KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
Work Logs Found: 409
Category Work Time: 2782 Hours
 Date
Hours
Work Log Summary

Details

 06-29-2024
8.00
Moving out
Details
       

 05-25-2024
1.00
Sanding
Details
       

 05-24-2024
3.00
Making space for the alternator fan
Details
       

 05-21-2024
18.00
Baffle & addition rivets on center bellcrank locat
Details
       

 05-14-2024
6.00
Alternator, starter & baffle tension rods
Details
       

 05-13-2024
6.00
Fuel servo, air bowl, baffle
Details
       

 05-12-2024
6.00
Various
Details
       

 05-06-2024
2.00
Nut plates
Details

 05-05-2024
3.00
Steering link
Details
       

 05-04-2024
4.00
Various
Details
       

 05-03-2024
8.00
Various
Details
       

 05-02-2024
7.00
Fairing and rudder install
Details
       

 05-01-2024
6.00
Installing the fairing
Details
       

 04-30-2024
3.00
Rigging the elevator Bellcrank
Details
       

 04-29-2024
8.00
Installing the elevators
Details
       

 04-28-2024
14.00
Various
Details
       

 04-25-2024
10.00
Nutplates & empennage installation
Details
       

 04-24-2024
2.00
Nut plates install on fiberglass tip ends
Details
     

 04-22-2024
7.00
Wingtips --- antenna & Nav lights.
Details
       

 04-19-2024
5.00
Closing Fiberglass tip
Details
       

 04-18-2024
8.00
Checking the empenage
Details
       

 04-17-2024
7.00
Finishing yesterday's work !
Details
       

 04-16-2024
11.00
Doing the SB00036
Details
       

 04-10-2024
3.00
Almost done !
Details
       

 04-09-2024
9.00
Cockpit almost ready
Details
       

 04-07-2024
5.00
An overlooked !
Details
       

 04-06-2024
3.00
Finishing the Canopy lock warning
Details
       

 04-04-2024
7.00
Canopy latch - micro switch installed
Details
       

 04-03-2024
8.00
Completing some tasks to get it ready for paint
Details
       

 04-02-2024
8.00
Continuing toward completing the interior
Details
       

 04-01-2024
6.00
Little things
Details
       

 03-31-2024
14.00
Luggage area
Details
     

 03-29-2024
5.00
Tightening the cockpit
Details
       

 03-28-2024
6.00
Nut plates !
Details

 03-27-2024
6.00
Cockpit floor & continuing cleaning
Details
       

 03-26-2024
12.00
Connecting the stick , installing the RG400 for th
Details
       

 03-20-2024
3.00
Cockpit work
Details
       

 03-19-2024
7.00
Reassembling the cabin
Details
       

 03-18-2024
3.00
Re-assembling the inside
Details
       

 03-15-2024
6.00
Riveting nutplates on bulkheads
Details
       

 03-14-2024
2.00
Spinner final drilling
Details
     

 03-12-2024
6.00
Spinner final drilling & gap filler plates install
Details
       

 03-10-2024
4.00
Spinner alignment
Details
       

 03-08-2024
8.00
Spinner cutting
Details
       

 03-07-2024
7.00
Spinner fiberglass work
Details
       

 03-06-2024
6.00
Spinner fitting
Details
       

 03-05-2024
14.00
Front end fit , trim, fiberglass
Details
       

 01-23-2024
3.00
Detwisting the cowling
Details
       

 01-22-2024
8.00
Straightening the cowling front end
Details
       

 01-12-2024
6.00
Baffle
Details
       

 01-08-2024
10.00
Baffle
Details
       

 12-18-2023
8.00
Baffle
Details
       

 12-11-2023
14.00
Installing exhaust & muffs
Details
       

 12-04-2023
10.00
Baffle and cooling questionning
Details
       

 12-01-2023
8.00
Trimming the baffles
Details
       

 11-27-2023
6.00
Baffle work continuing
Details
       

 11-20-2023
3.00
Baffle
Details
       

 10-15-2023
4.00
Baffles continuation
Details
       

 10-14-2023
8.00
Baffles
Details
       

 10-09-2023
8.00
Baffles
Details
       

 10-06-2023
4.00
Finishing the scoop ... almost !
Details
       

 10-01-2023
8.00
Scoop fixing & starting installing the baffles
Details
       

 09-30-2023
9.00
More fiberglassing
Details
       

 09-24-2023
8.00
Completing the removable air scoop
Details
       

 09-23-2023
7.00
Cowling ... on going tasks
Details
       

 09-17-2023
10.00
Installing & other
Details

 09-10-2023
9.00
Various
Details
       

 08-20-2023
10.00
Scoop , louvers & errands
Details
       

 07-30-2023
12.00
Accessories linked to the cowling
Details
       

 07-16-2023
6.00
Air filter
Details
       

 07-10-2023
16.00
Cowling ... on going !
Details
       

 07-03-2023
7.00
Continuing
Details
       

 07-02-2023
7.00
Various things ... preparing to final rivet it !
Details
       

 07-01-2023
6.00
Access holes & completing drilling
Details
       

 06-26-2023
7.00
Drilling hinges
Details
       

 06-11-2023
7.00
Over the hill !
Details
       

 06-10-2023
14.00
Final cowling trimming
Details
     

 06-08-2023
16.00
Rough fitting the cowling
Details
       

 06-06-2023
18.00
Adjusting the top cowling
Details
       

 06-04-2023
8.00
Fitting the top cowl
Details
     

 06-03-2023
7.00
Starting to install the cowling
Details
       

 05-30-2023
6.00
Nutplates again
Details

 05-28-2023
4.00
Access trap installed
Details
       

 05-22-2023
13.00
More nut plates - new battery rack, interior
Details
       

 05-15-2023
18.00
Aithre CO detector & F-671 skin
Details
       

 05-08-2023
12.00
Mechanical change of mind !
Details
       

 04-23-2023
10.00
Completed all connections that were possible
Details
       

 04-16-2023
6.00
Excitement is in the air !
Details
       

 04-09-2023
9.00
Various
Details
       

 03-19-2023
12.00
Various things before final closing
Details
       

 03-12-2023
12.00
Completing various things !
Details
       

 03-05-2023
16.00
Red cube install, small errands and garage
Details
       

 02-12-2023
3.00
Working on cowling
Details
       

 02-11-2023
6.00
Wiring and Cowling jig
Details
       

 02-04-2023
4.00
Various errands
Details
       

 01-29-2023
7.00
P-Mag & Back up alternator
Details
       

 01-28-2023
3.00
Flag terminals & brackets
Details
       

 01-27-2023
7.00
Wiring various
Details
       

 01-22-2023
5.00
Various
Details
       

 01-18-2023
1.00
MAP plumbing completed
Details
       

 01-15-2023
7.00
Adding more things on the firewall
Details
       

 01-14-2023
6.00
Small stuff but takes up a lot of time !
Details
       

 01-02-2023
12.00
Various
Details
     

 12-18-2022
6.00
Engine
Details
       

 12-11-2022
10.00
Working around the engine
Details
       

 12-03-2022
6.00
Hanging the engine
Details
       

 11-27-2022
11.00
Gear leg, brake & Wheels
Details
       

 11-20-2022
7.00
Gear leg drilled in place
Details
       

 11-19-2022
8.00
Engine mount , gear legs
Details
       

 11-13-2022
10.00
Forward top skin continuing
Details
       

 11-06-2022
8.00
Top forward skin
Details
       

 10-30-2022
5.00
Preparing forward skin
Details
       

 10-16-2022
17.00
Working at closing the forward skin
Details
     

 10-12-2022
16.00
Last weekend !
Details
       

 10-06-2022
12.00
Various
Details
     

 09-25-2022
8.00
Wiring continuing
Details
       

 09-24-2022
5.00
Seats & wiring
Details
       

 09-18-2022
6.00
Wiring continuation
Details
       

 08-22-2022
11.00
Soldering
Details
       

 08-20-2022
8.00
Seats and Intercom Harness
Details
       

 07-24-2022
4.00
Seat backing preparation
Details
       

 07-17-2022
5.00
Difficult DSUB to connect
Details
       

 07-03-2022
10.00
Wirring ... tiring !
Details
       

 06-18-2022
4.00
AN fitting safety & Inside the cabin
Details
       

 05-29-2022
10.00
Various
Details
       

 05-23-2022
8.00
Wiring
Details
       

 05-15-2022
10.00
Wiring continuing & other
Details
       

 05-08-2022
35.00
Wiring continuiing
Details
       

 04-03-2022
10.00
Wiring continuing
Details
       

 03-27-2022
12.00
Wiring continuing
Details
       

 03-20-2022
7.00
Various wirings & new knob installed
Details
       

 03-13-2022
7.00
Wiring
Details
       

 03-06-2022
12.00
Wiring continue
Details
       

 02-27-2022
8.00
Wiring
Details
       

 02-26-2022
7.00
Preparing to wire
Details
       

 02-13-2022
12.00
Preparing for wiring
Details
       

 02-06-2022
12.00
Canopy transition completed
Details
       

 01-31-2022
10.00
Canopy & panel
Details
       

 01-23-2022
10.00
Various
Details
       

 01-16-2022
10.00
Canopy continuing
Details
       

 01-09-2022
9.00
Canopy preparation
Details
     

 01-02-2022
5.00
Canopy, preparing for making the fiberglass transi
Details
       

 12-30-2021
8.00
Canopy, final drilling
Details
       

 12-29-2021
8.00
Canopy, metal preparation
Details
       

 12-28-2021
8.00
Canopy drilling process
Details
       

 12-19-2021
13.00
Canopy installation
Details
       

 12-05-2021
7.00
Working the canopy
Details
       

 12-04-2021
6.00
Finishing the canopy frame
Details
       

 11-28-2021
6.00
Preparing Canopy Frame ... continuing
Details
       

 11-27-2021
6.00
Canopy preparation
Details
       

 11-21-2021
14.00
Preparing for canopy installation
Details
       

 10-31-2021
8.00
Errands
Details
       

 10-23-2021
6.00
Riveting top rear fuselage
Details
       

 10-17-2021
12.00
Preparing for riveting top rear fuselage
Details
       

 10-03-2021
10.00
Many errands in preparation of riveting
Details
       

 09-26-2021
6.00
Adding components & preparing for final riveting
Details
       

 09-18-2021
16.00
Panel work - wiring -
Details
       

 09-05-2021
8.00
Panel work
Details
       

 08-28-2021
8.00
Cutting the panel
Details
     

 08-08-2021
3.00
Storage of the wings
Details
       

 08-01-2021
8.00
Corrosion !
Details
       

 07-28-2021
20.00
Dash work
Details
     

 07-03-2021
4.00
Trimming canopy skin & installing the cowling hing
Details
       

 07-02-2021
6.00
Struts install
Details
       

 07-01-2021
7.00
Drilling & fitting canopy skin
Details
       

 07-01-2021
1.00
Canopy top rear lock
Details
     

 06-16-2021
8.00
Drilling the forward canopy skin
Details
       

 06-05-2021
7.00
Jettison system
Details
       

 05-30-2021
8.00
Preparing for skinning the forward top side.
Details
       

 05-29-2021
3.00
Finisihing drilling / positionning inside cabin
Details
       

 05-23-2021
5.00
Center console
Details
       

 05-22-2021
5.00
Center console re-work
Details
       

 05-16-2021
8.00
Center console work
Details
       

 05-09-2021
6.00
Various
Details
       

 05-02-2021
8.00
Various cockpit assembly pre-installation
Details
       

 04-26-2021
5.00
Center console
Details
       

 04-25-2021
16.00
Various
Details
       

 04-19-2021
10.00
Canopy frame
Details
       

 04-18-2021
8.00
Errands
Details
       

 04-15-2021
10.00
Sub panel drilling & canopy deck
Details
       

 04-11-2021
10.00
Varia
Details
       

 04-09-2021
4.00
Various
Details
       

 04-05-2021
21.00
Electric flaps system & manual aileron trim
Details
       

 03-28-2021
16.00
Floor & seats
Details
       

 03-21-2021
3.00
Errands
Details

 03-08-2021
8.00
Off the rack !
Details
       

 02-28-2021
11.00
Fitting cabin floor
Details
       

 02-21-2021
5.00
Cabin floor fitting
Details
       

 02-20-2021
5.00
Rear top skin drilling
Details
       

 02-15-2021
9.00
Top skin drilling
Details
       

 02-08-2021
15.00
Working on fuselage top side
Details
       

 01-31-2021
8.00
Top side structure
Details
       

 01-30-2021
8.00
Preparing the roll bar
Details
       

 01-24-2021
12.00
Drilling the roll bar
Details
       

 01-18-2021
4.00
Adding parts on the fuselage
Details
       

 01-17-2021
6.00
Installing the tail deck
Details
       

 01-16-2021
3.00
Completed riveting and flipping it over
Details
       

 01-10-2021
10.00
Riveting and few errands
Details
       

 12-30-2020
11.00
Riveting the canoe !
Details
     

 12-29-2020
3.00
Getting it ready for riveting session
Details
       

 12-28-2020
10.00
Dimpling & priming
Details
     

 12-26-2020
7.00
Deburring & dimpling
Details
     

 12-20-2020
10.00
Deburring Dimpling continuing !
Details
       

 12-13-2020
12.00
Deburring, dimpling, counter sinking
Details
       

 12-06-2020
8.00
Canoe drilling done !
Details
       

 11-29-2020
14.00
Drilling skins
Details
       

 11-22-2020
4.00
Transition corner - Rib F-613
Details
       

 11-15-2020
20.00
Keep drilling skins
Details
       

 11-07-2020
6.00
Drilling skins
Details
       

 11-01-2020
8.00
Continuing drilling
Details
       

 10-30-2020
5.00
Adding Rudder cable fairing
Details
       

 10-17-2020
4.00
An other irritant !
Details
       

 10-12-2020
8.00
Adding F673 skins
Details
       

 10-11-2020
7.00
Started adding the skins on the structure
Details
       

 10-10-2020
8.00
Completing structure riveting
Details
       

 10-04-2020
12.00
Repair Bottom Longeron & continuing on
Details
       

 09-27-2020
6.00
Bottom Longeron & Tail wheel
Details
       

 09-21-2020
2.00
Completed priming structure
Details
       

 09-20-2020
16.00
Deburring, priming
Details
       

 09-13-2020
15.00
Pre-skin preparation
Details
       

 09-06-2020
8.00
Structure assembly continuing
Details
       

 09-05-2020
7.00
Structure assembly finishing
Details
       

 08-29-2020
8.00
Continuing structure assembly
Details
       

 08-23-2020
14.00
Installing bulkheads
Details
       

 08-09-2020
11.00
Baggage & Floor Ribs
Details
       

 07-26-2020
16.00
Installing F605 bulkhead
Details
       

 07-24-2020
16.00
Installing F604 bulkhead
Details
       

 07-21-2020
8.00
Attaching firewall to Longeron
Details
       

 07-20-2020
6.00
Bending the Longerons
Details
       

 07-18-2020
8.00
Firewall completion & sealing it off.
Details
       

 07-13-2020
5.00
Final firewall preparation
Details
       

 07-11-2020
3.00
Firewall wok
Details
       

 06-28-2020
4.00
Firewall preparation
Details
       

 05-18-2020
6.00
Installing Fuselage jig
Details
     

 05-17-2020
4.00
Moving wings out of garage
Details

 05-16-2020
4.00
Rivetting F606 partially

 05-10-2020
5.00
F606 deburring, priming & garage cleaning
Details
       

 04-26-2020
7.00
clean & prime
Details
     

 04-25-2020
6.00
F-606
Details
     

 04-20-2020
1.00
F602 Cut & drill rudder hole
Details
     

 04-19-2020
5.00
F604 & 605 preparation & riveting
Details
       

 04-14-2020
1.00
F605 Bulkhead
Details
       

 04-13-2020
8.00
F605 Bulkhead
Details
     

 04-11-2020
4.00
Bulkhead work
Details
       

 04-05-2020
6.00
Bulkhead preparation
Details
       

 04-02-2020
4.00
Fuselage ribs ---
Details
       

 03-29-2020
8.00
Sorting & organising
Details
       

 02-02-2020
6.00
Rivet flaps hinge
Details
     

 02-01-2020
5.00
Riveting intrados of RW
Details
       

 01-26-2020
2.00
Fuel tank leak repaired
Details
       

 01-25-2020
5.00
RW riveting continuing
Details
       

 01-18-2020
5.00
Riveting bottom skin on RW
Details
     

 01-12-2020
7.00
RW flap brace
Details
       

 01-05-2020
7.00
Errands before rivet bottom skins to ribs final
Details
       

 12-27-2019
8.00
Flap installation on RW
Details
       

 12-26-2019
6.00
Installing the RW aileron on the wing
Details
       

 12-22-2019
4.00
RW Aileron bracket
Details
       

 12-21-2019
4.00
Reassembling the RW
Details
       

 10-20-2019
6.00
Finish LW bottom skin rivetting
Details
       

 10-14-2019
6.00
Start riveting bottom skin
Details
       

 10-13-2019
8.00
Finishing details
       

 10-12-2019
5.00
Finishing details before closing wing final
       

 10-06-2019
4.00
Cleaning the tanks & preparing the area to add pro
Details
       

 10-02-2019
1.00
Checking tank leaks
Details
       

 09-29-2019
5.00
Installed the light in the RW LE
Details
       

 09-28-2019
7.00
Light install in LW LE
Details
     

 09-22-2019
3.00
LE Duckworks LE light -- starting the install
Details
       

 09-21-2019
2.00
Finish preparing the aileron gap fairing on LW
Details
     

 09-20-2019
0.00
Engine on it's way !
Details
     

 09-15-2019
4.00
Rivetted the flap brace
Details
       

 09-14-2019
6.00
Re-did my flap brace
Details
       

 09-08-2019
12.00
Various
Details
       

 08-10-2019
6.00
Installing aileron on wing
Details
       

 08-03-2019
7.00
HS final riveting
Details
       

 07-28-2019
4.00
Left flap final riveting
       

 07-28-2019
1.00
HS final riveting started
Details
       

 07-21-2019
4.00
Right flap riveted
Details
       

 07-14-2019
5.00
Final riveted both aileron
Details
       

 06-24-2019
4.00
VS & Rudder
Details
       

 06-07-2019
7.00
Prosealed the RW rear baffle
Details
       

 06-02-2019
9.00
Prosealed rear baffle of LW tank
Details
     

 06-01-2019
2.00
Prosealed the fuel pickup tube
Details
       

 05-26-2019
6.00
Final riveting of ailerons
Details
       

 05-25-2019
0.00
Flight for youth
Details
     

 05-18-2019
5.00
Various
Details
       

 05-11-2019
4.00
Pre-Cover inspection completed
Details
     

 04-26-2019
2.00
Rivetting VS
Details
       

 04-20-2019
5.00
Errands ...
Details
       

 04-19-2019
5.00
Riveting RW extrados
Details
       

 04-14-2019
11.00
RW preparation
Details
       

 04-13-2019
5.00
LW extrados riveting
Details
       

 04-07-2019
10.00
LW preparation for reveting
Details

 03-31-2019
10.00
Deburring & dimpling bottom skins
Details

 03-23-2019
10.00
Working on left wing bottom skins
Details
       

 03-17-2019
8.00
Drilling skins LW-under side
Details
       

 03-10-2019
8.00
Changing wing position on jig & drilling bottom ou
Details
       

 03-06-2019
7.00
Riveted both flaps
Details
       

 03-03-2019
12.00
Debur, dimble & prime
Details
       

 02-24-2019
4.00
Lightning holes & began installing top skin
Details
       

 02-23-2019
2.00
Drilling root bracket on the other flap
Details
     

 02-17-2019
9.00
Started the flaps
Details
       

 02-16-2019
7.00
Fixed the tip rib & completed the other aileron
Details
       

 02-10-2019
6.00
Try completing the LW-Aileron
Details
       

 02-09-2019
6.00
Finish RW aileron
Details

 02-06-2019
2.00
Finish drilling bottom side of RW aileron
Details
       

 02-03-2019
7.00
Riveting, bending & more drilling !
       

 02-02-2019
5.00
clean, dimpling, prime
       

 01-20-2019
8.00
Aileron preparation continuing
Details
       

 01-19-2019
5.00
Making the Aileron skin stiffener
Details
       

 01-13-2019
3.00
Aileron skeleton
Details
       

 01-12-2019
6.00
Starting the aileron
Details
       

 01-06-2019
5.00
Tanks almost done !
Details
       

 01-05-2019
4.00
Proseal top side of left tank
Details
       

 12-28-2018
6.00
Continuing prosealing the left fuel tank
Details
       

 12-09-2018
4.00
Assembling of the trim tab
Details
       

 12-02-2018
4.00
LW-Tank riveting
Details
       

 12-01-2018
4.00
LW tank pro-sealing parts
Details
       

 11-25-2018
5.00
Riveting & sealing all rivets
Details
       

 11-24-2018
5.00
Pro-seal the right tank-- continuing
       

 11-19-2018
5.00
Riveting the ribs
Details
       

 11-17-2018
10.00
First time using proseal
Details
       

 11-11-2018
8.00
Finish preparing Left wing Tank
Details
       

 10-21-2018
3.00
Skin dimpling & fixing a problem ! An other one !
Details
       

 10-20-2018
5.00
Counter sinking-dimpling
Details
       

 10-14-2018
3.00

Details
       

 10-13-2018
4.00

Details
       

 09-23-2018
4.00
Preparation continuing
Details
       

 09-22-2018
4.00
Preparation
Details
       

 09-09-2018
2.00
Finish drilling holes in LW tank
Details
       

 09-08-2018
6.00
Drilling, dimpling, nutplates install
Details
       

 09-05-2018
1.00
Installed the doubler for RW Fuel tank
Details
       

 09-03-2018
4.00
Drilling for the nut plates installation on RWT
       

 09-02-2018
2.00
Installed forward wing bracket and doublers
Details
       

 09-02-2018
2.00
Fuel hole & Fuel drain RWT
       

 09-02-2018
0.00
Doubler added
Details
       

 04-15-2018
3.00
Continue drilling LW tanks & adjusting the skins
Details
       

 04-08-2018
6.00
Drilling LW fuel tank
Details
       

 04-01-2018
12.00
Drilling, making parts and problem !
Details
       

 03-25-2018
4.00
Preparing to drill tank skin
       

 03-25-2018
5.00
Drilling tank skin of RW
Details
       

 03-24-2018
4.00
Prepared tank ribs ribs
Details
       

 03-24-2018
3.00
Drilled holes & installed ribs on rear baffle
Details
       

 03-18-2018
4.00
Rivet LE of LW
       

 03-18-2018
4.00
Finish deburring, dimpling & reassemble the wing
Details
       

 03-11-2018
9.00
Debur, dimple, assemble
Details
       

 03-04-2018
8.00
Debur, dimple, make
Details
       

 03-03-2018
7.00
Debur, dimple, prime & made parts
Details
       

 02-25-2018
6.00
Drilling & deburring LW top skin & LE
Details
       

 02-24-2018
4.00
Finish drilling the LE of LW
Details
       

 02-18-2018
6.00
cutting LE skin to lenght & start drilling it
       

 02-17-2018
6.00
Drilled inboard top skin on LW
       

 02-11-2018
6.00
Drilling top outboard skin on LW
Details
       

 02-10-2018
4.00
Drilling main ribs to rear spar
Details
       

 02-04-2018
3.00
Starting LW assembly on jig
Details
       

 02-04-2018
3.00
LW assembly
Details
       

 01-28-2018
8.00
Priming all internal parts of LW
Details

 01-21-2018
7.00
Preparing LW
Details
       

 01-21-2018
1.00
Finished riveting RW LE
     

 01-14-2018
2.00
Final LE work
       

 01-14-2018
3.00
Drilling & dimpling --- finishing LE skin
       

 01-14-2018
3.00
Cleaning , priming, riveting
       

 01-13-2018
3.00
Finish drilling second LE skin
       

 01-07-2018
1.00
Reassemble wing
       

 01-07-2018
2.00
Re-drill LE skin replacing the first one that had
Details
       

 01-07-2018
1.00
Installed the tie down final
       

 01-03-2018
4.00
Debur & dimpling
Details

 01-02-2018
3.00
Debur & dimpling
Details

 12-31-2017
3.00
Errands
       

 12-30-2017
3.00
Various errands
Details
       

 12-29-2017
4.00
One more mistake !!!
Details
       

 12-26-2017
3.00
Prepared many little things
Details
       

 12-17-2017
3.00
Other pictures of my LE work today
       

 12-17-2017
3.00
Leading edge RW - drilling
Details
       

 12-16-2017
4.00
Drilled bellcrank gussets in place and attached ha
       

 12-13-2017
2.00
Prepared Bellcrank and cut access trap
Details
       

 12-05-2017
3.00
Finish drilling inboard top skin on RW
Details
       

 12-04-2017
2.00
Drilling top inboard skin on RW
Details
       

 12-03-2017
4.00
Drilling top outside skin
       

 12-02-2017
3.00
Top outside skin prep
Details
       

 11-26-2017
4.00
Jig Modification
Details
       

 11-25-2017
8.00
Right wing level and ready for skinning
Details
       

 11-19-2017
7.00
Drill to size all pilot holes on RW & started to a
Details
       

 11-18-2017
3.00
Cut out bottom flange on rib station 73,5
Details
       

 11-12-2017
5.00
Ribs fitting on main spar
Details
       

 11-12-2017
7.00
Drilling to final size all the pilot holes in the
Details
       

 11-05-2017
4.00
Installing ribs on left wing
Details
     

 11-04-2017
1.00
Repair of station 83.5 Right wing
Details
       

 10-29-2017
5.00
Ribs install on right spar ... beginning
       

 10-29-2017
1.00
Problem
Details
       

 10-28-2017
7.00
Completed rear spar & primed
Details
     

 10-22-2017
7.00
Rear spar prep ...
Details
       

 10-21-2017
5.00
Rib deburring & bellcrank holder
       

 10-15-2017
8.00
Rib preparation continuing ...
Details
       

 10-14-2017
7.00
Ribs preparation continuing
Details
       

 10-14-2017
2.00
Rib preparation continuing
       

 10-09-2017
7.00
Ribs ... preparation continuing
       

 10-08-2017
8.00
Deburring & fluting
Details
       

 10-07-2017
5.00
Deburring ribs
Details
       

 09-10-2017
3.00
Removing the trailing edge bulge on right elevator
Details
       

 09-10-2017
1.00
Fiberglass tip installed
Details
     

 09-09-2017
3.00
Installing fiberglass tip on HS
Details
       

 09-04-2017
7.00
Riveting
Details
       

 08-30-2017
0.00
Yvon helped me to fix a couple rivets that were no
Details
     

 08-20-2017
8.00
working on installing doublers for the SB 14-01-31
Details
       

 08-15-2017
1.00
Rivet removal on HS structure
Details
       

 08-13-2017
2.00
HS -- comply with SB 14-01-31
Details
       

 05-06-2017
5.00
Cutting Lightning holes in wing ribs
Details
       

 04-05-2017
0.00
Pile of ribs without lightning hole yet
       

 04-01-2017
18.00
Bought an RV6 SN21488 (1994)
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.