Shaping F22 bulkhead, general detailing
Details

 03-25-2017
3.50
Routing Bulkheads to shape
Details

 03-24-2017
2.00
Instrument Panel - aft layups (the side you see)
Details

 03-23-2017
2.00
F22 Bulkhead Back Side Layup
Details

 03-19-2017
3.00
Made a fabric cabinet
Details

 03-12-2017
0.75
Instrument Panel repair
Details

 03-11-2017
4.50
Bulkheads
Details

 03-06-2017
2.00
Trimmed Seatbacks and Backside IP layups
Details

 03-05-2017
6.00
Seat Back Backside layups
Details
       

 03-04-2017
3.00
Seat Backs
Details

 03-03-2017
2.00
Seat Backs
Details

 03-02-2017
1.00
Set Up Epoxy Pump
Details

 02-26-2017
4.00
Cut cloth and laid up seat backs
Details

 02-25-2017
1.50
F22, F28 Templates
Details

 02-25-2017
3.50
Cut out all the foam for fuselage bulkheads
Details
       

 02-24-2017
2.00
Instrument Panel Router Template
Details
     

 02-18-2017
5.00
LWA9 Wing Attach Bushings
Details

 02-11-2017
3.00
CS1 and CS1A Pushrod End Inserts
Details

 02-11-2017
2.00
Axle wheel spacers
Details

 12-02-2016
0.50
NG6A Clean Up
Details

 11-20-2016
2.00
Seat Belt Attach Angles
Details
     

 11-19-2016
0.75
Canopy C8 Angles
     










Copyright © 2001-2024 Matronics. All Rights Reserved.