Powered By Kitlog Pro v2.0
BOB'S WEB SITE
RV-10
All
Work Logs Found:
132
Category Work Time:
368 Hours
Date
Hours
Work Log Summary
Details
07-22-2018
1.50
Service Bulletin 18-03-30 Compliance
Details
07-21-2018
2.50
Elevator Trim Part Assembly
Details
07-13-2018
3.00
Prepare Elevator Trim Plate
Details
05-04-2018
2.00
Fabricate Trim Brackets
Details
04-22-2018
6.00
Eppennage Tips
Details
04-05-2018
1.00
Fiberglass Tip Finishing
Details
12-05-2017
0.60
Fiberglass Prep
Details
12-03-2017
3.00
Empennage Fairings - 2
Details
12-02-2017
3.00
Empennage Fairings
Details
11-30-2017
1.60
Left Elevator Fairings
Details
11-27-2017
2.00
Right Elevator Tip Fairings
Details
11-26-2017
2.00
Elevator push rod
Details
11-25-2017
1.20
Primed elevator push rod
Details
11-24-2017
1.00
Alodine Elevator Push/Pull Tube
Details
11-19-2017
6.50
Fit HZ, VZ and Rudder to Tail Cone
Details
11-18-2017
5.00
Fit Elevators to Horitontal Stabilizer
Details
11-16-2017
1.50
Attach Left Elevator
Details
11-13-2017
1.50
Riveting Turtle Deck
Details
11-12-2017
2.00
Bell Crank Stiffners and Turtle Deck
Details
11-11-2017
0.70
Static Port Install
Details
11-10-2017
2.00
Rivet Aft Deck Parts
Details
11-08-2017
2.10
Tail Cone Riveting
Details
11-07-2017
1.50
Tail Cone Skin Riveting
Details
11-04-2017
1.00
Tail Cone Skin Riveting
Details
11-01-2017
1.00
Tail Cone Riveting - continued
Details
10-31-2017
1.20
Rivet Tail Cone Skins
Details
10-22-2017
3.00
Riveting Tail Cone Skins
Details
10-21-2017
2.00
Rivet Tail Cone Skins
Details
10-19-2017
1.00
battery case
Details
10-10-2017
1.20
Riveting Tailcone
Details
10-09-2017
1.30
Rivet bottom skin
Details
10-08-2017
2.00
Rivet prep & riveting
Details
10-07-2017
2.00
Riveting prep
Details
10-05-2017
1.00
Reassemble for Riveting
Details
10-03-2017
1.50
Cleco Primed Parts
Details
10-01-2017
6.50
Prime Stringers & Assemble Bulk Heads
Details
09-30-2017
2.50
Prep and Prime 1
Details
09-28-2017
1.10
Scuff Sand Tail Cone 3
Details
09-24-2017
5.50
Painting Prep and Priming
Details
09-23-2017
6.00
Scuff Sand Tail Cone 2
Details
09-22-2017
1.50
Scuff Sand Tail Cone 1
Details
09-10-2017
5.50
Dimple Tail Cone Parts
Details
09-09-2017
1.20
Dimpling skins
Details
09-08-2017
2.00
Dimpling_1
Details
09-06-2017
1.20
Dimple & Countersink
Details
09-04-2017
5.00
Completed Deburring
Details
09-02-2017
1.50
Deburring - Cont.
Details
09-01-2017
3.50
Disassemble tailcone - cont.
Details
08-31-2017
2.50
Disassemble for deburring, dimpling and priming
Details
08-27-2017
5.50
Finish Turtle-Deck and Aft-Deck Prep
Details
08-26-2017
3.00
Turtle-deck Prep
Details
08-13-2017
4.00
Turtle-deck
Details
08-12-2017
2.50
Drilling and more drilling
Details
08-11-2017
3.50
Tail Cone Longerons
Details
08-10-2017
2.30
Stiffners & Bulkheads
Details
08-06-2017
5.00
Prep'ing the Tail Cone
Details
08-05-2017
6.00
Tail cone bulkheads and skins
Details
08-04-2017
3.50
Tail Cone Bulkheads
Details
08-02-2017
2.00
Bulkhead Prep
Details
07-30-2017
1.50
HS Attach Bulkhead
Details
07-29-2017
1.50
Finish Trim Tabs
Details
07-29-2017
1.30
Begin Tail Cone Assembly
Details
07-17-2017
2.50
Trim Tab - Hinge cont...
Details
07-16-2017
3.50
Trim Tab - Hinge
Details
07-15-2017
2.00
Trim Tabs - Riveting
Details
07-14-2017
4.50
Trim Tabs
Details
07-12-2017
1.10
Trim Tabs
Details
06-25-2017
2.00
Trim Tabs - Close-out tabs
Details
06-24-2017
2.50
Clamping Blocks
Details
06-23-2017
1.00
Clamping block template
Details
06-19-2017
1.50
Add Mass Balance Weights
Details
06-18-2017
5.50
Elevator leading edge
Details
06-17-2017
1.50
Riveting End Rib Flanges
Details
06-15-2017
1.50
Trailing Edge Riveting
Details
06-11-2017
1.50
Epoxied Trailing Edge
Details
06-03-2017
0.70
Rivet End Rib Sheer Clips
Details
05-15-2017
12.00
Rivet skins
Details
04-28-2017
1.60
Skin Prep
Details
04-26-2017
1.00
Skin Prep
Details
04-24-2017
0.50
Elevator control horns
Details
04-23-2017
6.00
Drilling elevator skins and other details.
Details
04-22-2017
3.50
Prep'ing elevator skins
Details
04-21-2017
1.50
Preped elevator skins
Details
04-20-2017
1.00
More deburring
Details
04-19-2017
1.50
Prep'd elevator ribs
Details
04-18-2017
1.00
Split and debur elevator ribs
Details
04-16-2017
0.75
Began prep'ing elevator ribs
Details
04-14-2017
2.50
Finished riveting trailing edge of HZ
04-06-2017
1.50
HS Skin Riveting
Details
04-04-2017
1.50
HS Riveting
Details
04-03-2017
1.00
HS Riveting
Details
04-02-2017
6.00
Rivet HS Spar to Skins
Details
03-31-2017
4.50
Riveting HS Nose Ribs to Skins
Details
03-30-2017
3.50
HS Spar and Inspar Rib Assembly
Details
03-27-2017
1.00
HS Spar and Rib riveting
Details
03-26-2017
5.00
Paint Prep and Priming
Details
03-25-2017
7.50
Horizontal Stabilizer Prep
Details
03-24-2017
1.50
Horizontal Stabilizer Prep
Details
03-18-2017
7.00
Horizontal Stabilizer Prep
Details
02-12-2017
4.00
Rivet trailing edge
Details
02-11-2017
6.00
Prepare rudder skins for mating
Details
01-30-2017
1.50
Dry fit and operate trim tab
Details
01-29-2017
6.50
Trim tab saga
Details
01-17-2017
2.50
Rudder trim servo access
Details
01-16-2017
2.50
Rudder Trim Tab
Details
01-15-2017
3.50
Rudder Trim Tab
Details
01-07-2017
5.00
CAD work for Rudder Trim
Details
01-02-2017
2.00
Rudder Trim Tab
Details
12-31-2016
4.50
Back-riveting Ribs to Skins
Details
12-29-2016
2.00
Priming
Details
12-28-2016
2.00
Priming Prep
Details
12-18-2016
6.00
VS Skin & Rudder
Details
12-16-2016
3.50
Riveting VS Skins
Details
12-11-2016
5.00
Rivet VS Skin
Details
12-10-2016
6.00
Fabricate Rudder Ribs
Details
12-09-2016
1.50
Prep VS skin for riveting
Details
12-05-2016
1.50
Rivet VS Frame
Details
12-04-2016
5.00
Rivet VS Rear Spar
Details
12-03-2016
1.50
More Scotch Brite and Priming
Details
12-02-2016
2.50
Prepare Rudder Stops & Priming
Details
12-01-2016
1.00
VS Rear Spar Prep
Details
11-30-2016
2.00
VS Dimpling
Details
11-29-2016
2.00
VS Deburr & Dimpling
11-27-2016
6.50
Fit VS Skin to VS Skeleton
Details
11-26-2016
2.50
Prepare VS Rear Spar
Details
11-25-2016
0.50
Deburr
Details
11-22-2016
1.50
Match Drill VS Spar Doublers
Details
11-20-2016
2.00
Inventory - Empennage Parts
11-19-2016
2.50
Inventory - Empennage Parts
11-11-2016
2.50
Empennage Arrival
Details
11-06-2016
2.50
Tool Preparation
Details
11-05-2016
5.00
Tool Preparation
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
132
368
Elevator
26
67
Empennage
16
40
Horizontal Stab
13
44
Miscellaneous
2
4
Rudder
13
48
Tail Cone
45
115
Tools
2
8
Vertical Stab
15
42
Copyright © 2001-2024 Matronics. All Rights Reserved.