KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
Work Logs Found: 979
Category Work Time: 2250 Hours
 Date
Hours
Work Log Summary

Details

 09-12-2024
8.00
First Flight
Details
       

 08-21-2024
3.00
Main Gear Leg Fairings
Details
       

 08-12-2024
2.00
Alternator Wiring Issue
Details
       

 08-11-2024
6.00
Final touches and engine run
Details
       

 08-07-2024
1.00
Aileron Control Rod Boots
Details
       

 08-04-2024
1.00
CofA Photo Shoot
Details
       

 08-01-2024
8.00
Final CofA Inspection
Details
       

 07-20-2024
1.00
TC Visit
Details

 07-19-2024
2.00
Weight and Balance
Details
     

 07-14-2024
3.00
2: Weighing
Details
       

 07-14-2024
3.00
1: Preservative Oil
Details
       

 07-07-2024
3.00
Weigh Scale Ramps
Details
       

 07-07-2024
0.00
Canopy Cover
Details
       

 07-05-2024
2.00
Trim Tab Actuator
Details
       

 06-29-2024
2.00
2: Trim Tab Actuator
Details
       

 06-29-2024
3.00
1: Lifting Jacks
Details
       

 06-09-2024
1.00
Compass Deviation Card
Details
       

 06-06-2024
0.50
2: Alternator Wire Heat Shield
Details
       

 06-06-2024
1.50
1: Alternator
Details
       

 06-02-2024
1.00
3: Exhaust Heat Shields
Details
       

 06-02-2024
3.00
2: Exhaust Heat Shields
Details
       

 06-02-2024
2.00
1: Fuel Lines
Details
       

 05-26-2024
5.00
Brakes and Rudder Pedals
Details
       

 05-24-2024
1.00
Fuel Line Heat Sleeve
Details
       

 05-21-2024
3.50
Final Task List
Details
       

 05-19-2024
3.00
2: Propellor
Details
       

 05-19-2024
3.00
1: Windscreen Resin Work
Details
       

 05-18-2024
0.50
2: Fuel Line
Details
       

 05-18-2024
2.50
1: Engine Exhaust
Details
       

 05-17-2024
4.00
2: Engine Exhaust
Details
       

 05-17-2024
5.00
1: Windscreen Resin Work
Details
       

 05-16-2024
4.00
2: Engine Exhaust
Details
       

 05-16-2024
3.00
1: Windscreen Resin Work
Details
       

 05-15-2024
2.00
3: Cabin Heat and Alternator Wiring
Details
       

 05-15-2024
3.00
2: Engine Exhaust
Details
       

 05-15-2024
3.00
1: Windscreen Resin Work
Details
       

 05-14-2024
2.00
3: Cabin Heat System
Details
       

 05-14-2024
4.00
2: Exhaust System
Details
       

 05-14-2024
3.00
1: Windscreen Resin Work
Details
       

 05-13-2024
4.00
2: Exhaust
Details
       

 05-13-2024
4.00
1: Windscreen Resin Work
Details
       

 05-12-2024
3.00
Engine Cowl
Details
       

 05-05-2024
4.00
Engine Cowl
Details
       

 04-28-2024
4.00
Engine Cowl
Details
       

 04-25-2024
3.00
Engine Cowl
Details
       

 04-13-2024
4.00
Engine Cowl
Details
       

 04-01-2024
5.00
Cowl Hinge Pin Covers
Details
       

 03-03-2024
1.00
Registration Marks
Details
       

 02-25-2024
2.00
2: Fuel Tank Pressure Test
Details
       

 02-25-2024
8.00
1: Brakes
Details
       

 02-04-2024
4.00
Landing LIght Lens
Details
       

 01-28-2024
5.00
1: Calibrating Fuel Tanks and Fuel Pump
Details
       

 01-01-2024
4.00
1: Calibrating Fuel Tanks
Details
       

 12-31-2023
0.00
2: Calibrating Fuel Tanks
Details
       

 12-31-2023
5.00
1: Calibrating Fuel Tanks
Details
       

 12-26-2023
1.50
5: Fuel Tank Bolts
Details
       

 12-26-2023
1.50
4: Engine Exhaust
Details
       

 12-26-2023
1.00
3: Engine Exhaust
Details
       

 12-26-2023
1.00
2: Fuel Servo Gaskets
Details
       

 12-26-2023
1.00
1: Engine Oil Cooler Lines
Details
       

 10-01-2023
2.00
3: Engine Baffle Rubbers
       

 10-01-2023
0.00
2: Cowl Hinge Pin Covers 2
       

 10-01-2023
3.00
1: Cowl Hinge Pin Covers 1
       

 09-25-2023
2.00
2: Cowl Hinge Pin Covers
       

 09-25-2023
2.00
1: Cowl Firbreglass
       

 09-17-2023
1.00
3: Air Intake Baffles
       

 09-17-2023
4.00
2: Air Intake Baffles and Airfoils
       

 09-17-2023
2.00
1: Air Intake Rubber Seals
Details
       

 09-09-2023
2.00
Oil Cooler Air Duct
Details
       

 08-27-2023
0.50
2: Aircraft Data Plate
Details
       

 08-27-2023
3.00
1: Air Intake Rubber Seals
Details
       

 08-20-2023
2.00
2: Engine Baffles
Details
       

 08-20-2023
4.00
1: Fresh Air Box Rework
Details
       

 08-16-2023
3.00
Oil Cooler Fittings
Details
       

 08-13-2023
3.00
2: Air Intake Rework
Details
       

 08-13-2023
4.00
1: Oil Cooler Duct
Details
       

 08-09-2023
3.00
Oil Cooler Air Duct
Details
       

 08-06-2023
3.00
Oil Cooler Air Duct
Details
       

 08-04-2023
2.00
Top Cowl Oil Dipstick Door
Details
       

 08-01-2023
2.00
Top Cowl Oil Dipstick Door
Details
       

 07-30-2023
5.00
2: Baffles
Details
       

 07-30-2023
1.00
1: Bottom Cowl Induction Air Intake
Details
       

 07-28-2023
0.00
2: Bottom Cowl Induction Airt Intake - Part 2
Details
       

 07-28-2023
6.00
1: Bottom Cowl Induction Air Intake
Details
       

 07-27-2023
1.00
2: Bottom Cowl Induction Air Intake
Details
       

 07-27-2023
5.00
1: Right Wing Root Fairing plus Wing Bolts
Details
       

 07-26-2023
5.00
Left Wing Root Fairing
Details
       

 07-25-2023
3.00
2: Left Wing Root Fairing
Details
       

 07-25-2023
4.00
1: Left Wing Tip
Details
       

 07-24-2023
6.00
Brake System Issues
Details
       

 07-23-2023
2.00
Left Wing Tip
Details
       

 07-23-2023
3.00
2: Brake Fluid Filling
Details
       

 07-21-2023
2.00
Left wing root fairing
Details
       

 07-19-2023
4.00
Left Wing Tip
Details
       

 07-16-2023
0.50
Left Wing Tip
Details
       

 07-15-2023
5.00
Right Wing Tip
Details
       

 07-09-2023
3.00
Bottom Wing-to-Fuselage Rivets
Details
       

 07-02-2023
5.00
Engine Baffles
Details
       

 06-25-2023
12.00
Engine Baffles
Details
       

 06-10-2023
4.00
Engine Baffles
Details
       

 06-04-2023
0.50
3: No Step labels
Details
       

 06-04-2023
2.00
2: Engine Wiring
Details
       

 06-04-2023
4.00
1: Engine Baffles
Details
       

 05-28-2023
6.00
Engine Baffles
Details
       

 05-20-2023
2.00
Bottom Cowl Louvres
Details
       

 05-14-2023
1.00
2: Sliding Canopy Resin Work
Details
       

 05-14-2023
3.00
1: Bottom Cowl Louvres
Details
       

 05-07-2023
2.00
3: Bottom Cowl Louvers
Details
       

 05-07-2023
2.00
2: Engine Baffles
Details
       

 05-07-2023
2.00
1: Bottom Cowl Mixture Control Recess
Details
       

 05-06-2023
2.00
2: Bottom Cowl Mixture Bulge
Details
       

 05-06-2023
2.00
1: Windscreen fibreglass
Details
       

 05-05-2023
1.00
3: Windscreen Fibreglass
Details
     

 05-05-2023
1.00
2: Windscreen Fibreglass
Details
       

 05-05-2023
10.00
1: Windscreen Fibreglass
Details
       

 04-30-2023
2.00
1: Empennage Fairing
Details
       

 04-29-2023
1.00
3: Windscreen Fibreglass
Details
       

 04-29-2023
1.00
2: Sliding Canopy Fibreglass
Details
       

 04-29-2023
1.00
1: Empennage Fairing
Details
       

 04-25-2023
0.50
2: Fuel Divider Plug
Details
       

 04-25-2023
4.00
1: Engine Baffles
Details
       

 04-15-2023
2.50
3: Right Wing Tip
Details
       

 04-15-2023
1.00
2: Engine Baffles
Details
       

 04-15-2023
2.00
1: Engine cowl louvres
Details
       

 04-14-2023
1.50
Top Engine Cowl
Details
       

 04-12-2023
1.00
Engine Cowl
Details
       

 04-10-2023
3.00
2: Engine Cowl
Details
       

 04-10-2023
1.00
1: Engine Oil Drain
Details
       

 04-09-2023
5.00
Fuel Lines
Details
       

 04-05-2023
1.50
Bottom Engine Cowl
Details
       

 04-02-2023
0.50
4: AoA Sensor
Details
       

 04-02-2023
2.00
3: Wing Tips
Details
       

 04-02-2023
2.00
2: Bottom Engine Cowl
Details
       

 04-02-2023
2.00
1: Engine Mixture Control
Details
       

 03-28-2023
0.50
Instrument Panel Placard
Details
       

 03-26-2023
3.00
3: Fuel and Oil Lines
Details
       

 03-26-2023
1.00
2: Mixture Control Linkage
Details
     

 03-26-2023
1.00
1: Engine Silica Gel Cannisters
Details
       

 03-19-2023
1.00
4: Instrument Panel Labelling
Details
       

 03-19-2023
1.00
3: Bottom Cowl
Details
       

 03-19-2023
3.50
2: Bottom Cowl
Details
       

 03-19-2023
1.00
1: Airbox Alternate Air Hatch
Details
     

 03-13-2023
1.00
4: Compass Adjustment Access Holes
Details
       

 03-13-2023
2.00
3: Bottom Engine Cowl
Details
       

 03-13-2023
2.00
2: Bottom Engine Cowl
Details
       

 03-13-2023
2.00
1: Engine Air Filter Box
Details
       

 03-08-2023
2.00
Cockpit Touches
Details
       

 03-05-2023
3.00
2: Top Engine Cowl
Details
       

 03-05-2023
3.00
1: Engine Air Filter Box
Details
       

 02-26-2023
3.00
Engine Air Filter Box
Details
       

 02-25-2023
3.00
Engine Air Filter Box
Details
       

 02-19-2023
2.00
3: Engine Air Filter Box
Details
       

 02-19-2023
2.00
2: Cockpit Interior Finishing
Details
       

 02-19-2023
1.00
1: Sliding Cockpit Rail
Details
     

 02-18-2023
1.00
2: Engine Air Filter Box
Details
       

 02-18-2023
3.00
1: Engine Air Filter Box
Details
       

 02-05-2023
4.00
Engine Cowl
Details
       

 01-31-2023
1.50
Engine Cowl
Details
       

 01-29-2023
1.50
2: Engine Cowl
Details
       

 01-29-2023
4.00
1: Engine Cowl
Details
       

 01-26-2023
4.00
Engine Cowl
Details
       

 01-25-2023
2.00
Engine Cowl
Details
       

 01-09-2023
1.00
Engine Cowl Fasteners
Details
       

 01-08-2023
1.00
3: Engine Cowl Fasteners
Details
       

 01-08-2023
3.00
2: Engine Cowl Fasteners
Details
       

 01-08-2023
2.00
1: Engine Cowl Fasteners
Details
       

 01-06-2023
2.50
Engine Cowl Fasteners
Details
       

 01-02-2023
2.00
2: Engine Cowl Brackets
Details
       

 01-02-2023
4.00
1: VHF Com Antenna
Details
       

 12-11-2022
1.00
2: Transponder Antenna
Details
       

 12-11-2022
2.00
1: Brakes
Details
       

 11-27-2022
2.00
Engine Cowl Oil Door
Details
       

 11-24-2022
5.00
Top Cowl Oil Door
Details
       

 11-23-2022
4.00
2: Top Engine Cowl
Details
       

 11-23-2022
4.00
1: Mixture Control
Details
       

 11-09-2022
3.00
Fitting the Propeller
Details
       

 11-08-2022
3.00
Engne Baffles
Details
       

 11-06-2022
5.00
Engine Baffles
Details
       

 10-30-2022
0.00
3: Engine Baffles - Some Help
Details
       

 10-30-2022
0.00
2: Engine Baffle Pics
Details
       

 10-30-2022
12.00
1: Engine Baffles
Details
       

 10-23-2022
5.50
Engine Baffles
Details
       

 10-20-2022
2.00
Engine Wiring
Details
       

 10-16-2022
4.00
2: Engine Wiring
Details
       

 10-16-2022
1.00
1: Oil Seperator
Details
       

 10-15-2022
1.00
3: Oil Seperator
Details
       

 10-15-2022
2.00
2: Manifold Pressure and CHT Sensors
Details
       

 10-15-2022
2.00
1: Fuel Pressure Line
Details
       

 10-09-2022
4.00
Throttle Linkage
Details
       

 10-01-2022
4.00
2: Oil/Fuel Pressure Sensor Block
Details
       

 10-01-2022
2.00
1: Engine Fuel Lines
Details
       

 09-30-2022
2.00
2: Installing the Throttle Body
Details
       

 09-30-2022
0.50
1: Engine Preservation
Details
       

 09-11-2022
1.50
Engine Oil Cooler Connections
Details
       

 09-09-2022
3.50
The Engine is Installed
Details
       

 09-09-2022
0.00
A New Helper
Details
       

 08-28-2022
2.50
2: Fitting the Main Wheels
Details
       

 08-28-2022
2.00
1: Nose Wheel
Details
       

 08-27-2022
2.00
2: Fitting the Nose Gear and Wheels
Details
       

 08-27-2022
3.00
1: Lifting the Fuselage
Details
       

 08-14-2022
2.00
2: Lifting the Fuselage
Details
     

 08-14-2022
2.00
1: Cockpit Centre Section Covers
Details
       

 08-12-2022
4.00
Under Floor Controls and Wiring
Details
       

 08-07-2022
6.00
Wing Bolts
Details
       

 08-02-2022
1.00
Wing Bolts
Details
       

 07-30-2022
0.00
Hangar Time
Details
       

 07-30-2022
5.00
2: Wing Bolts
Details
       

 07-30-2022
1.00
1: Seat Modifications
Details
       

 07-17-2022
3.00
Seat Modifications
Details
       

 07-17-2022
0.00
Lockers
Details
       

 07-16-2022
0.00
Hangar First Aid Kit
Details
     

 05-15-2022
0.00
Hangar Clean-up
Details
       

 05-13-2022
0.00
Hangar Wood Heater
Details
       

 05-04-2022
0.00
Hangar Stuff
Details
       

 04-22-2022
0.00
Storeroom Progress
Details
       

 04-20-2022
2.00
OMG...I Have an Engine
Details
       

 04-08-2022
0.00
Store Room Steelwork
Details
       

 04-05-2022
0.00
Saving the Lemon Tree
Details
       

 03-31-2022
0.00
Hangar Store Room Concrete Floor
Details
       

 03-29-2022
0.00
Hangar Extension is Started
Details
       

 03-13-2022
1.50
Seat Modifications
Details
       

 03-12-2022
0.00
2: Seat Modifications
Details
       

 03-12-2022
6.00
1: Seat Modifications
Details
       

 02-20-2022
3.00
Wing Bolts
Details
     

 02-20-2022
0.00
Getting a Neighbour at the Hangar
Details
       

 02-19-2022
5.00
1: Cockpit Underfloor Wiring
Details
       

 02-18-2022
0.00
Metar Map
Details
       

 01-07-2022
1.50
5: Fuselage Trolley Repairs
Details
       

 01-07-2022
1.50
4: AoA Tubing
Details
       

 01-07-2022
1.00
3: Fuel Level Sender Wiring
Details
       

 01-07-2022
1.00
2: Auto Pilot Testing
Details
     

 01-07-2022
2.00
1: Auto Pilot Wiring
Details
       

 01-06-2022
0.00
3: Hangar Time
Details
       

 01-06-2022
1.00
2: Testing the Wing Lights
Details
     

 01-06-2022
3.50
1: Wing Wiring
Details
       

 01-05-2022
7.00
Wing Wiring
Details
       

 01-04-2022
1.50
3: Left Wing Wiring
Details
       

 01-04-2022
1.50
2: Pitot Tube Piping
Details
       

 01-04-2022
3.00
1: Fuel Tank Vent Lines
Details
       

 12-15-2021
0.00
SAAA Magazine Article
Details
       

 12-12-2021
0.00
4: Flap Control Rods - Part 2
Details
       

 12-12-2021
3.00
3: Flap Control Rods - Part 1
Details
       

 12-12-2021
0.00
2: Fuel Tank Attach Brackets - Part 2
Details
       

 12-12-2021
4.00
1: Fuel Tank Attach Brackets - Part 1
Details
       

 11-24-2021
0.00
Hangar Taxiway Line Marking
Details
       

 11-21-2021
1.00
3: Fitting the Pitot Tube
Details
       

 11-21-2021
2.50
2: Attaching Ailerons and Flaps
Details
       

 11-21-2021
2.00
1: Drilling the Wing Rear Spar Bolts
Details
       

 11-20-2021
2.00
Setting up the Wings
Details
       

 11-19-2021
1.50
Attaching the Wings
Details
       

 11-01-2021
0.00
Hangar Taxiway
Details
       

 10-31-2021
2.00
2: Wing Attach Bolts
Details
       

 10-31-2021
3.00
1: Windscreen clamps
Details
       

 10-08-2021
0.00
Hangar Taxiway
Details
       

 10-01-2021
0.00
Hangar Taxiway
Details
       

 09-25-2021
4.00
Front Windshield
Details
       

 09-24-2021
6.00
2: Fixing the Canopy to the Frame
Details
       

 09-24-2021
4.00
1: Canopy Skirt Handles
Details
       

 09-23-2021
0.00
2: Canopy Skirts
Details
       

 09-23-2021
4.00
1: Canopy Skirts
Details
       

 09-22-2021
0.00
Hangar Barn Door
Details
       

 09-21-2021
0.00
Hangar Security System
Details
       

 08-25-2021
0.00
Minor Earthworks
Details
       

 08-08-2021
0.00
2: Rear Canopy Skirt
Details
       

 08-08-2021
5.00
1: Canopy Rear Skirt
Details
       

 08-06-2021
0.00
Hangar Gas Bottle Shed
Details
       

 07-18-2021
0.00
5: Sunday Bloody Sunday
Details
       

 07-18-2021
0.50
4: Fuel Flow Sensor Mounting
Details
       

 07-18-2021
1.00
3: Canopy Skirt Hole Duplicator
Details
       

 07-18-2021
3.00
2: Rear Canopy Skirts
Details
       

 07-18-2021
3.00
1: Rear Canopy Skirts
Details
       

 07-14-2021
0.00
Hangar Lemon Tree
Details
       

 06-27-2021
2.00
3: Canopy Rear Skirts
Details
       

 06-27-2021
0.00
2: Canopy Side Skirts
Details
       

 06-27-2021
4.00
1: Canopy Side Skirts
Details
       

 06-13-2021
2.00
3: Technical Counsellor Inspection
Details
       

 06-13-2021
3.00
2: Canopy Side Skirts
Details
       

 06-13-2021
1.50
1: Trimming the Canopy
Details
       

 06-11-2021
0.00
Hangar Bathroom
Details
       

 05-16-2021
7.00
Canopy Side Skirts Continued
Details
       

 05-15-2021
0.00
3: VIP QA Inspection
Details
     

 05-15-2021
4.00
2: Canopy Side Skirts
Details
       

 05-15-2021
2.00
1: Trimming the Canopy (again)
Details
       

 05-09-2021
4.00
Canopy Latch MarkII
Details
       

 05-08-2021
5.00
Reassembled the Empennage
Details
       

 05-07-2021
0.00
Hangar Living Quarters
Details
       

 05-06-2021
0.00
Hangar Workshop is Finished
Details
       

 04-17-2021
0.00
Hangar Workshop
Details
       

 04-16-2021
0.00
The Big Move - Part 4
Details
       

 04-07-2021
0.00
Hangar Cabinets
Details
       

 04-04-2021
0.00
Hangar Progress
Details
       

 04-04-2021
0.00
Easter Bunny Visits the Hangar
Details
       

 03-27-2021
0.00
The Big Move - Part 3
Details
     

 03-21-2021
0.00
Hangar Wall Lining
Details
       

 03-19-2021
0.00
The Big Move - Part 2
Details
       

 03-13-2021
0.00
Hangar Kitchen Floor
Details
       

 03-06-2021
0.00
The Big Move - Part 1b
Details
       

 03-02-2021
0.00
The Big Move - Part 1a
Details
       

 02-28-2021
2.50
2: Canopy Side Skirts
Details
       

 02-28-2021
3.00
1: Canopy Extension Rails
Details
       

 02-27-2021
4.00
3: Canopy Extension Rails
Details
       

 02-27-2021
1.50
2: Canopy Guide Rails
Details
       

 02-27-2021
2.00
1: Canopy Guide Blocks
Details
       

 02-21-2021
0.00
Hangar Painting
Details
       

 02-14-2021
2.00
2: Canopy Side Skirts
Details
       

 02-14-2021
1.00
1: Cracked Windshield
Details
       

 02-13-2021
2.00
3: Canopy Guide Blocks
Details
       

 02-13-2021
1.50
2: Windshield
Details
       

 02-13-2021
1.50
1: Canopy Latch
Details
       

 02-12-2021
1.00
2: Canopy Latch
Details
       

 02-12-2021
1.50
1: Canopy Frame Adjustments
Details
       

 02-03-2021
0.50
Front Top Skin
Details
       

 01-29-2021
0.00
Hangar Painting
Details
       

 01-28-2021
0.00
Hangar Pressure Pump
Details
       

 01-26-2021
0.50
2: Canopy Guide Wheels
Details
     

 01-26-2021
3.50
1: Trimming the Windscreen
Details
       

 01-25-2021
1.00
5: Canopy Cover Strip
Details
       

 01-25-2021
2.50
4: More Canopy Work
Details
       

 01-25-2021
0.00
3: Trimming the Plexiglass Canopy
Details
       

 01-25-2021
1.50
2: Trimming the Plexiglass Canopy
Details
       

 01-25-2021
0.50
1: Canopy Guide Rollers
Details
       

 01-24-2021
0.50
5: Canopy Guide Rollers
Details
       

 01-24-2021
1.00
4: Canopy Cover Strip
Details
       

 01-24-2021
0.00
3: Sliding Canopy
Details
       

 01-24-2021
3.50
2: Sliding Canopy
Details
       

 01-24-2021
1.50
1: Sliding Canopy
Details
       

 01-23-2021
2.00
3: The Big Cut - Part 3
Details
     

 01-23-2021
1.00
2: The Big Cut - Part 2
Details
       

 01-23-2021
1.00
1: The Big Cut - Part 1
Details
       

 01-22-2021
0.00
Gyprock is installed
Details
       

 01-17-2021
4.00
Trimming the Plexiglass Bubble
Details
       

 01-16-2021
2.00
Getting back into it
Details
       

 01-01-2021
0.00
Moving Miss Tango
Details
       

 12-31-2020
0.00
Hangar Wall Lining and Benches
Details
       

 12-29-2020
0.00
Main Hangar Lighting
Details
       

 12-23-2020
0.00
Hangar First Fix Electrical
Details
       

 12-22-2020
0.00
Hangar Lighting
Details
       

 11-25-2020
0.00
Alternator
Details
     

 11-22-2020
3.00
Scat Tube Clamp Brackets
Details
       

 10-29-2020
2.00
Left Bottom Wing Skin
Details
       

 10-28-2020
0.00
Hangar Floor
Details
       

 10-25-2020
3.00
Oil Cooler Air Flow Louvre
Details
       

 10-21-2020
1.50
Left Wing Bottom Skin
Details
       

 10-18-2020
1.00
Map Box Lining
Details
     

 10-17-2020
3.00
3: Preparing the last wing skin section
Details
       

 10-17-2020
1.00
2: Dimpling wing rib rivet holes
Details
       

 10-17-2020
1.00
1: Forming the Pitot Mast Cutout
Details
       

 10-11-2020
1.50
2: Match drilling the pitot tube mast
Details
       

 10-11-2020
2.00
1: Wing inspection hole covers
Details
       

 10-01-2020
0.00
Hangar Landscaping
Details
       

 09-26-2020
0.00
Hangar Progress Pics
Details
       

 09-20-2020
2.00
Wing Skin
Details
       

 09-16-2020
0.00
Hangar Plumbing
Details
       

 09-11-2020
0.00
Hangar Plumbing
Details
       

 09-02-2020
0.50
Console Lid Leatherwork
Details
       

 08-23-2020
2.00
2: Disassembly
Details
       

 08-23-2020
2.00
1: Front Top Skin
Details
       

 08-22-2020
2.50
2: Oil Cooler Bracket
Details
       

 08-22-2020
2.50
1: Oil Cooler SCAT Tube Adaptor
Details
       

 08-17-2020
0.00
Pneumatic Squeezer
Details
     

 07-15-2020
3.00
Forward Top Skin
Details
       

 06-27-2020
3.00
Empennage Fairing
Details
       

 06-21-2020
5.00
Empennage Fairing
Details
       

 06-14-2020
2.00
2: Centre Console Tray
Details
       

 06-14-2020
3.00
1: Empennage Fairing
Details
       

 06-06-2020
0.00
Hangar Almost Complete
Details
       

 05-24-2020
2.50
2: Centre Console
Details
       

 05-24-2020
7.00
1: Oil Cooler Bracket
Details
       

 05-20-2020
0.00
Hangar Steelwork
Details
       

 05-09-2020
2.50
2: Oil Cooler Airflow Control
Details
       

 05-09-2020
2.00
1: Oil Cooler Bracket
Details
       

 05-03-2020
4.00
Oil Cooler
Details
       

 05-02-2020
2.00
2: Forward Fuselage Top Skin
Details
       

 05-02-2020
5.00
1: Map Lights
Details
       

 04-25-2020
2.00
2: Painting the Canopy Frame
Details
       

 04-25-2020
1.00
1: Oil Cooler Parts
Details
     

 04-21-2020
0.00
It's Finally Started
Details
       

 04-12-2020
2.00
2: Refitting the Elevators
Details
       

 04-12-2020
6.00
1: Empannage Painting
Details
       

 04-11-2020
1.00
3: Control Stick Bolts
Details
       

 04-11-2020
2.50
2: Body Work
Details
       

 04-11-2020
1.50
1: Aileron Pushrod Boots
Details
       

 04-05-2020
6.00
Fire Extinguisher Bracket
Details
       

 04-04-2020
2.00
Empennage Fairing Nutplates
Details
       

 04-03-2020
10.00
Log Books
Details
       

 04-02-2020
1.00
Passenger Joystick Wiring
Details
       

 03-21-2020
1.00
3: Access Problems
Details
       

 03-21-2020
2.00
2: Empennage Fairing
Details
       

 03-21-2020
2.00
1: Empennage Fairing
Details
       

 03-20-2020
2.50
Reassembling the Empennage
Details
       

 03-16-2020
1.00
2: Pitot Tube Relocation
Details
       

 03-16-2020
2.00
1: Instrument Panel Brackets
Details
       

 03-15-2020
1.50
4: Centre Section Side Covers
Details
       

 03-15-2020
2.50
3: Fitting the Front Deck Skin
Details
       

 03-15-2020
2.00
2: Canopy Roll Bar & Front Deck Skin
Details
       

 03-15-2020
1.00
1: Horis PFD GPS Mount
Details
       

 03-14-2020
3.00
3: Front Deck Skin
Details
       

 03-14-2020
2.00
2: Firewall Pass-Thru's
Details
       

 03-14-2020
1.00
1: Park Brake Fittings
Details
       

 03-10-2020
0.50
2: Panel Screws
Details
       

 03-10-2020
1.50
1: Vent and Throttle Brackets
Details
       

 03-01-2020
1.50
3: Pilot Side Seat Belts
Details
       

 03-01-2020
2.00
2: Seat Belt Cables
Details
       

 03-01-2020
2.00
1: Fuel Valve Cover & Other Tasks
Details
       

 02-29-2020
1.00
4: Fuel Valve Cover
Details
       

 02-29-2020
1.00
3: Cabin Heat Valve
Details
       

 02-29-2020
1.50
2: Angle of Attack Tubing
Details
       

 02-29-2020
1.50
1: Spar Bulkhead Covers
Details
       

 02-22-2020
1.00
5: Refitting Centre Tunnel Covers
Details
       

 02-22-2020
1.50
4: Firewall Holes
Details
       

 02-22-2020
1.00
3: Flap Motor Safety Wire
Details
       

 02-22-2020
0.50
2: Firewall Forward Fuel Line
Details
       

 02-22-2020
1.00
1: Relocating the Throttle Cable Penetration
Details
       

 02-21-2020
1.00
Firewall Rework - Not Happy!
Details
       

 02-16-2020
2.50
3: Various Tasks
Details
       

 02-16-2020
1.50
2: Spar Bulkhead Covers
Details
       

 02-16-2020
1.50
1: Front Top Skin
Details
     

 02-15-2020
1.50
5: Nose Gear Shock Absorber
Details
       

 02-15-2020
1.50
4: Engine Mount
Details
       

 02-15-2020
2.50
3: USB Power Outlet
Details
       

 02-15-2020
1.50
2: Throttle Mixture Bracket
Details
       

 02-15-2020
1.50
1: Ammeter Shunt Cover
Details
       

 02-14-2020
1.50
Throttle/Mixture Bracket
Details
       

 02-13-2020
1.50
VP-X Repairs
Details
       

 02-02-2020
0.50
5: Custom Locknut Spanner
Details
       

 02-02-2020
1.50
4: Various Small Jobs
Details
       

 02-02-2020
1.00
3: Fuel Flow Sensor
Details
       

 02-02-2020
2.50
2: Ammeter Shunt Cover
Details
       

 02-02-2020
1.50
1: Engine Controls and Cable Doubler
Details
       

 02-01-2020
2.00
4: Cable Clamp Firewall Doubler
Details
       

 02-01-2020
2.00
3: New Centre Tunnel Cover Plate
Details
       

 02-01-2020
1.50
2: Throttle/Mixture Bracket
Details
       

 02-01-2020
1.50
1: Throttle Firewall Feed-Through
Details
       

 01-27-2020
1.00
5: Engine Controls
Details
       

 01-27-2020
3.00
4: Fuel and Brake Lines
Details
       

 01-27-2020
1.00
3: Engine Controls Bracket
Details
       

 01-27-2020
1.00
2: Left Gear Leg Weldment
Details
       

 01-27-2020
1.00
1: VP-X Repairs
Details
       

 01-26-2020
4.00
Power Wiring
Details
       

 01-25-2020
3.00
2: Ammeter Shunt & Alternator Fuse Block
Details
       

 01-25-2020
0.00
1: A Morning Flight
Details
       

 01-20-2020
1.50
Ammeter Shunt and Alternator Fuse Block
Details
       

 01-19-2020
0.00
4: A tight squeeze, and a new pushbutton
Details
       

 01-19-2020
1.50
3: Ammeter Shunt and Alternator Fuse
Details
       

 01-19-2020
2.50
2: Fuel Flow Meter Installation
Details
       

 01-19-2020
4.00
1: Oil Seperator Doubler Plate
Details
       

 01-18-2020
3.00
2: Park Brake
Details
       

 01-18-2020
3.50
1: Gear Leg Weldment Bolt Holes
Details
       

 01-12-2020
0.00
3: Celebrating a Good Day's Work
Details
       

 01-12-2020
3.50
2: Trimming the Perspex Canopy
Details
       

 01-12-2020
1.50
1: Drilling the Canopy Latch Handle Hole
Details
       

 01-11-2020
0.00
4: Admiring the Instrument Panel
Details
       

 01-11-2020
2.00
3: Sliding Canopy Frame
Details
       

 01-11-2020
2.50
2: Sliding Canopy Frame
Details
       

 01-11-2020
1.50
1: Sliding Canopy Frame
Details
       

 01-05-2020
5.00
Canopy Slide Rail
Details
       

 01-04-2020
4.00
Reinstalled Instrument Panel
Details
       

 12-24-2019
0.00
Instrument Panel is Painted
Details
       

 12-20-2019
0.00
Revised Hangar Site
Details
     

 12-17-2019
0.00
Materials Delivered to Site
Details
       

 12-14-2019
0.50
2: Instument Panel
Details
     

 12-14-2019
3.50
1: Sliding Canopy
Details
       

 12-12-2019
1.00
Repairing Wing Rivet Depressions
Details
       

 12-08-2019
6.00
Sliding Canopy
Details
       

 12-07-2019
4.00
Cockpit Roll Bar
Details
       

 12-01-2019
1.00
3: Flushing Instrument Panel Rivets
Details
       

 12-01-2019
2.00
2: Cockpit Rollbar Mounting Bolt Spacers
Details
     

 12-01-2019
1.00
1: Right Wing Landing Light Wiring
Details
       

 11-30-2019
0.00
3: Landing Gear Pictures
Details
       

 11-30-2019
4.00
2: Nose Wheel
Details
       

 11-30-2019
1.50
1: Right Main Wheel
Details
       

 11-18-2019
1.50
Main Wheels
Details
       

 11-17-2019
4.50
2: Left Main Wheel
Details
       

 11-17-2019
4.00
1: Right Wing Tip
Details
       

 11-16-2019
4.50
2: Right Wing Tip
Details
       

 11-16-2019
0.00
1: Flying
Details
       

 11-10-2019
3.50
3: Canopy Roll Bar
Details
       

 11-10-2019
1.00
2: Wing Tip Repairs
Details
       

 11-10-2019
1.50
1: Gear Leg Weldment Bolts
Details
       

 11-09-2019
7.00
Gear Leg Weldment Bolts
Details
       

 11-07-2019
1.00
VHF Com Doubler Plate
Details
       

 11-03-2019
2.00
VHF Com Doubler Plate
Details
       

 10-26-2019
0.00
YMTG Hangar Site
Details
       

 10-20-2019
4.00
Firewall Wiring Pass-Though
Details
       

 10-19-2019
3.50
3: Engine Mount
Details
       

 10-19-2019
2.00
2: Map Box Door
Details
       

 10-19-2019
0.00
1: Storing Finish Kit Parts
Details
       

 10-18-2019
0.00
Unpacking the Finish Kit
Details
       

 10-17-2019
0.00
Finish Kit has arrived
Details
       

 10-13-2019
2.00
3: Right Wing Tip
Details
       

 10-13-2019
2.00
2: Right Wing Tip
Details
       

 10-13-2019
1.50
1: Right Wing Tip
Details
       

 10-12-2019
1.00
3: Right Fuel Tank
Details
       

 10-12-2019
2.00
2: Wing Tip Perspex Lens
Details
       

 10-12-2019
2.00
1: Right Wing Lights
Details
       

 10-11-2019
3.00
3: Right Wing Lights
Details
       

 10-11-2019
2.00
2: Wing Tip Perspex Lens
Details
       

 10-11-2019
2.00
1: Wing Tip Lights
Details
       

 10-10-2019
4.00
2: Wing Tip Lights
Details
       

 10-10-2019
2.00
1: Wing Tips
Details
       

 10-09-2019
2.00
3: Pitot Tube
Details
       

 10-09-2019
2.00
2: Left Fuel Tank
Details
       

 10-09-2019
1.50
1: Left Fuel Tank
Details
       

 10-08-2019
2.00
3: Left Wing Landing Light
Details
       

 10-08-2019
2.00
2: Left Wing Landing Light
Details
       

 10-08-2019
4.00
1: Left Wing Landing Lights
Details
       

 10-07-2019
2.00
2: Left Wing
Details
       

 10-07-2019
0.00
1: Workshop is Ready
Details
       

 10-06-2019
0.00
2: Prepping the Workshop
Details
       

 10-06-2019
2.50
1: Vertical Stabiliser Alignment
Details
       

 09-22-2019
3.00
3: Crating the Elevators
Details
       

 09-22-2019
2.00
2: Map Box
Details
       

 09-22-2019
1.00
1: Vertical Stabiliser Tip
Details
       

 09-21-2019
3.50
2: Map Box Door
Details
       

 09-21-2019
2.00
1: Vertical Stabiliser Tip
Details
       

 09-15-2019
2.00
3: Rudder Tip
Details
     

 09-15-2019
2.50
2: Magneto Wiring
Details
       

 09-15-2019
2.00
1: Map Box
Details
       

 09-14-2019
3.00
2: Map Box Door
Details
       

 09-14-2019
4.00
1: Elevator, Stabiliser, Rudder Tips
Details
       

 09-08-2019
2.00
2: Elevator Tips
Details
       

 09-08-2019
3.00
1: Elevator Tips
Details
       

 09-07-2019
2.00
2: Forward Fuselage Top Skin
Details
       

 09-07-2019
2.50
1: Elevator and Stabiliser Tips
Details
       

 08-25-2019
1.00
2: Ammeter Shunt
Details
       

 08-25-2019
4.00
1: More Skyview Work
Details
       

 08-24-2019
8.00
Troubleshooting the CO Monitor
Details
     

 08-18-2019
7.00
Fiddling with the Avionics
Details
       

 08-11-2019
6.00
Testing the Skyviews
Details
       

 08-10-2019
8.00
Installing the Skyviews
Details
       

 07-30-2019
0.50
Instrument Panel Vents
Details
       

 07-28-2019
0.00
2: Custom Keyring
Details
       

 07-28-2019
6.00
1: Instrument Panel Cooling Vents
Details
       

 07-27-2019
1.00
3: Instrument Panel Cooling Vents
Details
       

 07-27-2019
3.00
2: Centre Console
Details
       

 07-27-2019
3.00
1: Centre Console
Details
       

 07-26-2019
1.00
Glareshield Trim
Details
       

 07-21-2019
3.00
Rudder and Elevator Tips
Details
       

 07-20-2019
4.00
2: Rudder Fairings
Details
       

 07-20-2019
0.00
1: Flying
Details
       

 07-15-2019
1.00
Pilot Joystick Wiring
Details
       

 07-14-2019
3.00
3: VP-X Configuration
Details
       

 07-14-2019
2.00
2: Bottom Rudder Fairing
Details
       

 07-14-2019
1.00
1: Fuselage Wiring
Details
       

 07-13-2019
1.00
3: Bottom Rudder Fairing
Details
       

 07-13-2019
2.00
2: Tail Light Wiring
Details
       

 07-13-2019
3.00
1: Headset Jacks and Master Switch
Details
       

 06-30-2019
0.00
4: End of the Day
Details
       

 06-30-2019
3.50
3: AoA Head-Up Display
Details
       

 06-30-2019
1.50
2: Trim Indicator Wiring
Details
       

 06-30-2019
2.00
1: Ignition Switch Wiring
Details
       

 06-29-2019
4.50
2: Final Wiring and Floor Covers
Details
       

 06-29-2019
2.50
1: Park Brake Bracket
Details
       

 06-28-2019
1.50
2: Park Brake Bracket
Details
       

 06-28-2019
0.50
1: Various Labels
Details
       

 06-26-2019
2.00
Battery Fault Wiring
Details
       

 06-23-2019
2.00
3: CO Monitor Wiring
Details
     

 06-23-2019
2.00
2: Fresh Air Vents
Details
       

 06-23-2019
2.00
1: Cockpit Interior
Details
       

 06-22-2019
7.00
Centre Console
Details
       

 06-16-2019
2.00
Centre Console
Details
       

 06-10-2019
2.00
3: Joystick Wiring
Details
       

 06-10-2019
2.00
2: Top Rear Skin Installation
Details
       

 06-10-2019
2.00
1: Pilot Headset Jack Wiring
Details
       

 06-09-2019
3.00
3: Top Rear Skin Installation
Details
     

 06-09-2019
3.00
2: GPS Receiver
Details
       

 06-09-2019
2.00
1: Top Rear Skin Preparation
Details
       

 06-08-2019
4.00
Fuselage Top Rear Skin
Details
       

 06-07-2019
2.00
Fuselage Top Skin
Details
       

 06-06-2019
0.50
EarthX Battery
Details
       

 06-02-2019
2.00
2: Map Box
Details
       

 06-02-2019
3.00
1: Cabin Heat
Details
       

 06-01-2019
2.00
3: Modifying the Park Brake Valve
Details
       

 06-01-2019
3.00
2: Reconnecting the Rudder Pedals
Details
       

 06-01-2019
3.00
1: Installing the Horis PFD
Details
       

 05-26-2019
1.00
1: Leather Seats
Details
       

 05-04-2019
3.00
CoPilot Headset Wiring
Details
       

 04-27-2019
3.00
2: Tail Nav/Strobe Light Wiring
Details
       

 04-27-2019
1.00
1: Angle of Attack HUD
Details
       

 04-26-2019
1.00
2: Panel Switch Lighting
Details
       

 04-26-2019
1.00
1: Floor Wiring Loom
Details
       

 04-25-2019
6.00
Engine Instrument Wiring
Details
       

 04-22-2019
4.00
2: Engine Instrument Wiring
Details
       

 04-22-2019
3.00
1: Voltage Regulator
Details
       

 04-21-2019
14.00
EFIS Wiring
Details
       

 04-07-2019
1.00
3: Pitot Tube Plumbing
Details
       

 04-07-2019
1.00
2: Skyview Network Cable
Details
       

 04-07-2019
4.00
1: Remounting the Radio
Details
       

 04-06-2019
8.00
Radio and Joystick Wiring
Details
       

 03-31-2019
5.00
Head Set Cables
Details
       

 03-23-2019
0.00
2: Under Wraps
Details
     

 03-23-2019
4.00
1: CO Monitor
Details
       

 03-11-2019
3.00
Relocating the VHF Radio
Details
       

 03-10-2019
2.00
2: iPad Mount
Details
       

 03-10-2019
2.50
1: Relocating the VHF Com
Details
       

 03-09-2019
0.50
4: Instrument Panel Wiring Loom
Details
     

 03-09-2019
3.50
3: CO Monitor Wiring
Details
       

 03-09-2019
1.00
2: USB Power Outlet
Details
       

 03-09-2019
2.00
1: Audio Panel Wiring
Details
     

 03-03-2019
0.00
2: Instrument Panel Taking Shape
Details
       

 03-03-2019
5.00
1: Panel Switch Wiring
Details
       

 03-02-2019
2.50
2: Audio Wiring
Details
     

 03-02-2019
2.50
1: Nav/Strobe Switch Wiring
Details
       

 02-24-2019
6.50
Panel Switch Wiring
Details
       

 02-23-2019
6.00
Panel Switch Wiring
Details
       

 02-22-2019
0.50
2: Leather Seats
Details
       

 02-22-2019
4.00
1: Panel Wiring
Details
       

 02-03-2019
0.00
2: Shit it's Hot!
Details
       

 02-03-2019
6.00
1: Panel Switch Wiring - Take 2
Details
       

 02-02-2019
1.00
2: Testing the Panel Switch Backlights
Details
       

 02-02-2019
5.00
1: Panel Switch Wiring - Take 1
Details
       

 01-28-2019
2.00
CO Monitor Warning Light
Details
       

 01-27-2019
4.00
2: Instrument Panel Nutplates
Details
       

 01-27-2019
2.00
1: Magnetic Compass Installation
Details
       

 01-26-2019
3.00
Audio Mixer and AoA Switch Panel
Details
       

 01-13-2019
4.00
Instrument Panel
Details
     

 01-13-2019
0.00
Back in the Pilot Seat
Details
     

 01-11-2019
2.50
Instrument Panel Cut-Outs
Details
       

 01-10-2019
1.50
Instrument Panel Cut-Outs
Details
       

 01-09-2019
1.00
Instrument Panel Cut-Outs
Details
       

 01-08-2019
1.50
Instrument Panel Cut-Outs
Details
       

 01-07-2019
1.00
Instrument Panel Cut Outs
Details
       

 01-06-2019
0.00
2: Time for Contemplation
Details
     

 01-06-2019
4.50
1: Instrument Panel Cut-Outs and Layout
Details
       

 01-05-2019
4.00
2: Additional Sub-Panel Mounting Plate
Details
       

 01-05-2019
2.00
1: Instrument Panel Cut-Out
Details
       

 12-15-2018
6.50
More Panel Wiring
Details
       

 12-09-2018
6.00
Panel Switches
Details
       

 12-03-2018
2.00
More Panel Wiring
Details
       

 12-02-2018
7.00
More Panel Wiring
Details
       

 12-01-2018
3.00
Instrument Panel Wiring
Details
       

 11-11-2018
4.00
The Wiring Begins
Details
       

 11-10-2018
5.00
AoA Control Box Bracket
Details
       

 11-04-2018
2.00
2: AoA Bracket
Details
     

 11-04-2018
4.00
1: Mounting Avionics
Details
       

 11-03-2018
3.00
3: Started Mounting Avionics
Details
       

 11-03-2018
3.00
2: Front Deck
Details
       

 11-03-2018
2.00
1: Instrument Panel Layout
Details
       

 10-21-2018
1.50
4: Fresh Air Vents
Details
       

 10-21-2018
1.50
3: Front Deck
Details
       

 10-21-2018
2.00
2: Transponder Mounting Bracket
Details
       

 10-21-2018
1.00
1: Fuel Flow Sensor Bracket
Details
       

 10-20-2018
0.00
4: Workshop
Details
       

 10-20-2018
2.00
3: Fuel Lines and Other Small Jobs
Details
       

 10-20-2018
2.00
2: Red Cube Mounting Bracket
Details
       

 10-20-2018
4.00
1: Transponder Installation
Details
       

 10-14-2018
1.00
4: Rear Fusleage Skin
Details
       

 10-14-2018
1.50
3: Vertical Stabiliser Brackets
Details
     

 10-14-2018
2.00
2: Trim Motor Wiring
Details
       

 10-14-2018
1.00
1: Rudder Cable Fairings
Details
       

 10-13-2018
1.50
2: Rudder Cable
Details
       

 10-13-2018
4.50
1: Trim Motor Wiring
Details
       

 10-09-2018
2.00
Landing/Taxi Lights
Details
       

 10-07-2018
5.00
Mapping out a Wiring Plan
Details
       

 10-06-2018
3.00
2: Control Stick Wire Terminations
Details
       

 10-06-2018
2.00
1: Park Brake Control Cable Bracket
Details
       

 10-05-2018
0.50
4: Other Jobs
Details
       

 10-05-2018
0.50
3: Fresh Air Vents
Details
       

 10-05-2018
1.00
2: Bootlace Ferrules
Details
       

 10-05-2018
1.00
1: Firewall Wiring Penetration
Details
       

 09-23-2018
1.00
2: Headset Jacks
Details
       

 09-23-2018
5.00
1: Park Brake Valve
Details
       

 09-22-2018
4.00
More Firewall Rework
Details
       

 09-21-2018
1.50
Firewall Rework
Details
       

 09-16-2018
1.00
2: Forward Centre Tunnel Cover
Details
       

 09-16-2018
5.00
1: Installing Custom Fuel Lines
Details
       

 09-15-2018
2.00
6: Fuel Boost Pump Cover
Details
       

 09-15-2018
1.00
5: Fuel Vent Screens
Details
       

 09-15-2018
2.00
4: Cabin Heat Valve
Details
       

 09-15-2018
3.00
3: Firewall Sensor Block
Details
       

 09-15-2018
2.00
2: Firewall Control Cable Fittings
Details
       

 09-15-2018
1.00
1: Copilot Control Stick
Details
       

 09-14-2018
3.00
Firewall Forward Kit Arrived
Details
       

 09-09-2018
2.00
2: Control Stick Buttons
Details
       

 09-09-2018
4.00
1: Rudder Control Cables and Pedals
Details
       

 09-08-2018
2.50
4: Rudder Control Cables
Details
       

 09-08-2018
2.50
3: Tubing Rework
Details
       

 09-08-2018
2.50
2: Relay Coil Protection Diodes
Details
       

 09-08-2018
2.50
1: Flap Position Sensor
Details
       

 08-27-2018
1.00
Firewall
Details
       

 08-26-2018
4.00
Firewall
Details
       

 08-25-2018
1.50
2: Front Deck Nutplates
Details
       

 08-25-2018
5.00
1: Firewall Penetrations
Details
       

 08-23-2018
3.00
Various Small Jobs
Details
       

 08-19-2018
2.50
Firewall Components
Details
       

 08-18-2018
3.00
3: Firewall Components
Details
       

 08-18-2018
2.00
2: Fuel Vent Line Tubing
Details
       

 08-18-2018
3.00
1: Flap Position Sensor
Details
       

 08-17-2018
4.00
Flap Position Sensor
Details
       

 08-12-2018
3.00
2: Flap Position Sensor
Details
       

 08-12-2018
4.00
1: Installing the Fuel Pump
Details
     

 08-11-2018
6.00
Installing the Fuel Pump
Details
       

 08-10-2018
2.00
Installing the Fuel Pump
Details
       

 08-05-2018
4.00
2: Flap Position Sensor
Details
       

 08-05-2018
2.00
1: Centre Console
Details
       

 07-29-2018
0.00
AirVenture 2018
Details
       

 07-15-2018
3.00
Right Fuel Vent Line
Details
       

 07-14-2018
3.00
2: Brake Lines
Details
       

 07-14-2018
2.00
1: Andair Fuel Selector Valve
Details
       

 07-01-2018
1.00
3: Tubing Brake LInes
Details
       

 07-01-2018
2.00
2: PVC Brake Lines
Details
       

 07-01-2018
3.00
1: Front Deck
Details
       

 06-30-2018
4.50
2: Front Deck
Details
       

 06-30-2018
1.50
1: Instrument Panel Map Box
Details
       

 06-24-2018
1.50
3: Instrument Panel Map Box
Details
       

 06-24-2018
2.00
2: Instrument Panel Map Box
Details
       

 06-24-2018
2.50
1: Front Deck
Details
       

 06-23-2018
3.00
2: Front Deck and Instrument Panel
Details
       

 06-23-2018
6.00
1: Front Deck and Instrument Panel
Details
       

 06-17-2018
5.00
Front Deck and Instrument Panel
Details
       

 06-16-2018
3.50
2: Front Deck and Instrument Panel
Details
       

 06-16-2018
3.00
1: Installing the Rudder Stop
Details
       

 06-04-2018
1.50
Installing the Rudder Stop
Details
       

 06-03-2018
2.50
3: Installing the Forward Elevator Control Rod
Details
       

 06-03-2018
2.00
2: Modifying Seat Floor Ribs
Details
       

 06-03-2018
2.00
1: Fitting the Aft Elevator Control Rod
Details
       

 06-02-2018
1.50
4: Elevator Control Rods
Details
       

 06-02-2018
2.00
3: Mounting the Rudder
Details
       

 06-02-2018
2.00
2: Mounting the Vertical Stabiliser
Details
       

 06-02-2018
3.00
1: Mounting the Vertical Stabiliser
Details
       

 06-01-2018
2.00
Attaching the Vertical Stabiliser
Details
       

 05-28-2018
1.00
Elevator Control Rods
Details
       

 05-27-2018
2.00
3: Fresh Air Scoops
Details
       

 05-27-2018
2.50
2: Elevator Control Rods
Details
       

 05-27-2018
1.50
1: Building the Empennage
Details
       

 05-26-2018
2.00
3: Attaching the Elevators
Details
       

 05-26-2018
4.50
2: Bolting on the Horizontal Stabiliser
Details
       

 05-26-2018
4.00
1: Reassembling the Cockpit
Details
       

 05-25-2018
2.00
Reassembling the Cockpit
Details
       

 05-20-2018
2.00
2: Painting the Cockpit
Details
       

 05-20-2018
4.00
1: Prepping for Painting
Details
       

 05-06-2018
5.00
Prepping the Cockpit
Details
       

 05-05-2018
2.50
Fresh Air Vents
Details
       

 04-29-2018
3.00
Fresh Air Vents
Details
       

 04-08-2018
2.50
2: Fuselage Wiring Holes
Details
       

 04-08-2018
1.50
1: Attached Right Wing Control Surfaces
Details
       

 04-07-2018
1.50
3: Right Wing Inspection Covers
Details
       

 04-07-2018
2.50
2: Right Wing Bottom Outboard Skin
Details
       

 04-07-2018
2.00
1: Right Wing Bottom Outboard Skin
Details
       

 04-02-2018
4.00
Right Wing Bottom Skin
Details
       

 04-01-2018
1.00
3: Right Wing Bottom Skin
Details
       

 04-01-2018
2.50
2: Right Wing Landing Light
Details
       

 04-01-2018
2.00
1: Bellcrank Inspection Lights
Details
       

 03-31-2018
2.00
3: Bellcrank Inspection Lights
Details
       

 03-31-2018
2.50
2: Right Wing Landing Light
Details
       

 03-31-2018
1.50
1: Right Wing Landing LIght
Details
       

 03-25-2018
1.00
4: Caution Tags
Details
       

 03-25-2018
1.00
3: Left Wing Landing Light Wiring
Details
       

 03-25-2018
3.00
2: Leading Edge Landing Lights
Details
       

 03-25-2018
4.00
1: Leading Edge Landing Lights
Details
       

 03-12-2018
3.00
2: Leading Edge Landing Lights
Details
       

 03-12-2018
2.00
1: Leading Edge Landing Lights
Details
       

 03-11-2018
2.50
3: Leading Edge Landing LIghts
Details
       

 03-11-2018
2.50
2: Leading Edge Landing LIghts
Details
       

 03-11-2018
5.00
1: Dynon Skyview Network Hub
Details
       

 03-10-2018
2.00
Technical Counsellor Initial Inspection
Details
       

 03-10-2018
2.00
Dynon Skyview Network Hub
Details
       

 03-04-2018
3.50
Autopilot Pitch Servo
Details
       

 03-03-2018
2.50
Bits 'n Pieces
Details
       

 02-26-2018
2.00
Landing Gear Weldments
Details
       

 02-25-2018
4.00
3: Bolting in the Right Landing Gear Weldment
Details
       

 02-25-2018
1.50
2: Reaming the Gear Legs
Details
       

 02-25-2018
1.50
1: Flap Motor Wiring
Details
       

 02-24-2018
7.00
Flap Actuator
Details
       

 02-18-2018
4.00
2: Flap Actuator
Details
       

 02-18-2018
3.00
1: Fuel System Covers
Details
       

 02-17-2018
6.00
Fuel System Covers
Details
       

 02-12-2018
1.00
Cockpit Seats
Details
       

 02-11-2018
6.00
Cockpit Seats
Details
       

 01-28-2018
5.00
Cockpit Seats
Details
       

 01-27-2018
4.00
2: Cockpit Tunnel Cover
Details
       

 01-27-2018
4.00
1: Cockpit Floor
Details
       

 01-26-2018
7.00
Baggage Compartment
Details
       

 01-21-2018
3.00
2: Underfloor Wiring Duct
Details
       

 01-21-2018
1.00
1: Centre Section Floor Nutplates
Details
       

 01-20-2018
1.50
3: Wiring Holes in the Main Spar
Details
       

 01-20-2018
3.00
2: Seat Belt Wire Wear Strips
Details
       

 01-20-2018
1.00
1: Left Side Step
Details
       

 01-14-2018
5.00
Left Side Step
Details
       

 12-10-2017
4.00
Right Side Step
Details
       

 12-09-2017
5.00
Fitting the Steps
Details
       

 12-08-2017
3.50
ADAHRS Bracket and Static Tube
Details
       

 12-03-2017
2.00
ADAHRS and OAT
Details
       

 12-02-2017
1.50
2: Static Ports
Details
       

 12-02-2017
4.00
1: ADAHRS Mounting Bracket
Details
       

 12-01-2017
2.50
ADAHRS Mounting Bracket
Details
       

 11-26-2017
5.00
2: Forward Top Skin
Details
       

 11-26-2017
1.00
1: Elevator Bellcrank
Details
       

 11-25-2017
3.00
3: Fuselage Bits
Details
       

 11-25-2017
3.00
2: Rudder Pedal Assembly Install
Details
       

 11-25-2017
2.50
1: Brake Pedals
Details
       

 11-20-2017
2.00
Brake Pedals
Details
       

 11-19-2017
3.00
2: Brake Pedals
Details
       

 11-19-2017
3.50
1: Gear Leg Weldments
Details
       

 11-18-2017
4.00
2: Tail Tie-Down
Details
       

 11-18-2017
5.50
1: Fuselage Bits'n Pieces
Details
       

 11-13-2017
1.50
Seat and Flap Brackets
Details
       

 11-12-2017
1.00
2: Underwing Inspection Cover
Details
       

 11-12-2017
6.50
1: Seat and Firewall Brackets
Details
       

 11-11-2017
3.50
3: Control Column Assembly
Details
       

 11-11-2017
2.00
2: Firewall Holes
Details
       

 11-11-2017
4.00
1: Firewall Parts
Details
       

 11-05-2017
0.00
5: Summary of Hours Worked
Details
     

 11-05-2017
2.00
4: Left Wing Aileron and Flap Assembly
Details
       

 11-05-2017
2.50
3: Pitot Tube Installation
Details
       

 11-05-2017
1.50
2: Left Wing Wiring
Details
       

 11-05-2017
5.00
1: Instrument Panel Layout Rev 02.01
Details
     

 11-04-2017
2.00
3: Nav/Strobe Light Wiring
Details
       

 11-04-2017
3.00
2: Bellcrank Inpsection Lights
Details
       

 11-04-2017
2.00
1: Left Wing Wiring Conduit
Details
       

 11-03-2017
0.50
2: Inspection Lights
Details
       

 11-03-2017
2.00
1: Stall Warning
Details
       

 10-24-2017
1.00
Stall Warning Switch
Details
       

 10-23-2017
2.00
Stall Warning Switch
Details
       

 10-22-2017
2.00
3: Stall Warning Switch
Details
       

 10-22-2017
1.00
2: Pitot Tube Bracket continued
Details
       

 10-22-2017
4.00
1: Pitot Tube Bracket
Details
       

 10-21-2017
3.00
2: Left Wing Pitot Mount
Details
       

 10-21-2017
5.50
1: Roll Servo Wiring
Details
       

 10-15-2017
5.00
Right Wing Flap
Details
       

 10-14-2017
5.00
2: Attaching the Right Aileron
Details
       

 10-14-2017
4.00
1: Right Wing Aileron Control Rods
Details
       

 10-01-2017
0.00
22: Grypmat Tool Tray
Details
     

 10-01-2017
0.00
21: Handee Clamp and Washer Tool
Details
     

 10-01-2017
0.00
20: Handee Clamp
Details
     

 10-01-2017
0.00
19: Nutplate Jig
Details
     

 09-25-2017
1.00
Left Wing Conduit Brackets
Details
       

 09-24-2017
4.00
2: Wing Wiring Conduits
Details
       

 09-24-2017
2.00
1: Aileron Control Rods
Details
       

 09-23-2017
3.00
3: Angle of Attack Sensor
Details
       

 09-23-2017
5.00
2: Aileron Control Rods
Details
       

 09-23-2017
1.00
1: Aileron Bellcrank Re-Grease
Details
       

 09-17-2017
5.50
Roll Servo and Right Wing Fairings
Details
       

 09-16-2017
3.00
2: Right Wing Aileron Bellcrank
Details
       

 09-16-2017
5.00
1: Flap and Aileron Fairings
Details
       

 09-14-2017
1.00
Aileron hinge bracket SB parts
Details
       

 09-03-2017
7.00
Brackets and Fairings
Details
       

 09-02-2017
0.00
Wall Art
Details
     

 09-02-2017
9.00
Aileron and Flap Fairings
Details
       

 09-01-2017
7.00
Aileron Hinge Brackets
Details
       

 08-27-2017
4.00
Fuel Pick-Up and Level Sensors
Details
       

 08-26-2017
11.00
Fuselage Trolley
Details
       

 08-20-2017
20.00
Checking inventory and sorting parts
Details
       

 08-16-2017
1.00
Uncrating the QB Wings and Fuselage
Details
       

 08-14-2017
0.00
Wings and Fuselage are Delivered
Details
       

 07-25-2017
0.00
EAA AirVenture 2017
Details
       

 07-09-2017
4.50
Horizontal Stabiliser Tips
Details
       

 07-02-2017
4.00
Horizontal Stabiliser Tips
Details
       

 07-01-2017
3.00
More Filling and Sanding
Details
       

 06-25-2017
4.00
Mixing, Filling, Sanding...
Details
       

 06-24-2017
0.00
Sandpaper Storage Unit
Details
       

 06-19-2017
1.00
Basic Wiring Diagram - First Draft
Details
     

 06-18-2017
4.00
Fairing Elevator and Rudder Tips
Details
       

 06-12-2017
3.00
3: Rudder Tips
Details
       

 06-12-2017
1.50
2: Rudder Light Wiring
Details
       

 06-12-2017
1.50
1: Elevator Wing Tip Fairing
Details
       

 06-11-2017
3.00
Elevator Wing Tip Fairing
Details
       

 06-10-2017
1.50
3: Tail Nav/Strobe Light
Details
       

 06-10-2017
1.00
2: Map Box
Details
       

 06-10-2017
1.50
1: Elevator Tip Fairing
Details
       

 06-02-2017
1.00
Power Distribution Box
Details
       

 06-01-2017
1.00
Power Distribution Board
Details
       

 05-31-2017
1.50
Left Elevator Wing Tip
Details
       

 05-14-2017
1.50
2: Right Elevator Wing Tip
Details
       

 05-14-2017
1.00
1: Test Fitted Both Elevators
Details
       

 05-06-2017
3.00
Elevator Counterweights
Details
       

 04-30-2017
3.00
3: Trim Tab Assembly
Details
       

 04-30-2017
1.00
2: Trim Tab Servo Mount
Details
       

 04-30-2017
1.00
1: Left Elevator Trailing Edge
Details
       

 04-25-2017
0.50
4: Left Elevator Trailing Edge
Details
       

 04-25-2017
2.50
3: Trim Tab Assembly
Details
       

 04-25-2017
1.00
2: Almost a Disaster
Details
       

 04-25-2017
2.00
1: Trim Tab Servo Motor
Details
       

 04-24-2017
2.50
3: Building the Trim Tab
Details
       

 04-24-2017
2.00
2: Trim Tab Jigs and Tools
Details
       

 04-24-2017
1.50
1: Trim Tab Stiffeners
Details
     

 04-23-2017
0.00
Workshop Enhancements
Details
       

 04-22-2017
2.00
2: Primed the Trim Tab Skin
Details
       

 04-22-2017
3.00
1: Continuing with the Left Elevator
Details
       

 04-21-2017
1.00
Right Elevator Trailing Edge
Details
       

 04-20-2017
1.00
The Little Suprise Piece
Details
       

 04-19-2017
1.00
Left Elevator Assembly
Details
       

 04-17-2017
1.50
3: Left Elevator Assembly
Details
       

 04-17-2017
1.50
2: Left Elevator Counterbalance
Details
       

 04-17-2017
1.50
1: Right Elevator Trailing Edge
Details
       

 04-16-2017
2.50
3: Right Elevator Trailing Edge
Details
       

 04-16-2017
2.00
2: Right Elevator Spar
Details
       

 04-16-2017
0.50
1: Nav/Strobe Lights Arrive
Details
       

 04-15-2017
2.00
Elevator Stiffeners and Spar
Details
       

 04-14-2017
1.50
Match Drilling the Left Elevator
Details
       

 04-09-2017
3.00
Building the Right Elevator
Details
       

 03-27-2017
1.00
Continued with Right Elevator
Details
       

 03-26-2017
1.50
2: Assembling the Right Elevator
Details
       

 03-26-2017
3.50
1: Match Drilling the Right Elevator
Details
       

 03-25-2017
6.00
A Big Day of Prepping
Details
       

 03-15-2017
1.00
Continued Dimpling and Deburring
Details
       

 03-14-2017
1.50
Continued Alodining Elevator Stiffeners
Details
       

 03-13-2017
6.00
Building the Elevator Counterbalance Arms
Details
       

 03-12-2017
6.50
Match Drilling and Dimpling
Details
       

 03-11-2017
3.00
4: Cutting the Elevator Stiffeners to Size
Details
       

 03-11-2017
1.00
3: Finishing the Rudder Leading Edge
Details
       

 03-11-2017
1.00
2: Rolling the Rudder Leading Edge
Details
       

 03-11-2017
1.00
1: Riveting the Rudder Trailing Edge
Details
       

 03-08-2017
1.00
2: Gluing up the Rudder Trailing Edge
Details
       

 03-08-2017
1.00
1: Preparing the Rudder Trailing Edge
Details
       

 03-04-2017
5.00
Assembling the Rudder
Details
       

 03-03-2017
2.00
Primed and Ready
Details
       

 02-22-2017
1.50
Alodined Rudder Parts
Details
       

 02-20-2017
1.50
Countersinking the Rudder Trailing Edge Wedge
Details
       

 02-19-2017
1.00
3: Dimpling Difficult Holes
Details
       

 02-19-2017
3.00
2: Rudder Assembly and Dimpling
Details
       

 02-19-2017
2.00
1: Back Riveting the Rudder Stiffeners
Details
       

 02-18-2017
2.50
2: Assembling the Rudder Frame
Details
       

 02-18-2017
2.50
1: Painting and Alodining Rudder Parts
Details
       

 02-17-2017
3.00
Preparing the Rudder Skins
Details
       

 02-14-2017
1.00
Finished off the Rudder Stiffeners
Details
       

 02-13-2017
1.50
Started the Rudder stiffeners
Details
       

 02-12-2017
1.00
3: Finished the Vertical Stabiliser
Details
       

 02-12-2017
1.00
2: Provision for Tail Strobe/Nav Light
Details
       

 02-12-2017
2.50
1: Vertical Stabiliser Coming Together
Details
       

 02-11-2017
0.00
3: Sheesh, it sure is hot under this tin roof!
Details
       

 02-11-2017
1.00
2: No compromises
Details
       

 02-11-2017
2.00
1: Assembling vertical stabiliser
Details
       

 02-06-2017
0.50
Centre Hinge Bracket
Details
       

 01-29-2017
2.50
2: Spray Painting
Details
       

 01-29-2017
1.50
1: Alodining
Details
       

 01-28-2017
4.00
Drilling and Dimpling the Vertical Stabiliser
Details
       

 01-27-2017
2.00
Prepping the VS Ribs
Details
       

 01-26-2017
2.50
Finished the Horizontal Stabiliser
Details
       

 01-25-2017
1.00
2: A Start on the Vertical Stabiliser
Details
       

 01-25-2017
1.50
1: Final Stages of HS fabrication
Details
       

 01-15-2017
5.00
Horizontal Stabiliser is almost done
Details
       

 01-14-2017
6.00
Completed one side of the horizontal stabiliser
Details
       

 01-13-2017
1.50
First skin rivets
Details
       

 01-08-2017
3.00
Dimpling and priming HS skins
Details
       

 01-07-2017
2.50
Dimpling the HS skins
Details
       

 01-02-2017
1.00
2: Starting the Vertical Stabiliser
Details
       

 01-02-2017
1.50
2: Rivetting the HS Spars
Details
       

 01-02-2017
2.00
1: Rivet Gun Practice
Details
       

 01-01-2017
2.00
My First Rivet
Details
       

 12-31-2016
1.50
Primed HS Spars
Details
       

 12-30-2016
2.00
Alodined HS Spars
Details
       

 12-17-2016
1.50
2: Priming Wing Ribs
Details
       

 12-17-2016
2.50
1: Dimpling and Alodine
Details
       

 12-16-2016
0.50
Dimpling Pliers Arrived
Details
     

 12-04-2016
1.00
More Countersinking
Details
       

 12-03-2016
1.50
2: Right Horizontal Stabiliser Assembly
Details
       

 12-03-2016
2.00
1: Countersinking
Details
       

 12-01-2016
1.50
Disassemble and deburr
Details
       

 11-27-2016
4.50
Assembled Left Horizontal Stabiliser
Details
       

 11-26-2016
2.00
Deburring
Details
       

 11-23-2016
2.00
Disassemble and deburr
Details
       

 11-22-2016
2.00
Assembled ribs/spars
Details
       

 11-21-2016
1.00
Squaring wing ribs
Details
       

 11-20-2016
4.00
2: Deburring wing ribs
Details
       

 11-20-2016
2.00
1: Front Spar Attachment Angles
Details
       

 11-19-2016
3.00
Front Spars
Details
       

 10-23-2016
0.00
Preparing for my build
Details
       

 10-04-2016
1.00
Empennage Kit Arrived
Details
     

 10-01-2016
0.00
18: Brady Labeller
Details
       

 10-01-2016
0.00
17: West System Epoxy
Details
     

 10-01-2016
0.00
16: Drill Stops
Details
     

 10-01-2016
2.50
15: C-Frame Table
Details
       

 10-01-2016
0.00
14: Dremel
Details
     

 10-01-2016
0.00
13: Cleco's
Details
     

 10-01-2016
0.00
12: Torque Wrench
Details
     

 10-01-2016
0.00
11: Right-angle drill set
Details
     

 10-01-2016
0.00
10: Rivetting Tools
Details
       

 10-01-2016
0.00
08: Scotchbrite Wheel
Details
     

 10-01-2016
0.00
07: Bar Fridge
Details
     

 10-01-2016
0.00
06: Scotchbrite Pads
Details
     

 10-01-2016
0.00
05: Alodine
Details
     

 10-01-2016
0.00
04: Bandsaw
Details
     

 10-01-2016
0.00
03: Air Compressor
Details
       

 10-01-2016
0.00
02: Bench Sander
Details
       

 10-01-2016
0.00
01: Bench Grinder
Details
     

 09-25-2016
0.00
Started on my workbench
Details
       

 09-24-2016
0.00
Start Preparing the Workshop
Details
       

 09-21-2016
0.00
First Order
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.