Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-JVR RV10
All
Work Logs Found:
385
Category Work Time:
1238 Hours
Date
Hours
Work Log Summary
Details
07-09-2014
3.00
Various
Details
07-09-2014
3.00
Maiden flight
Details
07-08-2014
2.00
Various
Details
07-06-2014
4.00
Calibrate tanks
Details
07-06-2014
3.00
Aileron trim and pitot
Details
07-05-2014
1.00
Plenum
Details
07-04-2014
2.00
Wiring
Details
07-03-2014
1.00
Rear seats
Details
07-03-2014
2.00
Overhead Console Etc
Details
07-03-2014
3.00
Fairings and wheel pants
Details
07-03-2014
2.00
FAB
Details
07-02-2014
2.50
Install safety harnesses
Details
07-02-2014
1.00
Install Roof harnesses
Details
07-02-2014
2.50
FAB and Overhead Console
Details
07-01-2014
2.50
Weigh Aircraft
Details
07-01-2014
1.00
Install Prop
Details
06-30-2014
3.00
Wiring
Details
06-29-2014
1.50
Install LH center panel
Details
06-28-2014
0.50
Tail Lamp
Details
06-28-2014
3.00
Door Alarms
Details
06-28-2014
5.00
Central Locking
Details
06-27-2014
2.00
Wiring
Details
06-27-2014
2.00
Wingtip Lights
Details
06-27-2014
0.50
Tank Attach Bracket
Details
06-27-2014
0.50
Tail Light
Details
06-27-2014
2.00
Install Ailerons
Details
06-27-2014
1.00
Fuel Lines
Details
06-26-2014
1.00
Wing walks
Details
06-26-2014
1.50
Wing root fairing bracket.
Details
06-26-2014
2.50
Left wing lights
Details
06-26-2014
2.00
Install Landing Lights
Details
06-26-2014
5.00
Avionics
Details
06-26-2014
0.50
Ailerons
Details
06-25-2014
1.50
Wing Bolts & Tie downs
Details
06-25-2014
2.00
Taxi Lights
Details
06-25-2014
2.00
Landing Lights
Details
06-25-2014
4.00
Dynon Wiring
Details
06-24-2014
6.00
Nav and Taxi Lights
Details
06-24-2014
5.00
Dynon wiring
Details
06-12-2014
6.50
Wiring
Details
06-12-2014
1.50
Attach flaps
Details
06-12-2014
2.00
Alternator and starter wires
Details
06-11-2014
5.00
Wiring
Details
06-11-2014
3.50
Wing root fairings
Details
06-11-2014
0.50
Connect Aileron rods
Details
06-11-2014
1.00
Brakes
Details
06-10-2014
6.00
Wiring
Details
06-08-2014
4.50
Wiring
Details
06-06-2014
6.00
Wing root fairings
Details
06-05-2014
1.00
Fuel sender units
Details
06-05-2014
4.00
Attach wings
Details
06-05-2014
3.00
Attach Elevarors and Rudder
Details
05-28-2014
1.50
Luggage door strut
Details
05-28-2014
2.50
Carpets
Details
05-28-2014
2.00
Details
05-28-2014
3.00
Details
05-27-2014
2.50
Rear headset connectors
Details
05-23-2014
6.00
Upholstery
Details
05-22-2014
4.00
Wiring
Details
05-22-2014
3.00
Tunnel covers
Details
05-22-2014
1.50
Paint Luggage Door inside
Details
05-22-2014
2.00
Install Park Brake and Alt Air cables
Details
05-21-2014
3.00
Various
Details
05-21-2014
3.50
Prime and Paint
Details
05-21-2014
0.50
Install ELT antenna
Details
05-21-2014
2.00
Install COM antennae
05-21-2014
0.50
Attache Elevator Tube
Details
05-20-2014
4.00
Test Fit Instruments
Details
05-20-2014
2.50
Test fit instruments
Details
05-20-2014
3.50
Terminal Strip and breakers
Details
05-20-2014
8.00
Cut and glue leather to various panels
Details
05-15-2014
4.00
Cut Instrument panel
Details
05-14-2014
2.00
Elevator Trim
Details
05-14-2014
3.00
Aileron Trim
Details
05-13-2014
3.00
Torque tubes
Details
05-13-2014
4.00
Install VOR antenna, HS and VS
Details
05-13-2014
3.00
Clean AC
Details
05-12-2014
6.00
Relocate Aircraft
Details
05-02-2014
3.00
Wonderboom
Details
05-01-2014
4.00
Switch sub panel
Details
04-23-2014
3.00
Wonderboom
Details
04-17-2014
3.00
Wonderboom
Details
04-11-2014
3.00
Primer
Details
04-10-2014
2.50
Wing Tip Lenses
Details
04-09-2014
3.00
Repair and finish nose wheel spat
Details
04-09-2014
3.00
Firberglass Strips
Details
04-08-2014
4.00
Wing Tip ribs and plate nuts
Details
04-08-2014
2.00
Prep and prime ribs and brackets
Details
04-08-2014
1.00
Paint Brackets
Details
04-08-2014
3.00
Glass around windscreen
Details
04-04-2014
5.00
Move Aircraft to Paint Shop
Details
04-03-2014
4.00
Nose Gear Spat
Details
04-03-2014
3.00
Fit Nose Gear Fairing
Details
04-03-2014
3.00
Finish Main Wheel Spats
Details
04-02-2014
2.50
Intersection Fairings
Details
04-02-2014
4.00
Align main gear fairings
Details
04-01-2014
1.50
Pressure Test RH Fuel Tank
Details
04-01-2014
3.00
Landing Lights
Details
03-29-2014
3.00
Landing Lights
Details
03-28-2014
5.00
Wing Tips
Details
03-28-2014
1.50
Pressure test LH fuel tank
Details
03-27-2014
6.00
Rivet bottom skins
Details
03-27-2014
4.00
Ailerons and Flaps
Details
03-26-2014
6.00
Bottom skins
Details
03-24-2014
4.00
Bottom skins
Details
03-22-2014
2.50
Rudder
Details
03-22-2014
35.00
Install doors
Details
03-22-2014
3.00
FinishTip fairings
Details
03-21-2014
1.50
HS Tip Fairings
Details
03-21-2014
2.00
HS Tip Fairings
Details
03-21-2014
4.00
Fit Empennage
Details
03-21-2014
5.00
Finishing and painting
Details
03-19-2014
2.00
Oil Door
Details
03-19-2014
3.00
Finishing around doors.
Details
03-19-2014
1.50
Finish snorkel
Details
03-19-2014
3.00
Carpets
Details
03-19-2014
3.00
Attach Elevator Tips
Details
03-18-2014
2.50
Snorkel
Details
03-18-2014
1.50
Paint hinges
Details
03-18-2014
2.00
Glass windscreen coming
Details
03-18-2014
1.50
Finishing
Details
03-18-2014
2.50
Elevators
Details
03-14-2014
2.00
Apply Sika to coming
Details
03-11-2014
2.00
Door rubbers
Details
03-07-2014
6.00
Bond in door plexiglass
Details
03-06-2014
3.00
Rear Close Out Rings
Details
03-06-2014
2.50
Rear close out rings
Details
03-06-2014
5.00
Nose Gear Fairing
Details
03-06-2014
1.00
Mask and paint door rings
Details
03-06-2014
3.00
Main Gear Fairings
Details
03-05-2014
4.00
Rivet Fairings
Details
03-05-2014
2.00
Glass fairings
Details
03-03-2014
2.50
Side panels
Details
03-03-2014
3.50
Make main fairings
Details
03-03-2014
2.00
Fit main gear spats
Details
03-03-2014
2.00
Finishing
Details
03-03-2014
2.00
Door close out rings
Details
02-27-2014
4.00
Trim and fit front door Plexi Glass
Details
02-27-2014
8.00
Torque tubes and bell cracnk
Details
02-27-2014
2.00
Oil door
Details
02-27-2014
3.00
Glass wheel pants
Details
02-26-2014
4.00
Main wheel pants
Details
02-25-2014
2.00
Oil door
Details
02-25-2014
3.00
Engine Sensors
Details
02-22-2014
2.00
Rear Vents
Details
02-22-2014
0.00
Headset jack positions
Details
02-20-2014
2.50
Work on oil door
Details
02-20-2014
1.00
Reinforce cowl bracket
Details
02-20-2014
1.00
Nose wheel
Details
02-20-2014
3.00
Install O2 lines
Details
02-18-2014
2.00
Work on top cowl
Details
02-18-2014
1.00
Brake springs
Details
02-13-2014
3.50
Install Brake lines and Axle Extensions.
Details
02-12-2014
1.00
Stake front wheel mushrooms
Details
02-12-2014
2.00
Oil Door
Details
02-12-2014
1.50
Install eyeball
Details
02-12-2014
4.00
Install bottom louvres
Details
02-12-2014
1.00
Cowl bracket
Details
02-11-2014
1.00
Remake cowl bracket
Details
02-11-2014
4.00
Paint Plenum
Details
02-11-2014
2.50
Oil door
Details
02-06-2014
0.50
Spare fanbelt
Details
02-05-2014
3.00
Various
Details
02-05-2014
2.50
Scat Hoses
Details
02-04-2014
3.00
Install Oil Cooler
Details
02-04-2014
2.50
Install MAP items
Details
02-03-2014
1.00
Various
Details
02-03-2014
3.00
Install HT leads
Details
02-03-2014
3.00
Install control cables
Details
02-01-2014
2.00
Install Mount Covers
Details
01-30-2014
2.00
Valve covers
Details
01-30-2014
6.00
Details
01-29-2014
7.00
Work on cooling baffles
Details
01-03-2014
2.00
Work on Baffles
Details
11-27-2013
3.00
Install Exhaust System
Details
11-27-2013
2.00
Injection system
Details
11-27-2013
4.00
Cooling Baffles
Details
11-26-2013
4.00
Cooling baffles
Details
11-22-2013
3.00
Cooling Baffles
Details
11-21-2013
6.00
Cooling Baffles
Details
11-20-2013
3.00
Finishing on Doors
Details
11-20-2013
5.00
Cooling Baffles
Details
11-19-2013
3.00
Finshing doors
Details
11-19-2013
2.00
Fiber Glass on cowls
Details
11-19-2013
2.00
Cooling Baffles
Details
11-14-2013
3.00
Fiber glass Cowl rivets
Details
11-14-2013
2.00
Cowl hinge pin
Details
11-13-2013
1.00
Spinner
Details
11-13-2013
4.00
Cowl
Details
11-05-2013
3.00
Cowls
Details
11-04-2013
4.00
Top cowl hinges
Details
10-30-2013
3.00
Sand and Prime insides
Details
10-30-2013
4.00
Bottom Cow Hinges
Details
10-29-2013
2.00
Rivet cowl hinges
Details
10-29-2013
4.00
Prime doors
Details
10-29-2013
2.00
Cowls and cowl hinges
Details
10-25-2013
4.00
Drill top cowlhinges
Details
10-25-2013
6.00
Aileron push rods
Details
10-24-2013
4.00
Fit cowls
Details
10-24-2013
3.00
Doors finishing
Details
10-04-2013
3.00
Inlet ramps
Details
10-04-2013
2.00
Doors inside
Details
10-04-2013
1.00
Alternator
Details
10-03-2013
8.00
J stringers and tubes
Details
10-03-2013
6.00
Cowls
Details
10-02-2013
1.00
Start work on cowls
Details
10-02-2013
4.00
Gas Struts
Details
10-01-2013
8.00
Spinner
Details
10-01-2013
4.00
Door pins
Details
09-27-2013
8.00
Spinner
Details
09-27-2013
3.00
Door pins
Details
09-27-2013
9.00
Bottom skins
Details
09-24-2013
5.00
Install Windscreen
Details
09-21-2013
1.00
Visors
Details
09-19-2013
2.00
Hand hold covers
Details
09-18-2013
3.00
Hand hold covers
Details
09-13-2013
7.00
Install Engine
Details
09-12-2013
5.00
Install wheel brackets and brakes
Details
09-12-2013
0.50
Install nose gear rubbers
Details
09-11-2013
1.00
Install tunnel heat and cooling cables.
Details
09-11-2013
2.00
Install Landing Gear
Details
09-11-2013
2.00
Install Landing Gear
Details
09-11-2013
1.00
Install Engine Mount
Details
09-09-2013
2.00
Rear windows
Details
09-09-2013
3.00
Fit rear windows
Details
09-05-2013
5.00
Install Door Latches
Details
09-04-2013
4.00
Install Door Latches
Details
09-03-2013
3.00
Install Door Latches
Details
08-31-2013
2.00
Install Door Latches
Details
08-30-2013
3.00
Trim Right Hand Door
Details
08-30-2013
3.00
Fit door hinges
Details
08-29-2013
4.00
Trim Left hand door
Details
08-29-2013
4.00
Finish riveting on Firewall
Details
08-29-2013
2.00
Cleco and rivet top forward skin
Details
08-28-2013
1.00
ELT cable
Details
08-28-2013
3.00
Cabin top bolts
Details
08-27-2013
2.00
Unpack engine
Details
08-21-2013
3.00
Fit cabin top
Details
08-20-2013
3.00
Paint inside roof
Details
08-19-2013
4.00
Overhead console
Details
08-17-2013
2.00
Windscreen close out ring
Details
08-15-2013
8.50
Rivet Flap and Aileron gap fairings
Details
08-15-2013
5.00
Close out rings
Details
08-13-2013
1.00
Work on cabin top
Details
08-13-2013
4.00
Close out rings
Details
08-13-2013
3.00
Close out rings
Details
08-07-2013
8.50
Flap and Aileron gap fairings
Details
08-06-2013
6.00
Install ELT
Details
07-31-2013
1.00
Work on Cabin top
Details
07-30-2013
3.00
Work on doors
Details
07-27-2013
1.00
Gas stut doubler
Details
07-27-2013
4.50
Bond door halves together
Details
07-26-2013
2.00
Sand doors
Details
07-25-2013
2.00
Trim windscreen
Details
07-25-2013
1.00
Fit doors
Details
07-25-2013
3.00
Cut and trim doors
Details
07-24-2013
1.50
Drill strut
Details
07-24-2013
3.00
Drill cabin door openings
Details
07-23-2013
3.00
Match drill cabin top
Details
07-06-2013
3.00
Trim canopy
Details
07-06-2013
4.00
Cowl Hinges
Details
07-05-2013
2.00
Bottom instrument panel
Details
07-04-2013
2.00
Trim canopy
Details
07-04-2013
2.00
Rivet forward top fuselage
Details
07-04-2013
2.00
Dimple
Details
07-04-2013
3.00
Cowl hinges
Details
06-27-2013
3.00
Radio stack brackets
Details
06-27-2013
4.00
Radio rack
Details
06-26-2013
5.00
Oil Cooler mount
Details
06-25-2013
1.00
Install sender block
Details
06-25-2013
2.50
Install naca ducts
Details
06-25-2013
1.00
Install Cabin heat tubes
Details
06-24-2013
2.00
TG10 Cabin heat box
Details
06-24-2013
2.50
Install red cube
Details
06-21-2013
4.00
Kiddies rear seat
Details
06-20-2013
6.00
Rear seats
Details
06-19-2013
2.50
Rivet rear seat floors
Details
06-15-2013
2.00
Baggage Door
Details
06-14-2013
5.00
Baggage door install
Details
06-13-2013
3.00
Baggage cover wear blocks
Details
05-31-2013
4.00
Baggage bulkhead
Details
05-28-2013
2.50
Baggage door channel
Details
05-22-2013
4.00
Install rear seat and luggage floors
Details
05-22-2013
3.00
Install floors
Details
05-21-2013
4.50
Wiring
Details
05-21-2013
2.00
Install Pitch Servo
Details
05-17-2013
2.50
Connect tubes to ADHRS
Details
05-16-2013
3.00
ADHRS unit
Details
05-15-2013
2.50
ADHRS Tray
Details
05-14-2013
3.50
Jump start connector
Details
05-14-2013
2.00
Floor toolbox
Details
05-11-2013
3.00
Install P27
Details
05-10-2013
3.50
Install flap system
Details
05-09-2013
4.50
Install flap system
Details
05-08-2013
1.50
Adjust and final install Mid Elevator tube
Details
05-07-2013
2.50
Remove and rotate flap Motor Bracket
Details
05-01-2013
2.00
Install Control Sticks
Details
05-01-2013
2.00
Control stick bases
Details
04-30-2013
2.50
Make and install Elevator Idler Arm
Details
04-30-2013
3.00
Fabricate Pushrods
Details
04-30-2013
1.00
Assemble pushrods
Details
04-26-2013
1.00
Install rudder cable guides
Details
04-26-2013
4.00
Install brake lines
Details
04-25-2013
3.00
Install rudders and brakes
Details
04-23-2013
2.50
Work on tunnel cover
Details
04-23-2013
3.00
Rivet front seat floor covers
Details
04-23-2013
6.00
Assemble rudder and brake
Details
04-20-2013
3.00
Install fuel pump and filter
Details
04-20-2013
2.00
Inspection panel
Details
04-19-2013
1.00
Install steps
Details
04-19-2013
2.00
Install fuel selector
Details
04-18-2013
3.00
Park brake
Details
04-18-2013
2.00
Brake lines
Details
04-18-2013
3.00
Baggage door
Details
04-17-2013
4.00
Fabricate mid seat rail supports
Details
04-17-2013
5.00
Baggage door
Details
04-16-2013
3.00
Fabricate Elevator Trim assembly
Details
04-13-2013
3.00
Fabricate Elevator trim assembly
Details
04-12-2013
2.00
Manufacture rear Elevator tube
Details
04-11-2013
6.00
Rivet TC to Fuselage
Details
04-10-2013
10.50
Attach Tailcone to fuselage
Details
04-09-2013
8.00
Tailcone top aft skin
Details
04-09-2013
7.00
Bellcrank and Battery holder
Details
04-08-2013
2.00
Install Static Pitot system
Details
04-05-2013
6.00
Assemble Tailcone
Details
04-04-2013
10.00
Assemble Tailcone
Details
04-03-2013
8.00
Assemble Tailcone
Details
04-02-2013
1.00
Rivet channels
Details
04-01-2013
3.00
Rivet J Stiffeners
Details
04-01-2013
7.00
Rivet J Stiffeners
Details
03-30-2013
2.00
Prime parts
Details
03-30-2013
4.00
Assemble bulkheads
Details
03-28-2013
1.00
Harness anchor
Details
03-28-2013
6.00
Dissassemble Tailcone
Details
03-27-2013
3.00
Make parts
Details
03-08-2013
4.00
Assemble tailcone
Details
02-28-2013
9.00
Assemble tailcone
Details
02-20-2013
0.00
Stiffeners
Details
02-20-2013
4.00
Cleco Tailcone sides
Details
02-19-2013
4.00
Tailcone bulkheads and stiffeners
Details
02-19-2013
1.00
Strart on Tailcone
Details
02-15-2013
2.00
Assemble elevators
Details
02-14-2013
3.00
Manufacture trim tabs
Details
02-14-2013
2.00
Manufacture trim tabs
Details
02-14-2013
3.00
Manucture trim tabs
Details
02-14-2013
2.00
Assemble elevators
Details
02-13-2013
1.00
Elevator trim tab
Details
02-13-2013
2.00
Assemble elevators
Details
02-13-2013
2.00
Assemble elevators
Details
02-11-2013
4.00
Assemble elevators
Details
02-11-2013
4.00
Assemble elevators
Details
02-08-2013
5.00
Assemble Elevators
Details
02-07-2013
2.00
Prime elvator parts
Details
02-07-2013
7.00
Prepare elevator parts
Details
01-31-2013
2.00
Unpack wings
Details
01-30-2013
2.00
Rudder leading edge
Details
01-30-2013
2.00
Finish rudder
Details
01-29-2013
3.00
Assemble rudder
Details
01-29-2013
2.00
Assemble rudder
Details
01-28-2013
1.00
Assemble rudder
Details
01-25-2013
8.00
Assemble HS
Details
01-24-2013
4.00
Assemble and rivet HS
Details
01-19-2013
5.00
Do inventory
Details
01-16-2013
5.00
Assemble HS
Details
01-14-2013
3.50
Prepare HS
Details
01-11-2013
3.00
Prepare ribs
Details
01-10-2013
4.00
Build HS
Details
01-09-2013
6.00
Receive and unpk QB kit
Details
01-05-2013
7.00
Cleco HS
Details
10-09-2012
8.00
HS Spar
Details
09-13-2012
8.00
Trim spar caps
Details
09-13-2012
2.00
Spar Attach Brackets
Details
09-11-2012
0.00
Rudder
Details
09-10-2012
2.00
Rivet Stiffeners
Details
09-08-2012
2.00
Rivet on stiffeners
Details
09-08-2012
2.00
Prime and rivet rudder
Details
09-06-2012
9.00
Rudder horn
Details
08-27-2012
3.00
Rivet VS
Details
08-27-2012
0.00
Finish VS
Details
08-27-2012
1.50
Build Rudder
Details
08-25-2012
2.00
Assemble VS
Details
08-24-2012
1.50
Clean and prime
Details
08-24-2012
1.00
Build VS
Details
08-21-2012
7.00
Build VS
Details
08-21-2012
7.00
Build VS
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Category
# Logs
# Hours
All
385
6382
Avionics
22
313
Canopy
20
485
Cooling Baffles
10
273
Cowling
28
294
Doors
29
261
Electrical
22
304
Elevators
11
86
Empennage
5
199
Engine
18
284
Fairings
19
297
Firewall Forward
7
80
Fuselage
57
910
Horizontal Stab
10
156
Instrument Panel
5
154
Interior
5
146
Landing Gear
10
103
Miscellaneous
14
472
Paint
1
468
Prop
4
79
Rudder
11
117
Rudders & Brakes
4
41
Systems
6
50
Tailcone
23
209
Test Flights
1
19
Trim tabs
3
14
Vertical Stab
7
74
Windows
3
10
Windscreen
1
35
Wings
29
449
Copyright © 2001-2024 Matronics. All Rights Reserved.