KitLog pro

Powered By Kitlog Pro v2.0

JAN'S WEB SITE
Work Logs Found: 13
Category Work Time: 150 Hours
 Date
Hours
Work Log Summary

Details

 10-27-2016
24.00
FE-Analysis of the tailwheel
Details
       

 06-24-2016
24.00
FE-Analysis of the main-gear-subframe
Details
       

 04-16-2016
12.00
Disassembly Panel section
Details
       

 03-21-2016
12.00
Disassembly Front Section
       

 03-20-2016
12.00
Buildt a shop in the backyard
     

 03-19-2016
6.00
Picking up the overhauled Rotax 912
       

 03-16-2016
12.00
Disassembling front section
Details
       

 03-09-2016
2.00
Cutting the Fairings
Details
       

 11-14-2015
16.00
Engine removed from the frame
Details
       

 09-30-2015
2.00
Inspection of the fairings
Details
       

 09-21-2015
4.00
Carb removal
Details
       

 09-16-2015
12.00
Begining of engine removal
Details
       

 09-02-2015
12.00
First Overall Inspection of the HB-YGA
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.