KitLog pro

Powered By Kitlog Pro v2.0

Jan Hanekoms RV Web Site
Work Logs Found: 143
Category Work Time: 396 Hours
 Date
Hours
Work Log Summary

Details

 11-13-2017
2.50
Pin cover holes
Details
       

 11-08-2017
1.00
Cowl side hinges
Details
       

 11-08-2017
2.00
Cowl side hinges
Details
     

 11-08-2017
2.00
Cowl side hinges
Details
       

 11-07-2017
3.00
Fit cowl
Details

 09-13-2017
2.50
Fabricate oil door
Details

 08-15-2017
1.00
Cowl louvers
Details
       

 08-15-2017
2.50
Cowl hinges
Details
       

 08-14-2017
2.00
Rivet bottom cowl rear hinges
Details
       

 08-14-2017
1.50
Final trim cowls
Details
     

 08-14-2017
2.50
Cowl louvers
Details
       

 08-14-2017
1.00
Cowl bracket
Details
       

 08-11-2017
1.50
Fit bottom cowl
Details
       

 08-10-2017
1.50
Overhead console
Details
       

 08-10-2017
2.00
Fit top cowl
Details
       

 08-10-2017
2.00
Fit Cowls
Details
       

 08-10-2017
1.00
Fit bottom cowl
Details
     

 08-09-2017
2.00
Trim Cowls
Details

 08-09-2017
2.00
Part for console
Details
     

 08-08-2017
3.00
Install seat rails
Details
       

 08-07-2017
3.00
Seat rail mod
Details
       

 08-04-2017
0.50
Install CSU
Details
     

 08-04-2017
1.00
Engine hardware
Details
       

 08-03-2017
1.00
Nose wheel breakout force
Details
     

 08-03-2017
1.00
Install mount ers
Details
       

 08-03-2017
2.50
Hang engine
Details
       

 08-03-2017
1.00
Fuel pump
Details
       

 08-03-2017
0.50
Engine fittings
Details
       

 08-03-2017
1.00
Brake lines
Details
       

 08-02-2017
0.50
Nose gear fork and tyre
Details
       

 08-02-2017
1.50
Main wheel brackets
Details
       

 08-02-2017
1.00
Install nose wheel
Details

 08-02-2017
2.00
Install Nose Gear
Details
       

 08-02-2017
1.00
Install main wheel parts
Details
       

 08-02-2017
2.00
Assemble wheels
Details
       

 08-01-2017
3.00
Install Cabin top bolts
Details
       

 08-01-2017
2.50
Final install cabin top
Details
       

 07-31-2017
4.00
Sand and treat pinholes on cabin top
Details
       

 07-31-2017
1.50
Prime cabin top
Details
       

 07-31-2017
2.50
Overhead console
Details
       

 07-26-2017
2.00
Prime canopy
Details
     

 07-26-2017
4.00
Prep cabin top
Details
       

 07-25-2017
2.00
Final paint cabin top inside
Details
       

 07-24-2017
3.00
Prime, sand and paint first coats
Details
       

 07-07-2017
2.50
Unpack Engine
Details
     

 07-07-2017
4.00
Fill and sand cabn top inside
Details
       

 07-06-2017
2.00
Cabin Top
Details
       

 06-27-2017
3.50
Overhead console
Details
       

 06-22-2017
3.50
Trim Cabin top and console
Details
       

 06-20-2017
3.00
Install SS pins and magnets
Details
       

 06-20-2017
1.00
Install ACS Door Locks
Details
       

 06-20-2017
1.00
Attach doors
Details

 05-30-2017
2.50
Top cowl hinges
Details
       

 05-30-2017
1.00
SOS install
Details
       

 05-30-2017
2.50
Fuselage Forward top kin
Details
       

 05-29-2017
1.50
Cabin top
Details
       

 05-26-2017
2.50
Install door handle parts
Details
       

 05-17-2017
1.50
Remove Cabin top
Details
     

 05-16-2017
3.00
Drill rivet strips
Details
       

 05-12-2017
2.00
Install door parts
Details
       

 05-12-2017
2.00
Install door parts
Details
       

 05-12-2017
3.00
Install door parts
Details
     

 05-11-2017
3.50
Install door parts
Details
       

 05-10-2017
1.50
Install Door parts
Details
       

 05-10-2017
2.00
Install Door parts
Details
       

 02-06-2017
4.00
Match drill cabin top rear
Details
       

 12-09-2016
1.00
Fit FWD top fuselage
Details
       

 12-06-2016
4.50
Trim and Cabin Top
Details
       

 12-05-2016
3.00
Install throttle quadrant
Details
       

 12-02-2016
1.50
NACA ducts
Details
       

 12-02-2016
2.00
Instrument panel bulkhead
Details
       

 12-02-2016
0.50
Install NACA Ducts
Details
       

 12-02-2016
2.50
Cut instrument panel
Details
       

 12-01-2016
1.00
MAP sensor fitings
Details
       

 11-24-2016
1.00
Sensor Manifold
Details
       

 11-21-2016
2.50
Firewall eyeballs
Details
       

 11-21-2016
1.50
Attach oil cooler box
Details
     

 11-10-2016
3.00
Oil cooler box
Details
       

 11-09-2016
2.50
Engine mount
Details
       

 11-09-2016
3.00
Cowl hinges
Details
       

 11-03-2016
3.00
Tunnel covers
Details
       

 11-03-2016
4.00
Elevator trim assembly
Details
     

 11-02-2016
2.00
Empennage fairing
Details
       

 10-31-2016
4.00
Trim cabin top
Details
       

 10-31-2016
3.00
Flap system
Details
       

 10-28-2016
3.00
Elevator control tubes
Details
       

 10-28-2016
2.00
Control column
Details
       

 10-25-2016
1.50
Idler
Details
       

 10-25-2016
2.00
Control tube
Details
       

 10-24-2016
3.50
Pitch and Yaw servos
Details
       

 10-24-2016
2.00
Fabricate FWD elevator tube
Details
       

 10-22-2016
2.00
Staic System
Details
       

 10-20-2016
2.50
Rudder cables
Details
       

 09-30-2016
1.00
Seat rail support brackets
Details
       

 09-15-2016
3.00
Avionics and VPX planning session
Details

 09-14-2016
1.00
Modify floor acces hole covers.
Details
       

 09-14-2016
3.00
Make compartements
Details
       

 09-14-2016
2.00
Bulkhead platenuts
Details
       

 09-14-2016
1.50
Baggage covers
Details
       

 09-14-2016
1.00
Bagagge compartment
Details
       

 09-13-2016
1.00
Rear cover
Details
     

 09-13-2016
3.00
Floor rivets
Details
       

 09-13-2016
2.00
Baggage door frame
Details
       

 09-13-2016
1.00
Baggage bulkhead covers
Details
       

 09-12-2016
2.00
Door frame parts
Details
       

 09-02-2016
2.00
Toolbox
Details
       

 09-02-2016
2.50
Set floor and luggage floors
Details
     

 09-02-2016
1.00
Baggage door frame
Details
       

 09-01-2016
4.00
Install wiring
Details
       

 09-01-2016
3.00
Bagagge and seat floors.
Details
       

 08-30-2016
3.50
Bagagge floor panels
Details
       

 08-30-2016
3.00
Bagagge and seat floors.
Details
       

 08-29-2016
1.50
Tailcone Attach
Details
       

 08-29-2016
3.00
Tailcone Attach
Details
       

 08-29-2016
2.50
Install Steps
Details
       

 08-25-2016
1.00
Tailcone attach
Details
       

 08-25-2016
2.00
Tailcone attach
Details
       

 08-25-2016
1.50
Tailcone Attach
Details
     

 08-25-2016
2.00
Tailcone Attach
Details
       

 08-23-2016
2.50
Tailcone attach
Details
       

 08-23-2016
0.50
Brakes and rudders
Details
       

 08-23-2016
2.00
Brake lines
Details
       

 08-16-2016
3.00
Build Baggage Door
Details
       

 08-15-2016
2.50
Build Baggage door
Details
       

 08-12-2016
3.00
Install fuel system
Details
       

 08-12-2016
1.00
Cabin heat
Details
     

 08-10-2016
2.50
Cut inspection panel
Details
       

 08-09-2016
3.50
Fuel selctor and lines
Details
       

 08-08-2016
2.00
Park Brake
Details
       

 07-12-2016
4.00
Manufacture Mid Seat Rail Supports
Details
       

 07-12-2016
2.50
Make and install brake lines
Details
       

 07-09-2016
3.00
Instal Canin Heat vent valves
Details
       

 07-08-2016
2.00
Remove panels
Details

 04-07-2016
10.00
Finish Horizontal Stab
Details
       

 04-06-2016
12.00
Horizontal Stab
Details
       

 03-25-2016
17.00
Horizontal Tab skins
Details
       

 03-23-2016
13.00
Horizontal Stab
Details
       

 03-16-2016
11.00
Finish Rudder
Details
     

 03-07-2016
15.00
Fabricate rudder stiffeners
Details
       

 02-10-2016
12.00
Finish VS
Details
       

 02-02-2016
10.00
Prepare VS spar and ribs
Details
       

 12-19-2015
1.00
Finalize Tailcone
Details
       

 12-19-2015
8.00
Battery Bracket
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.