Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
All
Work Logs Found:
979
Category Work Time:
2250 Hours
Date
Hours
Work Log Summary
Details
09-12-2024
8.00
First Flight
Details
08-21-2024
3.00
Main Gear Leg Fairings
Details
08-12-2024
2.00
Alternator Wiring Issue
Details
08-11-2024
6.00
Final touches and engine run
Details
08-07-2024
1.00
Aileron Control Rod Boots
Details
08-04-2024
1.00
CofA Photo Shoot
Details
08-01-2024
8.00
Final CofA Inspection
Details
07-20-2024
1.00
TC Visit
Details
07-19-2024
2.00
Weight and Balance
Details
07-14-2024
3.00
2: Weighing
Details
07-14-2024
3.00
1: Preservative Oil
Details
07-07-2024
3.00
Weigh Scale Ramps
Details
07-07-2024
0.00
Canopy Cover
Details
07-05-2024
2.00
Trim Tab Actuator
Details
06-29-2024
2.00
2: Trim Tab Actuator
Details
06-29-2024
3.00
1: Lifting Jacks
Details
06-09-2024
1.00
Compass Deviation Card
Details
06-06-2024
0.50
2: Alternator Wire Heat Shield
Details
06-06-2024
1.50
1: Alternator
Details
06-02-2024
1.00
3: Exhaust Heat Shields
Details
06-02-2024
3.00
2: Exhaust Heat Shields
Details
06-02-2024
2.00
1: Fuel Lines
Details
05-26-2024
5.00
Brakes and Rudder Pedals
Details
05-24-2024
1.00
Fuel Line Heat Sleeve
Details
05-21-2024
3.50
Final Task List
Details
05-19-2024
3.00
2: Propellor
Details
05-19-2024
3.00
1: Windscreen Resin Work
Details
05-18-2024
0.50
2: Fuel Line
Details
05-18-2024
2.50
1: Engine Exhaust
Details
05-17-2024
4.00
2: Engine Exhaust
Details
05-17-2024
5.00
1: Windscreen Resin Work
Details
05-16-2024
4.00
2: Engine Exhaust
Details
05-16-2024
3.00
1: Windscreen Resin Work
Details
05-15-2024
2.00
3: Cabin Heat and Alternator Wiring
Details
05-15-2024
3.00
2: Engine Exhaust
Details
05-15-2024
3.00
1: Windscreen Resin Work
Details
05-14-2024
2.00
3: Cabin Heat System
Details
05-14-2024
4.00
2: Exhaust System
Details
05-14-2024
3.00
1: Windscreen Resin Work
Details
05-13-2024
4.00
2: Exhaust
Details
05-13-2024
4.00
1: Windscreen Resin Work
Details
05-12-2024
3.00
Engine Cowl
Details
05-05-2024
4.00
Engine Cowl
Details
04-28-2024
4.00
Engine Cowl
Details
04-25-2024
3.00
Engine Cowl
Details
04-13-2024
4.00
Engine Cowl
Details
04-01-2024
5.00
Cowl Hinge Pin Covers
Details
03-03-2024
1.00
Registration Marks
Details
02-25-2024
2.00
2: Fuel Tank Pressure Test
Details
02-25-2024
8.00
1: Brakes
Details
02-04-2024
4.00
Landing LIght Lens
Details
01-28-2024
5.00
1: Calibrating Fuel Tanks and Fuel Pump
Details
01-01-2024
4.00
1: Calibrating Fuel Tanks
Details
12-31-2023
0.00
2: Calibrating Fuel Tanks
Details
12-31-2023
5.00
1: Calibrating Fuel Tanks
Details
12-26-2023
1.50
5: Fuel Tank Bolts
Details
12-26-2023
1.50
4: Engine Exhaust
Details
12-26-2023
1.00
3: Engine Exhaust
Details
12-26-2023
1.00
2: Fuel Servo Gaskets
Details
12-26-2023
1.00
1: Engine Oil Cooler Lines
Details
10-01-2023
2.00
3: Engine Baffle Rubbers
10-01-2023
0.00
2: Cowl Hinge Pin Covers 2
10-01-2023
3.00
1: Cowl Hinge Pin Covers 1
09-25-2023
2.00
2: Cowl Hinge Pin Covers
09-25-2023
2.00
1: Cowl Firbreglass
09-17-2023
1.00
3: Air Intake Baffles
09-17-2023
4.00
2: Air Intake Baffles and Airfoils
09-17-2023
2.00
1: Air Intake Rubber Seals
Details
09-09-2023
2.00
Oil Cooler Air Duct
Details
08-27-2023
0.50
2: Aircraft Data Plate
Details
08-27-2023
3.00
1: Air Intake Rubber Seals
Details
08-20-2023
2.00
2: Engine Baffles
Details
08-20-2023
4.00
1: Fresh Air Box Rework
Details
08-16-2023
3.00
Oil Cooler Fittings
Details
08-13-2023
3.00
2: Air Intake Rework
Details
08-13-2023
4.00
1: Oil Cooler Duct
Details
08-09-2023
3.00
Oil Cooler Air Duct
Details
08-06-2023
3.00
Oil Cooler Air Duct
Details
08-04-2023
2.00
Top Cowl Oil Dipstick Door
Details
08-01-2023
2.00
Top Cowl Oil Dipstick Door
Details
07-30-2023
5.00
2: Baffles
Details
07-30-2023
1.00
1: Bottom Cowl Induction Air Intake
Details
07-28-2023
0.00
2: Bottom Cowl Induction Airt Intake - Part 2
Details
07-28-2023
6.00
1: Bottom Cowl Induction Air Intake
Details
07-27-2023
1.00
2: Bottom Cowl Induction Air Intake
Details
07-27-2023
5.00
1: Right Wing Root Fairing plus Wing Bolts
Details
07-26-2023
5.00
Left Wing Root Fairing
Details
07-25-2023
3.00
2: Left Wing Root Fairing
Details
07-25-2023
4.00
1: Left Wing Tip
Details
07-24-2023
6.00
Brake System Issues
Details
07-23-2023
2.00
Left Wing Tip
Details
07-23-2023
3.00
2: Brake Fluid Filling
Details
07-21-2023
2.00
Left wing root fairing
Details
07-19-2023
4.00
Left Wing Tip
Details
07-16-2023
0.50
Left Wing Tip
Details
07-15-2023
5.00
Right Wing Tip
Details
07-09-2023
3.00
Bottom Wing-to-Fuselage Rivets
Details
07-02-2023
5.00
Engine Baffles
Details
06-25-2023
12.00
Engine Baffles
Details
06-10-2023
4.00
Engine Baffles
Details
06-04-2023
0.50
3: No Step labels
Details
06-04-2023
2.00
2: Engine Wiring
Details
06-04-2023
4.00
1: Engine Baffles
Details
05-28-2023
6.00
Engine Baffles
Details
05-20-2023
2.00
Bottom Cowl Louvres
Details
05-14-2023
1.00
2: Sliding Canopy Resin Work
Details
05-14-2023
3.00
1: Bottom Cowl Louvres
Details
05-07-2023
2.00
3: Bottom Cowl Louvers
Details
05-07-2023
2.00
2: Engine Baffles
Details
05-07-2023
2.00
1: Bottom Cowl Mixture Control Recess
Details
05-06-2023
2.00
2: Bottom Cowl Mixture Bulge
Details
05-06-2023
2.00
1: Windscreen fibreglass
Details
05-05-2023
1.00
3: Windscreen Fibreglass
Details
05-05-2023
1.00
2: Windscreen Fibreglass
Details
05-05-2023
10.00
1: Windscreen Fibreglass
Details
04-30-2023
2.00
1: Empennage Fairing
Details
04-29-2023
1.00
3: Windscreen Fibreglass
Details
04-29-2023
1.00
2: Sliding Canopy Fibreglass
Details
04-29-2023
1.00
1: Empennage Fairing
Details
04-25-2023
0.50
2: Fuel Divider Plug
Details
04-25-2023
4.00
1: Engine Baffles
Details
04-15-2023
2.50
3: Right Wing Tip
Details
04-15-2023
1.00
2: Engine Baffles
Details
04-15-2023
2.00
1: Engine cowl louvres
Details
04-14-2023
1.50
Top Engine Cowl
Details
04-12-2023
1.00
Engine Cowl
Details
04-10-2023
3.00
2: Engine Cowl
Details
04-10-2023
1.00
1: Engine Oil Drain
Details
04-09-2023
5.00
Fuel Lines
Details
04-05-2023
1.50
Bottom Engine Cowl
Details
04-02-2023
0.50
4: AoA Sensor
Details
04-02-2023
2.00
3: Wing Tips
Details
04-02-2023
2.00
2: Bottom Engine Cowl
Details
04-02-2023
2.00
1: Engine Mixture Control
Details
03-28-2023
0.50
Instrument Panel Placard
Details
03-26-2023
3.00
3: Fuel and Oil Lines
Details
03-26-2023
1.00
2: Mixture Control Linkage
Details
03-26-2023
1.00
1: Engine Silica Gel Cannisters
Details
03-19-2023
1.00
4: Instrument Panel Labelling
Details
03-19-2023
1.00
3: Bottom Cowl
Details
03-19-2023
3.50
2: Bottom Cowl
Details
03-19-2023
1.00
1: Airbox Alternate Air Hatch
Details
03-13-2023
1.00
4: Compass Adjustment Access Holes
Details
03-13-2023
2.00
3: Bottom Engine Cowl
Details
03-13-2023
2.00
2: Bottom Engine Cowl
Details
03-13-2023
2.00
1: Engine Air Filter Box
Details
03-08-2023
2.00
Cockpit Touches
Details
03-05-2023
3.00
2: Top Engine Cowl
Details
03-05-2023
3.00
1: Engine Air Filter Box
Details
02-26-2023
3.00
Engine Air Filter Box
Details
02-25-2023
3.00
Engine Air Filter Box
Details
02-19-2023
2.00
3: Engine Air Filter Box
Details
02-19-2023
2.00
2: Cockpit Interior Finishing
Details
02-19-2023
1.00
1: Sliding Cockpit Rail
Details
02-18-2023
1.00
2: Engine Air Filter Box
Details
02-18-2023
3.00
1: Engine Air Filter Box
Details
02-05-2023
4.00
Engine Cowl
Details
01-31-2023
1.50
Engine Cowl
Details
01-29-2023
1.50
2: Engine Cowl
Details
01-29-2023
4.00
1: Engine Cowl
Details
01-26-2023
4.00
Engine Cowl
Details
01-25-2023
2.00
Engine Cowl
Details
01-09-2023
1.00
Engine Cowl Fasteners
Details
01-08-2023
1.00
3: Engine Cowl Fasteners
Details
01-08-2023
3.00
2: Engine Cowl Fasteners
Details
01-08-2023
2.00
1: Engine Cowl Fasteners
Details
01-06-2023
2.50
Engine Cowl Fasteners
Details
01-02-2023
2.00
2: Engine Cowl Brackets
Details
01-02-2023
4.00
1: VHF Com Antenna
Details
12-11-2022
1.00
2: Transponder Antenna
Details
12-11-2022
2.00
1: Brakes
Details
11-27-2022
2.00
Engine Cowl Oil Door
Details
11-24-2022
5.00
Top Cowl Oil Door
Details
11-23-2022
4.00
2: Top Engine Cowl
Details
11-23-2022
4.00
1: Mixture Control
Details
11-09-2022
3.00
Fitting the Propeller
Details
11-08-2022
3.00
Engne Baffles
Details
11-06-2022
5.00
Engine Baffles
Details
10-30-2022
0.00
3: Engine Baffles - Some Help
Details
10-30-2022
0.00
2: Engine Baffle Pics
Details
10-30-2022
12.00
1: Engine Baffles
Details
10-23-2022
5.50
Engine Baffles
Details
10-20-2022
2.00
Engine Wiring
Details
10-16-2022
4.00
2: Engine Wiring
Details
10-16-2022
1.00
1: Oil Seperator
Details
10-15-2022
1.00
3: Oil Seperator
Details
10-15-2022
2.00
2: Manifold Pressure and CHT Sensors
Details
10-15-2022
2.00
1: Fuel Pressure Line
Details
10-09-2022
4.00
Throttle Linkage
Details
10-01-2022
4.00
2: Oil/Fuel Pressure Sensor Block
Details
10-01-2022
2.00
1: Engine Fuel Lines
Details
09-30-2022
2.00
2: Installing the Throttle Body
Details
09-30-2022
0.50
1: Engine Preservation
Details
09-11-2022
1.50
Engine Oil Cooler Connections
Details
09-09-2022
3.50
The Engine is Installed
Details
09-09-2022
0.00
A New Helper
Details
08-28-2022
2.50
2: Fitting the Main Wheels
Details
08-28-2022
2.00
1: Nose Wheel
Details
08-27-2022
2.00
2: Fitting the Nose Gear and Wheels
Details
08-27-2022
3.00
1: Lifting the Fuselage
Details
08-14-2022
2.00
2: Lifting the Fuselage
Details
08-14-2022
2.00
1: Cockpit Centre Section Covers
Details
08-12-2022
4.00
Under Floor Controls and Wiring
Details
08-07-2022
6.00
Wing Bolts
Details
08-02-2022
1.00
Wing Bolts
Details
07-30-2022
0.00
Hangar Time
Details
07-30-2022
5.00
2: Wing Bolts
Details
07-30-2022
1.00
1: Seat Modifications
Details
07-17-2022
3.00
Seat Modifications
Details
07-17-2022
0.00
Lockers
Details
07-16-2022
0.00
Hangar First Aid Kit
Details
05-15-2022
0.00
Hangar Clean-up
Details
05-13-2022
0.00
Hangar Wood Heater
Details
05-04-2022
0.00
Hangar Stuff
Details
04-22-2022
0.00
Storeroom Progress
Details
04-20-2022
2.00
OMG...I Have an Engine
Details
04-08-2022
0.00
Store Room Steelwork
Details
04-05-2022
0.00
Saving the Lemon Tree
Details
03-31-2022
0.00
Hangar Store Room Concrete Floor
Details
03-29-2022
0.00
Hangar Extension is Started
Details
03-13-2022
1.50
Seat Modifications
Details
03-12-2022
0.00
2: Seat Modifications
Details
03-12-2022
6.00
1: Seat Modifications
Details
02-20-2022
3.00
Wing Bolts
Details
02-20-2022
0.00
Getting a Neighbour at the Hangar
Details
02-19-2022
5.00
1: Cockpit Underfloor Wiring
Details
02-18-2022
0.00
Metar Map
Details
01-07-2022
1.50
5: Fuselage Trolley Repairs
Details
01-07-2022
1.50
4: AoA Tubing
Details
01-07-2022
1.00
3: Fuel Level Sender Wiring
Details
01-07-2022
1.00
2: Auto Pilot Testing
Details
01-07-2022
2.00
1: Auto Pilot Wiring
Details
01-06-2022
0.00
3: Hangar Time
Details
01-06-2022
1.00
2: Testing the Wing Lights
Details
01-06-2022
3.50
1: Wing Wiring
Details
01-05-2022
7.00
Wing Wiring
Details
01-04-2022
1.50
3: Left Wing Wiring
Details
01-04-2022
1.50
2: Pitot Tube Piping
Details
01-04-2022
3.00
1: Fuel Tank Vent Lines
Details
12-15-2021
0.00
SAAA Magazine Article
Details
12-12-2021
0.00
4: Flap Control Rods - Part 2
Details
12-12-2021
3.00
3: Flap Control Rods - Part 1
Details
12-12-2021
0.00
2: Fuel Tank Attach Brackets - Part 2
Details
12-12-2021
4.00
1: Fuel Tank Attach Brackets - Part 1
Details
11-24-2021
0.00
Hangar Taxiway Line Marking
Details
11-21-2021
1.00
3: Fitting the Pitot Tube
Details
11-21-2021
2.50
2: Attaching Ailerons and Flaps
Details
11-21-2021
2.00
1: Drilling the Wing Rear Spar Bolts
Details
11-20-2021
2.00
Setting up the Wings
Details
11-19-2021
1.50
Attaching the Wings
Details
11-01-2021
0.00
Hangar Taxiway
Details
10-31-2021
2.00
2: Wing Attach Bolts
Details
10-31-2021
3.00
1: Windscreen clamps
Details
10-08-2021
0.00
Hangar Taxiway
Details
10-01-2021
0.00
Hangar Taxiway
Details
09-25-2021
4.00
Front Windshield
Details
09-24-2021
6.00
2: Fixing the Canopy to the Frame
Details
09-24-2021
4.00
1: Canopy Skirt Handles
Details
09-23-2021
0.00
2: Canopy Skirts
Details
09-23-2021
4.00
1: Canopy Skirts
Details
09-22-2021
0.00
Hangar Barn Door
Details
09-21-2021
0.00
Hangar Security System
Details
08-25-2021
0.00
Minor Earthworks
Details
08-08-2021
0.00
2: Rear Canopy Skirt
Details
08-08-2021
5.00
1: Canopy Rear Skirt
Details
08-06-2021
0.00
Hangar Gas Bottle Shed
Details
07-18-2021
0.00
5: Sunday Bloody Sunday
Details
07-18-2021
0.50
4: Fuel Flow Sensor Mounting
Details
07-18-2021
1.00
3: Canopy Skirt Hole Duplicator
Details
07-18-2021
3.00
2: Rear Canopy Skirts
Details
07-18-2021
3.00
1: Rear Canopy Skirts
Details
07-14-2021
0.00
Hangar Lemon Tree
Details
06-27-2021
2.00
3: Canopy Rear Skirts
Details
06-27-2021
0.00
2: Canopy Side Skirts
Details
06-27-2021
4.00
1: Canopy Side Skirts
Details
06-13-2021
2.00
3: Technical Counsellor Inspection
Details
06-13-2021
3.00
2: Canopy Side Skirts
Details
06-13-2021
1.50
1: Trimming the Canopy
Details
06-11-2021
0.00
Hangar Bathroom
Details
05-16-2021
7.00
Canopy Side Skirts Continued
Details
05-15-2021
0.00
3: VIP QA Inspection
Details
05-15-2021
4.00
2: Canopy Side Skirts
Details
05-15-2021
2.00
1: Trimming the Canopy (again)
Details
05-09-2021
4.00
Canopy Latch MarkII
Details
05-08-2021
5.00
Reassembled the Empennage
Details
05-07-2021
0.00
Hangar Living Quarters
Details
05-06-2021
0.00
Hangar Workshop is Finished
Details
04-17-2021
0.00
Hangar Workshop
Details
04-16-2021
0.00
The Big Move - Part 4
Details
04-07-2021
0.00
Hangar Cabinets
Details
04-04-2021
0.00
Hangar Progress
Details
04-04-2021
0.00
Easter Bunny Visits the Hangar
Details
03-27-2021
0.00
The Big Move - Part 3
Details
03-21-2021
0.00
Hangar Wall Lining
Details
03-19-2021
0.00
The Big Move - Part 2
Details
03-13-2021
0.00
Hangar Kitchen Floor
Details
03-06-2021
0.00
The Big Move - Part 1b
Details
03-02-2021
0.00
The Big Move - Part 1a
Details
02-28-2021
2.50
2: Canopy Side Skirts
Details
02-28-2021
3.00
1: Canopy Extension Rails
Details
02-27-2021
4.00
3: Canopy Extension Rails
Details
02-27-2021
1.50
2: Canopy Guide Rails
Details
02-27-2021
2.00
1: Canopy Guide Blocks
Details
02-21-2021
0.00
Hangar Painting
Details
02-14-2021
2.00
2: Canopy Side Skirts
Details
02-14-2021
1.00
1: Cracked Windshield
Details
02-13-2021
2.00
3: Canopy Guide Blocks
Details
02-13-2021
1.50
2: Windshield
Details
02-13-2021
1.50
1: Canopy Latch
Details
02-12-2021
1.00
2: Canopy Latch
Details
02-12-2021
1.50
1: Canopy Frame Adjustments
Details
02-03-2021
0.50
Front Top Skin
Details
01-29-2021
0.00
Hangar Painting
Details
01-28-2021
0.00
Hangar Pressure Pump
Details
01-26-2021
0.50
2: Canopy Guide Wheels
Details
01-26-2021
3.50
1: Trimming the Windscreen
Details
01-25-2021
1.00
5: Canopy Cover Strip
Details
01-25-2021
2.50
4: More Canopy Work
Details
01-25-2021
0.00
3: Trimming the Plexiglass Canopy
Details
01-25-2021
1.50
2: Trimming the Plexiglass Canopy
Details
01-25-2021
0.50
1: Canopy Guide Rollers
Details
01-24-2021
0.50
5: Canopy Guide Rollers
Details
01-24-2021
1.00
4: Canopy Cover Strip
Details
01-24-2021
0.00
3: Sliding Canopy
Details
01-24-2021
3.50
2: Sliding Canopy
Details
01-24-2021
1.50
1: Sliding Canopy
Details
01-23-2021
2.00
3: The Big Cut - Part 3
Details
01-23-2021
1.00
2: The Big Cut - Part 2
Details
01-23-2021
1.00
1: The Big Cut - Part 1
Details
01-22-2021
0.00
Gyprock is installed
Details
01-17-2021
4.00
Trimming the Plexiglass Bubble
Details
01-16-2021
2.00
Getting back into it
Details
01-01-2021
0.00
Moving Miss Tango
Details
12-31-2020
0.00
Hangar Wall Lining and Benches
Details
12-29-2020
0.00
Main Hangar Lighting
Details
12-23-2020
0.00
Hangar First Fix Electrical
Details
12-22-2020
0.00
Hangar Lighting
Details
11-25-2020
0.00
Alternator
Details
11-22-2020
3.00
Scat Tube Clamp Brackets
Details
10-29-2020
2.00
Left Bottom Wing Skin
Details
10-28-2020
0.00
Hangar Floor
Details
10-25-2020
3.00
Oil Cooler Air Flow Louvre
Details
10-21-2020
1.50
Left Wing Bottom Skin
Details
10-18-2020
1.00
Map Box Lining
Details
10-17-2020
3.00
3: Preparing the last wing skin section
Details
10-17-2020
1.00
2: Dimpling wing rib rivet holes
Details
10-17-2020
1.00
1: Forming the Pitot Mast Cutout
Details
10-11-2020
1.50
2: Match drilling the pitot tube mast
Details
10-11-2020
2.00
1: Wing inspection hole covers
Details
10-01-2020
0.00
Hangar Landscaping
Details
09-26-2020
0.00
Hangar Progress Pics
Details
09-20-2020
2.00
Wing Skin
Details
09-16-2020
0.00
Hangar Plumbing
Details
09-11-2020
0.00
Hangar Plumbing
Details
09-02-2020
0.50
Console Lid Leatherwork
Details
08-23-2020
2.00
2: Disassembly
Details
08-23-2020
2.00
1: Front Top Skin
Details
08-22-2020
2.50
2: Oil Cooler Bracket
Details
08-22-2020
2.50
1: Oil Cooler SCAT Tube Adaptor
Details
08-17-2020
0.00
Pneumatic Squeezer
Details
07-15-2020
3.00
Forward Top Skin
Details
06-27-2020
3.00
Empennage Fairing
Details
06-21-2020
5.00
Empennage Fairing
Details
06-14-2020
2.00
2: Centre Console Tray
Details
06-14-2020
3.00
1: Empennage Fairing
Details
06-06-2020
0.00
Hangar Almost Complete
Details
05-24-2020
2.50
2: Centre Console
Details
05-24-2020
7.00
1: Oil Cooler Bracket
Details
05-20-2020
0.00
Hangar Steelwork
Details
05-09-2020
2.50
2: Oil Cooler Airflow Control
Details
05-09-2020
2.00
1: Oil Cooler Bracket
Details
05-03-2020
4.00
Oil Cooler
Details
05-02-2020
2.00
2: Forward Fuselage Top Skin
Details
05-02-2020
5.00
1: Map Lights
Details
04-25-2020
2.00
2: Painting the Canopy Frame
Details
04-25-2020
1.00
1: Oil Cooler Parts
Details
04-21-2020
0.00
It's Finally Started
Details
04-12-2020
2.00
2: Refitting the Elevators
Details
04-12-2020
6.00
1: Empannage Painting
Details
04-11-2020
1.00
3: Control Stick Bolts
Details
04-11-2020
2.50
2: Body Work
Details
04-11-2020
1.50
1: Aileron Pushrod Boots
Details
04-05-2020
6.00
Fire Extinguisher Bracket
Details
04-04-2020
2.00
Empennage Fairing Nutplates
Details
04-03-2020
10.00
Log Books
Details
04-02-2020
1.00
Passenger Joystick Wiring
Details
03-21-2020
1.00
3: Access Problems
Details
03-21-2020
2.00
2: Empennage Fairing
Details
03-21-2020
2.00
1: Empennage Fairing
Details
03-20-2020
2.50
Reassembling the Empennage
Details
03-16-2020
1.00
2: Pitot Tube Relocation
Details
03-16-2020
2.00
1: Instrument Panel Brackets
Details
03-15-2020
1.50
4: Centre Section Side Covers
Details
03-15-2020
2.50
3: Fitting the Front Deck Skin
Details
03-15-2020
2.00
2: Canopy Roll Bar & Front Deck Skin
Details
03-15-2020
1.00
1: Horis PFD GPS Mount
Details
03-14-2020
3.00
3: Front Deck Skin
Details
03-14-2020
2.00
2: Firewall Pass-Thru's
Details
03-14-2020
1.00
1: Park Brake Fittings
Details
03-10-2020
0.50
2: Panel Screws
Details
03-10-2020
1.50
1: Vent and Throttle Brackets
Details
03-01-2020
1.50
3: Pilot Side Seat Belts
Details
03-01-2020
2.00
2: Seat Belt Cables
Details
03-01-2020
2.00
1: Fuel Valve Cover & Other Tasks
Details
02-29-2020
1.00
4: Fuel Valve Cover
Details
02-29-2020
1.00
3: Cabin Heat Valve
Details
02-29-2020
1.50
2: Angle of Attack Tubing
Details
02-29-2020
1.50
1: Spar Bulkhead Covers
Details
02-22-2020
1.00
5: Refitting Centre Tunnel Covers
Details
02-22-2020
1.50
4: Firewall Holes
Details
02-22-2020
1.00
3: Flap Motor Safety Wire
Details
02-22-2020
0.50
2: Firewall Forward Fuel Line
Details
02-22-2020
1.00
1: Relocating the Throttle Cable Penetration
Details
02-21-2020
1.00
Firewall Rework - Not Happy!
Details
02-16-2020
2.50
3: Various Tasks
Details
02-16-2020
1.50
2: Spar Bulkhead Covers
Details
02-16-2020
1.50
1: Front Top Skin
Details
02-15-2020
1.50
5: Nose Gear Shock Absorber
Details
02-15-2020
1.50
4: Engine Mount
Details
02-15-2020
2.50
3: USB Power Outlet
Details
02-15-2020
1.50
2: Throttle Mixture Bracket
Details
02-15-2020
1.50
1: Ammeter Shunt Cover
Details
02-14-2020
1.50
Throttle/Mixture Bracket
Details
02-13-2020
1.50
VP-X Repairs
Details
02-02-2020
0.50
5: Custom Locknut Spanner
Details
02-02-2020
1.50
4: Various Small Jobs
Details
02-02-2020
1.00
3: Fuel Flow Sensor
Details
02-02-2020
2.50
2: Ammeter Shunt Cover
Details
02-02-2020
1.50
1: Engine Controls and Cable Doubler
Details
02-01-2020
2.00
4: Cable Clamp Firewall Doubler
Details
02-01-2020
2.00
3: New Centre Tunnel Cover Plate
Details
02-01-2020
1.50
2: Throttle/Mixture Bracket
Details
02-01-2020
1.50
1: Throttle Firewall Feed-Through
Details
01-27-2020
1.00
5: Engine Controls
Details
01-27-2020
3.00
4: Fuel and Brake Lines
Details
01-27-2020
1.00
3: Engine Controls Bracket
Details
01-27-2020
1.00
2: Left Gear Leg Weldment
Details
01-27-2020
1.00
1: VP-X Repairs
Details
01-26-2020
4.00
Power Wiring
Details
01-25-2020
3.00
2: Ammeter Shunt & Alternator Fuse Block
Details
01-25-2020
0.00
1: A Morning Flight
Details
01-20-2020
1.50
Ammeter Shunt and Alternator Fuse Block
Details
01-19-2020
0.00
4: A tight squeeze, and a new pushbutton
Details
01-19-2020
1.50
3: Ammeter Shunt and Alternator Fuse
Details
01-19-2020
2.50
2: Fuel Flow Meter Installation
Details
01-19-2020
4.00
1: Oil Seperator Doubler Plate
Details
01-18-2020
3.00
2: Park Brake
Details
01-18-2020
3.50
1: Gear Leg Weldment Bolt Holes
Details
01-12-2020
0.00
3: Celebrating a Good Day's Work
Details
01-12-2020
3.50
2: Trimming the Perspex Canopy
Details
01-12-2020
1.50
1: Drilling the Canopy Latch Handle Hole
Details
01-11-2020
0.00
4: Admiring the Instrument Panel
Details
01-11-2020
2.00
3: Sliding Canopy Frame
Details
01-11-2020
2.50
2: Sliding Canopy Frame
Details
01-11-2020
1.50
1: Sliding Canopy Frame
Details
01-05-2020
5.00
Canopy Slide Rail
Details
01-04-2020
4.00
Reinstalled Instrument Panel
Details
12-24-2019
0.00
Instrument Panel is Painted
Details
12-20-2019
0.00
Revised Hangar Site
Details
12-17-2019
0.00
Materials Delivered to Site
Details
12-14-2019
0.50
2: Instument Panel
Details
12-14-2019
3.50
1: Sliding Canopy
Details
12-12-2019
1.00
Repairing Wing Rivet Depressions
Details
12-08-2019
6.00
Sliding Canopy
Details
12-07-2019
4.00
Cockpit Roll Bar
Details
12-01-2019
1.00
3: Flushing Instrument Panel Rivets
Details
12-01-2019
2.00
2: Cockpit Rollbar Mounting Bolt Spacers
Details
12-01-2019
1.00
1: Right Wing Landing Light Wiring
Details
11-30-2019
0.00
3: Landing Gear Pictures
Details
11-30-2019
4.00
2: Nose Wheel
Details
11-30-2019
1.50
1: Right Main Wheel
Details
11-18-2019
1.50
Main Wheels
Details
11-17-2019
4.50
2: Left Main Wheel
Details
11-17-2019
4.00
1: Right Wing Tip
Details
11-16-2019
4.50
2: Right Wing Tip
Details
11-16-2019
0.00
1: Flying
Details
11-10-2019
3.50
3: Canopy Roll Bar
Details
11-10-2019
1.00
2: Wing Tip Repairs
Details
11-10-2019
1.50
1: Gear Leg Weldment Bolts
Details
11-09-2019
7.00
Gear Leg Weldment Bolts
Details
11-07-2019
1.00
VHF Com Doubler Plate
Details
11-03-2019
2.00
VHF Com Doubler Plate
Details
10-26-2019
0.00
YMTG Hangar Site
Details
10-20-2019
4.00
Firewall Wiring Pass-Though
Details
10-19-2019
3.50
3: Engine Mount
Details
10-19-2019
2.00
2: Map Box Door
Details
10-19-2019
0.00
1: Storing Finish Kit Parts
Details
10-18-2019
0.00
Unpacking the Finish Kit
Details
10-17-2019
0.00
Finish Kit has arrived
Details
10-13-2019
2.00
3: Right Wing Tip
Details
10-13-2019
2.00
2: Right Wing Tip
Details
10-13-2019
1.50
1: Right Wing Tip
Details
10-12-2019
1.00
3: Right Fuel Tank
Details
10-12-2019
2.00
2: Wing Tip Perspex Lens
Details
10-12-2019
2.00
1: Right Wing Lights
Details
10-11-2019
3.00
3: Right Wing Lights
Details
10-11-2019
2.00
2: Wing Tip Perspex Lens
Details
10-11-2019
2.00
1: Wing Tip Lights
Details
10-10-2019
4.00
2: Wing Tip Lights
Details
10-10-2019
2.00
1: Wing Tips
Details
10-09-2019
2.00
3: Pitot Tube
Details
10-09-2019
2.00
2: Left Fuel Tank
Details
10-09-2019
1.50
1: Left Fuel Tank
Details
10-08-2019
2.00
3: Left Wing Landing Light
Details
10-08-2019
2.00
2: Left Wing Landing Light
Details
10-08-2019
4.00
1: Left Wing Landing Lights
Details
10-07-2019
2.00
2: Left Wing
Details
10-07-2019
0.00
1: Workshop is Ready
Details
10-06-2019
0.00
2: Prepping the Workshop
Details
10-06-2019
2.50
1: Vertical Stabiliser Alignment
Details
09-22-2019
3.00
3: Crating the Elevators
Details
09-22-2019
2.00
2: Map Box
Details
09-22-2019
1.00
1: Vertical Stabiliser Tip
Details
09-21-2019
3.50
2: Map Box Door
Details
09-21-2019
2.00
1: Vertical Stabiliser Tip
Details
09-15-2019
2.00
3: Rudder Tip
Details
09-15-2019
2.50
2: Magneto Wiring
Details
09-15-2019
2.00
1: Map Box
Details
09-14-2019
3.00
2: Map Box Door
Details
09-14-2019
4.00
1: Elevator, Stabiliser, Rudder Tips
Details
09-08-2019
2.00
2: Elevator Tips
Details
09-08-2019
3.00
1: Elevator Tips
Details
09-07-2019
2.00
2: Forward Fuselage Top Skin
Details
09-07-2019
2.50
1: Elevator and Stabiliser Tips
Details
08-25-2019
1.00
2: Ammeter Shunt
Details
08-25-2019
4.00
1: More Skyview Work
Details
08-24-2019
8.00
Troubleshooting the CO Monitor
Details
08-18-2019
7.00
Fiddling with the Avionics
Details
08-11-2019
6.00
Testing the Skyviews
Details
08-10-2019
8.00
Installing the Skyviews
Details
07-30-2019
0.50
Instrument Panel Vents
Details
07-28-2019
0.00
2: Custom Keyring
Details
07-28-2019
6.00
1: Instrument Panel Cooling Vents
Details
07-27-2019
1.00
3: Instrument Panel Cooling Vents
Details
07-27-2019
3.00
2: Centre Console
Details
07-27-2019
3.00
1: Centre Console
Details
07-26-2019
1.00
Glareshield Trim
Details
07-21-2019
3.00
Rudder and Elevator Tips
Details
07-20-2019
4.00
2: Rudder Fairings
Details
07-20-2019
0.00
1: Flying
Details
07-15-2019
1.00
Pilot Joystick Wiring
Details
07-14-2019
3.00
3: VP-X Configuration
Details
07-14-2019
2.00
2: Bottom Rudder Fairing
Details
07-14-2019
1.00
1: Fuselage Wiring
Details
07-13-2019
1.00
3: Bottom Rudder Fairing
Details
07-13-2019
2.00
2: Tail Light Wiring
Details
07-13-2019
3.00
1: Headset Jacks and Master Switch
Details
06-30-2019
0.00
4: End of the Day
Details
06-30-2019
3.50
3: AoA Head-Up Display
Details
06-30-2019
1.50
2: Trim Indicator Wiring
Details
06-30-2019
2.00
1: Ignition Switch Wiring
Details
06-29-2019
4.50
2: Final Wiring and Floor Covers
Details
06-29-2019
2.50
1: Park Brake Bracket
Details
06-28-2019
1.50
2: Park Brake Bracket
Details
06-28-2019
0.50
1: Various Labels
Details
06-26-2019
2.00
Battery Fault Wiring
Details
06-23-2019
2.00
3: CO Monitor Wiring
Details
06-23-2019
2.00
2: Fresh Air Vents
Details
06-23-2019
2.00
1: Cockpit Interior
Details
06-22-2019
7.00
Centre Console
Details
06-16-2019
2.00
Centre Console
Details
06-10-2019
2.00
3: Joystick Wiring
Details
06-10-2019
2.00
2: Top Rear Skin Installation
Details
06-10-2019
2.00
1: Pilot Headset Jack Wiring
Details
06-09-2019
3.00
3: Top Rear Skin Installation
Details
06-09-2019
3.00
2: GPS Receiver
Details
06-09-2019
2.00
1: Top Rear Skin Preparation
Details
06-08-2019
4.00
Fuselage Top Rear Skin
Details
06-07-2019
2.00
Fuselage Top Skin
Details
06-06-2019
0.50
EarthX Battery
Details
06-02-2019
2.00
2: Map Box
Details
06-02-2019
3.00
1: Cabin Heat
Details
06-01-2019
2.00
3: Modifying the Park Brake Valve
Details
06-01-2019
3.00
2: Reconnecting the Rudder Pedals
Details
06-01-2019
3.00
1: Installing the Horis PFD
Details
05-26-2019
1.00
1: Leather Seats
Details
05-04-2019
3.00
CoPilot Headset Wiring
Details
04-27-2019
3.00
2: Tail Nav/Strobe Light Wiring
Details
04-27-2019
1.00
1: Angle of Attack HUD
Details
04-26-2019
1.00
2: Panel Switch Lighting
Details
04-26-2019
1.00
1: Floor Wiring Loom
Details
04-25-2019
6.00
Engine Instrument Wiring
Details
04-22-2019
4.00
2: Engine Instrument Wiring
Details
04-22-2019
3.00
1: Voltage Regulator
Details
04-21-2019
14.00
EFIS Wiring
Details
04-07-2019
1.00
3: Pitot Tube Plumbing
Details
04-07-2019
1.00
2: Skyview Network Cable
Details
04-07-2019
4.00
1: Remounting the Radio
Details
04-06-2019
8.00
Radio and Joystick Wiring
Details
03-31-2019
5.00
Head Set Cables
Details
03-23-2019
0.00
2: Under Wraps
Details
03-23-2019
4.00
1: CO Monitor
Details
03-11-2019
3.00
Relocating the VHF Radio
Details
03-10-2019
2.00
2: iPad Mount
Details
03-10-2019
2.50
1: Relocating the VHF Com
Details
03-09-2019
0.50
4: Instrument Panel Wiring Loom
Details
03-09-2019
3.50
3: CO Monitor Wiring
Details
03-09-2019
1.00
2: USB Power Outlet
Details
03-09-2019
2.00
1: Audio Panel Wiring
Details
03-03-2019
0.00
2: Instrument Panel Taking Shape
Details
03-03-2019
5.00
1: Panel Switch Wiring
Details
03-02-2019
2.50
2: Audio Wiring
Details
03-02-2019
2.50
1: Nav/Strobe Switch Wiring
Details
02-24-2019
6.50
Panel Switch Wiring
Details
02-23-2019
6.00
Panel Switch Wiring
Details
02-22-2019
0.50
2: Leather Seats
Details
02-22-2019
4.00
1: Panel Wiring
Details
02-03-2019
0.00
2: Shit it's Hot!
Details
02-03-2019
6.00
1: Panel Switch Wiring - Take 2
Details
02-02-2019
1.00
2: Testing the Panel Switch Backlights
Details
02-02-2019
5.00
1: Panel Switch Wiring - Take 1
Details
01-28-2019
2.00
CO Monitor Warning Light
Details
01-27-2019
4.00
2: Instrument Panel Nutplates
Details
01-27-2019
2.00
1: Magnetic Compass Installation
Details
01-26-2019
3.00
Audio Mixer and AoA Switch Panel
Details
01-13-2019
4.00
Instrument Panel
Details
01-13-2019
0.00
Back in the Pilot Seat
Details
01-11-2019
2.50
Instrument Panel Cut-Outs
Details
01-10-2019
1.50
Instrument Panel Cut-Outs
Details
01-09-2019
1.00
Instrument Panel Cut-Outs
Details
01-08-2019
1.50
Instrument Panel Cut-Outs
Details
01-07-2019
1.00
Instrument Panel Cut Outs
Details
01-06-2019
0.00
2: Time for Contemplation
Details
01-06-2019
4.50
1: Instrument Panel Cut-Outs and Layout
Details
01-05-2019
4.00
2: Additional Sub-Panel Mounting Plate
Details
01-05-2019
2.00
1: Instrument Panel Cut-Out
Details
12-15-2018
6.50
More Panel Wiring
Details
12-09-2018
6.00
Panel Switches
Details
12-03-2018
2.00
More Panel Wiring
Details
12-02-2018
7.00
More Panel Wiring
Details
12-01-2018
3.00
Instrument Panel Wiring
Details
11-11-2018
4.00
The Wiring Begins
Details
11-10-2018
5.00
AoA Control Box Bracket
Details
11-04-2018
2.00
2: AoA Bracket
Details
11-04-2018
4.00
1: Mounting Avionics
Details
11-03-2018
3.00
3: Started Mounting Avionics
Details
11-03-2018
3.00
2: Front Deck
Details
11-03-2018
2.00
1: Instrument Panel Layout
Details
10-21-2018
1.50
4: Fresh Air Vents
Details
10-21-2018
1.50
3: Front Deck
Details
10-21-2018
2.00
2: Transponder Mounting Bracket
Details
10-21-2018
1.00
1: Fuel Flow Sensor Bracket
Details
10-20-2018
0.00
4: Workshop
Details
10-20-2018
2.00
3: Fuel Lines and Other Small Jobs
Details
10-20-2018
2.00
2: Red Cube Mounting Bracket
Details
10-20-2018
4.00
1: Transponder Installation
Details
10-14-2018
1.00
4: Rear Fusleage Skin
Details
10-14-2018
1.50
3: Vertical Stabiliser Brackets
Details
10-14-2018
2.00
2: Trim Motor Wiring
Details
10-14-2018
1.00
1: Rudder Cable Fairings
Details
10-13-2018
1.50
2: Rudder Cable
Details
10-13-2018
4.50
1: Trim Motor Wiring
Details
10-09-2018
2.00
Landing/Taxi Lights
Details
10-07-2018
5.00
Mapping out a Wiring Plan
Details
10-06-2018
3.00
2: Control Stick Wire Terminations
Details
10-06-2018
2.00
1: Park Brake Control Cable Bracket
Details
10-05-2018
0.50
4: Other Jobs
Details
10-05-2018
0.50
3: Fresh Air Vents
Details
10-05-2018
1.00
2: Bootlace Ferrules
Details
10-05-2018
1.00
1: Firewall Wiring Penetration
Details
09-23-2018
1.00
2: Headset Jacks
Details
09-23-2018
5.00
1: Park Brake Valve
Details
09-22-2018
4.00
More Firewall Rework
Details
09-21-2018
1.50
Firewall Rework
Details
09-16-2018
1.00
2: Forward Centre Tunnel Cover
Details
09-16-2018
5.00
1: Installing Custom Fuel Lines
Details
09-15-2018
2.00
6: Fuel Boost Pump Cover
Details
09-15-2018
1.00
5: Fuel Vent Screens
Details
09-15-2018
2.00
4: Cabin Heat Valve
Details
09-15-2018
3.00
3: Firewall Sensor Block
Details
09-15-2018
2.00
2: Firewall Control Cable Fittings
Details
09-15-2018
1.00
1: Copilot Control Stick
Details
09-14-2018
3.00
Firewall Forward Kit Arrived
Details
09-09-2018
2.00
2: Control Stick Buttons
Details
09-09-2018
4.00
1: Rudder Control Cables and Pedals
Details
09-08-2018
2.50
4: Rudder Control Cables
Details
09-08-2018
2.50
3: Tubing Rework
Details
09-08-2018
2.50
2: Relay Coil Protection Diodes
Details
09-08-2018
2.50
1: Flap Position Sensor
Details
08-27-2018
1.00
Firewall
Details
08-26-2018
4.00
Firewall
Details
08-25-2018
1.50
2: Front Deck Nutplates
Details
08-25-2018
5.00
1: Firewall Penetrations
Details
08-23-2018
3.00
Various Small Jobs
Details
08-19-2018
2.50
Firewall Components
Details
08-18-2018
3.00
3: Firewall Components
Details
08-18-2018
2.00
2: Fuel Vent Line Tubing
Details
08-18-2018
3.00
1: Flap Position Sensor
Details
08-17-2018
4.00
Flap Position Sensor
Details
08-12-2018
3.00
2: Flap Position Sensor
Details
08-12-2018
4.00
1: Installing the Fuel Pump
Details
08-11-2018
6.00
Installing the Fuel Pump
Details
08-10-2018
2.00
Installing the Fuel Pump
Details
08-05-2018
4.00
2: Flap Position Sensor
Details
08-05-2018
2.00
1: Centre Console
Details
07-29-2018
0.00
AirVenture 2018
Details
07-15-2018
3.00
Right Fuel Vent Line
Details
07-14-2018
3.00
2: Brake Lines
Details
07-14-2018
2.00
1: Andair Fuel Selector Valve
Details
07-01-2018
1.00
3: Tubing Brake LInes
Details
07-01-2018
2.00
2: PVC Brake Lines
Details
07-01-2018
3.00
1: Front Deck
Details
06-30-2018
4.50
2: Front Deck
Details
06-30-2018
1.50
1: Instrument Panel Map Box
Details
06-24-2018
1.50
3: Instrument Panel Map Box
Details
06-24-2018
2.00
2: Instrument Panel Map Box
Details
06-24-2018
2.50
1: Front Deck
Details
06-23-2018
3.00
2: Front Deck and Instrument Panel
Details
06-23-2018
6.00
1: Front Deck and Instrument Panel
Details
06-17-2018
5.00
Front Deck and Instrument Panel
Details
06-16-2018
3.50
2: Front Deck and Instrument Panel
Details
06-16-2018
3.00
1: Installing the Rudder Stop
Details
06-04-2018
1.50
Installing the Rudder Stop
Details
06-03-2018
2.50
3: Installing the Forward Elevator Control Rod
Details
06-03-2018
2.00
2: Modifying Seat Floor Ribs
Details
06-03-2018
2.00
1: Fitting the Aft Elevator Control Rod
Details
06-02-2018
1.50
4: Elevator Control Rods
Details
06-02-2018
2.00
3: Mounting the Rudder
Details
06-02-2018
2.00
2: Mounting the Vertical Stabiliser
Details
06-02-2018
3.00
1: Mounting the Vertical Stabiliser
Details
06-01-2018
2.00
Attaching the Vertical Stabiliser
Details
05-28-2018
1.00
Elevator Control Rods
Details
05-27-2018
2.00
3: Fresh Air Scoops
Details
05-27-2018
2.50
2: Elevator Control Rods
Details
05-27-2018
1.50
1: Building the Empennage
Details
05-26-2018
2.00
3: Attaching the Elevators
Details
05-26-2018
4.50
2: Bolting on the Horizontal Stabiliser
Details
05-26-2018
4.00
1: Reassembling the Cockpit
Details
05-25-2018
2.00
Reassembling the Cockpit
Details
05-20-2018
2.00
2: Painting the Cockpit
Details
05-20-2018
4.00
1: Prepping for Painting
Details
05-06-2018
5.00
Prepping the Cockpit
Details
05-05-2018
2.50
Fresh Air Vents
Details
04-29-2018
3.00
Fresh Air Vents
Details
04-08-2018
2.50
2: Fuselage Wiring Holes
Details
04-08-2018
1.50
1: Attached Right Wing Control Surfaces
Details
04-07-2018
1.50
3: Right Wing Inspection Covers
Details
04-07-2018
2.50
2: Right Wing Bottom Outboard Skin
Details
04-07-2018
2.00
1: Right Wing Bottom Outboard Skin
Details
04-02-2018
4.00
Right Wing Bottom Skin
Details
04-01-2018
1.00
3: Right Wing Bottom Skin
Details
04-01-2018
2.50
2: Right Wing Landing Light
Details
04-01-2018
2.00
1: Bellcrank Inspection Lights
Details
03-31-2018
2.00
3: Bellcrank Inspection Lights
Details
03-31-2018
2.50
2: Right Wing Landing Light
Details
03-31-2018
1.50
1: Right Wing Landing LIght
Details
03-25-2018
1.00
4: Caution Tags
Details
03-25-2018
1.00
3: Left Wing Landing Light Wiring
Details
03-25-2018
3.00
2: Leading Edge Landing Lights
Details
03-25-2018
4.00
1: Leading Edge Landing Lights
Details
03-12-2018
3.00
2: Leading Edge Landing Lights
Details
03-12-2018
2.00
1: Leading Edge Landing Lights
Details
03-11-2018
2.50
3: Leading Edge Landing LIghts
Details
03-11-2018
2.50
2: Leading Edge Landing LIghts
Details
03-11-2018
5.00
1: Dynon Skyview Network Hub
Details
03-10-2018
2.00
Technical Counsellor Initial Inspection
Details
03-10-2018
2.00
Dynon Skyview Network Hub
Details
03-04-2018
3.50
Autopilot Pitch Servo
Details
03-03-2018
2.50
Bits 'n Pieces
Details
02-26-2018
2.00
Landing Gear Weldments
Details
02-25-2018
4.00
3: Bolting in the Right Landing Gear Weldment
Details
02-25-2018
1.50
2: Reaming the Gear Legs
Details
02-25-2018
1.50
1: Flap Motor Wiring
Details
02-24-2018
7.00
Flap Actuator
Details
02-18-2018
4.00
2: Flap Actuator
Details
02-18-2018
3.00
1: Fuel System Covers
Details
02-17-2018
6.00
Fuel System Covers
Details
02-12-2018
1.00
Cockpit Seats
Details
02-11-2018
6.00
Cockpit Seats
Details
01-28-2018
5.00
Cockpit Seats
Details
01-27-2018
4.00
2: Cockpit Tunnel Cover
Details
01-27-2018
4.00
1: Cockpit Floor
Details
01-26-2018
7.00
Baggage Compartment
Details
01-21-2018
3.00
2: Underfloor Wiring Duct
Details
01-21-2018
1.00
1: Centre Section Floor Nutplates
Details
01-20-2018
1.50
3: Wiring Holes in the Main Spar
Details
01-20-2018
3.00
2: Seat Belt Wire Wear Strips
Details
01-20-2018
1.00
1: Left Side Step
Details
01-14-2018
5.00
Left Side Step
Details
12-10-2017
4.00
Right Side Step
Details
12-09-2017
5.00
Fitting the Steps
Details
12-08-2017
3.50
ADAHRS Bracket and Static Tube
Details
12-03-2017
2.00
ADAHRS and OAT
Details
12-02-2017
1.50
2: Static Ports
Details
12-02-2017
4.00
1: ADAHRS Mounting Bracket
Details
12-01-2017
2.50
ADAHRS Mounting Bracket
Details
11-26-2017
5.00
2: Forward Top Skin
Details
11-26-2017
1.00
1: Elevator Bellcrank
Details
11-25-2017
3.00
3: Fuselage Bits
Details
11-25-2017
3.00
2: Rudder Pedal Assembly Install
Details
11-25-2017
2.50
1: Brake Pedals
Details
11-20-2017
2.00
Brake Pedals
Details
11-19-2017
3.00
2: Brake Pedals
Details
11-19-2017
3.50
1: Gear Leg Weldments
Details
11-18-2017
4.00
2: Tail Tie-Down
Details
11-18-2017
5.50
1: Fuselage Bits'n Pieces
Details
11-13-2017
1.50
Seat and Flap Brackets
Details
11-12-2017
1.00
2: Underwing Inspection Cover
Details
11-12-2017
6.50
1: Seat and Firewall Brackets
Details
11-11-2017
3.50
3: Control Column Assembly
Details
11-11-2017
2.00
2: Firewall Holes
Details
11-11-2017
4.00
1: Firewall Parts
Details
11-05-2017
0.00
5: Summary of Hours Worked
Details
11-05-2017
2.00
4: Left Wing Aileron and Flap Assembly
Details
11-05-2017
2.50
3: Pitot Tube Installation
Details
11-05-2017
1.50
2: Left Wing Wiring
Details
11-05-2017
5.00
1: Instrument Panel Layout Rev 02.01
Details
11-04-2017
2.00
3: Nav/Strobe Light Wiring
Details
11-04-2017
3.00
2: Bellcrank Inpsection Lights
Details
11-04-2017
2.00
1: Left Wing Wiring Conduit
Details
11-03-2017
0.50
2: Inspection Lights
Details
11-03-2017
2.00
1: Stall Warning
Details
10-24-2017
1.00
Stall Warning Switch
Details
10-23-2017
2.00
Stall Warning Switch
Details
10-22-2017
2.00
3: Stall Warning Switch
Details
10-22-2017
1.00
2: Pitot Tube Bracket continued
Details
10-22-2017
4.00
1: Pitot Tube Bracket
Details
10-21-2017
3.00
2: Left Wing Pitot Mount
Details
10-21-2017
5.50
1: Roll Servo Wiring
Details
10-15-2017
5.00
Right Wing Flap
Details
10-14-2017
5.00
2: Attaching the Right Aileron
Details
10-14-2017
4.00
1: Right Wing Aileron Control Rods
Details
10-01-2017
0.00
22: Grypmat Tool Tray
Details
10-01-2017
0.00
21: Handee Clamp and Washer Tool
Details
10-01-2017
0.00
20: Handee Clamp
Details
10-01-2017
0.00
19: Nutplate Jig
Details
09-25-2017
1.00
Left Wing Conduit Brackets
Details
09-24-2017
4.00
2: Wing Wiring Conduits
Details
09-24-2017
2.00
1: Aileron Control Rods
Details
09-23-2017
3.00
3: Angle of Attack Sensor
Details
09-23-2017
5.00
2: Aileron Control Rods
Details
09-23-2017
1.00
1: Aileron Bellcrank Re-Grease
Details
09-17-2017
5.50
Roll Servo and Right Wing Fairings
Details
09-16-2017
3.00
2: Right Wing Aileron Bellcrank
Details
09-16-2017
5.00
1: Flap and Aileron Fairings
Details
09-14-2017
1.00
Aileron hinge bracket SB parts
Details
09-03-2017
7.00
Brackets and Fairings
Details
09-02-2017
0.00
Wall Art
Details
09-02-2017
9.00
Aileron and Flap Fairings
Details
09-01-2017
7.00
Aileron Hinge Brackets
Details
08-27-2017
4.00
Fuel Pick-Up and Level Sensors
Details
08-26-2017
11.00
Fuselage Trolley
Details
08-20-2017
20.00
Checking inventory and sorting parts
Details
08-16-2017
1.00
Uncrating the QB Wings and Fuselage
Details
08-14-2017
0.00
Wings and Fuselage are Delivered
Details
07-25-2017
0.00
EAA AirVenture 2017
Details
07-09-2017
4.50
Horizontal Stabiliser Tips
Details
07-02-2017
4.00
Horizontal Stabiliser Tips
Details
07-01-2017
3.00
More Filling and Sanding
Details
06-25-2017
4.00
Mixing, Filling, Sanding...
Details
06-24-2017
0.00
Sandpaper Storage Unit
Details
06-19-2017
1.00
Basic Wiring Diagram - First Draft
Details
06-18-2017
4.00
Fairing Elevator and Rudder Tips
Details
06-12-2017
3.00
3: Rudder Tips
Details
06-12-2017
1.50
2: Rudder Light Wiring
Details
06-12-2017
1.50
1: Elevator Wing Tip Fairing
Details
06-11-2017
3.00
Elevator Wing Tip Fairing
Details
06-10-2017
1.50
3: Tail Nav/Strobe Light
Details
06-10-2017
1.00
2: Map Box
Details
06-10-2017
1.50
1: Elevator Tip Fairing
Details
06-02-2017
1.00
Power Distribution Box
Details
06-01-2017
1.00
Power Distribution Board
Details
05-31-2017
1.50
Left Elevator Wing Tip
Details
05-14-2017
1.50
2: Right Elevator Wing Tip
Details
05-14-2017
1.00
1: Test Fitted Both Elevators
Details
05-06-2017
3.00
Elevator Counterweights
Details
04-30-2017
3.00
3: Trim Tab Assembly
Details
04-30-2017
1.00
2: Trim Tab Servo Mount
Details
04-30-2017
1.00
1: Left Elevator Trailing Edge
Details
04-25-2017
0.50
4: Left Elevator Trailing Edge
Details
04-25-2017
2.50
3: Trim Tab Assembly
Details
04-25-2017
1.00
2: Almost a Disaster
Details
04-25-2017
2.00
1: Trim Tab Servo Motor
Details
04-24-2017
2.50
3: Building the Trim Tab
Details
04-24-2017
2.00
2: Trim Tab Jigs and Tools
Details
04-24-2017
1.50
1: Trim Tab Stiffeners
Details
04-23-2017
0.00
Workshop Enhancements
Details
04-22-2017
2.00
2: Primed the Trim Tab Skin
Details
04-22-2017
3.00
1: Continuing with the Left Elevator
Details
04-21-2017
1.00
Right Elevator Trailing Edge
Details
04-20-2017
1.00
The Little Suprise Piece
Details
04-19-2017
1.00
Left Elevator Assembly
Details
04-17-2017
1.50
3: Left Elevator Assembly
Details
04-17-2017
1.50
2: Left Elevator Counterbalance
Details
04-17-2017
1.50
1: Right Elevator Trailing Edge
Details
04-16-2017
2.50
3: Right Elevator Trailing Edge
Details
04-16-2017
2.00
2: Right Elevator Spar
Details
04-16-2017
0.50
1: Nav/Strobe Lights Arrive
Details
04-15-2017
2.00
Elevator Stiffeners and Spar
Details
04-14-2017
1.50
Match Drilling the Left Elevator
Details
04-09-2017
3.00
Building the Right Elevator
Details
03-27-2017
1.00
Continued with Right Elevator
Details
03-26-2017
1.50
2: Assembling the Right Elevator
Details
03-26-2017
3.50
1: Match Drilling the Right Elevator
Details
03-25-2017
6.00
A Big Day of Prepping
Details
03-15-2017
1.00
Continued Dimpling and Deburring
Details
03-14-2017
1.50
Continued Alodining Elevator Stiffeners
Details
03-13-2017
6.00
Building the Elevator Counterbalance Arms
Details
03-12-2017
6.50
Match Drilling and Dimpling
Details
03-11-2017
3.00
4: Cutting the Elevator Stiffeners to Size
Details
03-11-2017
1.00
3: Finishing the Rudder Leading Edge
Details
03-11-2017
1.00
2: Rolling the Rudder Leading Edge
Details
03-11-2017
1.00
1: Riveting the Rudder Trailing Edge
Details
03-08-2017
1.00
2: Gluing up the Rudder Trailing Edge
Details
03-08-2017
1.00
1: Preparing the Rudder Trailing Edge
Details
03-04-2017
5.00
Assembling the Rudder
Details
03-03-2017
2.00
Primed and Ready
Details
02-22-2017
1.50
Alodined Rudder Parts
Details
02-20-2017
1.50
Countersinking the Rudder Trailing Edge Wedge
Details
02-19-2017
1.00
3: Dimpling Difficult Holes
Details
02-19-2017
3.00
2: Rudder Assembly and Dimpling
Details
02-19-2017
2.00
1: Back Riveting the Rudder Stiffeners
Details
02-18-2017
2.50
2: Assembling the Rudder Frame
Details
02-18-2017
2.50
1: Painting and Alodining Rudder Parts
Details
02-17-2017
3.00
Preparing the Rudder Skins
Details
02-14-2017
1.00
Finished off the Rudder Stiffeners
Details
02-13-2017
1.50
Started the Rudder stiffeners
Details
02-12-2017
1.00
3: Finished the Vertical Stabiliser
Details
02-12-2017
1.00
2: Provision for Tail Strobe/Nav Light
Details
02-12-2017
2.50
1: Vertical Stabiliser Coming Together
Details
02-11-2017
0.00
3: Sheesh, it sure is hot under this tin roof!
Details
02-11-2017
1.00
2: No compromises
Details
02-11-2017
2.00
1: Assembling vertical stabiliser
Details
02-06-2017
0.50
Centre Hinge Bracket
Details
01-29-2017
2.50
2: Spray Painting
Details
01-29-2017
1.50
1: Alodining
Details
01-28-2017
4.00
Drilling and Dimpling the Vertical Stabiliser
Details
01-27-2017
2.00
Prepping the VS Ribs
Details
01-26-2017
2.50
Finished the Horizontal Stabiliser
Details
01-25-2017
1.00
2: A Start on the Vertical Stabiliser
Details
01-25-2017
1.50
1: Final Stages of HS fabrication
Details
01-15-2017
5.00
Horizontal Stabiliser is almost done
Details
01-14-2017
6.00
Completed one side of the horizontal stabiliser
Details
01-13-2017
1.50
First skin rivets
Details
01-08-2017
3.00
Dimpling and priming HS skins
Details
01-07-2017
2.50
Dimpling the HS skins
Details
01-02-2017
1.00
2: Starting the Vertical Stabiliser
Details
01-02-2017
1.50
2: Rivetting the HS Spars
Details
01-02-2017
2.00
1: Rivet Gun Practice
Details
01-01-2017
2.00
My First Rivet
Details
12-31-2016
1.50
Primed HS Spars
Details
12-30-2016
2.00
Alodined HS Spars
Details
12-17-2016
1.50
2: Priming Wing Ribs
Details
12-17-2016
2.50
1: Dimpling and Alodine
Details
12-16-2016
0.50
Dimpling Pliers Arrived
Details
12-04-2016
1.00
More Countersinking
Details
12-03-2016
1.50
2: Right Horizontal Stabiliser Assembly
Details
12-03-2016
2.00
1: Countersinking
Details
12-01-2016
1.50
Disassemble and deburr
Details
11-27-2016
4.50
Assembled Left Horizontal Stabiliser
Details
11-26-2016
2.00
Deburring
Details
11-23-2016
2.00
Disassemble and deburr
Details
11-22-2016
2.00
Assembled ribs/spars
Details
11-21-2016
1.00
Squaring wing ribs
Details
11-20-2016
4.00
2: Deburring wing ribs
Details
11-20-2016
2.00
1: Front Spar Attachment Angles
Details
11-19-2016
3.00
Front Spars
Details
10-23-2016
0.00
Preparing for my build
Details
10-04-2016
1.00
Empennage Kit Arrived
Details
10-01-2016
0.00
18: Brady Labeller
Details
10-01-2016
0.00
17: West System Epoxy
Details
10-01-2016
0.00
16: Drill Stops
Details
10-01-2016
2.50
15: C-Frame Table
Details
10-01-2016
0.00
14: Dremel
Details
10-01-2016
0.00
13: Cleco's
Details
10-01-2016
0.00
12: Torque Wrench
Details
10-01-2016
0.00
11: Right-angle drill set
Details
10-01-2016
0.00
10: Rivetting Tools
Details
10-01-2016
0.00
08: Scotchbrite Wheel
Details
10-01-2016
0.00
07: Bar Fridge
Details
10-01-2016
0.00
06: Scotchbrite Pads
Details
10-01-2016
0.00
05: Alodine
Details
10-01-2016
0.00
04: Bandsaw
Details
10-01-2016
0.00
03: Air Compressor
Details
10-01-2016
0.00
02: Bench Sander
Details
10-01-2016
0.00
01: Bench Grinder
Details
09-25-2016
0.00
Started on my workbench
Details
09-24-2016
0.00
Start Preparing the Workshop
Details
09-21-2016
0.00
First Order
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
979
2250
01 Workshop
10
02 Tools
24
4
03 Empennage
145
324
04 Wings
84
236
05 Fuselage
140
392
06 Firewall
33
79
07 Engine/Propellor
134
359
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
35
88
11 Instrument Panel
69
184
12 Fuel System
27
65
13 Canopy
75
186
14 Landing Gear
16
46
15 Cockpit Interior
20
46
17 Painting
1
3
28 CofA
7
19
29 Regulatory
4
17
49 Miscellaneous
37
14
50 YMTG Hangar
51
Copyright © 2001-2024 Matronics. All Rights Reserved.