KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
Work Logs Found: 95
Category Work Time: 346 Hours
 Date
Hours
Work Log Summary

Details

 03-30-2024
1.00
D100 Pitot/Static/AOA tube color codes
Details

 09-15-2020
8.00
Calibrated Fuel Tanks
Details
       

 09-02-2020
4.00
Completed installation of Wing Root Faring
       

 08-28-2020
6.00
Replaced Lower Engine Mount Bolts
Details

 08-26-2020
6.00
PRE-DAR Inspection
Details

 08-20-2020
1.00
Tightened jam nuts for stabilator and stick
Details

 08-20-2020
1.00
Remaining Tasks Memo of 8/3/2020
Details

 08-20-2020
1.00
Installed Windshield Screws
Details

 08-19-2020
3.00
Stabilator Rigging
Details

 08-19-2020
2.00
Adjusted Engine Idle Settings
Details

 08-17-2020
2.00
Nose Gear Follow-up
Details

 08-17-2020
4.00
Faucet Electric Fuel Pump Test - 22 GPH
Details

 08-17-2020
2.00
Checked Throttle, Choke, Carb Heat Cable Linkages
Details

 08-03-2020
5.00
Installed and adjusted Aileron and Flaps
Details

 07-31-2020
25.00
Install Wing Tips
Details
       

 06-12-2020
2.00
Aim the Lights
Details

 06-11-2020
4.00
Completed Flap Torque Tube Installation
Details

 06-10-2020
2.00
Started Flap Torque Tube Installation

 06-10-2020
2.00
Completed/Tested Fuel System Connections
Details

 06-08-2020
1.00
Items to Check
Details

 06-08-2020
3.00
Install right wing to fuel selector
Details

 05-29-2020
3.00
Wired Wing Tip Strobe and Nav lights to switches.
Details

 05-29-2020
3.00
Wired Landing Lights
Details

 05-22-2020
2.00
Attached Wings
Details
     

 05-19-2020
8.00
Moved N519SM to Craig
Details
       

 05-18-2020
1.00
EARL's Inline Fuel Filter 230106
Details
     

 04-22-2020
1.00
Next Steps
Details

 04-21-2020
1.00
Install Firewall Plugs
Details
     

 04-13-2020
2.00
EarthX Battery Fault Indicator
Details

 04-09-2020
2.00
ELT Re-Install
Details

 04-02-2020
4.00
Fabricate and Install Wing Tip Weights
Details
     

 03-31-2020
1.00
ELT Checkout
Details
     

 03-30-2020
2.00
Fabricated Right Wing weight
Details
     

 03-26-2020
1.00
Charge Left Brakes
Details

 03-24-2020
1.00
Transponder Altitude Display
Details

 03-23-2020
3.00
Installed Brake Lines
Details
     

 03-18-2020
3.00
Installed Spinner - Test Ran Engine With Cowling I
Details
     

 03-18-2020
2.00
Installed Nose Cone and Ran Engine
Details
     

 03-18-2020
1.00
Configured GDL 82 ADSB Out
Details
     

 03-18-2020
2.00
Configured GDL 82 ADSB Out
Details
     

 02-10-2020
2.00
Install camlocs
Details

 01-30-2020
2.00
Cowling Front View
     

 01-30-2020
7.00
Bottom Cowling Fitting
Details
       

 01-15-2020
3.00
Initiated cowling installation
Details
     

 01-14-2020
2.00
Installed Oil Recovery container
       

 01-07-2020
5.00
First Engine Start
Details
     

 12-20-2019
4.00
Mounted and Pitched the Duc Prop
Details
     

 12-20-2019
12.00
Baffles and Engine Turn
Details
       

 12-16-2019
2.00
Remounted Panel
Details

 12-16-2019
2.00
Remounted Panel
Details

 12-03-2019
5.00
Frabicated Bracket for Left Wing Light
Details
     

 12-02-2019
10.00
Fuel Delivery System - Continued Fabrication
Details
       

 10-19-2019
1.00
Mount ADSB GPS Antenna
Details
     

 10-09-2019
10.00
Wing Landing Light Cutouts
Details
       

 10-09-2019
5.00
Mounted and wired ADSB
Details
     

 10-09-2019
5.00
Mounted and wired ADSB
Details
     

 10-09-2019
1.00
Mount GPS Antenna
Details
     

 09-24-2019
15.00
Completed & Test Landng, Strobe, & Nav Light Wirin
Details

 09-11-2019
2.00
Landing Light Wiring
Details
     

 09-10-2019
1.00
Wings Install Notes
Details
       

 09-09-2019
3.00
Ran Strobe n Nav Wires to Wing Tip
Details
       

 09-09-2019
3.00
Landing Light Cutout
Details
     

 08-28-2019
3.00
Install Wing Tips
Details
     

 08-26-2019
2.00
Finished Roll Bar Installation
Details
     

 08-20-2019
4.00
Test Install of Left and Right Wings
Details
       

 08-16-2019
2.00
Flap Handle Updates
Details
     

 08-08-2019
3.00
Installed CHT n EGT
Details
     

 08-08-2019
2.00
Install rollbar support
Details
       

 08-01-2019
4.00
Ran wires to the Beacon
Details
       

 07-31-2019
3.00
Fixed SL-40 Mic and Headphone
Details

 07-31-2019
3.00
Fixed SL-40 Mic and Headphone
Details

 07-30-2019
3.00
Wing Installation
Details
     

 07-19-2019
4.00
Checked torque of wing components
Details
       

 07-17-2019
5.00
Checked torque on Vertical Stabilizer
Details
     

 07-12-2019
5.00
Powder Coated a number of parts
Details
     

 07-06-2019
8.00
Moved Aircraft to Giorgio's Hangar
Details

 06-07-2019
3.00
Finished Ray Allen Trim Connections
Details

 06-07-2019
3.00
Finished Ray Allen Trim Connections
Details

 04-11-2019
1.00
Trim Circuit Breaker
Details

 04-11-2019
1.00
Trim Circuit Breaker
Details

 04-08-2019
7.00
Wiring Trim Servo
Details

 04-08-2019
7.00
Wiring Trim Servo
Details

 11-25-2018
3.00
Installed tail cone
Details
       

 11-19-2018
2.00
Trim Servo DB9 Pinout
Details
       

 11-19-2018
2.00
Trim Servo DB9 Pinout
Details
       

 11-19-2018
2.00
Trim Servo DB9 Pinou
Details

 11-17-2018
12.00
Mounted Horizontal Stabilizer
Details
       

 11-14-2018
3.00
Powered up Dynon Comm and XPNDR
Details
     

 11-14-2018
3.00
Powered up Dynon Comm and XPNDR
Details
     

 11-05-2018
2.00
Mounting the panel
Details

 10-01-2018
1.00
Installed Ray Allen TRIM servo.
Details

 08-01-2018
2.00
Learning to Navigate KitPro Log is a Challenge
Details

 10-07-2017
1.00
Initiating the KitPro Log
Details

 09-01-2017
5.00
Oil Cooler
Details
       

 09-01-2017
5.00
Mounted Engine
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.