LARRY'S WEB SITE
Work Logs Found: 890
Category Work Time: 2612 Hours
 Date
Hours
Work Log Summary

Details

 01-31-2020
5.00
Successful Completion of Airworthness Inspection
Details
     

 01-30-2020
5.50
Checked Aircraft For Correct Configuration
Details

 01-29-2020
2.10
Prepaired the Aircraft for Inspection
Details

 01-28-2020
2.20
Installed Leather Cover on Left Side Cockpit
Details
     

 01-27-2020
3.40
Safety Wired Five Turnbuckles Around Cockpit
Details

 01-14-2020
2.50
Completed the FAA Request for a Special Airworthin
Details

 01-04-2020
2.60
Mounted the Cowling - Finished Aircraft!!
Details
       

 12-29-2019
3.70
Secured Cockpit Side Panels
Details
     

 12-27-2019
3.50
Installed Front Cover on Fuselage
Details
     

 12-26-2019
2.20
Finished Forward Cover with Windshields
Details
       

 12-21-2019
2.30
Building Leather Cover for Right Side Panel
Details
     

 12-19-2019
1.10
Laced the Leather Cover on the Left Side Panel
Details

 12-18-2019
2.10
Installing Leather Edge Roll on Left Side Panel
Details
     

 12-14-2019
3.00
Installed the Leather Roll on the Front Cover
Details
     

 12-13-2019
1.80
Begin the Install of the Leather Roll on Front Cov
Details

 12-12-2019
2.10
Grommets Installed On Leather Covering
Details
     

 12-10-2019
2.10
Painted Windsceen Bases
Details
     

 12-08-2019
1.70
Cleaned Up Windscreens and Started on Cockpit Edge
Details

 12-07-2019
1.30
Secured Windscreens to Mount Base
Details

 12-04-2019
2.20
Completed Second Base for Windscreen
Details

 12-03-2019
2.10
Aircraft Windscreen Development
Details
     

 11-30-2019
2.80
Completed AOA Install and Calibration
Details
       

 11-29-2019
2.00
Fix Fuel Seep and Repositioned Left Brake Peddle
Details

 11-28-2019
0.90
Development of Windshield Mounting Base
Details

 11-27-2019
1.30
Tested the Instrument, Position and Landing Lights
Details

 11-27-2019
2.60
Mounted Bottom Wing Access Panels
Details
     

 11-26-2019
2.80
Installed Channel to Top Wing
Details
     

 11-24-2019
1.00
Taxi and Emergency Ignition Test
Details

 11-24-2019
1.60
Tail Wheel Adjustment and Installed the Remaining
Details

 11-21-2019
1.80
Completed Configuration of Left Brake Caliper
Details

 11-20-2019
2.80
Centered Caliper on Stator on Right Wheel
Details

 11-17-2019
3.10
Finished Install of Left Wing Gap Cover
Details
     

 11-16-2019
1.20
Replaced the ELT Battery and Completed Registratio
Details

 11-16-2019
3.10
Finished Top Right Wing Gap Cover Installation
Details

 11-15-2019
0.50
Oil Site Gage Vent
Details

 11-15-2019
3.20
Insrtalled Platform Over Bottom Wing
Details
     

 11-14-2019
0.50
Put Chain on Oil Cap
Details
     

 11-14-2019
2.10
Completed the Last Wing Gap Cover Strip
Details

 11-13-2019
0.70
Trouble Shooting AOA System
Details

 11-13-2019
1.80
Construction of a Wing Gap Cover Strip
Details
     

 11-10-2019
2.40
Good Engine Start and Successful Taxi Test
Details
     

 11-09-2019
2.70
Third Attemp at Taxi Testing
Details

 11-08-2019
2.60
Continued Safety Wiring of Turnbuckles
Details

 11-08-2019
1.10
Bled the Brakes Today
Details

 11-07-2019
2.70
Continued Safety Wiring of Turnbuckles
Details

 11-06-2019
4.10
Installed Wing Gap Cover and Safety Wired Turnbuck
Details
     

 11-04-2019
0.60
Trouble Shooting AOA System
Details

 11-04-2019
1.50
Finished Right Side Cross Cable and Tighten Turnbu
Details

 11-03-2019
1.20
Installed the Repaired AOA Display
Details

 11-03-2019
2.20
Finished Another Wing Gap Strip and Installed a Ey
Details
     

 11-02-2019
2.80
Full Power Run on Engine
Details
     

 11-01-2019
3.40
Lower Right Wing Gap Cover
Details
     

 10-31-2019
2.00
Adjusted the Calipers on the Brakes
Details

 10-29-2019
1.20
First Taxi Test
Details

 10-29-2019
1.80
Correction to Tail Wheel Mounting
Details

 10-27-2019
2.80
Finished the Installation of the New Tail Wheel
Details
     

 10-26-2019
1.80
Start on Installing New Tail Wheel Assembly
Details
     

 10-26-2019
1.60
Installed Jam Nuts and Cut First Wing Gap Strip
Details

 10-25-2019
1.10
Set Up for Taxi Testing
Details
     

 10-25-2019
1.20
Evaluation of Options for New Tail Wheel Install
Details

 10-25-2019
1.45
Conducted Fuel Flow Test
Details

 10-24-2019
2.80
Installed N number and Data Plate
Details
       

 10-23-2019
1.30
Painting the Patches on the Aircraft
Details

 10-23-2019
2.10
Connected Right Headset Plug, Added Labels on Inst
Details

 10-22-2019
0.50
Wiped Down the Seven Stripped Access Covers
Details

 10-22-2019
2.20
Removed AOA System to Return for Repair
Details

 10-20-2019
2.50
Fitting and Install Forward Fuselage Cover
Details
       

 10-20-2019
1.00
Calulated Weight and Balance/ Center of Gravity
Details

 10-19-2019
1.80
Weighted the Aircraft
Details
     

 10-19-2019
1.60
Installed New Master Soleniod
Details

 10-18-2019
1.30
Continued Installing Access Port Covers
Details

 10-17-2019
3.00
Continued Connections for 12V Accessory Plug
Details

 10-16-2019
0.80
Installed the Modified Aileron Tab on the Stick
Details

 10-16-2019
1.10
Installed 12 Access Covers on the Top Wing
Details
     

 10-16-2019
2.00
Continued Connections For 12V Accessory Plug
Details

 10-15-2019
2.00
Installed Accessory Power Plug Into Instrument Pan
Details
     

 10-15-2019
1.10
Added Plywood Slats to the Turtleback
Details

 10-14-2019
1.10
Starting Primer Painting of Fabric Access Covers
Details
     

 10-13-2019
0.80
Started Install of 12V Accessory Plug
Details

 10-13-2019
2.20
Continued Work on Aileron Alignment & Cables
Details

 10-12-2019
3.00
Installed Turnbuckle in Left Lower Aileron Cable
Details

 10-11-2019
2.30
Continued Trouble Shooting the AOA System
Details

 10-09-2019
1.10
Started on Setting Up the AOA System
Details

 10-09-2019
1.10
Installed the Outter Wheel Covers
Details
     

 10-09-2019
1.20
Applied Fabric Patches to Cable Opening
Details

 10-08-2019
3.70
Set Up Aileron Control Linkages
Details

 10-05-2019
3.40
Continued Rigging of Wings
Details

 10-04-2019
4.20
Finish Install of Lower Right Wing
Details
     

 10-03-2019
4.20
Completed Mounting of Lower Right Wing
Details

 10-02-2019
3.80
Started Mounting the Lower Right Wing
Details
     

 10-01-2019
3.00
Mounting of the Top Right Wing
Details
     

 09-30-2019
3.30
Completed the Mounting of the Lower Left Wing
Details
     

 09-29-2019
2.80
Continued Work on Mounting Lower Left Wing
Details

 09-27-2019
4.80
Continued Install on Lower Left Wing
Details
     

 09-26-2019
3.00
Mounted the Top Left Wing
Details
     

 09-24-2019
2.80
Air Speed Probe Installed and Top Left on Stand
Details
       

 09-23-2019
4.40
Installed AOA Signal Cable in Top Left Wing
Details
     

 09-19-2019
1.70
Moved Top Left Wing to Work Table
Details

 09-18-2019
2.40
Completed AOA Vane Wiring and Belly Patch
Details

 09-17-2019
3.20
Repaired Left Wing Stub Step and Mounted AOA Sende
Details
     

 09-16-2019
2.80
Shorten Front Cross Cables to Square Front Struts
Details

 09-15-2019
3.60
Completed the Air Tubes for A/S and Static
Details
       

 09-13-2019
4.60
Mounted the Center Wing Section on the Fuselage
Details
     

 09-11-2019
1.70
Replaced Copilot Intercom Switch and Mounted Belly
Details
     

 09-11-2019
2.00
Completed Painting of the Forward Cover, Side Pane
Details

 09-09-2019
1.00
Found and Repaired the Bad Connection on the Temp
Details

 09-09-2019
2.10
Continued Painting Forward Cover and Side Panels
Details
     

 09-02-2019
3.10
Start of Painting of Side Panels and Forward Fusel
Details
     

 09-01-2019
2.90
Tested the ELT and ADS-B Systems
Details

 08-31-2019
3.20
Install Ground Plane for ADS-B Antenna
Details
     

 08-30-2019
3.60
ADS-B and ELS Antenna Cables
Details
       

 08-29-2019
1.50
Installed the ADS-B Antenna
Details
     

 08-29-2019
2.20
Complete the Installation of the Oil Filler
Details

 08-28-2019
1.75
Oil Filler Hole in Forward Cover and ADS-B Antenna
Details
       

 08-28-2019
2.75
Completed Wiring of the ADS-B System
Details
     

 08-27-2019
3.00
Installing the Control Module for ADS-B System
Details
     

 08-26-2019
2.00
Finished Installing AOA Display on Instrument Pane
Details
     

 08-25-2019
2.50
Continued Work on AOA Wiring Harness
Details

 08-24-2019
3.30
Completed Wiring the AOA Display Plug
Details
     

 08-22-2019
1.80
Building Up AOA Wiring Harness
Details
     

 08-21-2019
2.00
Repair Left Wing Stub Step
Details

 08-21-2019
2.50
Repair Broken Wire on Temp Probe
Details
     

 08-20-2019
3.60
Wiring Harness for the G Meter/Clock
Details

 08-18-2019
1.10
Mounted the ELT
Details
     

 08-16-2019
2.50
Mounted G Meter into Instrument Panel
Details
     

 08-15-2019
3.10
Start the Install of the ADS-B System
Details
     

 08-14-2019
3.70
Fitting the Vane Mount to the Wing Strut
Details
     

 08-13-2019
3.20
Installed AOA Display Unit in Instrument Panel
Details
       

 08-10-2019
2.10
Evaluate Location for AOA Installation
Details
     

 08-09-2019
0.30
Received AOA Unit
Details

 08-08-2019
3.60
Programed Transponder and Radio Check
Details

 08-07-2019
2.80
Repaired Transponder Harness
Details

 08-06-2019
3.20
Picked Up Completed Cowling
Details
     

 08-04-2019
3.40
Moved the Blind Altimeter Mount
Details

 08-03-2019
3.20
Completed Transponder Wiring Harness
Details
     

 07-27-2019
3.30
Mounting of Transponder Case
Details
     

 07-23-2019
2.60
Finished the Power and Ground Wires On Transponder
Details
     

 07-22-2019
2.70
Changed Out Avionics 10 AMP CB For A 15 AMP
Details
     

 07-18-2019
2.00
Continued Work On Transponder Harness
Details

 07-17-2019
2.00
Wiring the Transponder Harness
Details
     

 07-15-2019
3.10
Continued Testing The Radio Wiring Harness
Details

 07-14-2019
2.30
Continued With the Installation of the Radio Harne
Details

 07-13-2019
2.20
Mounting the Blind Altimeter
Details
     

 07-12-2019
2.65
Construction of Blind Altimeter Mount
Details
     

 07-11-2019
3.50
Installing the Right Side Intercom PTT Switch
Details

 07-10-2019
3.40
Installed Lower Brace on Instrument Panel
Details
     

 07-09-2019
2.80
Construction of USB Power Supply and Instrument Pa
Details
     

 07-07-2019
1.50
Completed Forms 8050-1, 8050-2, and 8050-88
Details

 07-06-2019
3.40
Fitting Side Panels Radio Controls and Oil Filler
Details
       

 07-05-2019
3.80
Continued Working on VHF Radio Plug
Details
     

 07-04-2019
3.70
Installed Intercom PTT/Hot Switch
Details
       

 07-02-2019
2.90
Installed Music Input and Stick Yoke
Details
     

 07-01-2019
1.00
Replaced the Transponder Antenna Cable End With A
Details

 07-01-2019
3.20
Installed Wing Position Ligjhts
Details
     

 06-28-2019
2.00
Installed Position Light Plugs on Wing Ends
Details
     

 06-28-2019
4.60
Construction of the Stick Yoke
Details
     

 06-27-2019
1.00
Painted the Center Section Struts and Control Stic
Details

 06-27-2019
3.20
Installed the PTT Lines from the Control Stick
Details

 06-26-2019
3.20
Installed Lower Braces on Horizontal Stabilizer
Details
     

 06-24-2019
4.10
Final Installation of The Elevator
Details
     

 06-23-2019
2.70
Final Assembly of Horizontal and Vertical Stabiliz
Details
     

 06-20-2019
1.20
Started Mounting the Horzintial Stabilizer
Details

 06-20-2019
3.10
Continued Work on VHF Radio and Transponder Plugs
Details

 06-19-2019
3.40
Continued Work on Radio and Transponder Plugs
Details

 06-18-2019
2.90
Designed Push-to-Talk Wiring Tube
Details

 06-17-2019
3.50
Installed Gas Cap on Forward Fuselage Cover
Details
     

 06-16-2019
1.10
Installed Ribs in Forward Fuselage Cover
Details
       

 06-14-2019
1.60
Installed the Transponder Antenna on the Belly Pan
Details
     

 06-13-2019
0.60
Took the Cowling to Get a Vinyl Wrap
Details

 06-12-2019
3.80
Transponder Antennal and Insignia Instal
Details
       

 06-11-2019
2.60
Continued Wiring on the Radio Plug
Details
     

 06-10-2019
2.00
Starting Soldering the VHF Radio Plug
Details

 06-09-2019
1.80
Applied Primer to the Forward Fuselage Cover
Details
     

 06-08-2019
0.30
Tested Yoke Fitting on Stick
Details
       

 06-08-2019
1.40
Finished Labeling the Instrument Panel
Details

 06-06-2019
0.60
Cleared the Mounting Holes for Aft Cockpit Ring
Details

 06-04-2019
4.00
Installing Lables on the Instrument Panel
Details
       

 06-03-2019
1.80
Applied the Final Coat of Brown Paint on the Fusel
Details

 06-02-2019
2.00
Mounted VHF Radio in Instrument Panel
Details
     

 06-01-2019
3.80
Final Coat of Black and Brown Paint on Camouflage
Details

 05-31-2019
2.00
Painted a Second Coat of Black on the Fuselage
Details

 05-31-2019
1.50
Installing Landing Light Lens
Details
     

 05-29-2019
2.00
Rubbed Down The Fuselage with 3M Pad
Details

 05-29-2019
1.00
Installed the Antenna Lead in the Transponder Case
Details
     

 05-28-2019
3.70
Installed VHF Antenna and Beacon
Details
     

 05-27-2019
3.30
Completed Second Coat of Brown Paint
Details
     

 05-25-2019
3.80
Appling Second Coat of Camouflage Paint
Details
     

 05-24-2019
3.50
Completed the Camouflage Pattern on the Fuselage
Details
     

 05-22-2019
2.80
Finished the First Coat of Paint on the Fuselage
Details

 05-21-2019
2.40
Started Painting the Brown
Details
     

 05-20-2019
2.30
Sanded Light Brown Paint and Added Dark Green
Details
     

 05-19-2019
1.40
Added Light Brown Paint to the Fuselage
Details
     

 05-18-2019
0.60
Filed Request With FAA for Custom N Number
Details

 05-17-2019
2.30
Applied Sealing Coats to the Sides of the Fuselage
Details

 05-16-2019
3.20
Sanded the Bottom and Top of the Fuselage
Details
       

 05-13-2019
4.40
Painting Primer on Fuselage Bottom and Top
Details

 05-12-2019
2.30
Final Ironing of the Fuselage
Details

 05-11-2019
2.60
Finished Taping the Fuselage
Details
     

 05-10-2019
3.80
Continue To Tape The Fuselage
Details
     

 05-07-2019
3.60
Installing Fabric Tape to the Fuselage
Details

 05-06-2019
3.30
Glued Down the Right Side Top Fabric
Details
     

 05-04-2019
3.20
Installing Fabric on the Turtleback
Details
     

 05-03-2019
3.10
Installed Elevator Cable Fairings
Details
     

 05-01-2019
2.30
Finishing Fabric Around Landing Lights
Details
     

 04-30-2019
2.80
Installed Access Ports on Bottom of Fuselage
Details
     

 04-29-2019
3.10
Taped the Edges of the Wing Stubs
Details

 04-28-2019
3.10
Rivet Stitch Right Wing Stub
Details
     

 04-26-2019
4.00
Right Side Wing Stub Covering
Details
     

 04-25-2019
3.50
Completed First Ironing of Right Side Fuselage
Details
     

 04-24-2019
3.50
Covering Right Side of the Fuselage
Details

 04-22-2019
3.50
Rivet Stitched Bottom of Left Wing Stub
Details
       

 04-21-2019
2.50
Completed Covering Left Wing Stub
Details
       

 04-20-2019
2.00
Construction of Emergency Battery Case
Details
     

 04-19-2019
1.50
Fitting the Top Cover on the Left Wing Stub
Details
     

 04-18-2019
3.70
Covering the Left Wing Stub
Details
     

 04-17-2019
3.50
Ironed the Left Side Fabric
Details
       

 04-16-2019
3.00
Finished Gluing Up the Left Side Fuselage Covering
Details
     

 04-15-2019
2.50
Fiting the Fuselage Lift Side Fabric
Details
     

 04-11-2019
2.50
Ironed the Bottom Fabric on the Fuselage
Details
       

 04-07-2019
2.00
Final Fitting on Right Side Cockpit Plywood
Details
       

 04-06-2019
2.50
Installed Rudder Tail Light
Details
       

 04-05-2019
3.50
Continued Covering the Bottom of the Fuselage
Details
       

 04-03-2019
2.50
Started Covering the Bottom of the Fuselage
Details
     

 04-02-2019
3.00
Laid Out Fabric On Fuselage
Details
       

 04-01-2019
3.00
Wiring Inspection
Details
     

 03-29-2019
3.00
Installed Emergency Battery Wiring
Details
       

 03-28-2019
3.20
Continued Organization of Instrument Panel Wiring
Details

 03-27-2019
2.00
Worked on Organization of Instrument Panel Wiring
Details
     

 03-26-2019
3.70
Installed Right Wing Light Plug and Connect Light
Details

 03-25-2019
3.80
Installed Electric Plugs for Left Wing and Tail Li
Details
       

 03-24-2019
4.00
Tail Light and Beacon Wiring
Details
       

 03-23-2019
3.00
Scavenge Pump Engine Test Run
Details
     

 03-22-2019
2.50
Installed Air Filter and VHF Antenna Mount
Details
       

 03-21-2019
2.50
Completed Routing of Oil Scavenge Lines
Details
       

 03-20-2019
3.00
Removed Oil Scavenge Lines and Filter
Details
     

 03-19-2019
3.00
Second Engine Test Run and Connected Left Landing
Details
       

 03-18-2019
2.50
Wired Up the Right Landing Light
Details
       

 03-17-2019
2.20
Mounted Aft Ground Plane for VHF Antenna
Details
     

 03-16-2019
2.00
Final Brake Adjustment and Right Landing Light Ins
Details
     

 03-15-2019
2.00
Correct Caliper Fittings and Bleed Brake Lines
Details
     

 03-12-2019
3.50
Changed Oil Vent and Beacon Cutout
Details
     

 03-11-2019
4.00
Engine Full Power Test Run
Details

 03-10-2019
3.00
Addition of Mounting Tabs for Antenna Ground Plane
Details
       

 03-09-2019
2.50
Completed Installation of Right Landing Light
Details
     

 03-08-2019
2.00
Fixed a Fuel Seep and Put Brake Fluid in Left Brak
Details

 03-01-2019
2.00
Trim Strip for Left Landing Light
Details
     

 02-26-2019
2.50
Completed Installation of Flash Lube Kit
Details
     

 02-25-2019
3.50
Install Flash Lube Value Saver Kit
Details
     

 02-23-2019
2.50
Left Landing Light Bezel
Details
     

 02-22-2019
2.20
First Engine Start
Details
       

 02-21-2019
2.50
Removed and Installed Electric Fuel Pump
Details
     

 02-14-2019
2.50
Prime the Oil and Fuel Systems
Details
     

 02-13-2019
3.50
Pre-Oiling Engine
Details
       

 02-12-2019
3.00
Landing Light Trim and Engine Oil Prep
Details
     

 02-03-2019
1.50
Drilled Rivet Stitch Holes on Wing Stubs
Details

 02-02-2019
1.10
Setup Oil Accumulator Head Pressure
Details

 02-01-2019
1.50
Installed Landing Lights
Details
     

 01-31-2019
1.80
Landing Light Brackets
Details
     

 01-27-2019
2.20
Start of Electric Systems Testing
Details
     

 01-26-2019
2.50
Fuel Pressure Line and Test Install of Battery
Details
     

 01-22-2019
2.00
Corrected AMP Shunt Wiring
Details
       

 01-17-2019
2.00
Power Connections to Circuit Breakers
Details
     

 01-16-2019
3.50
Connected Main Ground and Ignition Power
Details
       

 01-10-2019
1.00
Completed the Starter Circuit
Details

 01-09-2019
2.00
Continued Wiring of the Instrument Panel
Details

 01-07-2019
2.00
Continued Wiring of Instrument Panel
Details

 01-06-2019
3.00
Continuing Connecting Engine Instruments
Details

 01-05-2019
3.50
Start Wiring From Firewall to Instrument Panel
Details
     

 01-04-2019
1.20
Secured Instrument Panel and Reconnected Wiring
Details
     

 01-03-2019
2.00
Initial Mount of Instrument Panel on Fuselage
Details
     

 01-02-2019
1.50
Mounting Transponder Case
Details
     

 12-28-2018
2.00
Transponder Opening on Instrument Panel
Details
     

 12-26-2018
0.60
Complete Anchor Strips on Second Lens
Details

 12-24-2018
1.30
Anchor Strip Installation on Landing Light Lens
Details
     

 12-23-2018
2.50
Installed Spacers on Brake Calipers
Details
       

 12-13-2018
2.60
Installed Wet Compass and IPad Holder
Details
       

 12-11-2018
1.50
Mounted the VSI and Altimeter Into Instrument Pane
Details

 12-10-2018
3.50
Installing Flight Instruments Into Pannel
Details
       

 12-09-2018
2.00
Mounting Emergency Power Diodes
Details
     

 12-08-2018
2.00
Installed the Light Controllers Mounting Shelf
Details
     

 12-06-2018
3.50
Installed Cockpit and Instrument Light Switches
Details
       

 12-04-2018
2.00
Install Light Controllers
Details
     

 12-01-2018
2.00
Mounted Terminal Blocks on Instrument Panel
Details
     

 11-24-2018
2.00
Installed Rheostat for Instruments Lights
Details
     

 11-23-2018
4.00
Power and Ground Wiring of Instruments
Details
     

 11-21-2018
2.00
Started Wire Labeling
Details

 11-19-2018
1.00
Wiring Instrument Lights Left Side
Details
     

 11-07-2018
2.00
Cut Out Left Landing Light Lens and Preped Washers
Details
     

 11-06-2018
1.20
Wing Stub Leading Edge Covering and Ground Plane
Details
       

 11-05-2018
2.00
Completed the Bottom Right Wing Including Insignia
Details
     

 11-04-2018
2.00
Completed Camouflage Painting on the Bottom Right
Details

 11-03-2018
3.00
Camouflage Painting on Bottom Right Wing
Details
     

 11-01-2018
2.00
Started Olive Painting on the Bottom Right Wing
Details
       

 10-31-2018
11.50
Kitlog Daily Work Entries
Details

 10-31-2018
2.00
Completed Camouflage Painting of Top Right Wing
Details
     

 10-30-2018
4.00
Olive and Green Camo Paint on Upper Right Wing
Details
     

 10-29-2018
4.00
Completed Camouflage Painting of Lower Left Wing
Details
     

 10-28-2018
3.00
Added the Green Camo Paint to the Bottom Left Wing
Details
     

 10-27-2018
4.00
Finished Camo Paint and Insignia on Top Left Wing
Details
       

 10-26-2018
2.75
Completed Camo Paint on Top Left Wing
Details
       

 10-25-2018
2.00
Form for Landing Light Lens and Lens
Details
       

 10-24-2018
2.50
Continued Camo Painting on Top Left Wing
Details
     

 10-23-2018
2.50
Start of Camo Painting of Top Left Wing
Details
     

 10-22-2018
3.00
Camo Painting on Center Wing Section
Details
     

 10-21-2018
1.00
Instrument Panel Wiring for Alternator Light
Details

 10-20-2018
2.50
Add Final Camo to Elevator and Horzontal Stabilize
Details
     

 10-19-2018
2.00
Landing Light Cutouts on Wing Stubs
Details
       

 10-17-2018
1.50
Installed TAC, Carb Heat, and AMP Meters
Details
       

 10-15-2018
5.00
Completed Access Panels on Wing Stubs
Details
     

 10-14-2018
3.00
Installing Engine Instrurments in Panel
Details
       

 10-13-2018
2.00
Continued Power Wiring and Shelf for Controllers
Details
     

 10-12-2018
2.00
Start of Power Connections from CB to Switches
Details
     

 10-10-2018
0.70
Added Landing Light Selector Switch
Details
     

 10-09-2018
1.00
Outer Wheel Covers Completed
Details
     

 10-08-2018
2.20
Painting the Black Border Around the Star
Details
     

 10-07-2018
1.00
Final Taping on Outer Wheel Cover
Details
     

 10-01-2018
1.00
Right Wing Stub Lower Access Panel
Details
     

 09-30-2018
13.00
Kitlog Daily Work Entries
Details

 09-30-2018
3.00
Finished Star on Outer Wheel Covers
Details
       

 09-29-2018
1.00
Outer Wheel Covers Red Centers Painting
Details

 09-28-2018
4.00
Installing Switches on to the Insturment Panel
Details
     

 09-27-2018
1.50
Add the Opening for the AMP Display
Details
       

 09-25-2018
2.00
Added Holes for the Volt Meter in the Insturment P
Details
       

 09-24-2018
2.20
Installed Brake Calapers on Aircraft Wheels
Details
       

 09-23-2018
2.00
Wheel and Brake Assembly
Details
     

 09-23-2018
1.00
Instrument Panel Cutout for Carb Heat Display
Details
     

 09-22-2018
3.50
Continuing the Painting of the Wheel Covers
Details
       

 09-21-2018
2.10
Painting Wheel Covers and Componets
Details
       

 09-18-2018
1.20
Started Tape Up of Outter Wheel Cover Design
Details
     

 09-17-2018
1.00
Access Panel for the Right Wing Stub
Details
     

 09-15-2018
0.50
Worked on Design for the Outter Wheel Covers
Details

 09-14-2018
2.20
Second Coat of Tan Paint on the Upper Left Wing
Details

 09-14-2018
0.80
Building Cross Members for the Wing Stubs
Details
     

 09-13-2018
4.00
Finish Coat of Tan Paint on the Top of the Upper L
Details
     

 09-12-2018
2.00
Finish Coat of Primer on Bottom of Upper Left Wing
Details
     

 09-11-2018
4.00
Started Sanding on the Upper Left Wing
Details
     

 09-10-2018
5.50
First Coat of Tan Finish on Bottom Left Wing
Details
     

 09-09-2018
1.00
Continued Layout of Instrument Panel Switches
Details
       

 09-08-2018
3.00
Started Sanding the Lower Left Wing Bottom
Details
     

 09-07-2018
1.30
Compass Install into Instrument Panel
Details
     

 09-06-2018
3.00
Second Coat of Tan Paint on Ailerons and Center Wi
Details

 09-05-2018
3.50
First Coat of Finish on Ailerons and Center Wing S
Details
       

 09-04-2018
3.50
Sanding and Primer Painting the Bottom of the Aile
Details
     

 09-03-2018
3.00
First Finish Coat on Horizontal and Vertical Stabi
Details
     

 09-02-2018
3.50
Finished Rudder and Sanding on Elevator
Details
       

 08-31-2018
4.00
Sanding and Painting the Left Side of the Rudder
Details
     

 08-31-2018
13.00
Kitlog Daily Work Entries
Details

 08-30-2018
3.25
Finish Paint on the Upper Right Wing
Details

 08-29-2018
0.50
Varnished the New Cutouts on the Cockpit Sides
Details

 08-28-2018
4.50
Final Coat for the Bottom of the Upper Right Wing
Details
     

 08-27-2018
4.00
Finish Basic Paint on Lower Right Wing
Details
     

 08-25-2018
4.00
Finish Paint on Right Half of the Rudder
Details
     

 08-24-2018
2.00
Sanding on the Lower Right Wing
Details
     

 08-23-2018
3.75
Sanding on the Rudder and Lower Right Wing
Details

 08-22-2018
1.75
Start of Finish Painting on the Rudder
Details
     

 08-21-2018
3.00
Start of Rudder Stripes and Final Primer on Center
Details
     

 08-21-2018
1.00
Drilled Holes for Aileron Cables in Cockpit Sides
Details
       

 08-20-2018
2.50
Finished Primer Painting on the Lower Left Wing
Details
     

 08-19-2018
4.00
Finished the Primer Painting of the Top of the Low
Details

 08-17-2018
2.50
Finished Two Coats Primer on Lower Left Wing
Details
     

 08-14-2018
2.30
Primer Painting the Lower Left Wing Bottom
Details
     

 08-12-2018
3.00
Fitting the Left Cockpit Side Panel
Details
     

 08-11-2018
4.00
Painting the Lower Left Wing
Details
       

 08-10-2018
3.00
Ironed the Top of the Lower Left Wing
Details

 08-09-2018
3.00
Applied Third Coat of Primer on Bottom of Lower Ri
Details
     

 08-08-2018
4.00
Third Coat of Primer on Lower Right WingTop
Details

 08-07-2018
3.00
Primer Painting on the Bottom of the Lower Right W
Details
     

 08-06-2018
2.50
Installation of Step on Left Wing Stub
Details
       

 08-06-2018
3.50
First Coat of Primer on the Bottom Right Wing Top
Details
     

 08-05-2018
2.00
Building Forward Brace for Left Wing Stub Step
Details
     

 08-04-2018
5.00
Rolled and Tipped Horizontal Stab and Center Wing
Details
       

 08-03-2018
4.50
Roll and Tip Primer Painting on Ailerons
Details
     

 08-01-2018
5.00
Two Coats of Primer Applied to Horizonal Stab
Details
     

 07-31-2018
3.00
Sanding the Bottom of the Upper Right Wing
Details
     

 07-31-2018
12.00
Kitlog Daily Work Entries
Details

 07-30-2018
1.30
Fairing for the Elevator and Rudder Cables
Details
       

 07-29-2018
3.00
Start of Sanding of Upper Right Wing
Details
     

 07-28-2018
4.00
Primer Paint on the Top of the Upper Right Wing
Details

 07-27-2018
3.50
Primer Painting of the Upper Right Wing Bottom
Details
     

 07-26-2018
3.00
Primer Painting of Lower Ailerons
Details

 07-24-2018
2.50
Primer Painting on Upper Right Aileron
Details
     

 07-23-2018
5.00
Painting of Vertical Stab and Prep on Ailerons
Details
       

 07-22-2018
4.00
Primer Paint on Elevator and Rudder
Details
     

 07-17-2018
3.00
Start of Elevator Painting
Details
     

 07-16-2018
4.00
Finished Two Coats Primer on Center Wing Section
Details
     

 07-15-2018
4.00
Started Painting the Center Section of the Wing
Details
     

 07-13-2018
3.00
Initial Sanding of Upper Left Wing
Details

 07-11-2018
3.00
Primer Painting of Bottom of the Upper Left Wing
Details
     

 07-10-2018
4.00
Two Coats Primer on Top Upper Left Wing
Details
     

 07-09-2018
2.00
Painting of the Bottom of the Belly Pan
Details
       

 07-08-2018
3.50
Wing Stub Leading Edges
Details
       

 07-07-2018
0.50
Punched TAC Instrument Hole in the Panel
Details
     

 07-06-2018
1.50
Second Coat of Paint on Inside Wheel Covers
Details

 07-05-2018
3.50
Inside Wheel Covers Mods and Painting
Details
       

 07-03-2018
2.00
Right Wing Stub Rib Bracing
Details
     

 07-02-2018
1.00
Purchase of Anti Collision Light
Details
     

 07-02-2018
2.75
Finished the Wing Stub Trailing Edges
Details
     

 07-01-2018
3.00
Wing Stub Trailing Edge Brackets
Details
       

 06-30-2018
10.50
Kitlog Daily Work Entries
Details

 06-30-2018
1.00
Applied a Coat of Varnish on Instrument Panel
Details

 06-29-2018
4.00
Install Access Ports on Bottom of Upper Left Wing
Details
     

 06-28-2018
3.80
Completed Rivet Stitching the Top of the Upper Lef
Details
       

 06-27-2018
1.00
Bending Trailing Edge for Wing Stubs
Details

 06-26-2018
2.00
Start of Rivet Stitching on Top of Upper Left Wing
Details

 06-24-2018
3.20
Fabric Taping of the Bottom of the Upper Left Wing
Details
     

 06-21-2018
3.00
300 Degree Ironing of the Upper Left Wing
Details
     

 06-19-2018
3.00
250 Degree Ironing of the Upper Left Wing
Details
     

 06-18-2018
4.00
Covering the Top of the Upper Left Wing
Details
       

 06-16-2018
2.00
Start of Instrument Panel Hole Punches
Details
     

 06-15-2018
1.50
Completed the Bottom Covering of the Upper Left Wi
Details

 06-14-2018
3.00
Covering the Bottom of the Upper Left Wing
Details

 06-13-2018
2.50
Continued Prep on Upper Left Wing for Covering
Details
     

 06-12-2018
4.00
Prep on the Upper Left Wing for Covering
Details
       

 06-11-2018
4.00
Completed Covering of the Upper Right Wing
Details
     

 06-08-2018
1.00
Installed Tubes for Pitot and Control Cable Faring
Details
       

 06-08-2018
3.00
Fabric Tape on Bottom of Upper Right Wing
Details
     

 06-07-2018
1.20
Production of Control Cable Faring
Details
     

 06-05-2018
0.50
Control Cable Faring Cover Male Form
Details
     

 06-04-2018
3.50
Pop Rivet Stitching Top of the Upper Right Wing
Details
       

 06-03-2018
3.00
300 Degree Ironing of Upper Right Wing
Details
     

 05-31-2018
2.00
250 Degrees Ironing of the Upper Right Wing
Details

 05-30-2018
12.50
Kitlog Daily Work Entries
Details

 05-30-2018
2.50
Covered the Top of the Upper Right Wing
Details
     

 05-29-2018
4.00
Prep of the Top of the Upper Right Wing
Details
       

 05-27-2018
5.00
Covered the Bottom of the Upper Right Wing
Details

 05-26-2018
1.00
Start of Upper Right Wing Covering Prep
Details
       

 05-26-2018
3.00
Finished Center Wing Section Installed Access Hole
Details
     

 05-25-2018
4.00
Installation of Access Holes on Center Wing Sectio
Details
     

 05-24-2018
4.30
Rivet Stitched Bottom of Center Wing Section
Details
       

 05-21-2018
5.00
Top Covering Center Section of the Wing
Details
       

 05-20-2018
3.25
Covered Bottom of Center Wing Section
Details

 05-18-2018
3.20
Start Prep of Center Wing Section
Details
     

 05-17-2018
2.50
Fixing the Interfacing Between the Center and Righ
Details
     

 05-17-2018
1.00
Finished Lower Left Wing Patch and Racked It
Details
     

 05-16-2018
3.00
Fix End Rib of Lower Left Wing
Details
       

 05-15-2018
0.30
Weldment for Aft Stub Edge Attachment
Details

 05-14-2018
3.50
Finished the Top of the Lower Left Wing
Details
     

 05-13-2018
2.00
Start Rivet Stitch Top Lower Left Wing
Details
     

 05-12-2018
2.00
Inspection Ports on Bottom Lower Left Wing
Details
     

 05-11-2018
4.00
Rivet Stitched Bottom of Lower Left Wing
Details
     

 05-08-2018
5.00
Installed the Top Fabric on the Lower Left Wing
Details
     

 05-07-2018
3.00
250 Degree Ironing of Bottom Fabric Lower Left Win
Details
     

 05-04-2018
3.00
Covered the Bottom of the Lower Left Wing
Details
     

 05-03-2018
2.30
Continued Work on Covering Lower Left Wing
Details
     

 05-02-2018
3.50
Finished Prep Work for Covering on Lower Left Wing
Details
       

 05-01-2018
4.20
Start Prep on Lower Left Wing for Covering
Details
       

 04-30-2018
9.50
Kitlog Daily Work Entries
Details

 04-30-2018
3.60
Finished the Covering of the Lower Right Wing
Details
     

 04-29-2018
3.80
Pop Rivet Stitching of Bottom Lower Right Wing
Details
     

 04-28-2018
6.00
Completed the Top of the Lower Right Wing
Details
       

 04-26-2018
3.00
Pop Rivet Stitch on Top Lower Right Wing
Details
       

 04-24-2018
3.50
250 Degree Ironing of Top Lower Right Wing
Details
     

 04-20-2018
3.00
Covering the Top of the Lower Right Wing
Details
     

 04-19-2018
3.50
Continuing Covering of Lower Right Wing
Details
       

 04-18-2018
4.50
Covering the Bottom of the Lower Right Wing
Details
     

 04-16-2018
5.00
Prep of Lower Right Wing for Covering
Details
       

 04-10-2018
0.50
Finished the Veneer on the Instrument Panel
Details
     

 04-09-2018
4.00
Start of Lower Right Wing Prep for Covering
Details
       

 04-08-2018
2.00
Removed Center Wing Section for Covering
Details
     

 04-07-2018
3.00
Removed Wings for Covering
Details
     

 04-06-2018
2.50
Horizontal Stabilizer Control Cable Penetrations
Details
       

 04-06-2018
1.00
Construction of Wing Racks
Details
     

 04-05-2018
2.50
Control Cable Paths Through the Horizontal Stabili
Details
     

 04-04-2018
2.50
Finished Covering the Top Left Aileron
Details
     

 04-03-2018
3.00
Covering the Top Left Aileron
Details
       

 04-02-2018
5.70
Finished Covering the Lower Left Aileron
Details
     

 03-31-2018
0.50
Veneer on Instrument Panel
Details
     

 03-31-2018
14.00
Kitlog Entries for March
Details

 03-30-2018
3.00
Covering of Lower Left Aileron
Details
       

 03-29-2018
2.00
Covering of the Lower Left Aileron
Details
     

 03-28-2018
3.00
Started Covering the Lower Left Aileron
Details
       

 03-27-2018
3.00
Finished the Top Right Aileron
Details
       

 03-26-2018
3.50
Covering of the Top Right Aileron
Details
     

 03-24-2018
4.00
Finished Covering the Lower Right Aileron
Details
       

 03-23-2018
3.30
Continuing Covering of Lower Right Aileron
Details
       

 03-22-2018
3.50
Finished Horizontal Stabilizer and Worked Lower Ri
Details
       

 03-19-2018
3.20
Start of Covering on Lower Right Aileron
Details
       

 03-18-2018
4.25
Continued Work on Horizontal Stabilizer
Details
     

 03-17-2018
4.75
Started Covering the Horizontal Stabilizer
Details
       

 03-16-2018
2.50
Mounted Aft Right Wing Sturt
Details
       

 03-15-2018
2.50
Wood Veneer Installation on Insturment Panel
Details
     

 03-14-2018
2.50
Installed the Right Forward Wing Strut
Details
       

 03-13-2018
1.00
Fish Mouth Plugs For Right Wing Struts
Details
     

 03-12-2018
2.00
Continued Work on Right Wing Struts
Details

 03-11-2018
2.00
Rebuilding Right Wing Struts
Details

 03-10-2018
2.50
Left Wing Forward Strut Installation
Details
     

 03-09-2018
2.50
Left Wing Froward Strut
Details
     

 03-08-2018
2.50
Left Wing Struts Reset
Details

 03-07-2018
4.50
Completed Covering the Elevator
Details
     

 03-06-2018
4.50
Elevator Covering Continues
Details
       

 03-05-2018
4.00
Continued Covering Left Side of Elevator
Details

 03-04-2018
2.50
Finished Vertical Stabilizer and Continued Elevato
Details
       

 03-03-2018
5.00
Covering of Vertical Stab and Elevator
Details
       

 03-02-2018
2.00
Start of Covering of the Vertical Stabilizer
Details
       

 03-01-2018
2.50
Full Tension on Rudder Fabric and Pop Rivet Stitch
Details
     

 02-28-2018
7.50
Kitlog Daily Work Entry
Details

 02-26-2018
3.00
Continued Work on the Right Side of the Rudder
Details
     

 02-25-2018
3.00
Covering of Right Side of the Rudder
Details
     

 02-23-2018
4.00
Covered the Left Side of the Rudder
Details
     

 02-18-2018
1.50
Evaluated the Fabric Glue
Details

 02-17-2018
4.00
Final Aileron Cable Adjustments and Rudder Prep
Details
       

 02-17-2018
1.00
Cable Penetrations of Fabric Locations
Details
     

 02-16-2018
3.00
Installed a Third Hinge on Each Lower Aileron
Details
       

 02-15-2018
2.50
Right Wing Lift and Drag Cable Rigging
Details
       

 02-14-2018
0.50
Wing Tip Light Bracket Fillit Blocks
Details
       

 02-14-2018
2.00
Left Wing Lift and Drag Cable Rigging
Details
       

 02-13-2018
2.50
Left Forward Lift and Drag Cable Rigging
Details
       

 02-12-2018
3.50
Removed Lower Ailerons For Adding Third Hinge
Details

 02-09-2018
1.50
Diagramed Electric Circuits for Fuse Requirements
Details

 02-08-2018
1.20
Wing Tip Filler Block Design and Left Wing Cabling
Details

 02-07-2018
3.25
Rigging the Right Wing Lift Cables
Details
       

 02-05-2018
3.50
Left Wing Lift Cables
Details
       

 02-04-2018
4.25
Kitlog Work Entry
Details

 02-02-2018
2.00
Rigging of the Left Wing
Details

 01-31-2018
10.00
Work Descriptions Written Into KitLog
Details

 01-31-2018
1.00
Weight of the Aircraft
Details
     

 01-31-2018
2.00
Left Wing Front Lift Cable Installation
Details
       

 01-30-2018
2.50
Left Wing Stub Ribs
Details
     

 01-29-2018
3.00
Left Wing Inter Rib Install
Details
       

 01-28-2018
2.50
Right Wing Stub Ribs
Details
       

 01-27-2018
3.00
Wing Stub Ribs Right Side
Details
       

 01-26-2018
4.00
Right Wing End Rib Install
Details

 01-25-2018
3.00
Aileron Cable Guide Installation
Details

 01-24-2018
2.50
Aileron Crossover Cable Center Shim
Details
     

 01-21-2018
1.50
Precovering Inspection
Details

 01-21-2018
0.50
Another Crossover Cable Bracket Design
Details

 01-19-2018
2.50
Continued Design on Crossover Cable Pulley
Details
     

 01-13-2018
2.00
Aileron Crossover Cable Pulley Design
Details
     

 01-12-2018
1.50
Aileron Cable Routing
Details
     

 01-11-2018
1.50
Installing Tyedown Straps
Details
     

 01-10-2018
5.00
Pitot Tube, Aileron Cable Pulleys, and Tyedown Str
Details
       

 01-09-2018
2.00
Pitot Bracket Shims and Off Set Pulleys
Details
       

 01-08-2018
3.00
Wing Corner Bracing and Cable Shims
Details
       

 01-04-2018
1.50
Installed the Covering on the Work Tent
Details

 01-04-2018
1.00
Control Assembly Modification for Aileron Control
Details
       

 01-02-2018
3.00
Set Up Work Tent in the Hanger
Details

 12-31-2017
9.00
Work Descriptions Written Into KitLog
Details

 12-21-2017
1.30
Control Stick Modification for Aileron Control
Details

 12-20-2017
2.50
Wing Corner Bracing and Aileron Cable Rigging
Details

 12-18-2017
2.00
Interconnecion oft the Ailerons
Details
       

 12-17-2017
2.00
Aileron Linkage and Corner Bracing
Details
       

 12-16-2017
3.50
Top Wing Tip Bracing
Details
       

 12-15-2017
3.00
Right Wing Tip Bracing and Aileron Cabling
Details
       

 12-14-2017
2.00
Aileron Cable Fitting
Details

 12-12-2017
3.50
Aileron Cabling Rigging Third Try
Details
     

 12-11-2017
4.50
Aileron Cable Pulley Fitting
Details

 12-09-2017
2.50
Aileron Pulley Configuration Change
Details
       

 12-08-2017
2.00
Installed Aileron Crossover Cable
Details
       

 12-08-2017
0.65
Designer Precovering Inspection
Details

 12-07-2017
3.00
Installed Right Outer Wing Strut Cross Cables
Details

 12-06-2017
2.00
Checking Wing Configuration and Bracing
Details
       

 12-05-2017
2.50
Rigging the Left Wing
Details
       

 12-04-2017
3.00
Left Wing Outer Sturts and Wing Alignment
Details
       

 12-02-2017
1.20
Stand for Instrument Panel
Details

 12-01-2017
4.00
Mounting Left Wings
Details
       

 11-30-2017
2.50
Work Descriptions Written Into KitLog
Details

 11-14-2017
3.50
Initial Rigging of the Right Wing
Details
     

 11-13-2017
3.80
Mounted Top of Right Wing Outer Struts
Details
       

 11-12-2017
4.50
Mounting the Right Outer Wing Struts
Details
       

 11-08-2017
1.30
Cross Brace Tabs Added to Right Outer Wing Support
Details

 11-02-2017
2.30
Construction of Outter Wing Struts
Details
     

 10-31-2017
7.50
Work Descriptions Written Into KitLog
Details

 10-31-2017
5.80
Fitting Lower Right Wing and Ground Cables
Details

 10-25-2017
1.50
Installed Ends on Outer Wing Support Struts
Details

 10-20-2017
2.00
Reinstalled Bungee Cords on each Axle.
Details

 10-18-2017
4.50
Mounting the Right Wings
Details
     

 10-14-2017
3.50
Sanded and Applied Finish Coat to Cockpit Sides
Details
     

 10-12-2017
2.80
Painting Wheel Disk with Primer
Details
     

 10-08-2017
4.00
Seat Throttles and Belly Pan
Details
       

 10-07-2017
3.50
Prepaired the Airframe for Move to the Hanger
Details

 10-06-2017
3.00
Belly Pan Final Trim and Installation
Details

 10-05-2017
2.70
Reinstalled the Throttles and Belly Pan Installati
Details
     

 10-05-2017
1.50
Kitlog Daily Work Entry
Details

 10-04-2017
2.40
Painted the Throttles and Initial Fitting of the B
Details

 10-03-2017
1.00
Kitlog Daily Work Entry
Details

 10-03-2017
1.75
Completed the Starter Connectioins and Fuel Drain
Details
     

 10-02-2017
2.20
Kitlog Work Entry
Details

 10-02-2017
2.50
Installing Engine Componets and Starter
Details
       

 10-02-2017
1.50
Installation of the Copper Fuel Line and Drain
Details
     

 10-01-2017
4.50
Reinstall Fuel Tank and Ready Engine
Details
       

 09-30-2017
8.50
Work Descriptions Written Into KitLog
Details

 09-30-2017
1.30
Throttle and Mixture Cable Clamps
Details
     

 09-28-2017
1.50
Installed Cable Clamps in the Engine Bay
Details

 09-27-2017
1.00
Installed the Six Grade 8 3/8 inch bolts on the Pr
Details

 09-26-2017
2.80
Installation of the Mixture Control Cable
Details
       

 09-25-2017
0.80
Kitlog Daily Work Entry
Details

 09-25-2017
2.00
Installed Primer Control Cable
Details
     

 09-24-2017
1.20
Kitlog Work Entries for the 22th & 23
Details

 09-24-2017
2.50
Forward Fuselage Cover Front Mounting Holes
Details
     

 09-23-2017
1.20
Painting the lower frame of the instrument pannel
Details
     

 09-23-2017
2.40
Installing Clamps to Protect the Oil Lines
Details
     

 09-22-2017
1.00
Test Mount on the Prop
Details
     

 09-21-2017
1.00
Kitlog Entries for the 19th and 20th
Details

 09-20-2017
1.00
Modification of the Left Throttle Mounting
Details
     

 09-20-2017
0.50
Kitlog Entry for Daily Work
Details

 09-20-2017
3.50
Completed Installation of the Right Throttle
Details
       

 09-19-2017
2.50
Right Throttle Design
Details

 09-18-2017
3.50
Completed Installation of Left Throttle
Details
     

 09-17-2017
1.00
Kitlog Daily Work Entry
Details

 09-17-2017
2.00
Added Secondary Firewall Terminal Block
Details
       

 09-13-2017
1.25
Kitlog Daily Work Entries for 10,11,12
Details

 09-12-2017
2.00
Firewall TopTerminal Blocks
Details
       

 09-11-2017
0.50
Mounted Lower Ground Buss
Details
     

 09-10-2017
0.70
Wiring for the Electric Fuel Pump
Details
     

 08-31-2017
21.00
Work Descriptions Written Into KitLog
Details

 08-29-2017
0.30
Kitlog Daily Work Entry
Details

 08-29-2017
0.70
Construction of the Throttle Back Plate
Details

 08-28-2017
0.75
Left Throttle Assembly Drilling
Details
     

 08-28-2017
0.40
Kitlog Daily Work Entry
Details

 08-27-2017
0.50
Wiring the Electric Scavenging Pump
Details
     

 08-26-2017
1.50
Replaced the Throttle Cable
Details

 08-26-2017
0.50
Kitlog Daily Work Entry
Details

 08-25-2017
0.75
Installed Anchor Nuts on Bottom of Instrument Pane
Details

 08-25-2017
0.75
Built Up Red Battery Cable & Terminated the Altern
Details

 08-24-2017
0.60
Kitlog Daily Work Entry
Details

 08-24-2017
2.50
Final Engine Electrical Wiring
Details
     

 08-22-2017
1.00
Kitlog Daily Build Entry
Details

 08-22-2017
3.00
CHT & EGT Prob Wiring
Details
       

 08-22-2017
1.50
Cable Clamps and Alternator Wiring
Details
       

 08-21-2017
1.25
Mounted Anchor Nuts for Instrument Panel
Details
     

 08-21-2017
2.00
Main Buss Connections
Details
       

 08-18-2017
0.50
Kitlog Daily Entry
Details

 08-18-2017
1.20
Installing the Starter Power Cable
Details
       

 08-17-2017
2.50
Mounted Solenoid, Fuses, and Shunt Assembly
Details
       

 08-17-2017
1.10
Kitlog Daily Entry
Details

 08-17-2017
2.50
Grounding the Fuselage and Engine
Details
       

 08-16-2017
0.50
Layout of the Throttle Quadrant
Details
     

 08-16-2017
1.00
KitLog Entry for Today
Details

 08-16-2017
0.75
Completed Two Wing Ribs for the Stubs
Details
     

 08-16-2017
1.20
Amp Meter Shunt Installed & Design Issues
Details
     

 08-15-2017
0.75
Kitlog Daily Entries
Details

 08-15-2017
2.00
Ingnition Wiring Installation
Details
       

 08-13-2017
1.00
Solenoid and Fuse Link Connection
Details
     

 08-13-2017
1.25
Kitlog Daily Entries
Details

 08-13-2017
1.00
Firewall Pass-Through for Electrical Wiring
Details
     

 08-12-2017
0.75
Throttle Cable Through the Firewall
Details
       

 08-12-2017
0.50
Oil Accumulator Control Cable Installation
Details
       

 08-12-2017
1.50
Kitlog Daily Entries
Details

 08-12-2017
0.75
Installed the CHT Probe
Details
     

 08-11-2017
3.50
Wing Ribs for the Wing Stubs
Details
       

 08-11-2017
0.75
Kitlog Daily Entry
Details

 08-11-2017
0.50
Installed the Mixture Control Cable Firewall Pass-
Details
     

 08-10-2017
1.50
Mixture Cable Mounting Bracket
Details
     

 08-10-2017
0.40
Kitlog Daily Entries
Details

 08-10-2017
2.00
Initial Electric Wiring Design Efforts
Details
     

 08-09-2017
3.20
Throttle Cable Attachment & Reconnect Lines
Details
       

 08-09-2017
0.40
Remounted the Left and Right Master Cylinders
Details
     

 08-08-2017
3.50
Finished Up Wing Stubs
Details
       

 08-08-2017
2.50
Carburetor Linkages and EGT Weldment
Details
       

 08-07-2017
5.00
Welded up the Aft Wing Stub
Details
     

 08-07-2017
0.50
Mounted the Engine Coils
Details
     

 08-06-2017
4.00
Continued Welding on Wing Stubs
Details
       

 08-05-2017
5.75
Wing Stub Construction
Details
       

 08-04-2017
3.50
Construction of the Wing Stub Spars
Details
       

 08-03-2017
3.00
Design Wing Stubs and Start Construction
Details
     

 08-02-2017
1.00
Firewall Pass Through and Engine Electronics
Details
     

 08-02-2017
5.50
Finish Cowling
Details
       

 08-02-2017
0.75
Drilled Holes on Instrument Panel for Cable Mounts
Details
     

 08-01-2017
1.50
Mounting for the Engine Coils
Details
       

 07-31-2017
8.00
Work Descriptions Written Into KitLog
Details

 07-30-2017
0.50
Installed Oil Vent Line
Details
     

 07-30-2017
3.00
Installed Anchor Nuts on Lower Instrument Pannal
Details
     

 07-29-2017
1.00
Picked up Prop from Culver Propellers
Details
     

 07-25-2017
1.50
Searching for Parts at AirVenture
Details

 07-20-2017
1.00
Lower Flange for Instrument Panel
Details
     

 07-18-2017
2.75
Installing Oil Lines Behind the Firewall
Details
       

 07-17-2017
0.50
Install Electric Fuel Pump Vertical
Details
     

 07-13-2017
3.00
Welding Battery Bottom, Fuel Pump Bracket & Tabs
Details
       

 07-12-2017
0.50
Carburetor Fuel Bypass Line Installed to Firewall
Details
     

 07-07-2017
1.50
Mounting Flang for Electric Fuel Pump
Details
     

 07-07-2017
1.50
Electric Scavenge Pump Input
Details
     

 07-05-2017
4.00
Oil Lines at the Firewall
Details
       

 07-04-2017
2.50
Reposistioned the Battery Box
Details
     

 07-03-2017
0.50
Safety Wired Engine Mounting Bolts
Details
     

 07-02-2017
5.00
Battery Box Top Completion
Details
     

 07-01-2017
6.50
Electric Scav Pump and Battery Box Top Continued
Details
       

 06-30-2017
7.50
Work Descriptions Written Into KitLog
Details

 06-30-2017
2.50
Oil Sump Vent Line and Battery Box Base
Details
       

 06-30-2017
3.00
Battery Box Top Constriction
Details
     

 06-29-2017
3.25
Oil Tank Fittings & Battery Box Construction
Details
       

 06-28-2017
4.75
Oil Tank Mounting Bracket and Carb Air Filter
Details
       

 06-28-2017
1.00
Fuel Tank Test Fill and Flow Rate
Details

 06-27-2017
4.00
Main Fuel Line Installation From Fuel Filter
Details
       

 06-20-2017
6.00
Continued Cowling Assembly
Details
       

 06-19-2017
2.00
Mounting Bolts for Air Filter Assembly
Details
     

 06-14-2017
4.00
Engine Cowling Initial Test Fitting
Details
       

 06-13-2017
3.50
Construction of Cowling Top
Details
       

 06-12-2017
4.75
Forming the Front of the Cowling
Details
       

 06-11-2017
2.00
Installed Anchor Nuts in place of Clip-Nuts
Details
       

 06-11-2017
1.80
Gasalator and Seat Belts
Details
       

 06-10-2017
3.80
Inline Oil Filter and Fuel Solenoids
Details
       

 06-07-2017
0.50
Mounted Engine Coils
Details
     

 05-31-2017
4.00
Work Descriptions Written Into KitLog
Details

 05-08-2017
6.50
Forward Fuselage Covering
Details
       

 05-07-2017
2.00
Instrument Panel lower anchors
Details
       

 05-06-2017
0.50
Bypass Design for Carb Heat Oil Cooler
Details
     

 05-05-2017
2.00
Issue with Center Wing Section
Details

 05-04-2017
3.50
Install Instrument Panel Lower Mount Bracket
Details
     

 05-03-2017
3.00
Aft Cockpit Trim
Details
     

 05-02-2017
3.00
Fitting the Aft Cockpit Cover
Details
     

 05-01-2017
4.00
Installing the Oil Accumulator
Details
       

 04-30-2017
3.00
Storage Brackets and Instrument Panel Layout
Details
       

 04-29-2017
2.50
Stained the Cockpit Plywood Panels
Details
     

 04-29-2017
1.00
Design of Emergency Fuel Shutoff Bracket
Details
     

 04-28-2017
2.40
Gascolator Brackit Construction
     

 04-27-2017
2.90
Mounted the Engine Oil Filter Assembly and Cockpit
       

 04-26-2017
4.20
Completed Seat Belt Installation
     

 04-23-2017
4.20
Begin Installation of Seat Belts
     

 04-21-2017
3.80
Tuttleback Installation and Storage Compartment Si
     

 04-20-2017
2.80
Construction of Storage Compartment
     

 04-18-2017
4.20
Construction of Cockpit Seat
       

 04-12-2017
3.80
Verified Engine Mounting Angle
     

 04-11-2017
3.60
Continued With Engine Install
     

 04-10-2017
3.80
Installed Engine Mount Bolts
       

 04-09-2017
5.30
Installed the Engine Mount and Engine
       

 04-07-2017
4.10
Completed the Framing of the Top Right Wing
     

 04-04-2017
4.20
Install Trailing Edge on Top Right Wing
       

 03-08-2017
4.00
Top Right Wing Tip Install
     

 03-05-2017
3.50
Starting Install of Aileron on Top Right Wing
       

 03-04-2017
2.80
Installing Leading Edge on Top Right Wing
     

 03-02-2017
4.00
Continued Installing Ribs on Top Right Wing
     

 03-01-2017
3.60
Installing Ribs on Top Right Wing
     

 02-28-2017
5.00
Installing Ribs on Top Right Wing
     

 02-27-2017
4.60
Wing Spar Configurations Top Right Wing
       

 02-25-2017
4.00
Aileron Cut Out on Lower Right Wing
     

 02-24-2017
3.40
Installing Rips on Lower Right Wing
     

 02-23-2017
3.30
Installed Leading Edge on Lower Left Wing
     

 02-21-2017
2.90
Lower Left Wing Rib Installation
     

 02-20-2017
4.20
Construction of Lower Left Wing
       

 02-19-2017
3.50
Initial Fitting of the Engine Mount
     

 02-16-2017
2.30
Rotec R3600 Removed from Crate
     

 02-15-2017
2.30
Finished Top Left Wing
     

 02-14-2017
4.30
Installing Aileron on Top Left Wing
       

 02-10-2017
3.60
Completed Installing Top Left Wing Ribs
     

 02-09-2017
3.40
Installing Wing Ribs Top Left Wing
     

 02-07-2017
3.80
Started the Top Left Wing Assembly
Details
       

 02-06-2017
2.80
Finished the Trailing Edge on the Lower Left Wing
Details

 02-05-2017
3.10
Continued Work on Aileron Configuration
Details

 02-04-2017
2.00
Formed W28 Sheets on 48" Break
Details

 02-03-2017
4.00
Begin Cutout of Lower Left Wing Aileron
Details
       

 01-29-2017
3.30
Building the Lower Left Wing Tip Bracing
Details
       

 01-28-2017
3.00
Building the Lower Left Aileron Forward Spar
Details
     

 01-27-2017
4.00
Install Trailing Edge and Wing Tip
Details
     

 01-25-2017
4.00
Completed Installation of Ribs and Leading Edge
Details
     

 01-23-2017
4.10
Installing Ribs on the Lower Left Wing
Details
       

 01-21-2017
3.30
Mounts for the Compression Struts
Details
       

 01-19-2017
3.50
nstalled Bracing Cables on the Center Wing Vertica
Details
     

 01-18-2017
3.00
Mounted Center Wing Struts to Fuselage
Details

 01-17-2017
4.00
Mounting the Center Wing Section
Details
       

 01-16-2017
3.50
Checked Control Cable Routing
Details
       

 01-13-2017
4.50
Complete Brake Linkage
Details
       

 01-12-2017
3.00
Left Side Brake Linkage
Details
     

 01-09-2017
5.00
Brake Line Installation
Details
       

 01-04-2017
2.00
Delivery of Engine Weldments For Mount Constructio
Details

 01-03-2017
3.00
Continued Center Wing Construction and Engine Moun
Details
       

 12-31-2016
2.50
Work Descriptions Entered into KitLog
Details

 12-30-2016
1.00
Inventory of Engine Delivery
Details
       

 12-30-2016
1.50
Delivery of Engine
Details
       

 12-29-2016
5.00
Center Wing Cutout and Leading Edge Installation
Details
       

 12-21-2016
3.00
Start of Mounting of Heal Brakes
Details
       

 12-13-2016
4.00
Installing Brake Master Cylinders
Details
       

 11-30-2016
4.00
Work Discriptions Entered into KitLog
Details

 11-28-2016
2.00
Design Work on Brake Peddle Linkage
Details

 11-23-2016
3.00
Tail Wheel Control Cables
Details
     

 11-22-2016
4.00
Installed the Tail Wheel Bungee Cord
Details
     

 11-21-2016
4.00
Install Cockpit Floor
Details
       

 11-12-2016
3.00
Ellevator Control Cables Installed
Details
       

 11-09-2016
4.00
Installation of Rudder Cables
Details
       

 11-03-2016
4.00
Fabrication of Tuttle Back Cover
Details
     

 11-01-2016
3.00
Installed Foot Channels and Rudder Post
Details

 10-31-2016
7.50
Work Descriptions Written Into KitLog
Details

 10-30-2016
2.50
Aft Landing Gear Support Cables Installed
Details
       

 10-28-2016
3.00
Start Install of Landing Gear Cable Bracing
Details
       

 10-19-2016
2.00
Installed Landing Gear Mount Bolts
Details

 10-16-2016
3.00
Mounting Main Landing Gear
Details
       

 10-12-2016
4.00
Continued Construction of Center Wing Section
Details

 10-11-2016
2.00
Mounted Tires on the Main Gear
Details
     

 10-11-2016
3.00
Center Wing Section Construction
Details
     

 10-10-2016
2.00
Installation of Bungee Cords on Main Axle
Details
     

 10-09-2016
2.00
Main Wheel Strut Closures
Details
       

 10-08-2016
5.00
Completion of Seat and Bagage Frame
Details
       

 10-07-2016
5.00
Continue Construction of Seat Frame
Details
       

 10-04-2016
3.00
Start of the Seat Frame
Details
     

 10-03-2016
3.00
Threaded Left Side Front Tabs
Details
     

 10-02-2016
3.00
Side Panel Mounting Tabs
Details
     

 10-01-2016
4.00
Mounting the Instrument Panel
Details
       

 09-30-2016
4.00
Work Descriptions Written Into KitLog
Details

 09-30-2016
3.00
Installing the Firewall
Details
       

 09-24-2016
5.00
Aft Wing Spar and Wing Ribs
Details
       

 09-21-2016
3.00
Completed one Main Spar
Details
     

 09-19-2016
3.00
Building the Main Spar
Details

 09-08-2016
5.00
Turtle Back and Firewall Mounting Tabs
Details
       

 09-06-2016
3.00
Completed the Top Support for the Turtleback
Details

 09-05-2016
3.50
Added Aft End of Tuttle Back
Details

 09-03-2016
2.00
Assembling the Firewall
Details
     

 08-31-2016
13.50
Work Descriptions Written Into KitLog
Details

 08-31-2016
5.00
Turtle Back and Gas Tank Stubs
Details
       

 08-30-2016
2.00
Mounting Tabs and Rudder Bar Clearance
Details
       

 08-30-2016
5.00
Adding Tabs for the Firewall Attachment
Details
       

 08-28-2016
3.00
Install Floor Pans and Rudder Bars
Details

 08-27-2016
3.00
Welded Mounting Points for Control Stick and Firew
Details

 08-26-2016
3.00
Measured Out Elevator Control Cables
Details
     

 08-23-2016
4.00
Tail Light Bracket and Rudder Extension
Details
       

 08-22-2016
3.50
Brake Caliper Mount Alignment
Details
       

 08-21-2016
3.00
Front Langing Gear Strut Stubs
Details
     

 08-20-2016
4.00
Modification of Landing Gear for Caliper Mounting
Details
     

 08-19-2016
3.00
Design and Fabrication of Caliper Axle Mounting Br
Details

 08-18-2016
3.00
Design of Caliper Mounting on Landing Gear Axle
Details

 08-17-2016
2.50
Mounting the Inside Wheel Covers
Details
     

 08-16-2016
4.00
Installed Center Wing Section Attachment Fittings
Details
       

 08-15-2016
4.25
Welding The Center Wing Attachment Studs
Details
       

 08-14-2016
4.00
Construction of the Turtle Back End
Details
     

 08-12-2016
2.00
Identified and Ordered Brake Parts
Details

 08-10-2016
4.00
Installation of Left Foot Channels
Details
     

 08-09-2016
3.20
Construction of Flight Controls
Details
     

 08-07-2016
2.00
Tuttle Back Assembly Front
Details
     

 08-07-2016
2.50
Floor Foot Channels and Instrument Panel
Details
       

 08-06-2016
3.00
Center Wing Section Struts
Details
     

 08-05-2016
2.00
Rudder Bars and Interlink
Details
     

 08-05-2016
3.50
Finished Motor Mounts and Tail Handle
Details
       

 08-04-2016
4.50
Installation of Engine Frame Mounts
Details
       

 08-04-2016
0.50
Forming the Fuselage Maneuver Handle
Details
     

 08-03-2016
3.50
Installation of Rudder Bars
Details
       

 08-02-2016
4.00
Initail Fitting of the Rudder Bars
Details
     

 07-31-2016
6.50
Work Descriptions Written Into KitLog
Details

 07-23-2016
3.50
Tig Welded Right Side Wing Strut Weldments
Details
       

 07-22-2016
2.00
Begin Control Stick Construction
Details
     

 07-21-2016
3.50
Continued Welding the Wing and Lift Fittings
Details
       

 07-20-2016
2.00
Tail Wheel Mounting
Details
       

 07-20-2016
2.00
Mounting the Wing and Lift Fittings
Details
       

 07-15-2016
4.50
Assembly of Main Axle
Details
       

 07-12-2016
3.00
Tail Post Brace
Details
       

 07-10-2016
1.20
Kitlog Daily Work Entries
Details

 07-10-2016
6.50
Construction of the Tail Wheel
Details
     

 07-09-2016
6.00
Correct Horizonatal Stabilizer Supports
Details
       

 07-05-2016
5.50
Horizontal Stabilizer Supports
Details

 07-04-2016
5.75
Landing Gear Struts and Main Axle
Details
       

 07-04-2016
0.40
Kitlog Daily Entry
Details

 07-02-2016
4.50
Trial Fitting of the Horizonal Stablizer and Rudde
Details
       

 07-02-2016
1.10
Kitlog Daily Entry
Details

 07-02-2016
2.50
Construction of the Cable Bracing on the Tail
Details
       

 06-30-2016
1.50
Work Descriptions Written Into KitLog
Details

 06-28-2016
5.50
Finish Welding and Painting of the Fuselage
Details
       

 06-27-2016
2.00
Fuselage End Welding
Details
       

 06-27-2016
6.00
Cross Brace Welding on the Fuselage
Details
       

 05-31-2016
4.00
Work Descriptions Written Into KitLog
Details

 05-24-2016
3.50
Correct Rudder Mounting Mistake
Details

 05-19-2016
4.00
Adding Diagonals to the Fuselage
Details

 05-17-2016
6.00
Installing the Rudder Post
Details
       

 05-11-2016
6.00
Continued Welding the Tail
Details

 05-10-2016
6.50
Welding the Tail Cross Members
Details

 05-06-2016
3.75
Installing the Tail Cross Members
Details

 05-04-2016
7.00
Aligning the Fuselage to the Center Line
Details
       

 05-02-2016
4.50
Continue Welding on Cross Members
Details

 04-30-2016
6.50
Work Descriptions Written Into KitLog
Details

 04-28-2016
4.00
Continue Welding on Cross Members of the Fuselage
Details

 04-27-2016
6.50
Welding Fuselage Cross Members
Details
       

 04-25-2016
5.75
Inspection of Joint Welds and Cutting Top and Bott
Details

 04-22-2016
6.50
Continue Fillin Welding on Fuselage Sides

 04-20-2016
4.50
Fillin Welding on Complex Joints
Details

 04-18-2016
4.40
Continued Welding on Fuselage Sides

 04-15-2016
6.75
Continued Welding on Fuselage Sides

 04-13-2016
5.50
Contiinued Welding on Fuselage Sides
Details

 04-12-2016
8.00
Welding on Fuselage Side
Details
       

 04-10-2016
6.00
Continued Tig Welding of the Fuselage

 04-08-2016
5.50
Welding on Fuselage Side
Details

 04-06-2016
6.00
Welding on Fuselage Side
Details

 04-04-2016
6.25
Fuselage Side Welding Continues
Details
       

 03-31-2016
5.00
Work Descriptions Written Into KitLog
Details

 03-26-2016
5.00
Tig Welding of the Fuselage Side Continues
Details
       

 03-25-2016
4.00
Tig Welding on Fuselage side continued
Details
       

 03-20-2016
6.50
Tig Welding Fuselage side
Details
       

 03-19-2016
4.00
Building wing spars
Details
       

 03-16-2016
6.00
Building Wing Spars
Details
       

 03-12-2016
3.00
Mounting Spreader Fittings
Details
       

 03-12-2016
2.00
Center Wing Section Spar Frame
Details
       

 03-07-2016
3.00
Center Wing Section Spars
Details
       

 03-06-2016
5.00
Wing Spars Center Section
Details
       

 03-02-2016
3.50
Vertical Stabilizer
Details
       

 02-28-2016
2.50
Work Descriptions Written Into KitLog
Details

 02-27-2016
7.00
Horizontal Stabilizer
Details
       

 02-22-2016
6.50
Elevator Completion
Details
       

 02-20-2016
5.00
Construction of the Elevator
Details
     

 02-12-2016
4.00
Finish the Rudder Frame
Details
     

 02-08-2016
5.00
Construction of the Rudder
Details
     

 12-31-2015
2.00
Work Descriptions Written Into KitLog
Details

 12-16-2015
2.50
Inventory Kit components and Set up Work Table
Details

 12-14-2015
3.50
Clean up Shop
Details

 12-11-2015
2.50
Pick up aircraft kit
Details
     

 12-09-2015
6.50
Forming and spot welding fuselage sides.
Details
       