Date
|
Hours
|
Work Log Summary
|
Details
|
01-31-2020
|
5.00
|
Successful Completion of Airworthness Inspection
|
Details
|
|
|
01-30-2020
|
5.50
|
Checked Aircraft For Correct Configuration
|
Details
|
|
|
01-29-2020
|
2.10
|
Prepaired the Aircraft for Inspection
|
Details
|
|
|
01-28-2020
|
2.20
|
Installed Leather Cover on Left Side Cockpit
|
Details
|
|
|
01-27-2020
|
3.40
|
Safety Wired Five Turnbuckles Around Cockpit
|
Details
|
|
|
01-14-2020
|
2.50
|
Completed the FAA Request for a Special Airworthin
|
Details
|
|
|
01-04-2020
|
2.60
|
Mounted the Cowling - Finished Aircraft!!
|
Details
|
|
|
12-29-2019
|
3.70
|
Secured Cockpit Side Panels
|
Details
|
|
|
12-27-2019
|
3.50
|
Installed Front Cover on Fuselage
|
Details
|
|
|
12-26-2019
|
2.20
|
Finished Forward Cover with Windshields
|
Details
|
|
|
12-21-2019
|
2.30
|
Building Leather Cover for Right Side Panel
|
Details
|
|
|
12-19-2019
|
1.10
|
Laced the Leather Cover on the Left Side Panel
|
Details
|
|
|
12-18-2019
|
2.10
|
Installing Leather Edge Roll on Left Side Panel
|
Details
|
|
|
12-14-2019
|
3.00
|
Installed the Leather Roll on the Front Cover
|
Details
|
|
|
12-13-2019
|
1.80
|
Begin the Install of the Leather Roll on Front Cov
|
Details
|
|
|
12-12-2019
|
2.10
|
Grommets Installed On Leather Covering
|
Details
|
|
|
12-10-2019
|
2.10
|
Painted Windsceen Bases
|
Details
|
|
|
12-08-2019
|
1.70
|
Cleaned Up Windscreens and Started on Cockpit Edge
|
Details
|
|
|
12-07-2019
|
1.30
|
Secured Windscreens to Mount Base
|
Details
|
|
|
12-04-2019
|
2.20
|
Completed Second Base for Windscreen
|
Details
|
|
|
12-03-2019
|
2.10
|
Aircraft Windscreen Development
|
Details
|
|
|
11-30-2019
|
2.80
|
Completed AOA Install and Calibration
|
Details
|
|
|
11-29-2019
|
2.00
|
Fix Fuel Seep and Repositioned Left Brake Peddle
|
Details
|
|
|
11-28-2019
|
0.90
|
Development of Windshield Mounting Base
|
Details
|
|
|
11-27-2019
|
1.30
|
Tested the Instrument, Position and Landing Lights
|
Details
|
|
|
11-27-2019
|
2.60
|
Mounted Bottom Wing Access Panels
|
Details
|
|
|
11-26-2019
|
2.80
|
Installed Channel to Top Wing
|
Details
|
|
|
11-24-2019
|
1.00
|
Taxi and Emergency Ignition Test
|
Details
|
|
|
11-24-2019
|
1.60
|
Tail Wheel Adjustment and Installed the Remaining
|
Details
|
|
|
11-21-2019
|
1.80
|
Completed Configuration of Left Brake Caliper
|
Details
|
|
|
11-20-2019
|
2.80
|
Centered Caliper on Stator on Right Wheel
|
Details
|
|
|
11-17-2019
|
3.10
|
Finished Install of Left Wing Gap Cover
|
Details
|
|
|
11-16-2019
|
1.20
|
Replaced the ELT Battery and Completed Registratio
|
Details
|
|
|
11-16-2019
|
3.10
|
Finished Top Right Wing Gap Cover Installation
|
Details
|
|
|
11-15-2019
|
0.50
|
Oil Site Gage Vent
|
Details
|
|
|
11-15-2019
|
3.20
|
Insrtalled Platform Over Bottom Wing
|
Details
|
|
|
11-14-2019
|
0.50
|
Put Chain on Oil Cap
|
Details
|
|
|
11-14-2019
|
2.10
|
Completed the Last Wing Gap Cover Strip
|
Details
|
|
|
11-13-2019
|
0.70
|
Trouble Shooting AOA System
|
Details
|
|
|
11-13-2019
|
1.80
|
Construction of a Wing Gap Cover Strip
|
Details
|
|
|
11-10-2019
|
2.40
|
Good Engine Start and Successful Taxi Test
|
Details
|
|
|
11-09-2019
|
2.70
|
Third Attemp at Taxi Testing
|
Details
|
|
|
11-08-2019
|
2.60
|
Continued Safety Wiring of Turnbuckles
|
Details
|
|
|
11-08-2019
|
1.10
|
Bled the Brakes Today
|
Details
|
|
|
11-07-2019
|
2.70
|
Continued Safety Wiring of Turnbuckles
|
Details
|
|
|
11-06-2019
|
4.10
|
Installed Wing Gap Cover and Safety Wired Turnbuck
|
Details
|
|
|
11-04-2019
|
0.60
|
Trouble Shooting AOA System
|
Details
|
|
|
11-04-2019
|
1.50
|
Finished Right Side Cross Cable and Tighten Turnbu
|
Details
|
|
|
11-03-2019
|
1.20
|
Installed the Repaired AOA Display
|
Details
|
|
|
11-03-2019
|
2.20
|
Finished Another Wing Gap Strip and Installed a Ey
|
Details
|
|
|
11-02-2019
|
2.80
|
Full Power Run on Engine
|
Details
|
|
|
11-01-2019
|
3.40
|
Lower Right Wing Gap Cover
|
Details
|
|
|
10-31-2019
|
2.00
|
Adjusted the Calipers on the Brakes
|
Details
|
|
|
10-29-2019
|
1.20
|
First Taxi Test
|
Details
|
|
|
10-29-2019
|
1.80
|
Correction to Tail Wheel Mounting
|
Details
|
|
|
10-27-2019
|
2.80
|
Finished the Installation of the New Tail Wheel
|
Details
|
|
|
10-26-2019
|
1.80
|
Start on Installing New Tail Wheel Assembly
|
Details
|
|
|
10-26-2019
|
1.60
|
Installed Jam Nuts and Cut First Wing Gap Strip
|
Details
|
|
|
10-25-2019
|
1.10
|
Set Up for Taxi Testing
|
Details
|
|
|
10-25-2019
|
1.20
|
Evaluation of Options for New Tail Wheel Install
|
Details
|
|
|
10-25-2019
|
1.45
|
Conducted Fuel Flow Test
|
Details
|
|
|
10-24-2019
|
2.80
|
Installed N number and Data Plate
|
Details
|
|
|
10-23-2019
|
1.30
|
Painting the Patches on the Aircraft
|
Details
|
|
|
10-23-2019
|
2.10
|
Connected Right Headset Plug, Added Labels on Inst
|
Details
|
|
|
10-22-2019
|
0.50
|
Wiped Down the Seven Stripped Access Covers
|
Details
|
|
|
10-22-2019
|
2.20
|
Removed AOA System to Return for Repair
|
Details
|
|
|
10-20-2019
|
2.50
|
Fitting and Install Forward Fuselage Cover
|
Details
|
|
|
10-20-2019
|
1.00
|
Calulated Weight and Balance/ Center of Gravity
|
Details
|
|
|
10-19-2019
|
1.80
|
Weighted the Aircraft
|
Details
|
|
|
10-19-2019
|
1.60
|
Installed New Master Soleniod
|
Details
|
|
|
10-18-2019
|
1.30
|
Continued Installing Access Port Covers
|
Details
|
|
|
10-17-2019
|
3.00
|
Continued Connections for 12V Accessory Plug
|
Details
|
|
|
10-16-2019
|
0.80
|
Installed the Modified Aileron Tab on the Stick
|
Details
|
|
|
10-16-2019
|
1.10
|
Installed 12 Access Covers on the Top Wing
|
Details
|
|
|
10-16-2019
|
2.00
|
Continued Connections For 12V Accessory Plug
|
Details
|
|
|
10-15-2019
|
2.00
|
Installed Accessory Power Plug Into Instrument Pan
|
Details
|
|
|
10-15-2019
|
1.10
|
Added Plywood Slats to the Turtleback
|
Details
|
|
|
10-14-2019
|
1.10
|
Starting Primer Painting of Fabric Access Covers
|
Details
|
|
|
10-13-2019
|
0.80
|
Started Install of 12V Accessory Plug
|
Details
|
|
|
10-13-2019
|
2.20
|
Continued Work on Aileron Alignment & Cables
|
Details
|
|
|
10-12-2019
|
3.00
|
Installed Turnbuckle in Left Lower Aileron Cable
|
Details
|
|
|
10-11-2019
|
2.30
|
Continued Trouble Shooting the AOA System
|
Details
|
|
|
10-09-2019
|
1.10
|
Started on Setting Up the AOA System
|
Details
|
|
|
10-09-2019
|
1.10
|
Installed the Outter Wheel Covers
|
Details
|
|
|
10-09-2019
|
1.20
|
Applied Fabric Patches to Cable Opening
|
Details
|
|
|
10-08-2019
|
3.70
|
Set Up Aileron Control Linkages
|
Details
|
|
|
10-05-2019
|
3.40
|
Continued Rigging of Wings
|
Details
|
|
|
10-04-2019
|
4.20
|
Finish Install of Lower Right Wing
|
Details
|
|
|
10-03-2019
|
4.20
|
Completed Mounting of Lower Right Wing
|
Details
|
|
|
10-02-2019
|
3.80
|
Started Mounting the Lower Right Wing
|
Details
|
|
|
10-01-2019
|
3.00
|
Mounting of the Top Right Wing
|
Details
|
|
|
09-30-2019
|
3.30
|
Completed the Mounting of the Lower Left Wing
|
Details
|
|
|
09-29-2019
|
2.80
|
Continued Work on Mounting Lower Left Wing
|
Details
|
|
|
09-27-2019
|
4.80
|
Continued Install on Lower Left Wing
|
Details
|
|
|
09-26-2019
|
3.00
|
Mounted the Top Left Wing
|
Details
|
|
|
09-24-2019
|
2.80
|
Air Speed Probe Installed and Top Left on Stand
|
Details
|
|
|
09-23-2019
|
4.40
|
Installed AOA Signal Cable in Top Left Wing
|
Details
|
|
|
09-19-2019
|
1.70
|
Moved Top Left Wing to Work Table
|
Details
|
|
|
09-18-2019
|
2.40
|
Completed AOA Vane Wiring and Belly Patch
|
Details
|
|
|
09-17-2019
|
3.20
|
Repaired Left Wing Stub Step and Mounted AOA Sende
|
Details
|
|
|
09-16-2019
|
2.80
|
Shorten Front Cross Cables to Square Front Struts
|
Details
|
|
|
09-15-2019
|
3.60
|
Completed the Air Tubes for A/S and Static
|
Details
|
|
|
09-13-2019
|
4.60
|
Mounted the Center Wing Section on the Fuselage
|
Details
|
|
|
09-11-2019
|
1.70
|
Replaced Copilot Intercom Switch and Mounted Belly
|
Details
|
|
|
09-11-2019
|
2.00
|
Completed Painting of the Forward Cover, Side Pane
|
Details
|
|
|
09-09-2019
|
1.00
|
Found and Repaired the Bad Connection on the Temp
|
Details
|
|
|
09-09-2019
|
2.10
|
Continued Painting Forward Cover and Side Panels
|
Details
|
|
|
09-02-2019
|
3.10
|
Start of Painting of Side Panels and Forward Fusel
|
Details
|
|
|
09-01-2019
|
2.90
|
Tested the ELT and ADS-B Systems
|
Details
|
|
|
08-31-2019
|
3.20
|
Install Ground Plane for ADS-B Antenna
|
Details
|
|
|
08-30-2019
|
3.60
|
ADS-B and ELS Antenna Cables
|
Details
|
|
|
08-29-2019
|
1.50
|
Installed the ADS-B Antenna
|
Details
|
|
|
08-29-2019
|
2.20
|
Complete the Installation of the Oil Filler
|
Details
|
|
|
08-28-2019
|
1.75
|
Oil Filler Hole in Forward Cover and ADS-B Antenna
|
Details
|
|
|
08-28-2019
|
2.75
|
Completed Wiring of the ADS-B System
|
Details
|
|
|
08-27-2019
|
3.00
|
Installing the Control Module for ADS-B System
|
Details
|
|
|
08-26-2019
|
2.00
|
Finished Installing AOA Display on Instrument Pane
|
Details
|
|
|
08-25-2019
|
2.50
|
Continued Work on AOA Wiring Harness
|
Details
|
|
|
08-24-2019
|
3.30
|
Completed Wiring the AOA Display Plug
|
Details
|
|
|
08-22-2019
|
1.80
|
Building Up AOA Wiring Harness
|
Details
|
|
|
08-21-2019
|
2.00
|
Repair Left Wing Stub Step
|
Details
|
|
|
08-21-2019
|
2.50
|
Repair Broken Wire on Temp Probe
|
Details
|
|
|
08-20-2019
|
3.60
|
Wiring Harness for the G Meter/Clock
|
Details
|
|
|
08-18-2019
|
1.10
|
Mounted the ELT
|
Details
|
|
|
08-16-2019
|
2.50
|
Mounted G Meter into Instrument Panel
|
Details
|
|
|
08-15-2019
|
3.10
|
Start the Install of the ADS-B System
|
Details
|
|
|
08-14-2019
|
3.70
|
Fitting the Vane Mount to the Wing Strut
|
Details
|
|
|
08-13-2019
|
3.20
|
Installed AOA Display Unit in Instrument Panel
|
Details
|
|
|
08-10-2019
|
2.10
|
Evaluate Location for AOA Installation
|
Details
|
|
|
08-09-2019
|
0.30
|
Received AOA Unit
|
Details
|
|
|
08-08-2019
|
3.60
|
Programed Transponder and Radio Check
|
Details
|
|
|
08-07-2019
|
2.80
|
Repaired Transponder Harness
|
Details
|
|
|
08-06-2019
|
3.20
|
Picked Up Completed Cowling
|
Details
|
|
|
08-04-2019
|
3.40
|
Moved the Blind Altimeter Mount
|
Details
|
|
|
08-03-2019
|
3.20
|
Completed Transponder Wiring Harness
|
Details
|
|
|
07-27-2019
|
3.30
|
Mounting of Transponder Case
|
Details
|
|
|
07-23-2019
|
2.60
|
Finished the Power and Ground Wires On Transponder
|
Details
|
|
|
07-22-2019
|
2.70
|
Changed Out Avionics 10 AMP CB For A 15 AMP
|
Details
|
|
|
07-18-2019
|
2.00
|
Continued Work On Transponder Harness
|
Details
|
|
|
07-17-2019
|
2.00
|
Wiring the Transponder Harness
|
Details
|
|
|
07-15-2019
|
3.10
|
Continued Testing The Radio Wiring Harness
|
Details
|
|
|
07-14-2019
|
2.30
|
Continued With the Installation of the Radio Harne
|
Details
|
|
|
07-13-2019
|
2.20
|
Mounting the Blind Altimeter
|
Details
|
|
|
07-12-2019
|
2.65
|
Construction of Blind Altimeter Mount
|
Details
|
|
|
07-11-2019
|
3.50
|
Installing the Right Side Intercom PTT Switch
|
Details
|
|
|
07-10-2019
|
3.40
|
Installed Lower Brace on Instrument Panel
|
Details
|
|
|
07-09-2019
|
2.80
|
Construction of USB Power Supply and Instrument Pa
|
Details
|
|
|
07-07-2019
|
1.50
|
Completed Forms 8050-1, 8050-2, and 8050-88
|
Details
|
|
|
07-06-2019
|
3.40
|
Fitting Side Panels Radio Controls and Oil Filler
|
Details
|
|
|
07-05-2019
|
3.80
|
Continued Working on VHF Radio Plug
|
Details
|
|
|
07-04-2019
|
3.70
|
Installed Intercom PTT/Hot Switch
|
Details
|
|
|
07-02-2019
|
2.90
|
Installed Music Input and Stick Yoke
|
Details
|
|
|
07-01-2019
|
1.00
|
Replaced the Transponder Antenna Cable End With A
|
Details
|
|
|
07-01-2019
|
3.20
|
Installed Wing Position Ligjhts
|
Details
|
|
|
06-28-2019
|
2.00
|
Installed Position Light Plugs on Wing Ends
|
Details
|
|
|
06-28-2019
|
4.60
|
Construction of the Stick Yoke
|
Details
|
|
|
06-27-2019
|
1.00
|
Painted the Center Section Struts and Control Stic
|
Details
|
|
|
06-27-2019
|
3.20
|
Installed the PTT Lines from the Control Stick
|
Details
|
|
|
06-26-2019
|
3.20
|
Installed Lower Braces on Horizontal Stabilizer
|
Details
|
|
|
06-24-2019
|
4.10
|
Final Installation of The Elevator
|
Details
|
|
|
06-23-2019
|
2.70
|
Final Assembly of Horizontal and Vertical Stabiliz
|
Details
|
|
|
06-20-2019
|
1.20
|
Started Mounting the Horzintial Stabilizer
|
Details
|
|
|
06-20-2019
|
3.10
|
Continued Work on VHF Radio and Transponder Plugs
|
Details
|
|
|
06-19-2019
|
3.40
|
Continued Work on Radio and Transponder Plugs
|
Details
|
|
|
06-18-2019
|
2.90
|
Designed Push-to-Talk Wiring Tube
|
Details
|
|
|
06-17-2019
|
3.50
|
Installed Gas Cap on Forward Fuselage Cover
|
Details
|
|
|
06-16-2019
|
1.10
|
Installed Ribs in Forward Fuselage Cover
|
Details
|
|
|
06-14-2019
|
1.60
|
Installed the Transponder Antenna on the Belly Pan
|
Details
|
|
|
06-13-2019
|
0.60
|
Took the Cowling to Get a Vinyl Wrap
|
Details
|
|
|
06-12-2019
|
3.80
|
Transponder Antennal and Insignia Instal
|
Details
|
|
|
06-11-2019
|
2.60
|
Continued Wiring on the Radio Plug
|
Details
|
|
|
06-10-2019
|
2.00
|
Starting Soldering the VHF Radio Plug
|
Details
|
|
|
06-09-2019
|
1.80
|
Applied Primer to the Forward Fuselage Cover
|
Details
|
|
|
06-08-2019
|
0.30
|
Tested Yoke Fitting on Stick
|
Details
|
|
|
06-08-2019
|
1.40
|
Finished Labeling the Instrument Panel
|
Details
|
|
|
06-06-2019
|
0.60
|
Cleared the Mounting Holes for Aft Cockpit Ring
|
Details
|
|
|
06-04-2019
|
4.00
|
Installing Lables on the Instrument Panel
|
Details
|
|
|
06-03-2019
|
1.80
|
Applied the Final Coat of Brown Paint on the Fusel
|
Details
|
|
|
06-02-2019
|
2.00
|
Mounted VHF Radio in Instrument Panel
|
Details
|
|
|
06-01-2019
|
3.80
|
Final Coat of Black and Brown Paint on Camouflage
|
Details
|
|
|
05-31-2019
|
2.00
|
Painted a Second Coat of Black on the Fuselage
|
Details
|
|
|
05-31-2019
|
1.50
|
Installing Landing Light Lens
|
Details
|
|
|
05-29-2019
|
2.00
|
Rubbed Down The Fuselage with 3M Pad
|
Details
|
|
|
05-29-2019
|
1.00
|
Installed the Antenna Lead in the Transponder Case
|
Details
|
|
|
05-28-2019
|
3.70
|
Installed VHF Antenna and Beacon
|
Details
|
|
|
05-27-2019
|
3.30
|
Completed Second Coat of Brown Paint
|
Details
|
|
|
05-25-2019
|
3.80
|
Appling Second Coat of Camouflage Paint
|
Details
|
|
|
05-24-2019
|
3.50
|
Completed the Camouflage Pattern on the Fuselage
|
Details
|
|
|
05-22-2019
|
2.80
|
Finished the First Coat of Paint on the Fuselage
|
Details
|
|
|
05-21-2019
|
2.40
|
Started Painting the Brown
|
Details
|
|
|
05-20-2019
|
2.30
|
Sanded Light Brown Paint and Added Dark Green
|
Details
|
|
|
05-19-2019
|
1.40
|
Added Light Brown Paint to the Fuselage
|
Details
|
|
|
05-18-2019
|
0.60
|
Filed Request With FAA for Custom N Number
|
Details
|
|
|
05-17-2019
|
2.30
|
Applied Sealing Coats to the Sides of the Fuselage
|
Details
|
|
|
05-16-2019
|
3.20
|
Sanded the Bottom and Top of the Fuselage
|
Details
|
|
|
05-13-2019
|
4.40
|
Painting Primer on Fuselage Bottom and Top
|
Details
|
|
|
05-12-2019
|
2.30
|
Final Ironing of the Fuselage
|
Details
|
|
|
05-11-2019
|
2.60
|
Finished Taping the Fuselage
|
Details
|
|
|
05-10-2019
|
3.80
|
Continue To Tape The Fuselage
|
Details
|
|
|
05-07-2019
|
3.60
|
Installing Fabric Tape to the Fuselage
|
Details
|
|
|
05-06-2019
|
3.30
|
Glued Down the Right Side Top Fabric
|
Details
|
|
|
05-04-2019
|
3.20
|
Installing Fabric on the Turtleback
|
Details
|
|
|
05-03-2019
|
3.10
|
Installed Elevator Cable Fairings
|
Details
|
|
|
05-01-2019
|
2.30
|
Finishing Fabric Around Landing Lights
|
Details
|
|
|
04-30-2019
|
2.80
|
Installed Access Ports on Bottom of Fuselage
|
Details
|
|
|
04-29-2019
|
3.10
|
Taped the Edges of the Wing Stubs
|
Details
|
|
|
04-28-2019
|
3.10
|
Rivet Stitch Right Wing Stub
|
Details
|
|
|
04-26-2019
|
4.00
|
Right Side Wing Stub Covering
|
Details
|
|
|
04-25-2019
|
3.50
|
Completed First Ironing of Right Side Fuselage
|
Details
|
|
|
04-24-2019
|
3.50
|
Covering Right Side of the Fuselage
|
Details
|
|
|
04-22-2019
|
3.50
|
Rivet Stitched Bottom of Left Wing Stub
|
Details
|
|
|
04-21-2019
|
2.50
|
Completed Covering Left Wing Stub
|
Details
|
|
|
04-20-2019
|
2.00
|
Construction of Emergency Battery Case
|
Details
|
|
|
04-19-2019
|
1.50
|
Fitting the Top Cover on the Left Wing Stub
|
Details
|
|
|
04-18-2019
|
3.70
|
Covering the Left Wing Stub
|
Details
|
|
|
04-17-2019
|
3.50
|
Ironed the Left Side Fabric
|
Details
|
|
|
04-16-2019
|
3.00
|
Finished Gluing Up the Left Side Fuselage Covering
|
Details
|
|
|
04-15-2019
|
2.50
|
Fiting the Fuselage Lift Side Fabric
|
Details
|
|
|
04-11-2019
|
2.50
|
Ironed the Bottom Fabric on the Fuselage
|
Details
|
|
|
04-07-2019
|
2.00
|
Final Fitting on Right Side Cockpit Plywood
|
Details
|
|
|
04-06-2019
|
2.50
|
Installed Rudder Tail Light
|
Details
|
|
|
04-05-2019
|
3.50
|
Continued Covering the Bottom of the Fuselage
|
Details
|
|
|
04-03-2019
|
2.50
|
Started Covering the Bottom of the Fuselage
|
Details
|
|
|
04-02-2019
|
3.00
|
Laid Out Fabric On Fuselage
|
Details
|
|
|
04-01-2019
|
3.00
|
Wiring Inspection
|
Details
|
|
|
03-29-2019
|
3.00
|
Installed Emergency Battery Wiring
|
Details
|
|
|
03-28-2019
|
3.20
|
Continued Organization of Instrument Panel Wiring
|
Details
|
|
|
03-27-2019
|
2.00
|
Worked on Organization of Instrument Panel Wiring
|
Details
|
|
|
03-26-2019
|
3.70
|
Installed Right Wing Light Plug and Connect Light
|
Details
|
|
|
03-25-2019
|
3.80
|
Installed Electric Plugs for Left Wing and Tail Li
|
Details
|
|
|
03-24-2019
|
4.00
|
Tail Light and Beacon Wiring
|
Details
|
|
|
03-23-2019
|
3.00
|
Scavenge Pump Engine Test Run
|
Details
|
|
|
03-22-2019
|
2.50
|
Installed Air Filter and VHF Antenna Mount
|
Details
|
|
|
03-21-2019
|
2.50
|
Completed Routing of Oil Scavenge Lines
|
Details
|
|
|
03-20-2019
|
3.00
|
Removed Oil Scavenge Lines and Filter
|
Details
|
|
|
03-19-2019
|
3.00
|
Second Engine Test Run and Connected Left Landing
|
Details
|
|
|
03-18-2019
|
2.50
|
Wired Up the Right Landing Light
|
Details
|
|
|
03-17-2019
|
2.20
|
Mounted Aft Ground Plane for VHF Antenna
|
Details
|
|
|
03-16-2019
|
2.00
|
Final Brake Adjustment and Right Landing Light Ins
|
Details
|
|
|
03-15-2019
|
2.00
|
Correct Caliper Fittings and Bleed Brake Lines
|
Details
|
|
|
03-12-2019
|
3.50
|
Changed Oil Vent and Beacon Cutout
|
Details
|
|
|
03-11-2019
|
4.00
|
Engine Full Power Test Run
|
Details
|
|
|
03-10-2019
|
3.00
|
Addition of Mounting Tabs for Antenna Ground Plane
|
Details
|
|
|
03-09-2019
|
2.50
|
Completed Installation of Right Landing Light
|
Details
|
|
|
03-08-2019
|
2.00
|
Fixed a Fuel Seep and Put Brake Fluid in Left Brak
|
Details
|
|
|
03-01-2019
|
2.00
|
Trim Strip for Left Landing Light
|
Details
|
|
|
02-26-2019
|
2.50
|
Completed Installation of Flash Lube Kit
|
Details
|
|
|
02-25-2019
|
3.50
|
Install Flash Lube Value Saver Kit
|
Details
|
|
|
02-23-2019
|
2.50
|
Left Landing Light Bezel
|
Details
|
|
|
02-22-2019
|
2.20
|
First Engine Start
|
Details
|
|
|
02-21-2019
|
2.50
|
Removed and Installed Electric Fuel Pump
|
Details
|
|
|
02-14-2019
|
2.50
|
Prime the Oil and Fuel Systems
|
Details
|
|
|
02-13-2019
|
3.50
|
Pre-Oiling Engine
|
Details
|
|
|
02-12-2019
|
3.00
|
Landing Light Trim and Engine Oil Prep
|
Details
|
|
|
02-03-2019
|
1.50
|
Drilled Rivet Stitch Holes on Wing Stubs
|
Details
|
|
|
02-02-2019
|
1.10
|
Setup Oil Accumulator Head Pressure
|
Details
|
|
|
02-01-2019
|
1.50
|
Installed Landing Lights
|
Details
|
|
|
01-31-2019
|
1.80
|
Landing Light Brackets
|
Details
|
|
|
01-27-2019
|
2.20
|
Start of Electric Systems Testing
|
Details
|
|
|
01-26-2019
|
2.50
|
Fuel Pressure Line and Test Install of Battery
|
Details
|
|
|
01-22-2019
|
2.00
|
Corrected AMP Shunt Wiring
|
Details
|
|
|
01-17-2019
|
2.00
|
Power Connections to Circuit Breakers
|
Details
|
|
|
01-16-2019
|
3.50
|
Connected Main Ground and Ignition Power
|
Details
|
|
|
01-10-2019
|
1.00
|
Completed the Starter Circuit
|
Details
|
|
|
01-09-2019
|
2.00
|
Continued Wiring of the Instrument Panel
|
Details
|
|
|
01-07-2019
|
2.00
|
Continued Wiring of Instrument Panel
|
Details
|
|
|
01-06-2019
|
3.00
|
Continuing Connecting Engine Instruments
|
Details
|
|
|
01-05-2019
|
3.50
|
Start Wiring From Firewall to Instrument Panel
|
Details
|
|
|
01-04-2019
|
1.20
|
Secured Instrument Panel and Reconnected Wiring
|
Details
|
|
|
01-03-2019
|
2.00
|
Initial Mount of Instrument Panel on Fuselage
|
Details
|
|
|
01-02-2019
|
1.50
|
Mounting Transponder Case
|
Details
|
|
|
12-28-2018
|
2.00
|
Transponder Opening on Instrument Panel
|
Details
|
|
|
12-26-2018
|
0.60
|
Complete Anchor Strips on Second Lens
|
Details
|
|
|
12-24-2018
|
1.30
|
Anchor Strip Installation on Landing Light Lens
|
Details
|
|
|
12-23-2018
|
2.50
|
Installed Spacers on Brake Calipers
|
Details
|
|
|
12-13-2018
|
2.60
|
Installed Wet Compass and IPad Holder
|
Details
|
|
|
12-11-2018
|
1.50
|
Mounted the VSI and Altimeter Into Instrument Pane
|
Details
|
|
|
12-10-2018
|
3.50
|
Installing Flight Instruments Into Pannel
|
Details
|
|
|
12-09-2018
|
2.00
|
Mounting Emergency Power Diodes
|
Details
|
|
|
12-08-2018
|
2.00
|
Installed the Light Controllers Mounting Shelf
|
Details
|
|
|
12-06-2018
|
3.50
|
Installed Cockpit and Instrument Light Switches
|
Details
|
|
|
12-04-2018
|
2.00
|
Install Light Controllers
|
Details
|
|
|
12-01-2018
|
2.00
|
Mounted Terminal Blocks on Instrument Panel
|
Details
|
|
|
11-24-2018
|
2.00
|
Installed Rheostat for Instruments Lights
|
Details
|
|
|
11-23-2018
|
4.00
|
Power and Ground Wiring of Instruments
|
Details
|
|
|
11-21-2018
|
2.00
|
Started Wire Labeling
|
Details
|
|
|
11-19-2018
|
1.00
|
Wiring Instrument Lights Left Side
|
Details
|
|
|
11-07-2018
|
2.00
|
Cut Out Left Landing Light Lens and Preped Washers
|
Details
|
|
|
11-06-2018
|
1.20
|
Wing Stub Leading Edge Covering and Ground Plane
|
Details
|
|
|
11-05-2018
|
2.00
|
Completed the Bottom Right Wing Including Insignia
|
Details
|
|
|
11-04-2018
|
2.00
|
Completed Camouflage Painting on the Bottom Right
|
Details
|
|
|
11-03-2018
|
3.00
|
Camouflage Painting on Bottom Right Wing
|
Details
|
|
|
11-01-2018
|
2.00
|
Started Olive Painting on the Bottom Right Wing
|
Details
|
|
|
10-31-2018
|
11.50
|
Kitlog Daily Work Entries
|
Details
|
|
|
10-31-2018
|
2.00
|
Completed Camouflage Painting of Top Right Wing
|
Details
|
|
|
10-30-2018
|
4.00
|
Olive and Green Camo Paint on Upper Right Wing
|
Details
|
|
|
10-29-2018
|
4.00
|
Completed Camouflage Painting of Lower Left Wing
|
Details
|
|
|
10-28-2018
|
3.00
|
Added the Green Camo Paint to the Bottom Left Wing
|
Details
|
|
|
10-27-2018
|
4.00
|
Finished Camo Paint and Insignia on Top Left Wing
|
Details
|
|
|
10-26-2018
|
2.75
|
Completed Camo Paint on Top Left Wing
|
Details
|
|
|
10-25-2018
|
2.00
|
Form for Landing Light Lens and Lens
|
Details
|
|
|
10-24-2018
|
2.50
|
Continued Camo Painting on Top Left Wing
|
Details
|
|
|
10-23-2018
|
2.50
|
Start of Camo Painting of Top Left Wing
|
Details
|
|
|
10-22-2018
|
3.00
|
Camo Painting on Center Wing Section
|
Details
|
|
|
10-21-2018
|
1.00
|
Instrument Panel Wiring for Alternator Light
|
Details
|
|
|
10-20-2018
|
2.50
|
Add Final Camo to Elevator and Horzontal Stabilize
|
Details
|
|
|
10-19-2018
|
2.00
|
Landing Light Cutouts on Wing Stubs
|
Details
|
|
|
10-17-2018
|
1.50
|
Installed TAC, Carb Heat, and AMP Meters
|
Details
|
|
|
10-15-2018
|
5.00
|
Completed Access Panels on Wing Stubs
|
Details
|
|
|
10-14-2018
|
3.00
|
Installing Engine Instrurments in Panel
|
Details
|
|
|
10-13-2018
|
2.00
|
Continued Power Wiring and Shelf for Controllers
|
Details
|
|
|
10-12-2018
|
2.00
|
Start of Power Connections from CB to Switches
|
Details
|
|
|
10-10-2018
|
0.70
|
Added Landing Light Selector Switch
|
Details
|
|
|
10-09-2018
|
1.00
|
Outer Wheel Covers Completed
|
Details
|
|
|
10-08-2018
|
2.20
|
Painting the Black Border Around the Star
|
Details
|
|
|
10-07-2018
|
1.00
|
Final Taping on Outer Wheel Cover
|
Details
|
|
|
10-01-2018
|
1.00
|
Right Wing Stub Lower Access Panel
|
Details
|
|
|
09-30-2018
|
13.00
|
Kitlog Daily Work Entries
|
Details
|
|
|
09-30-2018
|
3.00
|
Finished Star on Outer Wheel Covers
|
Details
|
|
|
09-29-2018
|
1.00
|
Outer Wheel Covers Red Centers Painting
|
Details
|
|
|
09-28-2018
|
4.00
|
Installing Switches on to the Insturment Panel
|
Details
|
|
|
09-27-2018
|
1.50
|
Add the Opening for the AMP Display
|
Details
|
|
|
09-25-2018
|
2.00
|
Added Holes for the Volt Meter in the Insturment P
|
Details
|
|
|
09-24-2018
|
2.20
|
Installed Brake Calapers on Aircraft Wheels
|
Details
|
|
|
09-23-2018
|
2.00
|
Wheel and Brake Assembly
|
Details
|
|
|
09-23-2018
|
1.00
|
Instrument Panel Cutout for Carb Heat Display
|
Details
|
|
|
09-22-2018
|
3.50
|
Continuing the Painting of the Wheel Covers
|
Details
|
|
|
09-21-2018
|
2.10
|
Painting Wheel Covers and Componets
|
Details
|
|
|
09-18-2018
|
1.20
|
Started Tape Up of Outter Wheel Cover Design
|
Details
|
|
|
09-17-2018
|
1.00
|
Access Panel for the Right Wing Stub
|
Details
|
|
|
09-15-2018
|
0.50
|
Worked on Design for the Outter Wheel Covers
|
Details
|
|
|
09-14-2018
|
2.20
|
Second Coat of Tan Paint on the Upper Left Wing
|
Details
|
|
|
09-14-2018
|
0.80
|
Building Cross Members for the Wing Stubs
|
Details
|
|
|
09-13-2018
|
4.00
|
Finish Coat of Tan Paint on the Top of the Upper L
|
Details
|
|
|
09-12-2018
|
2.00
|
Finish Coat of Primer on Bottom of Upper Left Wing
|
Details
|
|
|
09-11-2018
|
4.00
|
Started Sanding on the Upper Left Wing
|
Details
|
|
|
09-10-2018
|
5.50
|
First Coat of Tan Finish on Bottom Left Wing
|
Details
|
|
|
09-09-2018
|
1.00
|
Continued Layout of Instrument Panel Switches
|
Details
|
|
|
09-08-2018
|
3.00
|
Started Sanding the Lower Left Wing Bottom
|
Details
|
|
|
09-07-2018
|
1.30
|
Compass Install into Instrument Panel
|
Details
|
|
|
09-06-2018
|
3.00
|
Second Coat of Tan Paint on Ailerons and Center Wi
|
Details
|
|
|
09-05-2018
|
3.50
|
First Coat of Finish on Ailerons and Center Wing S
|
Details
|
|
|
09-04-2018
|
3.50
|
Sanding and Primer Painting the Bottom of the Aile
|
Details
|
|
|
09-03-2018
|
3.00
|
First Finish Coat on Horizontal and Vertical Stabi
|
Details
|
|
|
09-02-2018
|
3.50
|
Finished Rudder and Sanding on Elevator
|
Details
|
|
|
08-31-2018
|
4.00
|
Sanding and Painting the Left Side of the Rudder
|
Details
|
|
|
08-31-2018
|
13.00
|
Kitlog Daily Work Entries
|
Details
|
|
|
08-30-2018
|
3.25
|
Finish Paint on the Upper Right Wing
|
Details
|
|
|
08-29-2018
|
0.50
|
Varnished the New Cutouts on the Cockpit Sides
|
Details
|
|
|
08-28-2018
|
4.50
|
Final Coat for the Bottom of the Upper Right Wing
|
Details
|
|
|
08-27-2018
|
4.00
|
Finish Basic Paint on Lower Right Wing
|
Details
|
|
|
08-25-2018
|
4.00
|
Finish Paint on Right Half of the Rudder
|
Details
|
|
|
08-24-2018
|
2.00
|
Sanding on the Lower Right Wing
|
Details
|
|
|
08-23-2018
|
3.75
|
Sanding on the Rudder and Lower Right Wing
|
Details
|
|
|
08-22-2018
|
1.75
|
Start of Finish Painting on the Rudder
|
Details
|
|
|
08-21-2018
|
3.00
|
Start of Rudder Stripes and Final Primer on Center
|
Details
|
|
|
08-21-2018
|
1.00
|
Drilled Holes for Aileron Cables in Cockpit Sides
|
Details
|
|
|
08-20-2018
|
2.50
|
Finished Primer Painting on the Lower Left Wing
|
Details
|
|
|
08-19-2018
|
4.00
|
Finished the Primer Painting of the Top of the Low
|
Details
|
|
|
08-17-2018
|
2.50
|
Finished Two Coats Primer on Lower Left Wing
|
Details
|
|
|
08-14-2018
|
2.30
|
Primer Painting the Lower Left Wing Bottom
|
Details
|
|
|
08-12-2018
|
3.00
|
Fitting the Left Cockpit Side Panel
|
Details
|
|
|
08-11-2018
|
4.00
|
Painting the Lower Left Wing
|
Details
|
|
|
08-10-2018
|
3.00
|
Ironed the Top of the Lower Left Wing
|
Details
|
|
|
08-09-2018
|
3.00
|
Applied Third Coat of Primer on Bottom of Lower Ri
|
Details
|
|
|
08-08-2018
|
4.00
|
Third Coat of Primer on Lower Right WingTop
|
Details
|
|
|
08-07-2018
|
3.00
|
Primer Painting on the Bottom of the Lower Right W
|
Details
|
|
|
08-06-2018
|
2.50
|
Installation of Step on Left Wing Stub
|
Details
|
|
|
08-06-2018
|
3.50
|
First Coat of Primer on the Bottom Right Wing Top
|
Details
|
|
|
08-05-2018
|
2.00
|
Building Forward Brace for Left Wing Stub Step
|
Details
|
|
|
08-04-2018
|
5.00
|
Rolled and Tipped Horizontal Stab and Center Wing
|
Details
|
|
|
08-03-2018
|
4.50
|
Roll and Tip Primer Painting on Ailerons
|
Details
|
|
|
08-01-2018
|
5.00
|
Two Coats of Primer Applied to Horizonal Stab
|
Details
|
|
|
07-31-2018
|
3.00
|
Sanding the Bottom of the Upper Right Wing
|
Details
|
|
|
07-31-2018
|
12.00
|
Kitlog Daily Work Entries
|
Details
|
|
|
07-30-2018
|
1.30
|
Fairing for the Elevator and Rudder Cables
|
Details
|
|
|
07-29-2018
|
3.00
|
Start of Sanding of Upper Right Wing
|
Details
|
|
|
07-28-2018
|
4.00
|
Primer Paint on the Top of the Upper Right Wing
|
Details
|
|
|
07-27-2018
|
3.50
|
Primer Painting of the Upper Right Wing Bottom
|
Details
|
|
|
07-26-2018
|
3.00
|
Primer Painting of Lower Ailerons
|
Details
|
|
|
07-24-2018
|
2.50
|
Primer Painting on Upper Right Aileron
|
Details
|
|
|
07-23-2018
|
5.00
|
Painting of Vertical Stab and Prep on Ailerons
|
Details
|
|
|
07-22-2018
|
4.00
|
Primer Paint on Elevator and Rudder
|
Details
|
|
|
07-17-2018
|
3.00
|
Start of Elevator Painting
|
Details
|
|
|
07-16-2018
|
4.00
|
Finished Two Coats Primer on Center Wing Section
|
Details
|
|
|
07-15-2018
|
4.00
|
Started Painting the Center Section of the Wing
|
Details
|
|
|
07-13-2018
|
3.00
|
Initial Sanding of Upper Left Wing
|
Details
|
|
|
07-11-2018
|
3.00
|
Primer Painting of Bottom of the Upper Left Wing
|
Details
|
|
|
07-10-2018
|
4.00
|
Two Coats Primer on Top Upper Left Wing
|
Details
|
|
|
07-09-2018
|
2.00
|
Painting of the Bottom of the Belly Pan
|
Details
|
|
|
07-08-2018
|
3.50
|
Wing Stub Leading Edges
|
Details
|
|
|
07-07-2018
|
0.50
|
Punched TAC Instrument Hole in the Panel
|
Details
|
|
|
07-06-2018
|
1.50
|
Second Coat of Paint on Inside Wheel Covers
|
Details
|
|
|
07-05-2018
|
3.50
|
Inside Wheel Covers Mods and Painting
|
Details
|
|
|
07-03-2018
|
2.00
|
Right Wing Stub Rib Bracing
|
Details
|
|
|
07-02-2018
|
1.00
|
Purchase of Anti Collision Light
|
Details
|
|
|
07-02-2018
|
2.75
|
Finished the Wing Stub Trailing Edges
|
Details
|
|
|
07-01-2018
|
3.00
|
Wing Stub Trailing Edge Brackets
|
Details
|
|
|
06-30-2018
|
10.50
|
Kitlog Daily Work Entries
|
Details
|
|
|
06-30-2018
|
1.00
|
Applied a Coat of Varnish on Instrument Panel
|
Details
|
|
|
06-29-2018
|
4.00
|
Install Access Ports on Bottom of Upper Left Wing
|
Details
|
|
|
06-28-2018
|
3.80
|
Completed Rivet Stitching the Top of the Upper Lef
|
Details
|
|
|
06-27-2018
|
1.00
|
Bending Trailing Edge for Wing Stubs
|
Details
|
|
|
06-26-2018
|
2.00
|
Start of Rivet Stitching on Top of Upper Left Wing
|
Details
|
|
|
06-24-2018
|
3.20
|
Fabric Taping of the Bottom of the Upper Left Wing
|
Details
|
|
|
06-21-2018
|
3.00
|
300 Degree Ironing of the Upper Left Wing
|
Details
|
|
|
06-19-2018
|
3.00
|
250 Degree Ironing of the Upper Left Wing
|
Details
|
|
|
06-18-2018
|
4.00
|
Covering the Top of the Upper Left Wing
|
Details
|
|
|
06-16-2018
|
2.00
|
Start of Instrument Panel Hole Punches
|
Details
|
|
|
06-15-2018
|
1.50
|
Completed the Bottom Covering of the Upper Left Wi
|
Details
|
|
|
06-14-2018
|
3.00
|
Covering the Bottom of the Upper Left Wing
|
Details
|
|
|
06-13-2018
|
2.50
|
Continued Prep on Upper Left Wing for Covering
|
Details
|
|
|
06-12-2018
|
4.00
|
Prep on the Upper Left Wing for Covering
|
Details
|
|
|
06-11-2018
|
4.00
|
Completed Covering of the Upper Right Wing
|
Details
|
|
|
06-08-2018
|
1.00
|
Installed Tubes for Pitot and Control Cable Faring
|
Details
|
|
|
06-08-2018
|
3.00
|
Fabric Tape on Bottom of Upper Right Wing
|
Details
|
|
|
06-07-2018
|
1.20
|
Production of Control Cable Faring
|
Details
|
|
|
06-05-2018
|
0.50
|
Control Cable Faring Cover Male Form
|
Details
|
|
|
06-04-2018
|
3.50
|
Pop Rivet Stitching Top of the Upper Right Wing
|
Details
|
|
|
06-03-2018
|
3.00
|
300 Degree Ironing of Upper Right Wing
|
Details
|
|
|
05-31-2018
|
2.00
|
250 Degrees Ironing of the Upper Right Wing
|
Details
|
|
|
05-30-2018
|
12.50
|
Kitlog Daily Work Entries
|
Details
|
|
|
05-30-2018
|
2.50
|
Covered the Top of the Upper Right Wing
|
Details
|
|
|
05-29-2018
|
4.00
|
Prep of the Top of the Upper Right Wing
|
Details
|
|
|
05-27-2018
|
5.00
|
Covered the Bottom of the Upper Right Wing
|
Details
|
|
|
05-26-2018
|
1.00
|
Start of Upper Right Wing Covering Prep
|
Details
|
|
|
05-26-2018
|
3.00
|
Finished Center Wing Section Installed Access Hole
|
Details
|
|
|
05-25-2018
|
4.00
|
Installation of Access Holes on Center Wing Sectio
|
Details
|
|
|
05-24-2018
|
4.30
|
Rivet Stitched Bottom of Center Wing Section
|
Details
|
|
|
05-21-2018
|
5.00
|
Top Covering Center Section of the Wing
|
Details
|
|
|
05-20-2018
|
3.25
|
Covered Bottom of Center Wing Section
|
Details
|
|
|
05-18-2018
|
3.20
|
Start Prep of Center Wing Section
|
Details
|
|
|
05-17-2018
|
2.50
|
Fixing the Interfacing Between the Center and Righ
|
Details
|
|
|
05-17-2018
|
1.00
|
Finished Lower Left Wing Patch and Racked It
|
Details
|
|
|
05-16-2018
|
3.00
|
Fix End Rib of Lower Left Wing
|
Details
|
|
|
05-15-2018
|
0.30
|
Weldment for Aft Stub Edge Attachment
|
Details
|
|
|
05-14-2018
|
3.50
|
Finished the Top of the Lower Left Wing
|
Details
|
|
|
05-13-2018
|
2.00
|
Start Rivet Stitch Top Lower Left Wing
|
Details
|
|
|
05-12-2018
|
2.00
|
Inspection Ports on Bottom Lower Left Wing
|
Details
|
|
|
05-11-2018
|
4.00
|
Rivet Stitched Bottom of Lower Left Wing
|
Details
|
|
|
05-08-2018
|
5.00
|
Installed the Top Fabric on the Lower Left Wing
|
Details
|
|
|
05-07-2018
|
3.00
|
250 Degree Ironing of Bottom Fabric Lower Left Win
|
Details
|
|
|
05-04-2018
|
3.00
|
Covered the Bottom of the Lower Left Wing
|
Details
|
|
|
05-03-2018
|
2.30
|
Continued Work on Covering Lower Left Wing
|
Details
|
|
|
05-02-2018
|
3.50
|
Finished Prep Work for Covering on Lower Left Wing
|
Details
|
|
|
05-01-2018
|
4.20
|
Start Prep on Lower Left Wing for Covering
|
Details
|
|
|
04-30-2018
|
9.50
|
Kitlog Daily Work Entries
|
Details
|
|
|
04-30-2018
|
3.60
|
Finished the Covering of the Lower Right Wing
|
Details
|
|
|
04-29-2018
|
3.80
|
Pop Rivet Stitching of Bottom Lower Right Wing
|
Details
|
|
|
04-28-2018
|
6.00
|
Completed the Top of the Lower Right Wing
|
Details
|
|
|
04-26-2018
|
3.00
|
Pop Rivet Stitch on Top Lower Right Wing
|
Details
|
|
|
04-24-2018
|
3.50
|
250 Degree Ironing of Top Lower Right Wing
|
Details
|
|
|
04-20-2018
|
3.00
|
Covering the Top of the Lower Right Wing
|
Details
|
|
|
04-19-2018
|
3.50
|
Continuing Covering of Lower Right Wing
|
Details
|
|
|
04-18-2018
|
4.50
|
Covering the Bottom of the Lower Right Wing
|
Details
|
|
|
04-16-2018
|
5.00
|
Prep of Lower Right Wing for Covering
|
Details
|
|
|
04-10-2018
|
0.50
|
Finished the Veneer on the Instrument Panel
|
Details
|
|
|
04-09-2018
|
4.00
|
Start of Lower Right Wing Prep for Covering
|
Details
|
|
|
04-08-2018
|
2.00
|
Removed Center Wing Section for Covering
|
Details
|
|
|
04-07-2018
|
3.00
|
Removed Wings for Covering
|
Details
|
|
|
04-06-2018
|
2.50
|
Horizontal Stabilizer Control Cable Penetrations
|
Details
|
|
|
04-06-2018
|
1.00
|
Construction of Wing Racks
|
Details
|
|
|
04-05-2018
|
2.50
|
Control Cable Paths Through the Horizontal Stabili
|
Details
|
|
|
04-04-2018
|
2.50
|
Finished Covering the Top Left Aileron
|
Details
|
|
|
04-03-2018
|
3.00
|
Covering the Top Left Aileron
|
Details
|
|
|
04-02-2018
|
5.70
|
Finished Covering the Lower Left Aileron
|
Details
|
|
|
03-31-2018
|
0.50
|
Veneer on Instrument Panel
|
Details
|
|
|
03-31-2018
|
14.00
|
Kitlog Entries for March
|
Details
|
|
|
03-30-2018
|
3.00
|
Covering of Lower Left Aileron
|
Details
|
|
|
03-29-2018
|
2.00
|
Covering of the Lower Left Aileron
|
Details
|
|
|
03-28-2018
|
3.00
|
Started Covering the Lower Left Aileron
|
Details
|
|
|
03-27-2018
|
3.00
|
Finished the Top Right Aileron
|
Details
|
|
|
03-26-2018
|
3.50
|
Covering of the Top Right Aileron
|
Details
|
|
|
03-24-2018
|
4.00
|
Finished Covering the Lower Right Aileron
|
Details
|
|
|
03-23-2018
|
3.30
|
Continuing Covering of Lower Right Aileron
|
Details
|
|
|
03-22-2018
|
3.50
|
Finished Horizontal Stabilizer and Worked Lower Ri
|
Details
|
|
|
03-19-2018
|
3.20
|
Start of Covering on Lower Right Aileron
|
Details
|
|
|
03-18-2018
|
4.25
|
Continued Work on Horizontal Stabilizer
|
Details
|
|
|
03-17-2018
|
4.75
|
Started Covering the Horizontal Stabilizer
|
Details
|
|
|
03-16-2018
|
2.50
|
Mounted Aft Right Wing Sturt
|
Details
|
|
|
03-15-2018
|
2.50
|
Wood Veneer Installation on Insturment Panel
|
Details
|
|
|
03-14-2018
|
2.50
|
Installed the Right Forward Wing Strut
|
Details
|
|
|
03-13-2018
|
1.00
|
Fish Mouth Plugs For Right Wing Struts
|
Details
|
|
|
03-12-2018
|
2.00
|
Continued Work on Right Wing Struts
|
Details
|
|
|
03-11-2018
|
2.00
|
Rebuilding Right Wing Struts
|
Details
|
|
|
03-10-2018
|
2.50
|
Left Wing Forward Strut Installation
|
Details
|
|
|
03-09-2018
|
2.50
|
Left Wing Froward Strut
|
Details
|
|
|
03-08-2018
|
2.50
|
Left Wing Struts Reset
|
Details
|
|
|
03-07-2018
|
4.50
|
Completed Covering the Elevator
|
Details
|
|
|
03-06-2018
|
4.50
|
Elevator Covering Continues
|
Details
|
|
|
03-05-2018
|
4.00
|
Continued Covering Left Side of Elevator
|
Details
|
|
|
03-04-2018
|
2.50
|
Finished Vertical Stabilizer and Continued Elevato
|
Details
|
|
|
03-03-2018
|
5.00
|
Covering of Vertical Stab and Elevator
|
Details
|
|
|
03-02-2018
|
2.00
|
Start of Covering of the Vertical Stabilizer
|
Details
|
|
|
03-01-2018
|
2.50
|
Full Tension on Rudder Fabric and Pop Rivet Stitch
|
Details
|
|
|
02-28-2018
|
7.50
|
Kitlog Daily Work Entry
|
Details
|
|
|
02-26-2018
|
3.00
|
Continued Work on the Right Side of the Rudder
|
Details
|
|
|
02-25-2018
|
3.00
|
Covering of Right Side of the Rudder
|
Details
|
|
|
02-23-2018
|
4.00
|
Covered the Left Side of the Rudder
|
Details
|
|
|
02-18-2018
|
1.50
|
Evaluated the Fabric Glue
|
Details
|
|
|
02-17-2018
|
4.00
|
Final Aileron Cable Adjustments and Rudder Prep
|
Details
|
|
|
02-17-2018
|
1.00
|
Cable Penetrations of Fabric Locations
|
Details
|
|
|
02-16-2018
|
3.00
|
Installed a Third Hinge on Each Lower Aileron
|
Details
|
|
|
02-15-2018
|
2.50
|
Right Wing Lift and Drag Cable Rigging
|
Details
|
|
|
02-14-2018
|
0.50
|
Wing Tip Light Bracket Fillit Blocks
|
Details
|
|
|
02-14-2018
|
2.00
|
Left Wing Lift and Drag Cable Rigging
|
Details
|
|
|
02-13-2018
|
2.50
|
Left Forward Lift and Drag Cable Rigging
|
Details
|
|
|
02-12-2018
|
3.50
|
Removed Lower Ailerons For Adding Third Hinge
|
Details
|
|
|
02-09-2018
|
1.50
|
Diagramed Electric Circuits for Fuse Requirements
|
Details
|
|
|
02-08-2018
|
1.20
|
Wing Tip Filler Block Design and Left Wing Cabling
|
Details
|
|
|
02-07-2018
|
3.25
|
Rigging the Right Wing Lift Cables
|
Details
|
|
|
02-05-2018
|
3.50
|
Left Wing Lift Cables
|
Details
|
|
|
02-04-2018
|
4.25
|
Kitlog Work Entry
|
Details
|
|
|
02-02-2018
|
2.00
|
Rigging of the Left Wing
|
Details
|
|
|
01-31-2018
|
10.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
01-31-2018
|
1.00
|
Weight of the Aircraft
|
Details
|
|
|
01-31-2018
|
2.00
|
Left Wing Front Lift Cable Installation
|
Details
|
|
|
01-30-2018
|
2.50
|
Left Wing Stub Ribs
|
Details
|
|
|
01-29-2018
|
3.00
|
Left Wing Inter Rib Install
|
Details
|
|
|
01-28-2018
|
2.50
|
Right Wing Stub Ribs
|
Details
|
|
|
01-27-2018
|
3.00
|
Wing Stub Ribs Right Side
|
Details
|
|
|
01-26-2018
|
4.00
|
Right Wing End Rib Install
|
Details
|
|
|
01-25-2018
|
3.00
|
Aileron Cable Guide Installation
|
Details
|
|
|
01-24-2018
|
2.50
|
Aileron Crossover Cable Center Shim
|
Details
|
|
|
01-21-2018
|
1.50
|
Precovering Inspection
|
Details
|
|
|
01-21-2018
|
0.50
|
Another Crossover Cable Bracket Design
|
Details
|
|
|
01-19-2018
|
2.50
|
Continued Design on Crossover Cable Pulley
|
Details
|
|
|
01-13-2018
|
2.00
|
Aileron Crossover Cable Pulley Design
|
Details
|
|
|
01-12-2018
|
1.50
|
Aileron Cable Routing
|
Details
|
|
|
01-11-2018
|
1.50
|
Installing Tyedown Straps
|
Details
|
|
|
01-10-2018
|
5.00
|
Pitot Tube, Aileron Cable Pulleys, and Tyedown Str
|
Details
|
|
|
01-09-2018
|
2.00
|
Pitot Bracket Shims and Off Set Pulleys
|
Details
|
|
|
01-08-2018
|
3.00
|
Wing Corner Bracing and Cable Shims
|
Details
|
|
|
01-04-2018
|
1.50
|
Installed the Covering on the Work Tent
|
Details
|
|
|
01-04-2018
|
1.00
|
Control Assembly Modification for Aileron Control
|
Details
|
|
|
01-02-2018
|
3.00
|
Set Up Work Tent in the Hanger
|
Details
|
|
|
12-31-2017
|
9.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
12-21-2017
|
1.30
|
Control Stick Modification for Aileron Control
|
Details
|
|
|
12-20-2017
|
2.50
|
Wing Corner Bracing and Aileron Cable Rigging
|
Details
|
|
|
12-18-2017
|
2.00
|
Interconnecion oft the Ailerons
|
Details
|
|
|
12-17-2017
|
2.00
|
Aileron Linkage and Corner Bracing
|
Details
|
|
|
12-16-2017
|
3.50
|
Top Wing Tip Bracing
|
Details
|
|
|
12-15-2017
|
3.00
|
Right Wing Tip Bracing and Aileron Cabling
|
Details
|
|
|
12-14-2017
|
2.00
|
Aileron Cable Fitting
|
Details
|
|
|
12-12-2017
|
3.50
|
Aileron Cabling Rigging Third Try
|
Details
|
|
|
12-11-2017
|
4.50
|
Aileron Cable Pulley Fitting
|
Details
|
|
|
12-09-2017
|
2.50
|
Aileron Pulley Configuration Change
|
Details
|
|
|
12-08-2017
|
2.00
|
Installed Aileron Crossover Cable
|
Details
|
|
|
12-08-2017
|
0.65
|
Designer Precovering Inspection
|
Details
|
|
|
12-07-2017
|
3.00
|
Installed Right Outer Wing Strut Cross Cables
|
Details
|
|
|
12-06-2017
|
2.00
|
Checking Wing Configuration and Bracing
|
Details
|
|
|
12-05-2017
|
2.50
|
Rigging the Left Wing
|
Details
|
|
|
12-04-2017
|
3.00
|
Left Wing Outer Sturts and Wing Alignment
|
Details
|
|
|
12-02-2017
|
1.20
|
Stand for Instrument Panel
|
Details
|
|
|
12-01-2017
|
4.00
|
Mounting Left Wings
|
Details
|
|
|
11-30-2017
|
2.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
11-14-2017
|
3.50
|
Initial Rigging of the Right Wing
|
Details
|
|
|
11-13-2017
|
3.80
|
Mounted Top of Right Wing Outer Struts
|
Details
|
|
|
11-12-2017
|
4.50
|
Mounting the Right Outer Wing Struts
|
Details
|
|
|
11-08-2017
|
1.30
|
Cross Brace Tabs Added to Right Outer Wing Support
|
Details
|
|
|
11-02-2017
|
2.30
|
Construction of Outter Wing Struts
|
Details
|
|
|
10-31-2017
|
7.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
10-31-2017
|
5.80
|
Fitting Lower Right Wing and Ground Cables
|
Details
|
|
|
10-25-2017
|
1.50
|
Installed Ends on Outer Wing Support Struts
|
Details
|
|
|
10-20-2017
|
2.00
|
Reinstalled Bungee Cords on each Axle.
|
Details
|
|
|
10-18-2017
|
4.50
|
Mounting the Right Wings
|
Details
|
|
|
10-14-2017
|
3.50
|
Sanded and Applied Finish Coat to Cockpit Sides
|
Details
|
|
|
10-12-2017
|
2.80
|
Painting Wheel Disk with Primer
|
Details
|
|
|
10-08-2017
|
4.00
|
Seat Throttles and Belly Pan
|
Details
|
|
|
10-07-2017
|
3.50
|
Prepaired the Airframe for Move to the Hanger
|
Details
|
|
|
10-06-2017
|
3.00
|
Belly Pan Final Trim and Installation
|
Details
|
|
|
10-05-2017
|
2.70
|
Reinstalled the Throttles and Belly Pan Installati
|
Details
|
|
|
10-05-2017
|
1.50
|
Kitlog Daily Work Entry
|
Details
|
|
|
10-04-2017
|
2.40
|
Painted the Throttles and Initial Fitting of the B
|
Details
|
|
|
10-03-2017
|
1.00
|
Kitlog Daily Work Entry
|
Details
|
|
|
10-03-2017
|
1.75
|
Completed the Starter Connectioins and Fuel Drain
|
Details
|
|
|
10-02-2017
|
2.20
|
Kitlog Work Entry
|
Details
|
|
|
10-02-2017
|
2.50
|
Installing Engine Componets and Starter
|
Details
|
|
|
10-02-2017
|
1.50
|
Installation of the Copper Fuel Line and Drain
|
Details
|
|
|
10-01-2017
|
4.50
|
Reinstall Fuel Tank and Ready Engine
|
Details
|
|
|
09-30-2017
|
8.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
09-30-2017
|
1.30
|
Throttle and Mixture Cable Clamps
|
Details
|
|
|
09-28-2017
|
1.50
|
Installed Cable Clamps in the Engine Bay
|
Details
|
|
|
09-27-2017
|
1.00
|
Installed the Six Grade 8 3/8 inch bolts on the Pr
|
Details
|
|
|
09-26-2017
|
2.80
|
Installation of the Mixture Control Cable
|
Details
|
|
|
09-25-2017
|
0.80
|
Kitlog Daily Work Entry
|
Details
|
|
|
09-25-2017
|
2.00
|
Installed Primer Control Cable
|
Details
|
|
|
09-24-2017
|
1.20
|
Kitlog Work Entries for the 22th & 23
|
Details
|
|
|
09-24-2017
|
2.50
|
Forward Fuselage Cover Front Mounting Holes
|
Details
|
|
|
09-23-2017
|
1.20
|
Painting the lower frame of the instrument pannel
|
Details
|
|
|
09-23-2017
|
2.40
|
Installing Clamps to Protect the Oil Lines
|
Details
|
|
|
09-22-2017
|
1.00
|
Test Mount on the Prop
|
Details
|
|
|
09-21-2017
|
1.00
|
Kitlog Entries for the 19th and 20th
|
Details
|
|
|
09-20-2017
|
1.00
|
Modification of the Left Throttle Mounting
|
Details
|
|
|
09-20-2017
|
0.50
|
Kitlog Entry for Daily Work
|
Details
|
|
|
09-20-2017
|
3.50
|
Completed Installation of the Right Throttle
|
Details
|
|
|
09-19-2017
|
2.50
|
Right Throttle Design
|
Details
|
|
|
09-18-2017
|
3.50
|
Completed Installation of Left Throttle
|
Details
|
|
|
09-17-2017
|
1.00
|
Kitlog Daily Work Entry
|
Details
|
|
|
09-17-2017
|
2.00
|
Added Secondary Firewall Terminal Block
|
Details
|
|
|
09-13-2017
|
1.25
|
Kitlog Daily Work Entries for 10,11,12
|
Details
|
|
|
09-12-2017
|
2.00
|
Firewall TopTerminal Blocks
|
Details
|
|
|
09-11-2017
|
0.50
|
Mounted Lower Ground Buss
|
Details
|
|
|
09-10-2017
|
0.70
|
Wiring for the Electric Fuel Pump
|
Details
|
|
|
08-31-2017
|
21.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
08-29-2017
|
0.30
|
Kitlog Daily Work Entry
|
Details
|
|
|
08-29-2017
|
0.70
|
Construction of the Throttle Back Plate
|
Details
|
|
|
08-28-2017
|
0.75
|
Left Throttle Assembly Drilling
|
Details
|
|
|
08-28-2017
|
0.40
|
Kitlog Daily Work Entry
|
Details
|
|
|
08-27-2017
|
0.50
|
Wiring the Electric Scavenging Pump
|
Details
|
|
|
08-26-2017
|
1.50
|
Replaced the Throttle Cable
|
Details
|
|
|
08-26-2017
|
0.50
|
Kitlog Daily Work Entry
|
Details
|
|
|
08-25-2017
|
0.75
|
Installed Anchor Nuts on Bottom of Instrument Pane
|
Details
|
|
|
08-25-2017
|
0.75
|
Built Up Red Battery Cable & Terminated the Altern
|
Details
|
|
|
08-24-2017
|
0.60
|
Kitlog Daily Work Entry
|
Details
|
|
|
08-24-2017
|
2.50
|
Final Engine Electrical Wiring
|
Details
|
|
|
08-22-2017
|
1.00
|
Kitlog Daily Build Entry
|
Details
|
|
|
08-22-2017
|
3.00
|
CHT & EGT Prob Wiring
|
Details
|
|
|
08-22-2017
|
1.50
|
Cable Clamps and Alternator Wiring
|
Details
|
|
|
08-21-2017
|
1.25
|
Mounted Anchor Nuts for Instrument Panel
|
Details
|
|
|
08-21-2017
|
2.00
|
Main Buss Connections
|
Details
|
|
|
08-18-2017
|
0.50
|
Kitlog Daily Entry
|
Details
|
|
|
08-18-2017
|
1.20
|
Installing the Starter Power Cable
|
Details
|
|
|
08-17-2017
|
2.50
|
Mounted Solenoid, Fuses, and Shunt Assembly
|
Details
|
|
|
08-17-2017
|
1.10
|
Kitlog Daily Entry
|
Details
|
|
|
08-17-2017
|
2.50
|
Grounding the Fuselage and Engine
|
Details
|
|
|
08-16-2017
|
0.50
|
Layout of the Throttle Quadrant
|
Details
|
|
|
08-16-2017
|
1.00
|
KitLog Entry for Today
|
Details
|
|
|
08-16-2017
|
0.75
|
Completed Two Wing Ribs for the Stubs
|
Details
|
|
|
08-16-2017
|
1.20
|
Amp Meter Shunt Installed & Design Issues
|
Details
|
|
|
08-15-2017
|
0.75
|
Kitlog Daily Entries
|
Details
|
|
|
08-15-2017
|
2.00
|
Ingnition Wiring Installation
|
Details
|
|
|
08-13-2017
|
1.00
|
Solenoid and Fuse Link Connection
|
Details
|
|
|
08-13-2017
|
1.25
|
Kitlog Daily Entries
|
Details
|
|
|
08-13-2017
|
1.00
|
Firewall Pass-Through for Electrical Wiring
|
Details
|
|
|
08-12-2017
|
0.75
|
Throttle Cable Through the Firewall
|
Details
|
|
|
08-12-2017
|
0.50
|
Oil Accumulator Control Cable Installation
|
Details
|
|
|
08-12-2017
|
1.50
|
Kitlog Daily Entries
|
Details
|
|
|
08-12-2017
|
0.75
|
Installed the CHT Probe
|
Details
|
|
|
08-11-2017
|
3.50
|
Wing Ribs for the Wing Stubs
|
Details
|
|
|
08-11-2017
|
0.75
|
Kitlog Daily Entry
|
Details
|
|
|
08-11-2017
|
0.50
|
Installed the Mixture Control Cable Firewall Pass-
|
Details
|
|
|
08-10-2017
|
1.50
|
Mixture Cable Mounting Bracket
|
Details
|
|
|
08-10-2017
|
0.40
|
Kitlog Daily Entries
|
Details
|
|
|
08-10-2017
|
2.00
|
Initial Electric Wiring Design Efforts
|
Details
|
|
|
08-09-2017
|
3.20
|
Throttle Cable Attachment & Reconnect Lines
|
Details
|
|
|
08-09-2017
|
0.40
|
Remounted the Left and Right Master Cylinders
|
Details
|
|
|
08-08-2017
|
3.50
|
Finished Up Wing Stubs
|
Details
|
|
|
08-08-2017
|
2.50
|
Carburetor Linkages and EGT Weldment
|
Details
|
|
|
08-07-2017
|
5.00
|
Welded up the Aft Wing Stub
|
Details
|
|
|
08-07-2017
|
0.50
|
Mounted the Engine Coils
|
Details
|
|
|
08-06-2017
|
4.00
|
Continued Welding on Wing Stubs
|
Details
|
|
|
08-05-2017
|
5.75
|
Wing Stub Construction
|
Details
|
|
|
08-04-2017
|
3.50
|
Construction of the Wing Stub Spars
|
Details
|
|
|
08-03-2017
|
3.00
|
Design Wing Stubs and Start Construction
|
Details
|
|
|
08-02-2017
|
1.00
|
Firewall Pass Through and Engine Electronics
|
Details
|
|
|
08-02-2017
|
5.50
|
Finish Cowling
|
Details
|
|
|
08-02-2017
|
0.75
|
Drilled Holes on Instrument Panel for Cable Mounts
|
Details
|
|
|
08-01-2017
|
1.50
|
Mounting for the Engine Coils
|
Details
|
|
|
07-31-2017
|
8.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
07-30-2017
|
0.50
|
Installed Oil Vent Line
|
Details
|
|
|
07-30-2017
|
3.00
|
Installed Anchor Nuts on Lower Instrument Pannal
|
Details
|
|
|
07-29-2017
|
1.00
|
Picked up Prop from Culver Propellers
|
Details
|
|
|
07-25-2017
|
1.50
|
Searching for Parts at AirVenture
|
Details
|
|
|
07-20-2017
|
1.00
|
Lower Flange for Instrument Panel
|
Details
|
|
|
07-18-2017
|
2.75
|
Installing Oil Lines Behind the Firewall
|
Details
|
|
|
07-17-2017
|
0.50
|
Install Electric Fuel Pump Vertical
|
Details
|
|
|
07-13-2017
|
3.00
|
Welding Battery Bottom, Fuel Pump Bracket & Tabs
|
Details
|
|
|
07-12-2017
|
0.50
|
Carburetor Fuel Bypass Line Installed to Firewall
|
Details
|
|
|
07-07-2017
|
1.50
|
Mounting Flang for Electric Fuel Pump
|
Details
|
|
|
07-07-2017
|
1.50
|
Electric Scavenge Pump Input
|
Details
|
|
|
07-05-2017
|
4.00
|
Oil Lines at the Firewall
|
Details
|
|
|
07-04-2017
|
2.50
|
Reposistioned the Battery Box
|
Details
|
|
|
07-03-2017
|
0.50
|
Safety Wired Engine Mounting Bolts
|
Details
|
|
|
07-02-2017
|
5.00
|
Battery Box Top Completion
|
Details
|
|
|
07-01-2017
|
6.50
|
Electric Scav Pump and Battery Box Top Continued
|
Details
|
|
|
06-30-2017
|
7.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
06-30-2017
|
2.50
|
Oil Sump Vent Line and Battery Box Base
|
Details
|
|
|
06-30-2017
|
3.00
|
Battery Box Top Constriction
|
Details
|
|
|
06-29-2017
|
3.25
|
Oil Tank Fittings & Battery Box Construction
|
Details
|
|
|
06-28-2017
|
4.75
|
Oil Tank Mounting Bracket and Carb Air Filter
|
Details
|
|
|
06-28-2017
|
1.00
|
Fuel Tank Test Fill and Flow Rate
|
Details
|
|
|
06-27-2017
|
4.00
|
Main Fuel Line Installation From Fuel Filter
|
Details
|
|
|
06-20-2017
|
6.00
|
Continued Cowling Assembly
|
Details
|
|
|
06-19-2017
|
2.00
|
Mounting Bolts for Air Filter Assembly
|
Details
|
|
|
06-14-2017
|
4.00
|
Engine Cowling Initial Test Fitting
|
Details
|
|
|
06-13-2017
|
3.50
|
Construction of Cowling Top
|
Details
|
|
|
06-12-2017
|
4.75
|
Forming the Front of the Cowling
|
Details
|
|
|
06-11-2017
|
2.00
|
Installed Anchor Nuts in place of Clip-Nuts
|
Details
|
|
|
06-11-2017
|
1.80
|
Gasalator and Seat Belts
|
Details
|
|
|
06-10-2017
|
3.80
|
Inline Oil Filter and Fuel Solenoids
|
Details
|
|
|
06-07-2017
|
0.50
|
Mounted Engine Coils
|
Details
|
|
|
05-31-2017
|
4.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
05-08-2017
|
6.50
|
Forward Fuselage Covering
|
Details
|
|
|
05-07-2017
|
2.00
|
Instrument Panel lower anchors
|
Details
|
|
|
05-06-2017
|
0.50
|
Bypass Design for Carb Heat Oil Cooler
|
Details
|
|
|
05-05-2017
|
2.00
|
Issue with Center Wing Section
|
Details
|
|
|
05-04-2017
|
3.50
|
Install Instrument Panel Lower Mount Bracket
|
Details
|
|
|
05-03-2017
|
3.00
|
Aft Cockpit Trim
|
Details
|
|
|
05-02-2017
|
3.00
|
Fitting the Aft Cockpit Cover
|
Details
|
|
|
05-01-2017
|
4.00
|
Installing the Oil Accumulator
|
Details
|
|
|
04-30-2017
|
3.00
|
Storage Brackets and Instrument Panel Layout
|
Details
|
|
|
04-29-2017
|
2.50
|
Stained the Cockpit Plywood Panels
|
Details
|
|
|
04-29-2017
|
1.00
|
Design of Emergency Fuel Shutoff Bracket
|
Details
|
|
|
04-28-2017
|
2.40
|
Gascolator Brackit Construction
|
|
|
|
04-27-2017
|
2.90
|
Mounted the Engine Oil Filter Assembly and Cockpit
|
|
|
|
04-26-2017
|
4.20
|
Completed Seat Belt Installation
|
|
|
|
04-23-2017
|
4.20
|
Begin Installation of Seat Belts
|
|
|
|
04-21-2017
|
3.80
|
Tuttleback Installation and Storage Compartment Si
|
|
|
|
04-20-2017
|
2.80
|
Construction of Storage Compartment
|
|
|
|
04-18-2017
|
4.20
|
Construction of Cockpit Seat
|
|
|
|
04-12-2017
|
3.80
|
Verified Engine Mounting Angle
|
|
|
|
04-11-2017
|
3.60
|
Continued With Engine Install
|
|
|
|
04-10-2017
|
3.80
|
Installed Engine Mount Bolts
|
|
|
|
04-09-2017
|
5.30
|
Installed the Engine Mount and Engine
|
|
|
|
04-07-2017
|
4.10
|
Completed the Framing of the Top Right Wing
|
|
|
|
04-04-2017
|
4.20
|
Install Trailing Edge on Top Right Wing
|
|
|
|
03-08-2017
|
4.00
|
Top Right Wing Tip Install
|
|
|
|
03-05-2017
|
3.50
|
Starting Install of Aileron on Top Right Wing
|
|
|
|
03-04-2017
|
2.80
|
Installing Leading Edge on Top Right Wing
|
|
|
|
03-02-2017
|
4.00
|
Continued Installing Ribs on Top Right Wing
|
|
|
|
03-01-2017
|
3.60
|
Installing Ribs on Top Right Wing
|
|
|
|
02-28-2017
|
5.00
|
Installing Ribs on Top Right Wing
|
|
|
|
02-27-2017
|
4.60
|
Wing Spar Configurations Top Right Wing
|
|
|
|
02-25-2017
|
4.00
|
Aileron Cut Out on Lower Right Wing
|
|
|
|
02-24-2017
|
3.40
|
Installing Rips on Lower Right Wing
|
|
|
|
02-23-2017
|
3.30
|
Installed Leading Edge on Lower Left Wing
|
|
|
|
02-21-2017
|
2.90
|
Lower Left Wing Rib Installation
|
|
|
|
02-20-2017
|
4.20
|
Construction of Lower Left Wing
|
|
|
|
02-19-2017
|
3.50
|
Initial Fitting of the Engine Mount
|
|
|
|
02-16-2017
|
2.30
|
Rotec R3600 Removed from Crate
|
|
|
|
02-15-2017
|
2.30
|
Finished Top Left Wing
|
|
|
|
02-14-2017
|
4.30
|
Installing Aileron on Top Left Wing
|
|
|
|
02-10-2017
|
3.60
|
Completed Installing Top Left Wing Ribs
|
|
|
|
02-09-2017
|
3.40
|
Installing Wing Ribs Top Left Wing
|
|
|
|
02-07-2017
|
3.80
|
Started the Top Left Wing Assembly
|
Details
|
|
|
02-06-2017
|
2.80
|
Finished the Trailing Edge on the Lower Left Wing
|
Details
|
|
|
02-05-2017
|
3.10
|
Continued Work on Aileron Configuration
|
Details
|
|
|
02-04-2017
|
2.00
|
Formed W28 Sheets on 48" Break
|
Details
|
|
|
02-03-2017
|
4.00
|
Begin Cutout of Lower Left Wing Aileron
|
Details
|
|
|
01-29-2017
|
3.30
|
Building the Lower Left Wing Tip Bracing
|
Details
|
|
|
01-28-2017
|
3.00
|
Building the Lower Left Aileron Forward Spar
|
Details
|
|
|
01-27-2017
|
4.00
|
Install Trailing Edge and Wing Tip
|
Details
|
|
|
01-25-2017
|
4.00
|
Completed Installation of Ribs and Leading Edge
|
Details
|
|
|
01-23-2017
|
4.10
|
Installing Ribs on the Lower Left Wing
|
Details
|
|
|
01-21-2017
|
3.30
|
Mounts for the Compression Struts
|
Details
|
|
|
01-19-2017
|
3.50
|
nstalled Bracing Cables on the Center Wing Vertica
|
Details
|
|
|
01-18-2017
|
3.00
|
Mounted Center Wing Struts to Fuselage
|
Details
|
|
|
01-17-2017
|
4.00
|
Mounting the Center Wing Section
|
Details
|
|
|
01-16-2017
|
3.50
|
Checked Control Cable Routing
|
Details
|
|
|
01-13-2017
|
4.50
|
Complete Brake Linkage
|
Details
|
|
|
01-12-2017
|
3.00
|
Left Side Brake Linkage
|
Details
|
|
|
01-09-2017
|
5.00
|
Brake Line Installation
|
Details
|
|
|
01-04-2017
|
2.00
|
Delivery of Engine Weldments For Mount Constructio
|
Details
|
|
|
01-03-2017
|
3.00
|
Continued Center Wing Construction and Engine Moun
|
Details
|
|
|
12-31-2016
|
2.50
|
Work Descriptions Entered into KitLog
|
Details
|
|
|
12-30-2016
|
1.00
|
Inventory of Engine Delivery
|
Details
|
|
|
12-30-2016
|
1.50
|
Delivery of Engine
|
Details
|
|
|
12-29-2016
|
5.00
|
Center Wing Cutout and Leading Edge Installation
|
Details
|
|
|
12-21-2016
|
3.00
|
Start of Mounting of Heal Brakes
|
Details
|
|
|
12-13-2016
|
4.00
|
Installing Brake Master Cylinders
|
Details
|
|
|
11-30-2016
|
4.00
|
Work Discriptions Entered into KitLog
|
Details
|
|
|
11-28-2016
|
2.00
|
Design Work on Brake Peddle Linkage
|
Details
|
|
|
11-23-2016
|
3.00
|
Tail Wheel Control Cables
|
Details
|
|
|
11-22-2016
|
4.00
|
Installed the Tail Wheel Bungee Cord
|
Details
|
|
|
11-21-2016
|
4.00
|
Install Cockpit Floor
|
Details
|
|
|
11-12-2016
|
3.00
|
Ellevator Control Cables Installed
|
Details
|
|
|
11-09-2016
|
4.00
|
Installation of Rudder Cables
|
Details
|
|
|
11-03-2016
|
4.00
|
Fabrication of Tuttle Back Cover
|
Details
|
|
|
11-01-2016
|
3.00
|
Installed Foot Channels and Rudder Post
|
Details
|
|
|
10-31-2016
|
7.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
10-30-2016
|
2.50
|
Aft Landing Gear Support Cables Installed
|
Details
|
|
|
10-28-2016
|
3.00
|
Start Install of Landing Gear Cable Bracing
|
Details
|
|
|
10-19-2016
|
2.00
|
Installed Landing Gear Mount Bolts
|
Details
|
|
|
10-16-2016
|
3.00
|
Mounting Main Landing Gear
|
Details
|
|
|
10-12-2016
|
4.00
|
Continued Construction of Center Wing Section
|
Details
|
|
|
10-11-2016
|
2.00
|
Mounted Tires on the Main Gear
|
Details
|
|
|
10-11-2016
|
3.00
|
Center Wing Section Construction
|
Details
|
|
|
10-10-2016
|
2.00
|
Installation of Bungee Cords on Main Axle
|
Details
|
|
|
10-09-2016
|
2.00
|
Main Wheel Strut Closures
|
Details
|
|
|
10-08-2016
|
5.00
|
Completion of Seat and Bagage Frame
|
Details
|
|
|
10-07-2016
|
5.00
|
Continue Construction of Seat Frame
|
Details
|
|
|
10-04-2016
|
3.00
|
Start of the Seat Frame
|
Details
|
|
|
10-03-2016
|
3.00
|
Threaded Left Side Front Tabs
|
Details
|
|
|
10-02-2016
|
3.00
|
Side Panel Mounting Tabs
|
Details
|
|
|
10-01-2016
|
4.00
|
Mounting the Instrument Panel
|
Details
|
|
|
09-30-2016
|
4.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
09-30-2016
|
3.00
|
Installing the Firewall
|
Details
|
|
|
09-24-2016
|
5.00
|
Aft Wing Spar and Wing Ribs
|
Details
|
|
|
09-21-2016
|
3.00
|
Completed one Main Spar
|
Details
|
|
|
09-19-2016
|
3.00
|
Building the Main Spar
|
Details
|
|
|
09-08-2016
|
5.00
|
Turtle Back and Firewall Mounting Tabs
|
Details
|
|
|
09-06-2016
|
3.00
|
Completed the Top Support for the Turtleback
|
Details
|
|
|
09-05-2016
|
3.50
|
Added Aft End of Tuttle Back
|
Details
|
|
|
09-03-2016
|
2.00
|
Assembling the Firewall
|
Details
|
|
|
08-31-2016
|
13.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
08-31-2016
|
5.00
|
Turtle Back and Gas Tank Stubs
|
Details
|
|
|
08-30-2016
|
2.00
|
Mounting Tabs and Rudder Bar Clearance
|
Details
|
|
|
08-30-2016
|
5.00
|
Adding Tabs for the Firewall Attachment
|
Details
|
|
|
08-28-2016
|
3.00
|
Install Floor Pans and Rudder Bars
|
Details
|
|
|
08-27-2016
|
3.00
|
Welded Mounting Points for Control Stick and Firew
|
Details
|
|
|
08-26-2016
|
3.00
|
Measured Out Elevator Control Cables
|
Details
|
|
|
08-23-2016
|
4.00
|
Tail Light Bracket and Rudder Extension
|
Details
|
|
|
08-22-2016
|
3.50
|
Brake Caliper Mount Alignment
|
Details
|
|
|
08-21-2016
|
3.00
|
Front Langing Gear Strut Stubs
|
Details
|
|
|
08-20-2016
|
4.00
|
Modification of Landing Gear for Caliper Mounting
|
Details
|
|
|
08-19-2016
|
3.00
|
Design and Fabrication of Caliper Axle Mounting Br
|
Details
|
|
|
08-18-2016
|
3.00
|
Design of Caliper Mounting on Landing Gear Axle
|
Details
|
|
|
08-17-2016
|
2.50
|
Mounting the Inside Wheel Covers
|
Details
|
|
|
08-16-2016
|
4.00
|
Installed Center Wing Section Attachment Fittings
|
Details
|
|
|
08-15-2016
|
4.25
|
Welding The Center Wing Attachment Studs
|
Details
|
|
|
08-14-2016
|
4.00
|
Construction of the Turtle Back End
|
Details
|
|
|
08-12-2016
|
2.00
|
Identified and Ordered Brake Parts
|
Details
|
|
|
08-10-2016
|
4.00
|
Installation of Left Foot Channels
|
Details
|
|
|
08-09-2016
|
3.20
|
Construction of Flight Controls
|
Details
|
|
|
08-07-2016
|
2.00
|
Tuttle Back Assembly Front
|
Details
|
|
|
08-07-2016
|
2.50
|
Floor Foot Channels and Instrument Panel
|
Details
|
|
|
08-06-2016
|
3.00
|
Center Wing Section Struts
|
Details
|
|
|
08-05-2016
|
2.00
|
Rudder Bars and Interlink
|
Details
|
|
|
08-05-2016
|
3.50
|
Finished Motor Mounts and Tail Handle
|
Details
|
|
|
08-04-2016
|
4.50
|
Installation of Engine Frame Mounts
|
Details
|
|
|
08-04-2016
|
0.50
|
Forming the Fuselage Maneuver Handle
|
Details
|
|
|
08-03-2016
|
3.50
|
Installation of Rudder Bars
|
Details
|
|
|
08-02-2016
|
4.00
|
Initail Fitting of the Rudder Bars
|
Details
|
|
|
07-31-2016
|
6.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
07-23-2016
|
3.50
|
Tig Welded Right Side Wing Strut Weldments
|
Details
|
|
|
07-22-2016
|
2.00
|
Begin Control Stick Construction
|
Details
|
|
|
07-21-2016
|
3.50
|
Continued Welding the Wing and Lift Fittings
|
Details
|
|
|
07-20-2016
|
2.00
|
Tail Wheel Mounting
|
Details
|
|
|
07-20-2016
|
2.00
|
Mounting the Wing and Lift Fittings
|
Details
|
|
|
07-15-2016
|
4.50
|
Assembly of Main Axle
|
Details
|
|
|
07-12-2016
|
3.00
|
Tail Post Brace
|
Details
|
|
|
07-10-2016
|
1.20
|
Kitlog Daily Work Entries
|
Details
|
|
|
07-10-2016
|
6.50
|
Construction of the Tail Wheel
|
Details
|
|
|
07-09-2016
|
6.00
|
Correct Horizonatal Stabilizer Supports
|
Details
|
|
|
07-05-2016
|
5.50
|
Horizontal Stabilizer Supports
|
Details
|
|
|
07-04-2016
|
5.75
|
Landing Gear Struts and Main Axle
|
Details
|
|
|
07-04-2016
|
0.40
|
Kitlog Daily Entry
|
Details
|
|
|
07-02-2016
|
4.50
|
Trial Fitting of the Horizonal Stablizer and Rudde
|
Details
|
|
|
07-02-2016
|
1.10
|
Kitlog Daily Entry
|
Details
|
|
|
07-02-2016
|
2.50
|
Construction of the Cable Bracing on the Tail
|
Details
|
|
|
06-30-2016
|
1.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
06-28-2016
|
5.50
|
Finish Welding and Painting of the Fuselage
|
Details
|
|
|
06-27-2016
|
2.00
|
Fuselage End Welding
|
Details
|
|
|
06-27-2016
|
6.00
|
Cross Brace Welding on the Fuselage
|
Details
|
|
|
05-31-2016
|
4.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
05-24-2016
|
3.50
|
Correct Rudder Mounting Mistake
|
Details
|
|
|
05-19-2016
|
4.00
|
Adding Diagonals to the Fuselage
|
Details
|
|
|
05-17-2016
|
6.00
|
Installing the Rudder Post
|
Details
|
|
|
05-11-2016
|
6.00
|
Continued Welding the Tail
|
Details
|
|
|
05-10-2016
|
6.50
|
Welding the Tail Cross Members
|
Details
|
|
|
05-06-2016
|
3.75
|
Installing the Tail Cross Members
|
Details
|
|
|
05-04-2016
|
7.00
|
Aligning the Fuselage to the Center Line
|
Details
|
|
|
05-02-2016
|
4.50
|
Continue Welding on Cross Members
|
Details
|
|
|
04-30-2016
|
6.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
04-28-2016
|
4.00
|
Continue Welding on Cross Members of the Fuselage
|
Details
|
|
|
04-27-2016
|
6.50
|
Welding Fuselage Cross Members
|
Details
|
|
|
04-25-2016
|
5.75
|
Inspection of Joint Welds and Cutting Top and Bott
|
Details
|
|
|
04-22-2016
|
6.50
|
Continue Fillin Welding on Fuselage Sides
|
|
|
|
04-20-2016
|
4.50
|
Fillin Welding on Complex Joints
|
Details
|
|
|
04-18-2016
|
4.40
|
Continued Welding on Fuselage Sides
|
|
|
|
04-15-2016
|
6.75
|
Continued Welding on Fuselage Sides
|
|
|
|
04-13-2016
|
5.50
|
Contiinued Welding on Fuselage Sides
|
Details
|
|
|
04-12-2016
|
8.00
|
Welding on Fuselage Side
|
Details
|
|
|
04-10-2016
|
6.00
|
Continued Tig Welding of the Fuselage
|
|
|
|
04-08-2016
|
5.50
|
Welding on Fuselage Side
|
Details
|
|
|
04-06-2016
|
6.00
|
Welding on Fuselage Side
|
Details
|
|
|
04-04-2016
|
6.25
|
Fuselage Side Welding Continues
|
Details
|
|
|
03-31-2016
|
5.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
03-26-2016
|
5.00
|
Tig Welding of the Fuselage Side Continues
|
Details
|
|
|
03-25-2016
|
4.00
|
Tig Welding on Fuselage side continued
|
Details
|
|
|
03-20-2016
|
6.50
|
Tig Welding Fuselage side
|
Details
|
|
|
03-19-2016
|
4.00
|
Building wing spars
|
Details
|
|
|
03-16-2016
|
6.00
|
Building Wing Spars
|
Details
|
|
|
03-12-2016
|
3.00
|
Mounting Spreader Fittings
|
Details
|
|
|
03-12-2016
|
2.00
|
Center Wing Section Spar Frame
|
Details
|
|
|
03-07-2016
|
3.00
|
Center Wing Section Spars
|
Details
|
|
|
03-06-2016
|
5.00
|
Wing Spars Center Section
|
Details
|
|
|
03-02-2016
|
3.50
|
Vertical Stabilizer
|
Details
|
|
|
02-28-2016
|
2.50
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
02-27-2016
|
7.00
|
Horizontal Stabilizer
|
Details
|
|
|
02-22-2016
|
6.50
|
Elevator Completion
|
Details
|
|
|
02-20-2016
|
5.00
|
Construction of the Elevator
|
Details
|
|
|
02-12-2016
|
4.00
|
Finish the Rudder Frame
|
Details
|
|
|
02-08-2016
|
5.00
|
Construction of the Rudder
|
Details
|
|
|
12-31-2015
|
2.00
|
Work Descriptions Written Into KitLog
|
Details
|
|
|
12-16-2015
|
2.50
|
Inventory Kit components and Set up Work Table
|
Details
|
|
|
12-14-2015
|
3.50
|
Clean up Shop
|
Details
|
|
|
12-11-2015
|
2.50
|
Pick up aircraft kit
|
Details
|
|
|
12-09-2015
|
6.50
|
Forming and spot welding fuselage sides.
|
Details
|
|