Powered By Kitlog Pro v2.0
JOHN'S WEB SITE
S-20 Raven
All
Work Logs Found:
16
Category Work Time:
64 Hours
Date
Hours
Work Log Summary
Details
05-09-2016
8.00
Re-do Rib 8 both wings
Details
04-30-2016
5.00
Root Skins
Details
04-27-2016
5.00
Installed Ribs Right Wing
Details
04-26-2016
6.00
Rib Assembly
Details
04-25-2016
3.00
Ribs
Details
04-24-2016
4.00
Bell Crank Assemblies
Details
04-21-2016
2.00
Wing Tip Bows
Details
04-20-2016
4.00
Teleflex Retainer/Cable Guide
04-20-2016
4.00
Install Bell Crank Braces
Details
04-19-2016
1.00
Jury Strut Bracket
04-18-2016
3.00
Installed Compression Tubes/Aileron Rub Block
04-16-2016
8.00
Trailing Edge Spar Root Fittings
Details
04-14-2016
8.00
Begin work on Spars
Details
04-06-2016
2.00
Build Parts Board
04-05-2016
1.50
Wings Kit Arrives
03-01-2016
0.00
Test Flight at Rans in Hays
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
16
65
Miscellaneous
3
4
Wings
13
61
Copyright © 2001-2024 Matronics. All Rights Reserved.