Powered By Kitlog Pro v2.0
Johns Web Site
S-19
All
Work Logs Found:
95
Category Work Time:
346 Hours
Date
Hours
Work Log Summary
Details
03-30-2024
1.00
D100 Pitot/Static/AOA tube color codes
Details
09-15-2020
8.00
Calibrated Fuel Tanks
Details
09-02-2020
4.00
Completed installation of Wing Root Faring
08-28-2020
6.00
Replaced Lower Engine Mount Bolts
Details
08-26-2020
6.00
PRE-DAR Inspection
Details
08-20-2020
1.00
Tightened jam nuts for stabilator and stick
Details
08-20-2020
1.00
Remaining Tasks Memo of 8/3/2020
Details
08-20-2020
1.00
Installed Windshield Screws
Details
08-19-2020
3.00
Stabilator Rigging
Details
08-19-2020
2.00
Adjusted Engine Idle Settings
Details
08-17-2020
2.00
Nose Gear Follow-up
Details
08-17-2020
4.00
Faucet Electric Fuel Pump Test - 22 GPH
Details
08-17-2020
2.00
Checked Throttle, Choke, Carb Heat Cable Linkages
Details
08-03-2020
5.00
Installed and adjusted Aileron and Flaps
Details
07-31-2020
25.00
Install Wing Tips
Details
06-12-2020
2.00
Aim the Lights
Details
06-11-2020
4.00
Completed Flap Torque Tube Installation
Details
06-10-2020
2.00
Started Flap Torque Tube Installation
06-10-2020
2.00
Completed/Tested Fuel System Connections
Details
06-08-2020
1.00
Items to Check
Details
06-08-2020
3.00
Install right wing to fuel selector
Details
05-29-2020
3.00
Wired Wing Tip Strobe and Nav lights to switches.
Details
05-29-2020
3.00
Wired Landing Lights
Details
05-22-2020
2.00
Attached Wings
Details
05-19-2020
8.00
Moved N519SM to Craig
Details
05-18-2020
1.00
EARL's Inline Fuel Filter 230106
Details
04-22-2020
1.00
Next Steps
Details
04-21-2020
1.00
Install Firewall Plugs
Details
04-13-2020
2.00
EarthX Battery Fault Indicator
Details
04-09-2020
2.00
ELT Re-Install
Details
04-02-2020
4.00
Fabricate and Install Wing Tip Weights
Details
03-31-2020
1.00
ELT Checkout
Details
03-30-2020
2.00
Fabricated Right Wing weight
Details
03-26-2020
1.00
Charge Left Brakes
Details
03-24-2020
1.00
Transponder Altitude Display
Details
03-23-2020
3.00
Installed Brake Lines
Details
03-18-2020
3.00
Installed Spinner - Test Ran Engine With Cowling I
Details
03-18-2020
2.00
Installed Nose Cone and Ran Engine
Details
03-18-2020
1.00
Configured GDL 82 ADSB Out
Details
03-18-2020
2.00
Configured GDL 82 ADSB Out
Details
02-10-2020
2.00
Install camlocs
Details
01-30-2020
2.00
Cowling Front View
01-30-2020
7.00
Bottom Cowling Fitting
Details
01-15-2020
3.00
Initiated cowling installation
Details
01-14-2020
2.00
Installed Oil Recovery container
01-07-2020
5.00
First Engine Start
Details
12-20-2019
4.00
Mounted and Pitched the Duc Prop
Details
12-20-2019
12.00
Baffles and Engine Turn
Details
12-16-2019
2.00
Remounted Panel
Details
12-16-2019
2.00
Remounted Panel
Details
12-03-2019
5.00
Frabicated Bracket for Left Wing Light
Details
12-02-2019
10.00
Fuel Delivery System - Continued Fabrication
Details
10-19-2019
1.00
Mount ADSB GPS Antenna
Details
10-09-2019
10.00
Wing Landing Light Cutouts
Details
10-09-2019
5.00
Mounted and wired ADSB
Details
10-09-2019
5.00
Mounted and wired ADSB
Details
10-09-2019
1.00
Mount GPS Antenna
Details
09-24-2019
15.00
Completed & Test Landng, Strobe, & Nav Light Wirin
Details
09-11-2019
2.00
Landing Light Wiring
Details
09-10-2019
1.00
Wings Install Notes
Details
09-09-2019
3.00
Ran Strobe n Nav Wires to Wing Tip
Details
09-09-2019
3.00
Landing Light Cutout
Details
08-28-2019
3.00
Install Wing Tips
Details
08-26-2019
2.00
Finished Roll Bar Installation
Details
08-20-2019
4.00
Test Install of Left and Right Wings
Details
08-16-2019
2.00
Flap Handle Updates
Details
08-08-2019
3.00
Installed CHT n EGT
Details
08-08-2019
2.00
Install rollbar support
Details
08-01-2019
4.00
Ran wires to the Beacon
Details
07-31-2019
3.00
Fixed SL-40 Mic and Headphone
Details
07-31-2019
3.00
Fixed SL-40 Mic and Headphone
Details
07-30-2019
3.00
Wing Installation
Details
07-19-2019
4.00
Checked torque of wing components
Details
07-17-2019
5.00
Checked torque on Vertical Stabilizer
Details
07-12-2019
5.00
Powder Coated a number of parts
Details
07-06-2019
8.00
Moved Aircraft to Giorgio's Hangar
Details
06-07-2019
3.00
Finished Ray Allen Trim Connections
Details
06-07-2019
3.00
Finished Ray Allen Trim Connections
Details
04-11-2019
1.00
Trim Circuit Breaker
Details
04-11-2019
1.00
Trim Circuit Breaker
Details
04-08-2019
7.00
Wiring Trim Servo
Details
04-08-2019
7.00
Wiring Trim Servo
Details
11-25-2018
3.00
Installed tail cone
Details
11-19-2018
2.00
Trim Servo DB9 Pinout
Details
11-19-2018
2.00
Trim Servo DB9 Pinout
Details
11-19-2018
2.00
Trim Servo DB9 Pinou
Details
11-17-2018
12.00
Mounted Horizontal Stabilizer
Details
11-14-2018
3.00
Powered up Dynon Comm and XPNDR
Details
11-14-2018
3.00
Powered up Dynon Comm and XPNDR
Details
11-05-2018
2.00
Mounting the panel
Details
10-01-2018
1.00
Installed Ray Allen TRIM servo.
Details
08-01-2018
2.00
Learning to Navigate KitPro Log is a Challenge
Details
10-07-2017
1.00
Initiating the KitPro Log
Details
09-01-2017
5.00
Oil Cooler
Details
09-01-2017
5.00
Mounted Engine
Details
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
95
346
Avionics
11
30
Avionics
16
38
Brakes
2
4
Canopy
2
4
Control Surfaces
2
8
Empennage
2
2
Engine
18
76
Final Assembly
4
13
Fuel System
5
18
Fuselage
6
28
Lighting
6
38
Miscellaneous
5
17
Paperwork
2
3
Wing Tip
3
31
Wings
11
36
Copyright © 2001-2024 Matronics. All Rights Reserved.