KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site
Work Logs Found: 592
Category Work Time: 950 Hours
 Date
Hours
Work Log Summary

Details

 02-23-2014
10.00
Finish welding.
Details

 10-18-2013
1.00
Fuse out of jig
Details

 10-08-2013
3.00
Finished tack welding the fuselage
Details

 09-02-2013
5.00
More Tack Welding
Details
     

 08-23-2013
3.00
More Tack Welding
Details
       

 07-28-2013
4.00
More tack welding.
Details

 07-26-2013
2.50
More tack welding
Details

 07-20-2013
6.00
Tacked more fuselage up to the baggage door.
Details
       

 07-13-2013
3.00
Tack welding
Details
       

 06-30-2013
2.00

Details
     

 06-29-2013
5.00
Tack welding bottom fuselage
Details
       

 06-27-2013
2.00
First weld on the fuselage
Details
       

 02-22-2012
2.50
Installed left tank, made cradle.
Details

 02-06-2012
2.00
Cut out the stiffeners and pocket covers.
Details

 01-17-2012
1.00
Finished riveting the right wing skin.
Details
       

 01-14-2012
4.00
More riveting
Details

 01-10-2012
3.00
Riveting the right bottom skin.
Details

 01-03-2012
2.00
Riveting on the right wing.
Details

 01-02-2012
2.50
Riveting left bottom skin.
Details
     

 12-31-2011
2.00
rivet squeezing.
Details

 12-07-2011
2.00
Left bottom side main spar rivets.
Details

 11-29-2011
8.00
Finished top skins and installed bottom skins
Details

 10-25-2011
3.00
More riveting.
Details

 10-11-2011
18.00
riveting, lots of riveting
Details

 07-19-2011
2.50
Finished riveting the right bottom nose skin.
Details

 07-18-2011
1.00
Began riveting the right bottom nose skin.
Details

 07-01-2011
3.00
Finished riveting the right top nose skin.
Details

 06-22-2011
2.00
Riveting right top nose skin.
Details

 06-19-2011
4.00
Riveting bottom skin, D cell.
Details

 05-03-2011
4.00
Began riveting skins!
Details

 02-28-2011
1.00
installed 3rd and 4th right skins, prepped 5th.
Details

 02-26-2011
1.50
Installed first 2 skins and primed two more.
Details
       

 02-19-2011
1.50
dimpling and priming.
Details

 02-16-2011
1.00
Dimple and prep...
Details

 02-14-2011
1.00
finished prepping 4th right skin.
Details

 02-13-2011
2.00
Work on the 3rd and 4th right wing skin.
Details

 02-12-2011
2.00
Prepping the 3rd right skin.
Details

 02-07-2011
1.00
Finished dimpling the second right skin.
Details

 01-29-2011
1.50
dimpling the right skin.
Details

 01-22-2011
2.50
Prepping skins.
Details

 01-19-2011
1.00
Prepped some skin.
Details

 01-15-2011
3.00
Work on the right wing skeleton.
Details

 01-05-2011
0.50
More dimpling on the skeleton.
Details

 01-03-2011
7.00
More prep on the right wing skeleton.
Details

 12-31-2010
3.00
Finished right bottom skin, removed skins and bega
Details

 12-30-2010
6.00
Began prepping the right bottom skin.
Details
     

 12-29-2010
3.00
Prepped left bottom skin.
Details

 12-28-2010
2.00
Bottom skin prep.
Details

 11-10-2010
1.00
Deburred left bottom skin.
Details

 10-06-2010
6.00
Lots of work on the left wing skins.
Details

 10-04-2010
1.00
Worked on the left wing skin prep.
Details

 09-25-2010
2.50
work on the left wing skins.
Details

 09-22-2010
1.00
Installed the second left top skin.
Details
       

 09-15-2010
1.50
Began dimpling the 3rd left top skin.
Details

 09-14-2010
1.50
deburred the 3rd left top skin.
Details

 09-13-2010
1.50
Finished dimpling the 2nd left top wing skin.
Details

 09-11-2010
1.50
More skin prepping.
Details

 09-09-2010
1.00
More skin prepping...
Details

 09-08-2010
1.00
debur, dimple, repeat.
Details

 09-07-2010
1.50
Prepped the short bottom skin by the fuel tank.
Details

 09-05-2010
1.00
Fit left root skin onto skeleton.
Details
       

 09-01-2010
1.00
Primed skins.
Details

 08-31-2010
1.00
Countersunk the left wing skin stiffeners.
Details

 08-25-2010
1.00
Began dimpling the left wing skins.
Details

 08-24-2010
1.00
More dimpling...
Details

 08-20-2010
2.50
Began dimpling the left wing skeleton.
Details

 08-17-2010
0.50
some more deburring
Details

 08-14-2010
0.50
More deburring....
Details

 08-11-2010
4.00
Deburring and more deburring.
Details

 08-09-2010
1.00
Removed the left wing skin for debur/dimpling.
Details

 07-22-2010
1.00
Installed the right fuel tank.
Details

 07-21-2010
2.00
Mounted left tank; worked on the right tank.
Details

 07-20-2010
1.50
Made filler hole doublers.
Details
     

 07-19-2010
2.00
Cut hole for fuel filler in left wing.
Details

 06-26-2010
1.00
Finished the fuel tank straps.
Details

 06-20-2010
5.00
Forming bottom straps for fuel tanks.
Details
       

 06-07-2010
0.50
Fit the anti-chaff rubber to the bottom tank strap
Details

 06-06-2010
1.00
primed the right wing tank straps.
Details

 06-05-2010
1.50
Worked on the bottom tank straps.
Details

 06-02-2010
1.00
Finished the short tensioner straps.
Details
     

 06-01-2010
1.00
More work on the small tensioner straps...
Details

 05-26-2010
1.00
Worked on the tensioner straps.
Details

 05-24-2010
1.50
More work on the fuel tank strap tensioners.
Details

 05-17-2010
1.50
Worked on the bottom fuel tank strap tensioners.
Details
       

 05-12-2010
1.00
Worked on the fuel tank tensioner straps.
Details

 05-05-2010
1.00
Worked on the tank strap tensioners
Details

 05-04-2010
1.00
Made top tank straps for the right wing.
Details

 05-03-2010
1.50
Began to fit the left fuel tank.
Details

 04-28-2010
1.00
Finished fuel tank covers.
Details
       

 04-12-2010
1.00
Began riveting the stiffeners to the left fuel tan
Details

 04-10-2010
1.50
Primed the fuel tank covers.
Details
       

 04-07-2010
1.50
Dimpled the fuel tank covers.
Details
     

 04-05-2010
1.00
More work on the fuel tank covers.
Details

 03-30-2010
1.00
Drilled stiffeners to the left fuel tank cover.
Details
     

 03-29-2010
1.00
Countersunk holes in fuel tank cover supports.
Details

 03-09-2010
0.50
Drilled/installed the right fuel tank bay stiffene
Details

 03-08-2010
1.00
Installed left bay stiffeners.
Details
     

 03-06-2010
1.00
Joggled the tank bay stiffeners.
Details

 03-03-2010
1.00
Finished forming tank bay stiffeners.
Details

 03-02-2010
0.50
Fuel Tank Inspection.
Details
       

 03-02-2010
0.50
Formed 2 tank bay stiffeners.
Details
       

 03-01-2010
1.50
formed the wing stiffeners for the fuel tank bays.
Details

 02-25-2010
0.50
Cut out tank bay stiffeners.
Details

 02-22-2010
1.00
Drilled the right fuel tank nut plates.
Details
     

 02-17-2010
0.50
Drilled the nut plate holes for the left fuel tank
Details
     

 02-16-2010
1.00
Drilling on the fuel tank covers.
Details

 02-15-2010
1.50
Drilled the right fuel tank cover.
Details

 02-13-2010
3.00
Fuel tank cover.
Details

 02-10-2010
1.00
Drilled the right aft root skin.
Details
     

 02-09-2010
2.00
Worked on the left aft root skin.
Details

 02-03-2010
1.50
Drilled the left root skin.
Details
     

 02-02-2010
1.00
Finished drilling the left root skin.
Details
     

 02-01-2010
1.00
Started drilling the root skin.
Details

 01-24-2010
1.00
Formed root leading edges.
Details

 01-20-2010
1.00
Cut out root skins and tank panels.
Details

 01-19-2010
1.00
Installed lugs on the large inspection holes.
Details
     

 01-18-2010
1.50
Finished riveting the lugs onto the rings.
Details

 01-12-2010
1.50
More work on the rings.
Details

 01-11-2010
1.00
Began riveting lug nuts.
Details

 01-10-2010
1.00
Applied a light coat of zinc oxide to rings.
Details

 01-06-2010
1.00
Finished prepping backing rings.
Details

 01-05-2010
1.00
More work on the backing rings.
Details

 01-04-2010
1.50
Nut plate work on the backing rings.
Details
       

 01-02-2010
2.00
Prepping the inspection hole covers.
Details
     

 12-31-2009
6.00
More work on the inspection holes and covers.
Details
       

 12-30-2009
5.50
More work on the inspection hole covers.
Details

 12-29-2009
3.50
Working on the inspection hole covers.
Details
       

 12-29-2009
3.00
Cut all inspection holes in wings.
Details
     

 12-28-2009
6.00
Inspection hole work.
Details
       

 11-24-2009
2.50
Inspection hole covers...
Details

 11-18-2009
1.00
Made templates for inspection holes/covers.
Details

 11-16-2009
1.00
Finished drilling the bottom right skin.
Details

 11-14-2009
1.00
Drilled the bottom right skin to the skeleton.
Details

 11-11-2009
2.00
Work on the right wing's bottom skin.
Details

 11-10-2009
1.00
Finished drilling the last top skin.
Details
     

 11-06-2009
1.00
More drilling on the last top right skin.
Details

 11-04-2009
1.50
Installed the final top skin on the right wing.
Details

 11-03-2009
1.00
Final leading edge formed.
Details

 10-28-2009
0.50
Rough cut out most inspection hole covers and ring
Details

 10-27-2009
1.50
Worked on the inspection cover jigs.
Details
     

 10-15-2009
0.50
fit and drilled skin to right wing aft the fuel ta
Details

 10-12-2009
1.00
Cut and drilled the left skin aft the fuel tank ba
Details
       

 10-02-2009
2.00
Drilled the bottom skin to the spar.
Details

 09-30-2009
1.00
Began drilling left bottom skin.
Details

 09-29-2009
1.00
Aligned skin onto skeleton.
Details

 09-28-2009
1.00
Marked and predrilled the left bottom skin.
Details

 09-24-2009
1.00
Started work on the left bottom main skin.
Details
     

 09-23-2009
0.50
oops.
Details

 09-22-2009
1.50
Predrilled and began drilling the last right skin.
Details
       

 09-21-2009
1.50
Formed the last right leading edge.
Details

 09-14-2009
1.00
Finished drilling the 3rd right skin.
Details

 09-09-2009
2.50
Drilled the 3rd right skin.
Details

 09-03-2009
1.00
formed the right wing 3rd skin leading edge.
Details

 09-02-2009
1.50
Finished drilling the second right wing skin.
Details

 08-18-2009
1.50
More work on the second right skin.
Details

 08-17-2009
1.00
finished prepping the second right wing skin.
Details

 08-05-2009
1.00
Fit and traced the second right wing skin.
Details

 08-04-2009
0.50
Formed the second leading edge.
Details

 07-23-2009
1.00
Drilled the 1st right skin.
Details

 07-22-2009
1.00
More work on the first right skin.
Details

 07-21-2009
1.00
Fitted and traced the 1st right wing skin.
Details

 07-06-2009
1.00
Formed the first leading edge of the right wing.
Details

 06-24-2009
1.00
Finished replacing the third left skin.
Details
       

 06-23-2009
0.50
More work on the "new" 3rd skin.
Details

 06-18-2009
1.00
More work on the new 3rd left skin.
Details
       

 06-17-2009
1.00
Began to repair the 3rd left skin.
Details
     

 06-10-2009
0.50
drilled overlap holes to #30.
Details

 06-09-2009
1.50
More drilling of the left wing skin.
Details

 06-08-2009
1.50
Worked on the 4th left skin.
Details
       

 06-07-2009
1.50
Prepped the 4th left skin.
Details

 06-02-2009
2.00
Worked on the third and fourth left skin.
Details

 06-01-2009
1.00
Third left skin nose drilled.
Details
       

 05-29-2009
1.00
trimmed and reinstalled 3rd skin.
Details

 05-21-2009
1.00
Prepped 3rd skin for drilling.
Details

 05-20-2009
1.50
Matched and traced the 3rd left skin.
Details

 05-18-2009
1.50
Finished drilling 2nd skin and formed next leading
Details

 05-17-2009
2.00
Drilled the second left skin.
Details
     

 05-16-2009
0.50
Marked hole locations for second skin.
Details

 05-14-2009
1.50
Another skin fitted.
Details
       

 05-11-2009
2.00
Drilled left tip skin to ribs.
Details
       

 05-07-2009
0.50
Drilled holes in left tip skin.
Details

 05-05-2009
1.50
more work on the left tip skin.
Details

 05-04-2009
1.50
Traced the left wing tip skin.
Details
       

 04-27-2009
0.50
Marked center line on ribs
Details

 04-23-2009
0.50
Made another leading edge.
Details

 04-22-2009
1.50
Began wing skinning.
Details
       

 04-20-2009
1.00
Finished pitot mount mounting.
Details
       

 04-15-2009
1.50
Aileron Pocket Ribs Riveted.
Details
     

 04-14-2009
2.00
Worked on pitot mounting bracket.
Details
       

 04-13-2009
1.50
Attached the strut attach points and pulleys
Details
     

 04-11-2009
1.50
Finished false spars.
Details

 04-10-2009
2.00
More work on the false spars.
Details
       

 04-09-2009
0.50
Drilled the right false spar doublers.
Details

 04-07-2009
1.50
Worked on the false spars.
Details

 04-05-2009
0.50
Measured false spar doublers
Details

 03-31-2009
1.00
drilled and installed right fairleads
Details

 03-30-2009
1.50
Aileron cable retainers and fairlead install.
Details
       

 03-29-2009
2.00
Various assembly has taken place.
Details
       

 03-28-2009
1.00
riveted on the false spar attach angles.
Details

 03-24-2009
1.00
Drilled false spars.
Details
     

 03-21-2009
1.50
Primed wing attach steel
Details

 03-18-2009
1.50
Built aileron cable retainers.
Details
       

 03-17-2009
1.50
Drilled attach angles.
Details

 03-10-2009
1.00
Finished installing the wing conduit.
Details
       

 03-09-2009
0.50
Riveted conduit supports
Details
     

 03-03-2009
1.00
Made the conduit mounting brackets.
Details

 03-02-2009
0.50
Cut out false spars.
Details

 02-28-2009
2.50
Riveting and drilling...
Details
       

 02-26-2009
1.00
Riveted the left wing middle ribs.
Details

 02-24-2009
2.00
Riveted the right nose ribs onto spar.
Details

 02-23-2009
2.00
Riveted the nose ribs to the left wing.
Details

 02-21-2009
0.50
Riveted the -3 rivets.
Details

 02-18-2009
1.50
Finished the flap support supports.
Details
     

 02-17-2009
1.00
Began forming the flap drive support support.
Details

 02-14-2009
1.00
Finished deburring ribs/attach angles
Details

 02-11-2009
0.50
Started deburring the center ribs.
Details

 02-10-2009
1.00
Placed and drilled rear ribs and false spar ribs.
Details

 02-09-2009
2.00
Finished left nose ribs;
Details
       

 02-08-2009
1.50
Positioned and drilled left nose ribs,
Details

 02-07-2009
2.50
Finished drilling the right nose ribs.
Details
       

 02-03-2009
1.50
Began attaching nose ribs.
Details
       

 02-02-2009
0.00
Spar problem resolution...
Details

 01-31-2009
1.50
Major (cosmetic) spar problem discovered...
Details
       

 01-28-2009
2.00
Fit and drilled the left wing middle ribs.
Details
       

 01-27-2009
2.00
Finished drilling the right wing middle ribs.
Details
       

 01-26-2009
2.00
Began installing the center ribs
Details
       

 01-24-2009
2.50
Installed grease fittings and began installing fla
Details
       

 01-21-2009
1.00
"welded" on grease fitting nuts.
Details

 01-20-2009
2.00
Finished drilling the aileron and flap drive linka
Details

 01-19-2009
2.50
Aligned and attached rear spars; drilled right ail
Details
       

 01-18-2009
1.50
Leveled main spars
Details
       

 01-14-2009
1.50
Level Spars.
Details

 01-13-2009
1.00
Sanded and fit flap drive assembly.
Details
     

 01-12-2009
1.50
Leveling and head scratching
Details

 01-11-2009
1.50
Move post and hand both wings in jig.
Details
     

 01-09-2009
2.00
Lifted left wing into jig...
Details
       

 01-07-2009
2.00
More initial wing assembly
Details
     

 01-06-2009
2.00
Fixed a problem and began clamping the drive arms.
Details

 01-04-2009
2.50
Welded tip holding jigs.
Details
       

 01-03-2009
0.00
Finished shop arranging.
Details
       

 01-03-2009
5.00
Began building the wing assembly jig.
Details
       

 01-02-2009
0.00
More shop arranging.
Details
       

 01-01-2009
0.00
Reorganizing the shop.
Details
       

 12-24-2008
1.50
Finished riveting the right aileron
Details

 12-10-2008
1.00
assembled and blind riveted the left aileron.
Details

 12-09-2008
1.00
Finished riveting the right aileron.
Details

 12-07-2008
1.00
Flush riveted aileron nose skin.
Details

 12-02-2008
1.00
Assembled the right aileron.
Details

 11-28-2008
2.00
filled aileron counter balance tubes.
Details

 11-14-2008
0.50
Finshed riveting the ribs to the righ aileron spar
Details

 11-12-2008
1.00
Began assembling the right aileron.
Details

 11-08-2008
2.50
began assembling the left aileron.
Details

 11-05-2008
1.00
Finished riveting the right flap.
Details

 11-03-2008
1.00
Riveted the bottom of the right flap.
Details

 11-02-2008
0.50
blind riveted the nose ribs to the skin.
Details

 10-29-2008
0.50
finished assembling the right flap.
Details

 10-27-2008
1.00
riveted ribs onto right flap.
Details

 10-21-2008
1.50
Finished riveting the left flap.
Details
       

 10-20-2008
1.00
More riveting on the left flap
Details

 10-13-2008
1.00
More riveting of the left flap.
Details

 10-12-2008
0.50
Riveting left flap
Details

 10-10-2008
1.00
Riveting nose skin.
Details

 10-09-2008
1.50
reassembled the left flap
Details

 09-29-2008
1.00
Drilled more holes in the left flap.
Details

 09-03-2008
1.00
More riveting of the rear flap ribs.
Details

 09-02-2008
1.50
Riveted the remainder of the flap attach angles
Details

 08-27-2008
2.00
Riveting flap rib attach angles
Details
       

 08-22-2008
1.50
Riveted attach angles...
Details

 08-21-2008
0.50
Filed the flap hinge holes.
Details

 08-18-2008
1.00
Cut out hinge holes on flap nose skin.
Details

 08-14-2008
1.50
Finished redrilling the left flap nose skin.
Details
     

 08-13-2008
1.00
Fit and drilled the new doubler plates.
Details

 08-12-2008
0.50
Redrilled the left flap attach angles
Details
     

 08-11-2008
1.00
(re)formed the flap hinge doublers.
Details

 08-09-2008
2.50
Prepped and primed the control surfaces
Details

 08-08-2008
1.00
prepped ailerons for priming
Details

 08-07-2008
1.00
Finished dimpling aileron skins and spars
Details

 08-06-2008
1.00
Began dimpling the ailerons.
Details

 08-05-2008
1.00
finished deburring the right aileron
Details

 07-21-2008
0.50
More Deburring/Disassembly or right aileron
Details

 07-18-2008
1.00
More deburring the ailerons.
Details

 07-16-2008
1.00
More deburring of the left aileron
Details

 07-15-2008
1.00
began deburring the ailerons
Details

 07-14-2008
1.00
Back on it! cut out aileron hinge holes in nose s
Details
       

 04-30-2008
1.00
Finished drilling the aileron skins.
Details

 04-22-2008
1.00
worked on the left aileron.
Details

 04-21-2008
2.00
Work on the aileron gussetts was performed.
Details
     

 04-14-2008
1.00
Cut out aileron gussetts.
Details

 04-09-2008
1.50
Worked on aileron nose skins
Details

 04-07-2008
1.00
Finished drilling the aileron nose skin(s)
Details
     

 03-31-2008
1.00
resumed work on the ailerons
Details

 03-15-2008
2.50
Worked on the aileron nose skins.
Details
       

 03-09-2008
1.50
Finished bending skins and marked for first holes.
Details

 02-27-2008
1.00
Worked on Brake
Details

 02-26-2008
1.50
Finished drilling rear aileron ribs.
Details
       

 02-25-2008
1.00
drilled left aileron rear ribs.
Details

 02-17-2008
1.00
prepped ribs for mounting.
Details

 02-10-2008
2.00
Drilled the hinge doubler plates and rear attach a
Details

 02-02-2008
2.00
Drilled all the nose ribs to the aileron spars.
Details
       

 01-23-2008
1.50
Began drilling nose rib attach angles to spar.
Details

 01-22-2008
1.00
Started marking hinge locations.
Details

 01-19-2008
1.50
Finished dimpling the flap skins/spars.
Details

 01-15-2008
1.50
Deburring and Dimpling.
Details
     

 01-14-2008
1.50
Deburred almost all holes in the right flap.
Details

 01-08-2008
1.50
Disassembled and cut holes for flap hinges.
Details

 01-07-2008
2.00
Finished drilling the right flap.
Details
       

 01-05-2008
2.00
Finished drilling the #40 holes in the top of the
Details
     

 01-02-2008
1.00
Drilled more holes in the right flap nose skin.
Details
     

 01-01-2008
2.00
Drilled Right flap nose skin
Details
       

 12-29-2007
1.50
assembled the right flap skeleton and drilled 1st
Details

 12-28-2007
0.00
Back at it!
Details
       

 10-02-2007
1.00
Finished deburring the left flap.
Details
     

 10-01-2007
1.00
Began deburring the left flap parts.
Details

 09-25-2007
1.00
Cut out hinge area and disassembled "right" flap.
Details
     

 09-24-2007
1.00
Finished drilling the right flap.
Details

 09-20-2007
0.50
Began drilling the underside of the right flap.
Details

 09-19-2007
1.50
Fit and drilled gussetts to top of right flap.
Details
     

 09-18-2007
1.50
Recut Gussets...... :-(
Details
     

 09-17-2007
0.50
Cut out flap gussetts.
Details

 09-12-2007
2.00
Drilled more on the righ flap nose skin
Details
       

 09-11-2007
1.50
Began drilling the right flap nose skin.
Details
       

 09-10-2007
1.00
Bent flap nose skin, aileron spar and training edg
Details
     

 09-06-2007
1.50
Deburred and reassembled the flap skeleton.
Details
       

 09-05-2007
1.00
Finished drilling the flap ribs to the spar.
Details

 09-04-2007
1.50
Drilled and fitted the left flap ribs.
Details
     

 08-30-2007
4.00
Finished drilling nose ribs and hinge doublers.
Details
       

 08-29-2007
4.00
Began fitting nose ribs to the flap spars.
Details
       

 08-21-2007
1.50
Cut aileron and flap nose skins.
Details
       

 08-14-2007
1.50
Began prepping for the flap assembly.
Details

 08-05-2007
0.50
MAJOR MILESTONE! Finished riveting the right rear
Details
       

 08-04-2007
2.00
Riveted more rear spar attach angles.
Details
     

 08-01-2007
0.50
Began riveting the right rear spar attach angles.
Details

 07-31-2007
1.00
preped the right rear spar attach angles for rivet
Details

 07-28-2007
5.50
Riveted the rib attach angles onto the right main
Details

 07-19-2007
1.00
Finished drilling the righ main spar rib attach an
Details

 07-18-2007
1.50
More drilling of the rib attach angles.

 07-17-2007
0.50
Drilling more rib attach angles.
Details

 07-16-2007
1.00
flush-riveted the rib spacers into place.
Details

 07-14-2007
1.00
Finished riveting the right main spar caps.
Details

 07-11-2007
1.00
More riveting of the right main spar cap strips.
Details

 07-10-2007
1.00
Began riveting the right main spar cap strips.
Details

 07-09-2007
1.50
Layed out the right main spar.
Details
     

 07-02-2007
1.00
Finished riveting the left main spar.
Details

 06-30-2007
2.50
Finished fitting and drilling the attach angles.
Details

 06-30-2007
2.00
Began riveting the rib attach angles on the left m
Details

 06-29-2007
1.50
Continued to fit and drill rib attach angles.
Details
       

 06-27-2007
1.50
Finished prepping the rib attach angles and began
Details

 06-26-2007
1.00
More bending/drilling/deburring of main spar rib a
Details
       

 06-25-2007
1.00
Began drilling the rib attach angles.
Details

 06-23-2007
2.00
flush riveted spacers; began marking rib attach an
Details

 06-16-2007
7.00
Riveted the left main spar.
Details
       

 06-12-2007
1.50
Finished laying out the left main spar.
Details

 06-11-2007
1.00
Began laying out the left main spar.
Details

 06-09-2007
0.50
Finished drilling the right rear spar attach angle
Details

 06-06-2007
1.50
Aligned and drilled rib attach angles.
Details

 05-29-2007
1.00
Finished riveting the right rear spar.
Details

 05-23-2007
2.00
More riveting on the right rear spar.
Details

 05-22-2007
1.00
Began riveting the right rear spar.
Details

 05-19-2007
2.00
Began assembling the right rear spar.
Details

 05-16-2007
1.00
Riveted the 5/32 rivets at the attach plate.
Details

 05-15-2007
1.50
Finished riveting the caps on the left rear spar.
Details
     

 05-14-2007
1.00
Began to rivet the left rear spar.
Details
       

 05-08-2007
1.00
Placed rivets in spar caps.
Details

 05-05-2007
2.50
Finished fitting the attach angles.
Details

 05-02-2007
1.50
Began drilling attach angles.
Details
     

 05-01-2007
1.00
Assembled the left rear spar.
Details

 04-17-2007
1.50
Primed the spar cap strips.
Details
       

 04-16-2007
2.50
Primed the spar webs and small pieces.
Details

 04-15-2007
3.00
Alodined the rib attach spacers and misc parts.
Details

 04-14-2007
3.50
Began alodining spars.
Details
     

 04-10-2007
1.00
Deburred lightening holes.
Details

 04-09-2007
2.50
Finished deburring and drilled lightening holes.
Details
       

 04-07-2007
2.00
Finished drilling spar splice plate and shaped att
Details

 04-07-2007
1.50
Deburring left rear spar cap strips.
Details

 04-06-2007
2.50
Drilling and fitting the spar attach plates.
Details

 04-04-2007
0.50
Finished drilling the left rear spar caps.
Details

 04-03-2007
1.00
More drilling of spar caps.
Details

 04-01-2007
0.50
Drilled holes in spar cap stips.
Details

 03-31-2007
1.00
Aligned the left rear spar cap strips.
Details

 03-28-2007
1.00
Finished deburring right rear spar. Began layout
Details

 03-24-2007
2.00
Deburring lots of holes in the right rear spar.
Details

 03-20-2007
2.00
Finished drilling the right rear spar; began debur
Details

 03-17-2007
1.50
Trimmed the attach end of right rear spar and cut
Details

 03-14-2007
1.50
Fitted and drilled the rib attach angles on the ri
Details
     

 03-10-2007
5.50
Worked on rib spacers.
Details
     

 03-06-2007
1.00
More drilling of the right rear spar cap strips.
Details
     

 03-05-2007
1.00
Began drilling the rear spar cap strips.
Details
     

 03-03-2007
2.50
Continued measuring and laying out the right rear
Details

 03-01-2007
0.50
Began laying out the right rear spar.
Details

 02-28-2007
1.00
Finished match drilling the rear spar cap strips.
Details

 02-27-2007
1.50
Began match drilling the rear spar cap strips.
Details
       

 02-26-2007
1.50
Marked, aligned and clamped the rear spar cap stri
Details

 02-20-2007
1.50
Started laying out the right rear spar.
Details

 02-19-2007
1.00
Finished deburring the last of the main spars.
Details

 02-13-2007
1.00
Finished deburring the main spar cap strips.
Details
     

 02-12-2007
1.00
Deburring, deburring and deburring.
Details

 02-10-2007
2.50
Deburring lots of holes.
Details

 02-07-2007
1.00
Tonight I began the arduous task of deburring the
Details

 02-06-2007
0.50
Counter sunk the middle hole for the rib spacers.
Details

 02-05-2007
1.00
Finished drilling the rib spacers.
Details

 01-31-2007
1.00
Drilling more rib spacers.
Details

 01-30-2007
1.00
More drilling of the rib spacers.
Details

 01-29-2007
1.00
Drilling more rib spacers.
Details

 01-27-2007
3.00
Strut attach bars and rib spacers.
Details

 01-25-2007
1.00
Finally back to work! Drilled strut attach spacer
Details

 12-26-2006
1.50
Drilled the attach and splice plates.
Details

 12-12-2006
2.00
Finished drilling the right main spar cap strips.
Details

 12-05-2006
1.00
Drilled more holes in the left main spar cap strip
Details

 12-04-2006
1.00
More cap strip drilling.
Details
       

 12-01-2006
1.50
Finished marking and began drilling right main spa
Details

 11-29-2006
1.00
Began marking rivet locations.
Details

 11-27-2006
2.00
Laid out the right main spar cap strips.
Details
       

 11-26-2006
2.00
Finished deburring holes for the left main spar.
Details

 11-25-2006
2.00
Deburring and deburring
Details

 11-21-2006
1.50
Deburred spacer drill holes.
Details

 11-15-2006
1.50
Final drilled and fitted the left strut attach bar
Details
     

 11-07-2006
1.00
Finished shaping the strut attach bars.
Details
     

 11-06-2006
1.50
Finished cutting and match drilling strut attach b
Details
     

 11-04-2006
2.00
began cutting the strut attach bars.
Details

 11-01-2006
1.50
Drilled and attached strut attach spacer and trimm
Details
       

 10-30-2006
0.50
drilled rivet holes in the connector plates.
Details
     

 10-29-2006
1.00
Finished drilling the splice plate.
Details

 10-28-2006
3.50
Fit and drilled more rib spacers.
Details
       

 10-15-2006
1.00
Drilled and fit more rib spacers.
Details

 10-12-2006
1.00
Drilled and fit more rib spacers.
Details

 10-09-2006
1.50
Drilled and fit more rib spacers.
Details

 10-04-2006
1.00
Finished cutting spacers to length and began drill
Details
     

 10-03-2006
1.00
Finish sanded more rib spacers.
Details

 10-02-2006
1.50
Cut more spacers to length.
Details

 09-27-2006
1.00
made the long spacers
Details
     

 09-26-2006
1.00
Finished cutting the rib spacers to width.
Details

 09-25-2006
1.50
Began cutting the spacers to size.
Details
       

 09-20-2006
1.00
Finally finished drilling the left main spar cap s
Details

 09-18-2006
1.50
Drilled more holes in the left main spar caps.
Details

 09-12-2006
1.00
Drilling more holes in the left main spar caps.
Details

 09-11-2006
1.50
More drilling of the left main spar caps.
Details

 09-08-2006
1.00
Drilled more holes in the left main spar
Details

 09-06-2006
1.00
Drilling more holes
Details
     

 09-05-2006
1.50
Began drilling holes in left main spar caps
Details

 08-29-2006
0.50
Finished marking the left main spar caps
Details

 08-28-2006
0.50
More rivet hole marking
Details

 08-26-2006
1.00
Began marking rivet locations
Details

 08-23-2006
0.50
Finished aligning and clamping left main spar caps
Details

 08-22-2006
1.50
Lined up the left main spar cap strips
Details
       

 08-15-2006
1.00
Finished shaping the spar cap stips
Details

 08-14-2006
1.00
shaping the spar cap strips
Details
     

 07-30-2006
1.50
Began cutting cap strips to length
Details

 07-27-2006
1.00
Finished deburring lightening holes
Details

 07-22-2006
0.50
Deburred lightening holes
Details

 07-21-2006
1.00
Prepped work table for spar work
Details
     

 07-20-2006
1.00
Prepped spar plates
Details

 07-18-2006
2.00
Smoothed spar plates and transfered hole locations
Details
       

 07-11-2006
2.50
Cut out main spar plates
Details

 07-06-2006
0.50
Glued templates to metal
Details
     

 07-03-2006
1.50
copied and cut out spar plate templates
Details

 06-28-2006
1.00
Layout and cut lightening holes in spars
Details

 06-27-2006
1.00
Layout and cut lightening holes in main spars

 06-24-2006
1.00
Cut lightening holes in spar webs
Details
       

 06-12-2006
2.00
Bend spar webs
Details
     

 05-03-2006
1.50
Finish cut the spar webs
Details

 05-01-2006
0.00
Break explanation
Details

 04-11-2006
1.00
finished rough cutting the spars
Details

 04-10-2006
1.00
Rough cutting spars
Details

 03-24-2006
1.00
Finished the 8' brake
Details

 03-21-2006
1.00
More welding on the 8' brake
Details
       

 03-20-2006
1.00
More 8' brake work.
Details
       

 03-18-2006
3.00
Welding 8' brake
Details

 03-13-2006
2.00
Cutting steel for 8' break.
Details

 03-11-2006
1.00
Finished riveting stiffeners
Details

 03-11-2006
1.00
Began building 8' metal break
Details

 03-05-2006
2.50
Riveting wing root ribs together
Details

 03-04-2006
1.50
Removing rivets from middle ribs
Details

 02-28-2006
1.50
Attaching middle and tip rib stiffeners.

 02-23-2006
1.50
Attaching more middle rib stiffeners

 02-22-2006
0.50
Attaching rib stiffeners
Details

 02-20-2006
1.00
Attaching more rib stiffeners
Details

 02-19-2006
1.50
Attaching rib stiffeners
Details

 02-17-2006
1.00
Rib stiffeners
Details

 02-14-2006
1.00
Riveted nose rib stiffeners
Details
       

 02-13-2006
1.50
Nose rib stiffeners and priming.
Details
     

 02-11-2006
1.50
Riveting rib stiffeners and priming attach angles.
Details

 02-04-2006
1.50
Preping stiffeners for attachment
Details

 01-31-2006
2.00
Building paint booth
Details
       

 01-30-2006
1.00
Attaching Stiffeners to ribs
Details
       

 01-23-2006
1.50
Prepping nose ribs for stiffeners
Details

 01-20-2006
2.00
Riveting Stiffeners
Details

 01-15-2006
2.50
Finished Alodining
Details
       

 01-14-2006
4.00
Alodining
Details

 01-11-2006
2.00
Alodining
Details
       

 01-09-2006
2.00
Rib Alodining
Details
       

 01-04-2006
0.50
Prepping for Alodining
Details

 01-03-2006
1.50
Drilled aileron pocket attach angles
Details

 01-02-2006
4.00
Rib Stiffeners/attach angles
Details

 12-31-2005
0.50
drilling stiffener angles
Details

 12-29-2005
1.00
Drilled more rib stiffeners
Details

 12-27-2005
1.50
Drilling rib attach angles
Details

 12-26-2005
9.00
Rib stiffeners/attach angles
Details
       

 12-21-2005
1.00
Bending attach angles
Details

 12-19-2005
1.00
Bending Attach Angles
Details
       

 12-16-2005
2.00
Wing Stiffeners and attach angles
Details

 12-07-2005
2.00
Rib Stiffeners and Attach Angles
Details

 12-05-2005
2.00
Rib Angles
Details

 11-30-2005
0.50
Wing Stiffener figuring
Details

 11-28-2005
2.00
Finishing wing ribs
Details
       

 11-27-2005
1.00
Aileron pocket ribs
Details

 11-23-2005
2.00
Aileron pocket ribs
Details

 11-22-2005
1.00
More aileron pocket ribs
Details

 11-21-2005
2.50
Cutting and forming aileron pocket ribs
Details

 11-16-2005
1.50
Setback with aileron pocket ribs
Details
     

 11-15-2005
1.50
Rough Cut Aileron Pocket Ribs
Details

 11-14-2005
1.00
Finished forming aileron nose ribs
Details
     

 11-13-2005
1.00
Began forming Aileron Nose Ribs
Details

 11-12-2005
3.00
Aileron nose ribs
Details

 11-11-2005
2.00
Flap nose ribs and aileron nose ribs
Details

 11-09-2005
1.00
Formed flap rib flanges
Details

 11-07-2005
1.25
Flanged flap nose ribs
Details
       

 11-05-2005
1.50
Flap nose rib making
Details
     

 11-03-2005
2.00
cut out flap nose ribs
Details
       

 11-01-2005
1.00
Made flap nose rib jigs
Details
     

 10-28-2005
2.00
Flanging lightening holes
Details

 10-25-2005
1.00
Flanging more nose rib holes
Details

 10-24-2005
0.50
Flanged nose ribs
Details

 10-22-2005
4.00
Flange Nose Rib Holes
Details
       

 10-21-2005
6.00
Flanging middle ribs
Details
       

 10-16-2005
1.50
Flange Wing Ribs
Details

 10-11-2005
1.50
Flange Wing Ribs
Details

 10-10-2005
2.00
Flange Wing Ribs
Details
       

 09-12-2005
1.50
Rib flanging
Details

 09-08-2005
2.00
Flange lightening holes
Details
     

 07-19-2005
1.00
Flanging lightening holes
Details

 07-13-2005
2.00
Finished flanging jig

 07-06-2005
0.50
Worked on flanging jigs

 06-27-2005
1.00
Building flanging jigs

 06-20-2005
0.50
Worked on rib flanging jig

 06-18-2005
7.00
Flanging Tool/Form Blocks
Details
       

 03-16-2005
0.75
Cut lightening holes in Flap back ribs

 03-15-2005
0.50
Cut lightening holes in flap ribs

 03-14-2005
1.75
Cut lightening holes in Ail. & Flap ribs

 03-11-2005
1.00
Cut lightening holes in Flap/Ail. ribs

 03-09-2005
1.00
Fluted full ribs & cut lightening holes

 03-08-2005
1.50
Cut out and formed full ribs

 03-05-2005
6.50
Formed ribs
Details

 03-04-2005
2.00
Traced and cut out rear aileron ribs

 03-03-2005
0.75
Cut blanks for aileron ribs

 03-02-2005
0.75
Drilled lightening holes in back ribs

 03-01-2005
1.00
Cut lightening holes in back ribs

 02-28-2005
1.00
Cut out and formed 4 back ribs

 02-26-2005
2.50
Made small middle ribs
Details

 02-23-2005
0.75
Cut flap torque tube holes in mid ribs

 02-22-2005
0.50
drilled aileron cable hole
Details
     

 02-21-2005
1.25
Cutting lightening holes in middle ribs
     

 02-19-2005
0.50
Cut lightening holes in middle ribs

 02-17-2005
1.00
Cut lightening holes in middle ribs

 02-16-2005
1.00
Cut lightening holes in middle ribs

 02-15-2005
0.50
Cut lightening holes in middle ribs

 02-14-2005
0.75
Cut lightening holes in middle ribs

 02-13-2005
1.50
Cut lightening holes in middle ribs
       

 02-12-2005
3.00
Formed middle ribs

 02-11-2005
0.50
Formed middle ribs

 02-10-2005
0.50
Formed middle ribs

 02-09-2005
1.00
Began forming the middle ribs

 02-08-2005
1.00
Routed the mid ribs to length

 02-07-2005
1.00
Made jigs for routing the lengths.

 02-02-2005
0.75
Cut flange edges of the center ribs

 01-29-2005
3.50
Rough cut and traced center ribs

 01-24-2005
1.00
Routed nose ribs to proper length

 01-22-2005
2.00
Routed nose ribs to proper length

 01-08-2005
0.75
Cut lightening holes in nose ribs

 01-04-2005
1.00
Cut lightening holes in nose ribs

 01-02-2005
1.50
Cut lighening holes in nose ribs
     

 01-01-2005
1.50
made jig; cut lightening holes
Details
       

 12-31-2004
3.00
Made forms and cut holes
Details

 12-30-2004
1.50
Worked on hole flange backer block

 12-29-2004
1.00
Formed Nose Ribs

 12-28-2004
1.50
Forming nose ribs

 12-24-2004
0.50
forming nose ribs

 12-20-2004
0.75
Formed nose ribs

 12-16-2004
0.75
Formed Nose Ribs

 12-11-2004
1.00
formed nose ribs

 12-10-2004
1.50
formed nose ribs
Details
       

 12-07-2004
1.00
Deburred nose ribs

 12-04-2004
1.50
cut out nose ribs; polish/debur nose rib
Details
       

 11-29-2004
1.00
cut out nose ribs

 11-24-2004
1.00
Cutting out nose ribs

 11-23-2004
1.50
Drilled corner holes in nose ribs.

 11-19-2004
1.00
Tracing nose ribs

 11-18-2004
1.50
Tracing out nose ribs

 11-17-2004
1.00
Rough Cut nose ribs
Details

 11-16-2004
1.00
Tracing nose ribs
Details

 11-15-2004
1.00
Nose rib tracing
Details

 11-12-2004
1.00
Cutting out nose rib blanks
Details

 11-01-2004
16.00
Wing rib form block making
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.