Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-LOL RV7
All
Work Logs Found:
195
Category Work Time:
583 Hours
Date
Hours
Work Log Summary
Details
01-03-2014
5.00
Various
Details
01-02-2014
1.00
Maiden Flight
Details
01-02-2014
5.00
Final Assembly
Details
01-01-2014
3.50
Final Assembly
Details
12-31-2013
2.00
Final Inspection
Details
12-31-2013
2.00
Final Assembly
Details
12-30-2013
2.50
Roll servo
Details
12-24-2013
4.00
Various
Details
12-23-2013
3.00
Test Radios
Details
12-21-2013
4.00
Map box
Details
12-19-2013
2.00
Repair brake leak
Details
12-19-2013
2.00
Pitot tube
Details
12-19-2013
2.00
Paint Aileron stripes
Details
12-19-2013
2.00
Install ailerons
Details
12-19-2013
1.00
Flight ready
Details
12-18-2013
2.50
Repair brake leak
Details
12-18-2013
5.00
Install cable bracket
Details
12-18-2013
3.00
Fit top intersection fairings
Details
12-18-2013
3.00
Final fit of cowls
Details
12-16-2013
4.50
Wiring
Details
12-13-2013
4.00
Wheel pants & fairings
Details
12-13-2013
1.50
Taxi Iights
Details
12-13-2013
2.00
Magneto timing
Details
12-11-2013
2.00
Weighing
Details
12-11-2013
2.00
Fuel tanks
Details
12-11-2013
2.00
fuel System
Details
12-11-2013
1.50
First engine start
Details
12-11-2013
3.00
Final assembly
Details
12-11-2013
3.00
Final Assembly
Details
12-10-2013
2.00
Wing tip lenses
Details
12-10-2013
3.00
Prop and spinner
Details
12-10-2013
2.00
Fill brake system
Details
12-10-2013
2.00
Debugging
Details
12-10-2013
2.00
Control Columns
Details
12-10-2013
1.00
Adjsut flap linkages
Details
12-09-2013
4.00
Paint Ailerons
Details
12-09-2013
1.50
Install prop
Details
12-09-2013
2.00
Elevator trim
Details
12-09-2013
2.50
Elevator install
Details
12-05-2013
4.00
Wing tip lights
Details
12-05-2013
4.00
Install Instrument Panel
Details
12-04-2013
2.00
Wiring in fuselage
Details
12-04-2013
4.00
Landing lights
Details
12-04-2013
3.00
Install flaps
Details
12-03-2013
1.00
Install canopy
Details
12-03-2013
2.00
Fuel system
Details
12-03-2013
3.00
Finalise wing attach
Details
12-03-2013
3.00
Enige Sensors Wiring
Details
11-29-2013
4.00
Landing Lights
Details
11-29-2013
4.00
Finish Firewall Forward wiring
Details
11-28-2013
6.00
Attach both wings
Details
11-27-2013
3.00
Fuel Tank
Details
11-27-2013
1.00
EGT and CHT wiring
Details
11-27-2013
3.00
Cowling rubbers
Details
11-26-2013
2.00
Wiring
Details
11-26-2013
1.00
Paint cover
Details
11-26-2013
2.00
Cowl Plate nuts
Details
11-22-2013
3.00
Various
Details
11-22-2013
2.00
Fuel system
Details
11-21-2013
1.00
Wiring
Details
11-21-2013
2.00
fuel System
Details
11-20-2013
3.00
Panel Wiring
Details
11-20-2013
1.00
Install Safety Harnesses
Details
11-20-2013
2.00
Install OAT
Details
11-20-2013
3.00
Install Anntenae
Details
11-19-2013
5.00
Panel wiring
Details
11-16-2013
2.00
Rudder cables
Details
11-14-2013
4.00
Wiring on back of panel
Details
11-13-2013
2.00
Spinner
Details
11-13-2013
4.00
Final Fit empennage
Details
11-06-2013
4.00
Wiring
Details
11-05-2013
4.00
Wiring
Details
11-05-2013
3.00
Instrument panel
Details
11-04-2013
4.00
Wiring
Details
11-04-2013
1.50
Terminal strip
Details
11-01-2013
6.00
Instrument Panel
Details
10-31-2013
5.00
Instrument Panel
Details
10-30-2013
3.00
Switch and breaker panel
Details
10-30-2013
4.00
Instrument Panel
Details
10-24-2013
4.00
Engine Control Cables
Details
10-23-2013
4.00
Install oil cooler
Details
10-23-2013
2.00
Install Oil Cooler
Details
10-22-2013
3.00
Intsall Cabin Heat system
Details
10-04-2013
4.00
Install exhaust
Details
10-04-2013
2.00
Alternator
Details
10-02-2013
4.00
Install Camlocks
Details
09-26-2013
2.00
Paint Plenum
Details
09-26-2013
2.00
Mixture controls
Details
09-26-2013
2.00
Final fit plenum
Details
09-26-2013
2.00
Final fit Cooling Baffles
Details
09-25-2013
5.00
Trim and paint cooling baffles
Details
09-25-2013
3.00
Snorkel
Details
09-25-2013
2.00
Paint Cooling Baffles
Details
09-21-2013
3.00
Snorkel
Details
09-20-2013
6.00
Cooling baffles and snorkel
Details
09-19-2013
2.00
Fit Plenum
Details
09-19-2013
5.00
Cooling Baffles
Details
09-18-2013
1.00
Plenum
Details
09-18-2013
6.00
Cooling Baffles
Details
09-17-2013
3.00
Unpack all parts
Details
09-17-2013
4.00
Cooling baffles
Details
07-23-2013
4.00
Temporary assemble for painting
Details
06-26-2013
6.00
Dissassemble for painting
Details
06-10-2013
4.00
Pack and load aircraft
Details
05-22-2013
5.00
Swop Engine
Details
05-22-2013
4.00
Root fairing
Details
05-09-2013
7.50
Root fairings
Details
05-02-2013
8.00
Wings install
Details
04-17-2013
4.00
Landing lights
Details
04-04-2013
8.00
Install Plate Nuts
Details
03-28-2013
2.00
Attach wings
Details
03-28-2013
3.00
Attach wings
Details
03-28-2013
3.00
Attach wings
Details
03-08-2013
4.00
Wing tips
Details
03-08-2013
6.00
Rivet RH wing bottom skin
Details
03-07-2013
8.00
Wing bottom skins
Details
03-07-2013
1.50
Vent hoses
Details
03-07-2013
8.00
Install crotch strap brackets
Details
03-05-2013
3.00
Flap hinges
Details
02-27-2013
3.00
Flap brace and flaps
Details
02-26-2013
2.50
Install RH Aileron
Details
02-20-2013
2.00
Install LH aileron
Details
02-18-2013
2.00
Aileron brackets
Details
02-14-2013
3.00
Aileron gap fairings
Details
02-12-2013
2.00
Install aileron brackets
Details
02-11-2013
4.00
Bottom skins
Details
02-06-2013
5.00
Bellcranks and control tubes
Details
02-05-2013
2.00
Install intersection fairings
Details
02-05-2013
2.00
Aileron control rods
Details
02-02-2013
2.00
Wiring
Details
02-02-2013
4.00
Aileron brackets
Details
02-01-2013
2.00
Fairing brackets
Details
01-31-2013
2.00
Z brackets
Details
01-31-2013
4.00
Main wheel fairings
Details
01-25-2013
1.00
Side panels
Details
01-23-2013
2.00
Fairing brackets
Details
01-22-2013
2.00
Prepare fairings
Details
01-22-2013
1.00
Jack adaptor
Details
01-18-2013
3.00
Side panels
Details
01-18-2013
2.00
Cap covers
Details
01-17-2013
4.00
Finish rudder
Details
01-17-2013
1.00
Baggage tie downs
Details
01-16-2013
2.00
Stiffeners
Details
01-16-2013
2.00
Main gear fairings
Details
12-18-2012
2.00
Install stiffeners
Details
12-11-2012
2.00
Install Rudder trailing edge
Details
12-08-2012
2.00
Landing gear stiffeners
Details
12-07-2012
8.00
Assemble rudder
Details
12-06-2012
4.00
Trailing edge
Details
12-06-2012
5.00
Fabricate gear leg fairings
Details
12-04-2012
4.00
Fabricate gear leg fairings
Details
12-04-2012
4.00
Build new rudder
Details
11-30-2012
2.00
Install canopy
Details
11-30-2012
4.00
Build new rudder
Details
11-29-2012
0.50
Wiring - Flap motor
Details
11-29-2012
8.00
Build new rudder
Details
11-29-2012
2.00
Aileron Trim
Details
11-28-2012
2.00
Wiring
Details
11-28-2012
1.50
Vents
Details
11-28-2012
8.00
Install fuel system
Details
11-28-2012
1.00
Flap system
Details
11-22-2012
2.00
Install roll servo & Compass
Details
11-14-2012
2.00
Flaps system
Details
11-07-2012
2.50
Paint inside cabin
Details
11-07-2012
3.00
Paint flap cover channels
Details
11-06-2012
2.50
Fuel Pump Assy
Details
11-06-2012
1.00
Fuel Pump Assy
Details
11-02-2012
2.00
Fuel Pump Assy
Details
11-01-2012
2.00
Fuel Pump Assy
Details
10-27-2012
2.50
Contol column
Details
10-26-2012
2.00
Compass bracket
Details
10-26-2012
0.50
Comm 1 antenna cable
Details
10-20-2012
1.00
Roll Servo
Details
10-19-2012
2.00
Roll servo bracket
Details
10-17-2012
1.00
Shoulder harness cable sliders
Details
10-09-2012
3.00
Static System
Details
10-09-2012
2.00
Install antennas
Details
10-04-2012
4.00
Fit Canopy
Details
10-03-2012
4.00
Fit Canopy
Details
09-15-2012
2.50
Pitch servo
Details
09-14-2012
1.00
Elevator travel
Details
09-13-2012
1.00
Elevator trim
Details
09-04-2012
1.00
Wiring and servo bracket
Details
09-04-2012
1.50
Rudder cables
Details
09-04-2012
1.00
Elevator bellcrank
Details
08-18-2012
1.00
Repair HS
Details
08-18-2012
3.00
Assemble Empennage
Details
08-17-2012
4.00
Repair HS
Details
08-14-2012
1.00
New project arrives
Details
07-19-2012
6.00
Stirp and cut apart
Details
03-16-2012
4.00
Strip Firwall Forward
Details
03-15-2012
2.00
Strip wings
Details
03-03-2012
6.00
Strip fuselage
Details
03-01-2012
2.00
Strip fuselage
Details
02-28-2012
3.00
Strip wings
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
Category
# Logs
# Hours
All
195
5571
Avionics
21
313
Baggage Area
1
18
Canopy
4
485
Cooling Baffles
11
273
Cowling
4
294
Electrical
19
304
Elevators
2
86
Empennage
6
199
Engine
10
284
Fairings
10
297
Fuselage
22
910
Horizontal Stab
1
156
Instrument Panel
1
154
Landing Gear
4
103
Miscellaneous
23
472
Paint
3
468
Prop
3
79
Rudder
7
117
Rudders & Brakes
2
41
Systems
8
50
Test Flights
1
19
Wings
32
449
ZU-RVI RV10 Home
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.