KitLog pro

Powered By Kitlog Pro v2.0

Williams Web Site
Work Logs Found: 253
Category Work Time: 754 Hours
 Date
Hours
Work Log Summary

Details

 11-13-2018
2.00
Airworthiness inspection
Details
     

 10-17-2018
1.00
Weigh in
Details

 10-03-2018
2.00
Signage
Details

 10-02-2018
2.00
Wheel base measurements
Details

 10-01-2018
4.00
installed all center constol sides
Details

 09-30-2018
2.00
Completed install of armrest/stick cover.
Details

 09-29-2018
2.00
Replaced missing rivits.
Details

 09-28-2018
1.00
Attached fuel placards to wing
Details

 09-27-2018
2.00
finished riveting rear windows
Details

 09-26-2018
2.00
continued riveting rear windows
Details

 09-25-2018
2.00
trimmed windsheild
Details

 09-25-2018
2.00
Began riveting rear windows.

 09-24-2018
2.00
Install top window
Details

 09-22-2018
2.00
Preped windshiled and top window
Details

 09-20-2018
2.00
added silicon to fuel fillers
Details

 09-19-2018
1.00
Positiionee windshield
Details

 09-18-2018
1.50
trimmed windshield
Details

 09-16-2018
2.00
top window
Details

 09-07-2018
2.00
windshield
Details

 09-06-2018
2.00
Windsheild
Details

 09-05-2018
3.00
Fitted windshield
Details

 09-04-2018
2.00
cleaned tool box
Details

 09-03-2018
2.00
boot cowl
Details

 09-02-2018
2.00
boot cowl and glare shield
Details

 09-01-2018
2.00
boot cowl and top window
Details

 08-31-2018
2.00
preped dash anti glare sheild
Details

 08-30-2018
2.50
Dip stick accss cover
Details

 08-29-2018
2.50
Glare shield
Details

 08-28-2018
2.00
glare sheild
Details

 08-27-2018
3.50
installed baggage carpet seat belts
Details

 08-26-2018
4.00
Route cables and hoses set carpet velcro
Details

 08-25-2018
2.00
Seats and signage
Details

 08-23-2018
2.00
Riveted more baggage
Details

 08-22-2018
2.00
carpet
Details

 08-21-2018
2.00
Continued riviting baggage area
Details

 08-20-2018
2.50
Polysulfide to fuEl filler neck
Details

 08-19-2018
2.50
seat floor
Details

 08-18-2018
2.50
seat bottoms
Details

 08-17-2018
2.00
Vritical supports
Details

 08-16-2018
2.00
Rear supports
Details

 08-11-2018
2.00
baggage area
Details

 08-07-2018
2.00
re glued side panel skins
Details

 08-06-2018
3.00
Cut carpet
Details

 08-05-2018
2.00
Drained fuel.
Details

 08-04-2018
2.00
Taxi test
Details

 08-03-2018
3.00
coax problem
Details

 08-01-2018
2.00
Routed cables below baggage area
Details

 07-31-2018
2.00
Static and xmit problem
Details

 07-30-2018
2.00
Static whith engine running
Details

 07-29-2018
3.00
Static problem
Details

 07-28-2018
2.00
Taxi test
Details

 07-27-2018
2.00
taxi test
Details

 07-26-2018
2.00
Rivet RH inboard wing skins
Details

 07-25-2018
2.00
Calibrated RH wing sending unit
Details

 07-24-2018
2.00
Replaced battery
Details

 07-23-2018
3.00
calibrate left wing tank sending unit
Details

 07-22-2018
3.00
rivet inboard lh wing skins & charge bu battery
Details

 07-21-2018
3.00
Taxi with cowl on
Details

 07-19-2018
2.00
Taxi test
Details

 07-18-2018
2.00
runst on steering rods
Details

 07-17-2018
2.00
bled brakes.
Details

 07-16-2018
3.00
parking brake problems
Details

 07-15-2018
2.00
Taxi test
Details

 07-14-2018
3.00
Inboard wing skins
Details

 07-13-2018
2.00
paint
Details

 07-12-2018
2.00
paint
Details

 07-11-2018
2.00
masked bagage comartment
Details

 07-10-2018
2.00
ELT
Details

 07-09-2018
1.00
ELT
Details

 07-08-2018
3.00
Adding gps cable to ELT
Details

 07-07-2018
2.00
Flaperon adjustment
Details

 07-06-2018
1.50
Elevator bellcrank
Details

 07-05-2018
2.00
begarn reassembly
Details

 07-04-2018
2.00
Paint tubes and rods
Details

 07-03-2018
1.00
control rods
Details

 07-02-2018
2.00
Rust on torque tube
Details

 07-01-2018
2.00
Panel and elt wiring
Details

 06-30-2018
3.00
panel wiring
Details

 06-29-2018
1.50
ELT
Details

 06-28-2018
3.00
panel wiring
Details

 06-27-2018
2.00
routed ELT remote cable
Details

 06-24-2018
2.00
Firewall pass through
Details

 06-23-2018
2.00
Numbers and exhaust pipe
Details

 06-22-2018
2.00
gps cable to elt
Details

 06-21-2018
8.00
Buff and shine
Details

 06-20-2018
2.00
Remove printing on external aluminum
Details

 06-14-2018
1.50
inspection plate
Details

 06-13-2018
3.00
Inspection access covers
Details

 06-11-2018
2.00
Configure Dynon
Details

 06-10-2018
4.00
Install front baffle on engine
Details

 06-09-2018
3.00
First engine run
Details

 06-08-2018
2.00
Found ignition problem
Details

 06-07-2018
3.00
Exhaust pipe install
Details

 06-06-2018
1.00
First start
Details

 06-05-2018
2.00
gascolator leak
Details

 06-04-2018
2.00
reposition wing bolts
Details

 06-03-2018
1.00
Repostion wing bolts
Details

 06-02-2018
1.00
Engine start
Details

 06-01-2018
2.00
Wiring problem
Details

 05-31-2018
2.00
Engine start
Details

 05-30-2018
3.00
used starter
Details

 05-28-2018
2.00
center console
Details

 05-27-2018
3.00
Center console
Details

 05-26-2018
3.00
5v for sensors
Details

 05-25-2018
3.00
Conected fuel control
Details

 05-24-2018
2.00
center console
Details

 05-23-2018
2.00
Install center console
Details

 05-22-2018
1.50
Cener console install
Details

 05-21-2018
1.50
Center console
Details

 05-19-2018
2.50
Pannel
Details

 05-18-2018
1.50
Instument Panel
Details

 05-17-2018
2.00
PTT
Details

 05-16-2018
2.00
PTT
Details

 05-15-2018
2.00
PTT
Details

 05-06-2018
2.00
avionics and wiring
Details

 05-05-2018
3.00
wiring
Details

 05-04-2018
3.00
trans ponder and adsb
Details

 05-03-2018
3.00
xponder and adsb config
Details

 05-02-2018
2.00
xponder and adsb
Details

 05-01-2018
3.00
xponder
Details

 04-30-2018
2.00
Com radio
Details

 04-29-2018
4.00
antennas
Details

 04-28-2018
1.00
ADSB
Details

 04-27-2018
2.00
Headset jacks
Details

 04-26-2018
3.00
Fuel pums
Details

 04-25-2018
2.00
Began wiring fuel pumps.
Details

 04-24-2018
3.00
Flaperons
Details

 04-23-2018
2.00
lights
Details

 04-22-2018
3.00
lights
Details

 04-21-2018
3.00
ADAHRS & lights
Details

 04-20-2018
1.00
ADAHRS
Details

 04-19-2018
2.00
ADHARS
Details

 04-18-2018
2.00
connected componenets
Details

 04-17-2018
2.00
Connected Dydnon electric
Details

 04-16-2018
2.00
Made up connections
Details

 04-15-2018
1.00
Made up and connected ground wire
Details

 04-14-2018
4.00
conect ring connector and attach
Details

 04-13-2018
4.00
Attach avionics
Details

 04-12-2018
3.00
Layed out location of avionics on deck
Details

 04-11-2018
3.00
Began install of avionics flight deck
Details
       

 04-10-2018
3.00
seats
Details

 04-09-2018
3.00
seats
Details

 04-08-2018
4.00
seats
Details

 04-07-2018
3.00
fuel lines and electric
Details
     

 04-06-2018
3.00
Fuel and electric
Details

 04-05-2018
3.00
Hose and electric
Details

 04-04-2018
3.00
routed fuel line
Details

 04-02-2018
2.00
reconnect and adj cables
Details

 03-31-2018
1.00
Oil cooler
Details

 03-30-2018
2.00
fuel lines
Details

 03-29-2018
2.00
Re install rudder
Details

 03-28-2018
3.00
replaced missing rivits
Details

 03-27-2018
3.00
Missing rivets in fin spar support
Details

 03-26-2018
3.00
elevator cable bungee
Details

 03-25-2018
2.00
Rudder cable abrasion
Details

 03-24-2018
4.50
fuel shut off valve repostioned
Details

 03-22-2018
3.00
Reroute fuel lines
Details

 03-21-2018
3.00
Header tank
Details

 03-20-2018
3.00
Elevator cable
Details

 03-19-2018
2.00
adj elevator control cable
Details

 03-18-2018
3.00
adj elev cables
Details

 03-17-2018
2.00
adj elev. cont. cables
Details

 03-16-2018
2.00
adjust elevator control lines
Details

 03-15-2018
3.00
header tank install
Details

 03-14-2018
3.00
Tension rudder cables
Details

 03-13-2018
3.00
Rudder cable tension adj
Details

 03-12-2018
2.00
Controll cable tension adj
Details

 03-11-2018
3.00
Drilled hole for return line
Details

 03-10-2018
2.00
Header tank install
Details

 03-09-2018
3.00
L bracket for header
Details

 03-08-2018
3.00
Fuel lines
Details

 03-07-2018
2.00
Plumb fuel lines
Details

 03-06-2018
3.00
Plumb fuel lines
Details

 03-05-2018
2.00
Fuel line
Details

 03-04-2018
3.00
Flaperon adjustment
Details

 03-03-2018
3.00
Aileron control connect
Details

 03-02-2018
2.00
Flaperon hinge point install.
Details

 03-01-2018
3.00
Plumb fuel lines
Details

 02-28-2018
3.00
Attach LH wing and struts
Details

 02-27-2018
3.00
Re attach
Details

 02-26-2018
3.00
Added tab butt splice connectors
Details

 02-25-2018
6.00
Added fuel line
Details

 02-24-2018
2.00
LH Door
Details

 02-24-2018
4.00
Began reinstall of L wing
Details

 02-23-2018
3.00
Flaperon install
Details

 02-22-2018
3.00
Attache RH wing and strut
Details

 02-21-2018
3.00
Right door attach
Details

 02-19-2018
4.00
Right wing work
Details

 02-18-2018
3.00
Removed alum fuel tube
Details

 02-17-2018
5.00
Removed RH wing
Details

 02-16-2018
2.00
Wing braces
Details

 02-15-2018
3.50
Wing brace
Details

 02-14-2018
5.00
Finished riviting doors
Details

 02-12-2018
3.00
Strut installation
Details

 02-11-2018
45.00
Struts
Details

 02-11-2018
6.00
Install of struts
Details

 02-10-2018
4.00
Attaching wings
Details
     

 02-09-2018
3.00
Fin
Details
     

 02-08-2018
4.00
Elevator trim install
Details

 02-05-2018
3.00
connect elevator cables
Details

 02-04-2018
3.00
Attach stab and elev
Details

 02-03-2018
4.00
Attach stab
Details

 02-02-2018
2.00
Start empannage attach
Details

 02-01-2018
3.00
Move to hanger
Details

 01-23-2018
3.00
Tap6-32 hole for windshield install
Details

 10-06-2017
5.00
Baffles
Details

 10-05-2017
6.00
Baffles
Details

 10-04-2017
6.00
Side panels
Details

 10-03-2017
3.00
Side panels
Details

 10-02-2017
6.00
Mounting engine
Details
       

 09-29-2017
4.00
Fuel pumps and filters
Details
     

 09-28-2017
6.00
Finish up empennage
Details
     

 09-27-2017
5.00
Fin and elevator
Details

 09-25-2017
6.00
Completing tail
     

 09-24-2017
5.00
Fin and elevator
Details

 09-23-2017
2.00
Working on Fin and elevator
Details

 09-22-2017
6.00
Elevator cables
Details

 09-21-2017
3.00
Elevator setup
Details

 09-20-2017
5.00
Rudder stops
Details

 09-19-2017
4.00
Rudder fair leads
Details

 09-12-2017
3.00
rudder cables
Details

 09-11-2017
4.00
Swag rudder cables
Details

 09-10-2017
6.00
rudder, fin and cables
Details

 09-09-2017
4.00
Control installaation
Details
     

 09-08-2017
6.00
Fin and stab
Details

 09-07-2017
4.00
fin and sab
Details

 09-06-2017
4.00
fin assembly
Details
     

 09-05-2017
2.00
Fin build
Details

 09-04-2017
3.00
stabiliser install
Details
     

 09-03-2017
4.00
Stabilizer install
Details
       

 09-01-2017
3.00
Fuel line routing
Details

 08-31-2017
8.00
Install controls
Details

 08-30-2017
2.00
Torque tube support
Details
     

 08-27-2017
1.50
Flap motor
Details

 08-26-2017
1.50
Install master cylinder
Details

 08-23-2017
3.00
Nose gear
Details
     

 08-22-2017
1.50
Nose gear
Details

 08-21-2017
1.00
Nose gear
Details

 08-13-2017
4.00
landing gear
Details
     

 08-10-2017
6.00
Landing gear
Details
     

 08-09-2017
4.00
Wheels and main landing gear
Details
     

 08-07-2017
4.00
Landing gear
Details

 08-05-2017
1.50
R wing tank
Details

 08-04-2017
7.00
Finishe Left wing
Details

 08-02-2017
1.00
Began riveting top skins
Details
       

 06-06-2017
9.00
Flaperons
Details
       

 03-03-2017
4.00
Woking on Stab
Details

 03-02-2017
4.00
Working on stab
Details
       

 03-01-2017
4.00
Assem stab
Details

 02-28-2017
2.00
Began assembly of Stabilizer
Details
       

 02-27-2017
3.00
Unpack and inventory
Details
       

 01-26-2017
6.00
Completed rudder
Details

 01-25-2017
6.00
Began construction of rudder
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.