KitLog pro

Powered By Kitlog Pro v2.0

Jan Hanekoms RV Web Site
Work Logs Found: 778
Category Work Time: 2142 Hours
 Date
Hours
Work Log Summary

Details

 10-13-2011
3.00
Windows
Details

 05-02-2011
4.00
Various
Details

 03-19-2011
6.00
Car towbar
Details
       

 03-16-2011
2.00
Rudder gust lock
Details

 03-05-2011
2.00
Various
Details

 03-05-2011
5.00
Interieur
Details
       

 03-02-2011
3.00
Tank Leak
Details
       

 02-23-2011
2.50
RH Fuel tank
Details
       

 02-08-2011
10.00
Annual inspection
Details

 02-04-2011
7.00
Proving flights
Details

 01-22-2011
8.00
Proving flights
Details

 12-28-2010
7.00
Proving flights
Details

 12-27-2010
4.00
Proving flights
Details

 12-23-2010
5.00
Proving flights
Details

 12-21-2010
6.00
Proving flights
Details

 12-20-2010
6.00
Proving flights
Details

 12-17-2010
10.50
Final assembly
Details

 12-04-2010
11.00
Final assembly
Details
       

 12-03-2010
3.00
Documentation
Details

 12-03-2010
2.00
Control stick wiring.
Details

 12-01-2010
24.00
Final assembly
Details
       

 11-30-2010
1.50
Top cowl
Details

 11-29-2010
2.00
Top cowl
Details

 11-27-2010
4.00
Wings attach
Details
     

 11-26-2010
4.00
Rudder
Details
       

 11-26-2010
2.00
Pitch servo mod
Details
       

 11-25-2010
4.00
Final attach trim system
Details
       

 11-24-2010
4.50
Final attach HS and VS
Details

 11-22-2010
1.50
Strip paint
Details

 11-22-2010
1.00
Paint cover plates
Details

 11-20-2010
6.00
Move to Brits Airfied
Details
       

 11-19-2010
3.00
Various
Details
       

 11-19-2010
3.00
Various
Details

 11-18-2010
1.00
Panel labels
Details

 11-18-2010
3.50
Forward panels
Details

 11-18-2010
2.50
Fit cover plate on instrument panel
Details

 11-18-2010
3.50
Finishing
Details
       

 11-17-2010
2.00
Pitot mast
Details
       

 11-17-2010
1.50
Forward panels
Details

 11-16-2010
2.00
Overhead console
Details
       

 11-16-2010
2.50
Cut pitot bracket to fit attach plate to wing insp
Details
     

 11-16-2010
2.50

Details
       

 11-15-2010
4.50
Hook up and install LH panel
Details
       

 11-13-2010
3.00
Paint door handle covers.
Details

 11-11-2010
2.00
Cut door handle covers
Details

 11-10-2010
2.00
Wiring
Details

 11-08-2010
11.50
Wiring
Details
       

 11-08-2010
2.00
Fit plenum rubber seal
Details
     

 11-06-2010
2.00
Dynon OAT
Details
     

 11-05-2010
3.25
RS232 wiring
Details

 11-04-2010
3.00
Test and debug
Details

 11-04-2010
3.00
Pilot and co pilot headsets
Details
     

 11-04-2010
1.00
Control columns
Details
     

 11-03-2010
4.00
Antennas
Details

 11-02-2010
2.00
Upholster central forward console panel
Details

 11-02-2010
3.75
Stormscope
Details
       

 11-02-2010
2.25
Diagrams
Details

 11-01-2010
3.50
Wiring
Details

 11-01-2010
1.50
Templates
Details

 11-01-2010
2.00
Attach valcro to seat backs
Details

 10-30-2010
4.50
Upholster side panels
Details

 10-30-2010
4.00
Install trays
Details
       

 10-29-2010
1.50
Cubby hole
Details
     

 10-28-2010
1.50
Wiring
Details

 10-27-2010
2.50
Rear cockpit
Details

 10-27-2010
5.00
Interior - Various
Details
       

 10-27-2010
1.50
Avionic trays
Details

 10-26-2010
2.50
Repair DME
Details
       

 10-26-2010
2.50
Fill sparkplug access holes
Details
       

 10-26-2010
2.50
Avionics trays
Details
     

 10-25-2010
2.00
Fit nut plats for air inlet panels
Details

 10-23-2010
5.00
Paint instrument panel
Details
       

 10-23-2010
2.00
Install plate nuts to cockpit side panels
Details

 10-21-2010
6.50
Various
Details
       

 10-21-2010
2.50
Avionics rack
Details
       

 10-20-2010
4.00
Work on LH instrument panel
Details
     

 10-19-2010
9.00
Work on LH panel
Details
       

 10-19-2010
2.00
Install plate nuts to cockpit side panels
Details

 10-18-2010
5.50
Make vent covers
Details
       

 10-18-2010
2.00
Install instruments
Details
     

 10-18-2010
1.50
Cut inlet baffle rubbers to fit inlet baffle
Details
       

 10-15-2010
2.00
Door alarms
Details

 10-14-2010
3.00
Door alarms
Details
       

 10-13-2010
2.50
Side panels
Details

 10-13-2010
1.50
Door pin guides.
Details
       

 10-12-2010
2.00
Fit baffle rubbers to sides of inlet
Details
     

 10-12-2010
4.00
Carpets
Details
       

 10-11-2010
6.00
Tunnel cover and sides
Details
       

 10-11-2010
2.00
Glue bottom cowl baffle rubbers to clamping strips
Details
     

 10-09-2010
4.50
Fit cowl rubbers
Details
       

 10-09-2010
3.00
Carpets etc
Details
       

 10-07-2010
4.50
Rear windows
Details

 10-06-2010
1.25
Fit carbon fibre plenum
Details
     

 10-05-2010
3.00
Rear windows
Details
       

 10-05-2010
1.50
Rear side panels
Details

 10-05-2010
2.00
Instal baffle rods
Details
       

 10-04-2010
6.00
Vanity holders etc
Details
       

 10-02-2010
3.50
Kiddie seat
Details
       

 10-02-2010
6.00
Install baffle rods
Details

 09-30-2010
1.00
Remove all masking.
Details
       

 09-30-2010
1.00
Rear beam
Details
     

 09-30-2010
1.50
Paint rear seat backs
Details
       

 09-30-2010
1.00
Paint lenses
Details
     

 09-30-2010
1.50
Paint all parts
Details
       

 09-30-2010
3.00
Mask and cover parts
Details
       

 09-29-2010
2.50
Layout lines
Details
     

 09-29-2010
6.00
Carpets and side panels
Details
       

 09-28-2010
3.00
Baggage cover
Details
     

 09-27-2010
2.00
Baggage cover
Details
       

 09-23-2010
3.00
Central locking
Details
       

 09-22-2010
1.50
Central locking
Details
       

 09-21-2010
2.00
Cut baffle rod threads
Details

 09-21-2010
4.00
Central locking
Details
       

 09-20-2010
2.25
Cut baffle rods threads
Details

 09-20-2010
4.75
Central locking system
Details

 09-18-2010
7.50
Paint wheel pants, etc
Details
       

 09-18-2010
5.00
Fit plug wire brackets
Details
     

 09-17-2010
1.00
Polish
Details

 09-16-2010
1.75
Polish cowl
Details

 09-14-2010
2.75
Various
Details

 09-14-2010
2.00
Install landing lights in wingtips
Details
     

 09-13-2010
2.00
Trim door
Details

 09-13-2010
2.00
Sand fairings and spats
Details

 09-11-2010
5.00
Sand spats and fairings to prepare for paint
Details
     

 09-10-2010
1.50
Fit LH door
Details

 09-09-2010
1.50
LH Door
Details

 09-09-2010
1.50
Apply 1K body fine to fairind pin holes

 09-08-2010
4.50
Doors
Details

 09-07-2010
2.00
Attach plate nuts to right wheel fairing
Details

 09-06-2010
2.00
Polish RH door
Details

 09-06-2010
2.00
Fit plate nuts to wheel fairings
Details

 09-04-2010
3.50
Paint wingtips, doors
Details

 09-04-2010
2.50
Intersection fairings
Details

 09-03-2010
1.00
Prep doors inside
Details

 09-02-2010
1.50
Sand inside of doors
Details

 09-01-2010
3.00
Paint doors and wingtips
Details
       

 08-31-2010
2.00
Sand wingtips
Details

 08-31-2010
6.00
Paint doors and wingtips
Details

 08-30-2010
2.50
Sand inside of doors and flat wingtips
Details

 08-30-2010
4.50
Doors
Details

 08-28-2010
6.00
Paint fuselage lines and prime wingtips
Details
       

 08-28-2010
8.00
Paint fuselage lines
Details
       

 08-28-2010
3.00
Layout fuselage lines
Details
       

 08-26-2010
2.25
Polish fuselage
Details

 08-25-2010
1.50
Cut and fit stiffeners for inside of wingtips
Details

 08-24-2010
2.25
Polish fuselage
Details

 08-23-2010
5.50
Polish fuselage
Details

 08-23-2010
2.50
Fit strobe mirror plate nuts and polish fuselage
Details

 08-21-2010
3.00
Polish fuselage
Details

 08-21-2010
4.50
Finalise fitting of wingtip lenses
Details
     

 08-16-2010
2.00
Fit right wingtip lense
Details

 08-14-2010
3.50
Landing light subassembly
Details
     

 08-12-2010
1.50
Rivet nutplates to VA-194C Cup
Details

 08-11-2010
1.50
Rivet nutplates to wingtip
Details
     

 08-07-2010
6.50
fuelage markings
Details
       

 08-06-2010
4.50
Fuselage
Details
       

 08-05-2010
7.00
Paint fuselage
Details
       

 08-04-2010
6.50
Paint fuselage
Details
     

 08-02-2010
3.00
Sand fuselage
Details

 08-02-2010
3.50
Landing light subassembly
Details
     

 07-31-2010
3.00
Sand fuselage
Details

 07-31-2010
3.00
Clean workshop
Details

 07-29-2010
2.00
Clean workshop
Details

 07-26-2010
4.00
Paint fuselage
Details

 07-24-2010
2.00
Sand cowls
Details

 07-23-2010
1.50
Prep fuselage
Details

 07-22-2010
2.50
Sand fuselage
Details

 07-21-2010
1.00
Flat runs
Details

 07-20-2010
2.00
Flat cowls
Details

 07-19-2010
2.00
Flat fuselage
Details

 07-17-2010
7.00
Sand and paint fuselage
Details

 07-17-2010
5.50
Paint fuselage
Details
       

 07-15-2010
1.50
Sand fuselage to prepare for paint

 07-15-2010
1.50
Sand belly
Details

 07-13-2010
2.00
Sand fuselage
Details

 07-12-2010
2.00
Flat fuselage
Details

 07-10-2010
6.00
Paint Fuselage
Details
       

 07-10-2010
7.50
Paint Fuselage
Details
       

 07-10-2010
5.50
Paint fuselage
Details
       

 07-09-2010
1.50
Sand top cowl
Details

 07-08-2010
1.50
Mask windows
Details

 07-06-2010
2.00
Mask windows
Details

 07-05-2010
3.50
Oil door
Details
     

 07-05-2010
2.00
Mask windows
Details
     

 07-05-2010
2.25
Mask fuselage
Details
       

 07-03-2010
3.50
Sanding canopy door frame
Details
       

 07-03-2010
3.50
Paint plenum and baffle brackets and sand door to
Details

 07-02-2010
1.00
Door rubber
Details

 07-01-2010
1.50
Sand canopy door frame
Details

 06-29-2010
1.50
Sand canopy and work on plug wires
Details

 06-28-2010
2.00
Sand frame
Details

 06-28-2010
2.00
Fit plug wire clamps to baffles
Details
     

 06-26-2010
4.00
Transport wings
Details
       

 06-24-2010
2.00
Misc.
Details

 06-22-2010
3.50
Try to paint wing
Details

 06-21-2010
3.00
Paint RH wing
Details

 06-21-2010
1.50
Install aileron trim spring brackets
Details
     

 06-19-2010
4.50
Sand right wing

 06-16-2010
3.50
Final coats RH wing
Details
     

 06-15-2010
3.50
Paint LH wing
Details

 06-14-2010
4.50
LH Wing
Details
       

 06-12-2010
3.50
Sand left wing

 06-12-2010
7.00
LH Wing
Details
     

 06-10-2010
3.00
RH Wing
Details

 06-08-2010
2.50
RH Wing
Details
     

 06-08-2010
2.00
Paint and sand left wing

 06-07-2010
2.00
Paint and sand left wing

 06-05-2010
8.00
Paint RH wing
Details

 06-05-2010
6.00
Paint and sand wings

 06-04-2010
1.50
Wing Jig
Details
     

 06-04-2010
5.50
Prime wings
Details
       

 06-03-2010
1.00
Paint and sand left wing

 06-01-2010
2.00
Paint right wing

 05-31-2010
1.50
Paint and sand right wing

 05-29-2010
3.00
Paint wing

 05-27-2010
1.00
Prepare wings for priming

 05-25-2010
2.00
Prepare wings for priming

 05-24-2010
2.00
Prepare wings for priming

 05-24-2010
1.50
Pitot mount
Details
     

 05-22-2010
3.00
Re piant LH Flap
Details
     

 05-22-2010
3.00
Prepare ailerons for painting

 05-21-2010
3.50
Polish Flaps and Ailerons
Details

 05-20-2010
5.00
Final paint Flaps and Ailerons
Details
       

 05-19-2010
3.25
Flaps and Ailerons
Details
       

 05-18-2010
3.75
Wing tips
Details
     

 05-17-2010
3.50
Wing tips
Details
       

 05-15-2010
2.00
Wing tips fitting
Details
     

 05-15-2010
2.50
Brake fuid leak
Details

 05-13-2010
4.50
Wing tip fitting
Details

 05-12-2010
1.50
LH wingtip
Details
       

 05-11-2010
1.50
RH wingtip
Details
       

 05-10-2010
2.50
Control pushrods
Details

 05-08-2010
5.00
Paint HS
Details
     

 05-06-2010
2.00
Prep HS
Details

 05-05-2010
1.00
Handles
Details

 05-04-2010
2.00
Finalise installation of torque tube subassemblies
Details

 05-03-2010
2.00
Install torque tubes
Details
       

 04-29-2010
1.00
Prime torque tube collars and aileron torgue tubes
Details

 04-27-2010
0.50
Drill Plenum plate nuts.
Details

 04-27-2010
2.00
Cut wingtips to fit wing edge
Details

 04-24-2010
3.00
Finalise torque tube assemblies
Details

 04-20-2010
2.00
Work on torque tube assemblies
Details
     

 04-19-2010
1.50
Drill and rivet AN490 rod ends to bellcrank to ail
Details
     

 04-17-2010
1.50
Rivet threaded rod ends to torque tube bellcrank p
Details
     

 04-15-2010
1.00
Measure and drill bellcrank to aileron pushrods
Details
     

 04-13-2010
2.00
Drill threaded rod ends
Details
     

 04-12-2010
1.00
Prime torque tube to bellcrank push rods
Details

 04-10-2010
2.50
Prepare baffles and plenum for priming
Details

 04-08-2010
1.50
Rivet left wing bottom skins
Details
     

 04-08-2010
1.00
Aileron tubes
Details

 04-07-2010
1.50
Ailerons
Details
       

 04-06-2010
2.50
Rivet left wing bottom skin
Details

 04-05-2010
2.00
SB 10-1-4 Install striker plate
Details
     

 04-05-2010
5.00
SB 10-1-4 Door Latch
Details
       

 04-05-2010
4.50
Rivet left wing bottom skin
Details

 04-05-2010
1.50
Rivet bottom skin
Details
       

 04-03-2010
1.50
Tank pressure test
Details
     

 04-03-2010
1.50
Rivet bottom skin

 03-31-2010
3.50
Rivet bottom skin
Details

 03-30-2010
3.00
Wing Bottom skin
Details

 03-30-2010
1.50
Roll servo
Details
       

 03-30-2010
2.00
Remove plastic from W1005-L
Details

 03-29-2010
5.50
Polish HS
Details

 03-29-2010
4.00
Bottom skins
Details
       

 03-27-2010
4.00
Rivet flap gap fairings
Details
     

 03-27-2010
2.00
Prepare and paint HS
Details
     

 03-26-2010
2.50
Gap fairings
Details
       

 03-25-2010
1.50
Wing wiring
Details
       

 03-25-2010
1.50
Install fuel sender uits
Details
       

 03-25-2010
2.50
Aileron Trim
Details
       

 03-25-2010
1.75
Aileron and flap gap fairings
Details

 03-24-2010
1.50
Fit intersection fairing molds
Details
       

 03-23-2010
1.50
Perform non QB tasks
Details

 03-23-2010
4.00
Paint HS
Details
       

 03-23-2010
1.00
Bend fuel sender float wires
Details
     

 03-22-2010
8.00
Paint Empennage
Details
       

 03-20-2010
9.50
Paint empennage parts
Details
       

 03-20-2010
5.50
Paint all empennage parts
Details
       

 03-18-2010
6.00
Prep Empennage parts
Details
       

 03-18-2010
4.50
Prep and prime empennage aprts
Details

 03-16-2010
1.50
Repair rudder skin damage
Details
       

 03-16-2010
1.00
Prime baffles
Details

 03-16-2010
4.00
Prepare paint
Details
       

 03-16-2010
2.00
Prepare HS for prime
Details

 03-16-2010
1.00
Camera mount
Details
       

 03-13-2010
1.50
Prime plenum
Details
     

 03-10-2010
4.50
Cut out RH side
Details
       

 03-09-2010
4.00
Install instrument rack
Details
     

 03-08-2010
1.50
Install instrument rack
Details
       

 03-08-2010
1.50
Install instrument rack
Details

 03-08-2010
3.00
Draw door latch
Details

 03-08-2010
6.50
Door Safety Latch SB
Details
       

 03-06-2010
5.50
Wing gap fairing
Details

 03-06-2010
3.00
Prepare plenum and baffles for priming
Details

 03-03-2010
2.00
Brakes
Details

 03-02-2010
1.50
Sand plenum
Details

 03-02-2010
2.50
Ogygen door
Details
       

 03-02-2010
6.00
Install Oxygen System
Details
       

 03-02-2010
2.00
External power connector
Details
       

 03-01-2010
2.00
Wiring etc
Details
       

 03-01-2010
2.00
Sand plenum angles and fill plenum with microballo
Details
     

 03-01-2010
2.50
Fabricate tray
Details
     

 02-27-2010
1.00
Scat hoses
Details
       

 02-27-2010
2.00
Bond exstra fibreglass on plenum angles
Details

 02-25-2010
1.00
Magneto wiring
Details

 02-24-2010
1.00
Magneto SB
Details

 02-13-2010
3.00
Wiring etc
Details
       

 02-11-2010
5.50
Do EFIS and EMS wiring
Details
       

 02-10-2010
2.00
Wiring
Details
       

 02-09-2010
1.50
Wiring
Details

 02-09-2010
4.00
Slick Magneto SB
Details
       

 02-08-2010
1.50
SOS Wiring
Details
       

 02-08-2010
2.00
Cut oil door hole in plenum
Details
       

 02-06-2010
0.50
Plenum chamber
Details
       

 02-06-2010
3.50
Mold plenum to baffle angles
Details
     

 02-06-2010
1.00
Headset junction box
Details
       

 02-06-2010
5.50
Engine wiring
Details
       

 02-05-2010
1.00
Alternator and Starter wiring
Details
       

 02-04-2010
1.25
Fuel pump wirng
Details
       

 02-04-2010
2.00
Flap wiring
Details
       

 02-04-2010
1.00
Fit plenum to baffle angles
Details

 02-03-2010
1.00
Ground wiring
Details
       

 02-02-2010
4.50
Wiring
Details
     

 02-02-2010
2.00
Finalise and fit plenum angles
Details
       

 02-01-2010
3.25
Wiring
Details
     

 02-01-2010
2.00
Measure and fit plenum angles
Details
     

 01-29-2010
1.50
Wiring
Details

 01-25-2010
2.00
Manufacture Plenum Chamber
Details
       

 01-25-2010
2.00
Manufacture Plenum Chamber
Details
       

 01-20-2010
2.00
Switch panel
Details
     

 01-19-2010
3.50
Wiring
Details
       

 01-18-2010
6.00
Wiring
Details
       

 01-18-2010
2.00
Finish cooling baffles
Details

 01-14-2010
1.50
Wiring diagram
Details

 01-14-2010
1.50
Wiring
Details

 01-14-2010
1.50
Fit scat tube flange to CB1007A baffle
Details

 01-13-2010
2.00
Wiring
Details

 01-12-2010
2.50
Trim cooling baffles to fit under top cowl
       

 01-11-2010
2.00
Trim enjine baffles
Details

 01-09-2010
1.00
Wiring diagram
Details

 01-08-2010
2.75
Wiring
Details
     

 01-08-2010
1.00
Fuel selector
Details
       

 01-07-2010
2.25
Teminal block
Details
       

 01-06-2010
2.50
Work on wiring diagrams
Details
       

 01-05-2010
3.00
Switch Panel
Details
     

 01-04-2010
2.50
Switch panel
Details

 01-02-2010
2.50
Scat hoses
Details
       

 01-01-2010
2.50
Various small jobs
Details
       

 01-01-2010
0.75
Spark plug wires
Details
       

 01-01-2010
1.50
Alternator install
Details
       

 12-31-2009
1.50
Various small tasks
Details
       

 12-31-2009
1.50
Lower cowl
Details
       

 12-31-2009
1.00
HS Fairings
Details
 

 12-31-2009
2.50
Fuel system
Details
       

 12-31-2009
1.50
FAB
Details
       

 12-31-2009
1.25
Exhaust
Details
       

 12-30-2009
2.50
Various
Details

 12-30-2009
1.75
Exhaust
Details
       

 12-29-2009
1.50
FAB
Details

 12-29-2009
3.00
Exhaust
Details
       

 12-29-2009
2.50
Cowl scoop extension.
Details
       

 12-28-2009
3.50
FAB
Details
       

 12-28-2009
3.00
FAB
Details
       

 12-26-2009
5.50
FAB
Details
       

 12-24-2009
5.00
Sand and prime cabin
Details
       

 12-23-2009
5.00
Sand and prime
Details

 12-17-2009
2.50
Fabricate clips and trim baffles
Details

 12-15-2009
3.00
Fit conical gussets to baffles
Details

 12-14-2009
1.00
Sand canopy and apply 1K body fine
Details

 12-10-2009
1.50
Sand canopy and canopy doors
Details

 12-07-2009
1.00
Measure and drill conical gusset rivet pattern
Details

 12-07-2009
1.00
Fill pin holes on canopy and doors
Details

 12-04-2009
5.00
Prime fuselage
Details
       

 12-03-2009
3.50
Prepare for priming
Details
       

 12-03-2009
2.00
Prepare for priming
Details
     

 12-02-2009
1.25
Sanding door frames
Details
     

 12-01-2009
1.50
Various small jobs
Details
       

 12-01-2009
2.00
Sanding
Details
     

 11-30-2009
5.50
Sand windscreen fairing
Details
       

 11-30-2009
2.00
Fabricate conical gussets left and right
Details
       

 11-28-2009
4.00
Sand windscreen
Details
       

 11-28-2009
2.50
Attach CB1001A to fwd left air ramp
Details
     

 11-27-2009
1.00
Sand Sikaflex
Details
       

 11-27-2009
1.50
Sand canopy
Details

 11-27-2009
1.00
Fit lower intrument panel
Details
       

 11-27-2009
3.00
Fibreglass windscreen
Details
       

 11-26-2009
0.50
Sand Sikaflex
Details
       

 11-26-2009
2.00
Fit CB1001A
Details

 11-25-2009
2.00
Fit CB-1011A and CB1001A front baffles

 11-25-2009
1.50
Finishing
Details

 11-24-2009
4.50
Finish windscreen
Details
       

 11-24-2009
5.00
Bond in windscreen
Details
       

 11-23-2009
4.00
Windscreen
Details
       

 11-23-2009
2.50
Fit left and right air ramps and cut to fit cowl
Details

 11-21-2009
1.50
Sanding around doors
Details
     

 11-19-2009
1.00
Position and match drill scat tube flange
Details

 11-14-2009
3.50
Consruct left air ramp
Details
       

 11-12-2009
2.00
Construct right air ramp
Details

 11-11-2009
1.50
Door finishing
Details

 11-10-2009
1.50
Sand Door
Details

 11-09-2009
1.50
Sand door
Details
     

 11-09-2009
2.00
Prepare CB710A fed right air ram
Details

 11-09-2009
0.50
Control Cables
Details
       

 11-09-2009
2.00
Control cables
Details
       

 11-07-2009
5.50
Paint fairngs
Details
       

 11-06-2009
1.00
Throttle body
Details

 11-05-2009
2.00
Oil Cooler
Details
       

 11-05-2009
2.00
Fit baffles and aft center support bracket
Details
     

 11-04-2009
2.50
Seats and cabin heat
Details
       

 11-03-2009
1.50
Seat rails
Details

 11-03-2009
2.00
Prime fairings
Details

 11-02-2009
4.00
Sand all fairings
Details

 11-02-2009
1.50
Finishing Fairings
Details

 10-31-2009
4.00
Sand and prime fairings
Details
     

 10-29-2009
4.00
Fairing finishing
Details

 10-28-2009
4.50
Fairing finishing
Details

 10-27-2009
1.50
Fuel system
Details
     

 10-27-2009
2.50
Fairing finishing
Details

 10-26-2009
2.50
Fit nose gear fairing
Details
       

 10-26-2009
4.00
Fairing finishing
Details
       

 10-24-2009
5.00
Fit Nose Gear fairing
Details
     

 10-24-2009
1.00
Fairing bracket plate nuts
Details

 10-23-2009
1.50
Epoxy inside of fairng
Details
       

 10-22-2009
2.00
Fit nose fairing
Details
       

 10-19-2009
1.50
Fit wheel fairing front to nose wheel
Details

 10-12-2009
2.00
Fit wheel fairing front to wheel fairing after ali
Details

 10-03-2009
6.00
Main Gear leg fairings
Details
       

 10-03-2009
3.00
Main Gear leg fairings
Details
       

 10-02-2009
1.50
Main Gear leg fairings
Details

 10-01-2009
2.50
Main fairings plate nuts
Details

 09-30-2009
3.00
Fit Farings and nutplates
Details
       

 09-29-2009
1.50
Fit main fairings
Details

 09-19-2009
3.00
Reinforce inside of fairings
Details
     

 09-17-2009
4.50
Fit Main fairings
Details
       

 09-17-2009
2.00
Fit Main fairings
Details
       

 09-15-2009
1.00
Main fairings
Details

 09-15-2009
2.00
Cowl finishing
Details

 09-14-2009
3.00
Cowl finishing
Details
     

 09-14-2009
2.00
Cowl finishing
Details

 09-12-2009
3.00
Top cowl
Details

 09-12-2009
1.50
Nose wheel spat
Details
     

 09-11-2009
2.50
Cowl finishing
Details
     

 09-08-2009
2.50
Cowl priming
Details
       

 09-07-2009
2.50
Cowl Finishing
Details
       

 09-03-2009
1.00
Cowl finishing
Details

 09-03-2009
1.00
Cowl finishing
Details

 09-02-2009
4.00
Cowls finishing
Details
       

 09-01-2009
1.50
Oil door
Details
     

 08-29-2009
2.00
Oil door
Details
       

 08-29-2009
1.00
Cowl louversr
Details
     

 08-26-2009
2.00
Cowl louvers
Details
       

 08-24-2009
1.50
Bottom cowl
Details
       

 08-22-2009
2.50
Rivet top cowl.
Details

 08-22-2009
4.00
Fit top cowl hinges
Details

 08-21-2009
1.50
Rivet bottom cowl
Details

 08-20-2009
1.50
Match drill cowl hinges
Details

 08-20-2009
3.50
Cowl hinges
Details
       

 08-19-2009
4.00
Cowls
Details

 08-18-2009
1.25
Top cowl hinges
Details

 08-17-2009
4.00
Drill cowls
Details

 08-13-2009
1.50
Fit cam locks on bottom of cowls
Details
     

 08-11-2009
0.75
Top cowl
Details

 08-11-2009
1.50
Cowl pin retainer
Details

 08-10-2009
3.00
Fabricate S-1002 fillets
Details
     

 08-10-2009
0.50
Cowl
Details

 08-08-2009
6.00
Bottom cowl
Details
       

 08-06-2009
2.50
Fit top cowl
Details
       

 08-06-2009
1.00
Fit top cowl
Details
       

 08-06-2009
2.00
Fabricate S-1002 fillets
Details

 08-05-2009
1.50
Make dummy back plate
Details
       

 08-05-2009
1.50
Fit cowls
Details
       

 08-04-2009
3.25
Paint prop
Details
       

 08-03-2009
1.50
spinner attach
Details
       

 08-03-2009
2.00
Fabricate S-1001 gap fillers
Details
     

 08-01-2009
1.50
Remove scratch
Details
       

 08-01-2009
2.50
Attach spinner
Details
       

 07-30-2009
1.00
Prepare CB1009A cylinder 1 baffle.
Details

 07-29-2009
3.00
Spinner
Details
       

 07-27-2009
2.00
Prepare S-602-1 spinner doubler ring
Details

 07-25-2009
3.50
Hang enjine

 07-25-2009
5.00
Hang engine
Details
       

 07-25-2009
1.50
Fuel lines
Details
       

 07-22-2009
2.00
Rivet CB1008A cylinder 5 baffle to right aft baffl
Details

 07-18-2009
1.50
Attach pitch control bracket
Details

 07-15-2009
2.00
Prepare CB1007A right aft case baffle
Details

 07-13-2009
2.00
Attach doubler plates to CB-1004A
Details

 07-11-2009
4.00
Prepare Baffle stiffeners and Cyl 5 and 6 baffles
Details

 07-08-2009
1.00
Left Door
Details

 07-08-2009
0.50
Fuel Flow sender bracket
Details
       

 07-07-2009
1.50
Cabin heat cables
Details
     

 07-06-2009
3.00
Fit push pull cables for heat selector boxes
Details

 07-02-2009
4.00
Finish close out rings and paint
Details
     

 07-01-2009
1.50
Door windows
Details
       

 06-29-2009
1.50
Paint sub panel
Details
       

 06-29-2009
2.50
Install VA-170 manifold prsuure gauge
Details

 06-25-2009
3.00
Bond door windows
Details
       

 06-24-2009
2.00
Cut Sub panel
Details

 06-22-2009
2.00
Prepare doors for bonding of windows
Details

 06-22-2009
1.00
Prepare doors for bonding of windows
Details

 06-20-2009
3.50
Various
Details
       

 06-20-2009
2.00
Install enjine fittings
Details
     

 06-17-2009
2.00
Control Cables
Details
       

 06-16-2009
1.50
Door finishing
Details

 06-16-2009
0.50
Brake pipes
Details

 06-16-2009
3.50
Axle Extensions
Details
       

 06-16-2009
3.50
Attach brake lines
Details
       

 06-15-2009
2.50
Prepare U-1013C-R
Details

 06-13-2009
4.50
Nose gear
Details
       

 06-11-2009
1.50
Prepare U1010-L
Details
     

 06-08-2009
0.50
Prepare U1010-L bracket for assembly

 06-08-2009
4.00
Assemble wheels
Details

 06-06-2009
4.50
Various
Details
       

 06-06-2009
2.50
Sanding Cabin

 06-06-2009
2.50
Brake assemblies
Details
       

 06-05-2009
2.00
Sand and prime
Details

 06-05-2009
2.00
Landing gear
Details

 06-05-2009
3.00
Attach main gear
Details
       

 06-04-2009
2.00
Sanding cabin
Details

 06-02-2009
3.00
Sanding cabin
Details

 05-23-2009
3.00
Sanding cabin
Details

 05-20-2009
1.00
Sanding Cabin
Details

 05-19-2009
3.50
Sanding Cabin
Details
       

 05-18-2009
2.50
Sanding cabin
Details

 05-18-2009
3.00
Sanding Cabin
Details

 05-16-2009
3.25
Sand canopy
Details

 05-14-2009
2.50
Sand canopy and window edges.
Details

 05-11-2009
2.25
Prime canopy
Details

 05-09-2009
3.00
Sand windows and prepare to prime
Details

 05-06-2009
2.50
Sand window edges and fill pin holes
Details

 05-05-2009
2.50
Work on windows
Details

 05-02-2009
2.50
Work on windows
Details

 05-01-2009
3.00
Work on close-out rings and canopy
Details

 04-29-2009
6.00
Engine mount
Details
       

 04-28-2009
1.50
Wing root fairing supports
Details

 04-28-2009
2.50
Fit close-out rings
Details

 04-27-2009
4.50
Paint doors
Details
       

 04-25-2009
4.50
Work on doors
Details

 04-24-2009
1.50
Prime doors
Details
       

 04-23-2009
1.50
Sand RH door
Details
       

 04-23-2009
2.50
Sand doors and canopy after filling
Details

 04-20-2009
2.75
Sand doors to fit canopy
Details

 04-20-2009
1.50
Install locks
Details
       

 04-18-2009
1.50
Work and canopy and door gaps

 04-18-2009
2.00
Oil cooler box
Details

 04-16-2009
1.50
Work on canopy and door gaps
Details

 04-14-2009
1.50
Work on door and canopy gaps
Details

 04-09-2009
1.50
Finishing on rear windows
Details

 04-08-2009
2.00
Fit door windows for bonding
Details

 04-08-2009
2.00
Bond in RH Rear window
Details
       

 04-08-2009
2.00
Bond in LH rear window
Details
       

 04-07-2009
2.00
Close out rings
Details
       

 04-06-2009
1.50
Close out rings
Details
       

 04-04-2009
2.00
Windows
Details
     

 04-04-2009
1.00
Rear windows
Details

 04-04-2009
5.00
Fit cabin pin blocks
Details
       

 04-04-2009
4.00
Door gas struts
Details
       

 04-03-2009
2.50
Drill door pin holes
Details
       

 04-02-2009
4.00
Fit and trim doors
Details
     

 04-01-2009
2.00
Attach centre cabin brace
Details
     

 04-01-2009
3.00
Apply flox and resin
Details
       

 03-31-2009
4.00
Rivet tailcone forward top skin
Details
       

 03-31-2009
2.50
Attach cabin
Details

 03-30-2009
1.50
Overhead console
Details
     

 03-30-2009
4.00
Final install cabin
Details
       

 03-28-2009
3.00
Make roof liner
Details
       

 03-26-2009
2.50
Door Latches
Details
     

 03-25-2009
2.00
Door Latches
Details
       

 03-24-2009
1.50
Door latches
Details
       

 03-24-2009
4.00
Attach latch mechanism to door
Details
     

 03-23-2009
4.00
Fit handle assemblies
Details
       

 03-21-2009
2.00
Match drill canopy handle to door handle assembly
Details
     

 03-20-2009
2.50
Overhead console
Details
       

 03-20-2009
1.00
Close out rings
Details
       

 03-19-2009
5.00
Sand overhead console

 03-18-2009
2.00
Sanding of console mold
Details
     

 03-18-2009
6.50
Close out rings
Details
       

 03-17-2009
3.00
Overhead console
Details
       

 03-16-2009
4.00
Overhead console
Details
     

 03-14-2009
2.50
Work on overhead console
Details
       

 03-14-2009
2.00
Close out ring
Details
     

 03-14-2009
1.00
Close out ring
Details
     

 03-13-2009
4.00
Make close out ring
Details
       

 03-12-2009
2.00
Trim doors
Details

 03-11-2009
4.00
Attach door hinges
Details

 03-10-2009
2.00
Trim Doors
Details
       

 03-09-2009
4.00
Trim doors
Details

 03-06-2009
2.00
Bond door
Details
       

 03-05-2009
2.25
Fit and drill doors
Details
       

 03-05-2009
4.00
Bond LH door
Details
       

 03-04-2009
2.00
Trim doors
Details
       

 03-03-2009
2.00
Trim doors
Details
     

 03-02-2009
2.00
Work on doors
Details

 02-28-2009
4.25
Drill and countersink canopy
Details
       

 02-27-2009
4.50
Trim Windows
Details
     

 02-26-2009
4.00
Trim windscreen bottom
Details
     

 02-25-2009
3.00
Match drill canopy frame
Details
       

 02-25-2009
1.25
Canopy brace
Details

 02-23-2009
3.50
Trim canopy
Details
       

 02-23-2009
4.00
Fit canopy
Details
       

 02-21-2009
3.50
Fuel system
Details
       

 02-21-2009
5.00
Cut canopy on scribe lines
Details
       

 02-20-2009
2.50
Fuel System
Details
       

 02-19-2009
1.75
Rivet cowl hinges and mark scribe line
Details
     

 02-19-2009
3.00
Cowl hinges
Details
       

 02-18-2009
2.00
Unpack and check FF kit
Details

 02-17-2009
2.00
Cowl hinges
Details
     

 02-16-2009
2.00
De-burr hinges
Details

 02-12-2009
1.50
Rivet seat-backs
Details
     

 02-10-2009
2.50
Cowl Hinges
Details
       

 02-09-2009
2.00
Rivet seat-backs
Details

 02-09-2009
1.00
Rivet forward skin
Details

 02-07-2009
3.00
Sub Panel Cut Outs
Details
       

 02-07-2009
5.00
Assemble seat-backs
Details
     

 02-06-2009
1.50
Panel Planning
Details

 02-05-2009
2.50
Panel Planning
Details

 02-05-2009
1.00
Measure and cut angles for seat-backs
Details

 02-04-2009
2.50
Flap System
Details
       

 02-04-2009
2.00
Flap System
Details
       

 02-04-2009
4.00
Flap System
Details

 02-03-2009
3.00
Control System
Details
       

 02-02-2009
2.50
Rudder Cables
Details
       

 02-02-2009
2.00
Rivet seat floors and install nutplates
Details

 02-02-2009
3.00
Manufacture Control tubes
Details
       

 02-02-2009
1.50
Elevator Idler
Details
     

 02-02-2009
1.00
Cabin Heat box
Details
       

 02-02-2009
2.00
Brake System
Details
       

 01-31-2009
2.50
Fit Rudder Pedals
Details
       

 01-31-2009
4.00
Fit baggage door and left baggage cover
Details
       

 01-31-2009
1.00
Baggage door
Details

 01-31-2009
1.00
Aseemble Rudder Pedals
Details
     

 01-29-2009
1.50
Mid Seat Supports
Details
     

 01-29-2009
1.50
Assemble Rudder Pedals
Details
       

 01-28-2009
2.00
Rudder pedals
Details
       

 01-28-2009
1.50
Rivet cabin floors
Details
     

 01-26-2009
1.50
Rudder pedals
Details
     

 01-26-2009
3.00
Rivet baggage door and right seat floor
Details

 01-26-2009
1.50
Brake lines
Details
       

 01-24-2009
1.50
Covers
Details
       

 01-24-2009
3.00
Brake line install
Details
       

 01-22-2009
1.00
Tunnel covers
Details
     

 01-20-2009
3.00
Floor panels, etc.
Details
     

 01-19-2009
1.50
Rear Bulkheads
Details

 01-19-2009
2.00
Prime and rivet baggage door
Details
     

 01-19-2009
1.50
Install Baggage wear blocks
Details
       

 01-17-2009
3.00
Planning
Details

 01-17-2009
6.00
Baggage floors and others
Details
       

 01-17-2009
4.00
Baggage door construction
Details

 01-15-2009
2.00
Wiring
Details
       

 01-15-2009
2.50
Antenna mounting
Details
       

 01-14-2009
3.50
Start with wiring
Details
       

 01-13-2009
2.00
Start with wiring
Details

 01-12-2009
2.00
nspection panels
Details
       

 01-12-2009
4.00
Baggage area construction
Details
     

 01-10-2009
3.50
Install steps
Details

 01-10-2009
2.50
Install P27
Details
       

 01-10-2009
1.00
Finish Steps install
Details
     

 01-10-2009
1.50
Finish reviting
Details

 01-09-2009
2.50
Baggage door seal
Details
       

 01-08-2009
4.50
Attache tialcone
Details
       

 01-08-2009
5.00
Attach Tailcone
Details
       

 01-07-2009
4.00
Fit tailcone
Details
       

 01-06-2009
2.00
Elevator servo
Details
       

 12-26-2008
0.50
VS plate nuts
Details
       

 12-26-2008
2.50
Gap fairing
Details
       

 12-24-2008
2.00
Fairings
Details
       

 12-24-2008
4.00
Diss-assemble Empennage
Details
     

 12-23-2008
2.50
Hs and VS Fairings
Details
       

 12-22-2008
3.00
Rudder tip fairings
Details
       

 12-22-2008
1.50
Empennage gap fairings
Details
     

 12-22-2008
2.50
Elevator tip fairings
Details
       

 12-22-2008
1.00
Elevator lock
Details
       

 12-20-2008
3.00
Empennage fairing
Details
       

 12-19-2008
3.50
Elevator Push Rod
Details
       

 12-16-2008
1.50
Pushrod tube
Details
     

 12-16-2008
3.50
Prime trim servo
Details
       

 12-15-2008
1.00
Trim servo link
Details

 12-10-2008
2.50
Trim mount bracket assembly
Details
     

 12-08-2008
2.00
Bellcrank brackets
Details
     

 12-03-2008
2.00
Pushrod assembly
Details
     

 12-02-2008
4.50
Assemble Empennage
Details
       

 12-01-2008
4.00
Attach empennage
Details
       

 11-27-2008
1.50
Rivet top aft skin
Details
     

 11-26-2008
3.50
Rivet Rear top Skin
Details
       

 11-26-2008
2.50
Dimple Tailcone top skins
Details
       

 11-26-2008
2.00
Battey bracket
Details
       

 11-25-2008
2.00
Rivet aft Tailcone deck
Details
       

 11-24-2008
10.00
Rivet Bottom Tailcone
Details
       

 11-24-2008
2.25
Rivet bellcrank angles
Details
     

 11-22-2008
8.00
Rivet tailcone
Details
       

 11-21-2008
1.00
Rivet bulkheads
Details
       

 11-20-2008
4.50
Dimple skins
Details
       

 11-20-2008
5.00
Dimple and prime Tailcone parts
Details
       

 11-20-2008
2.00
Assemble bulkheads
Details
       

 11-18-2008
5.00
Cleco Tailcone top skins
Details
       

 11-17-2008
3.00
Match drill longerons
Details
       

 11-17-2008
4.50
Match drill
Details
       

 11-13-2008
4.00
Assemlbe Tailcone
Details
       

 11-13-2008
2.00
Assemble Tailcone
Details
       

 11-13-2008
1.00
Assemble Tailcone
Details
       

 11-12-2008
1.00
Tailcone bulkheads
Details
     

 11-12-2008
4.00
Prepare J stiffeners
Details
       

 11-11-2008
1.00
Tailcone bulheads
Details
       

 11-11-2008
2.00
Tailcone bulhead assembly
Details
       

 11-11-2008
1.00
Start on Tailcone
Details
     

 11-11-2008
1.00
Elevators finished
Details
       

 11-10-2008
2.50
Install trim tab hinges
Details
       

 11-10-2008
2.00
Assemble trim tabs
Details
       

 11-06-2008
2.00
Dimple trim tab skins
Details
     

 11-03-2008
2.00
Bend tabs on trim tab skins
Details
     

 11-01-2008
2.50
Trim tabs
Details
     

 10-30-2008
2.50
Finish elevators
Details
       

 10-30-2008
0.00
Finish Elevators
Details
     

 10-29-2008
2.00
Rivet Elevators
Details
       

 10-29-2008
2.00
Fit trailing edge parts
Details
       

 10-28-2008
1.50
Rivet skins
Details
     

 10-27-2008
4.00
Rivet Elevators
Details
       

 10-27-2008
2.00
Rivet Elevator rear spars
Details
       

 10-23-2008
2.00
Rivet RH elevator skin
Details

 10-23-2008
1.00
Rivet RH elevator ribs
Details

 10-22-2008
3.00
Dimple Elevator parts
Details

 10-20-2008
0.50
Dimple parts
Details

 10-20-2008
1.50
Dimple parts
Details

 10-18-2008
2.00
Foam ribs
Details
     

 10-16-2008
4.00
Rivet ribs
Details
       

 10-16-2008
3.00
Dimple skins
Details
       

 10-14-2008
2.50
Cover plates
Details

 10-14-2008
3.00
Assemble Elevators
Details
       

 10-13-2008
2.00
Finish Rudder
Details
       

 10-13-2008
3.00
Elevators
Details
     

 10-13-2008
0.50
Cleco skins to structure
Details

 10-11-2008
4.00
Rib assemblies
Details

 10-09-2008
2.00
Rivet rudder
Details

 10-09-2008
2.00
Rivet rudder
Details

 10-09-2008
0.50
De-burr elevator parts
Details

 10-08-2008
4.00
Assemble Rudder
Details
       

 10-06-2008
1.75
Elevator ribs
Details

 10-02-2008
2.00
Rivet HS
Details
       

 10-01-2008
1.00
Rivet HS skins
Details

 09-30-2008
2.50
Rivet HS skin
Details

 09-30-2008
2.50
Rivet HS skin
Details

 09-29-2008
1.50
Rivet ribs and skins
Details
       

 09-29-2008
2.00
Assemble HS
Details
       

 09-27-2008
3.00
Strart with HS assembly
Details
       

 09-27-2008
4.00
Prep and dimple HS parts
Details
       

 09-25-2008
3.00
Match drill skins
Details

 09-22-2008
1.50
Cleco rear spar and match drill to inspar ribs
Details
       

 09-20-2008
3.00
Cleco nose ribs and spar to skin
Details
     

 09-18-2008
2.00
Cleco nose and inspar ribs
Details
     

 09-15-2008
2.00
Prepare nose ribs
Details

 09-13-2008
1.00
Prepare inspar ribs
Details

 09-11-2008
3.00
Prime HS parts
Details
     

 09-09-2008
3.50
Match drill and rivet spar doublers
Details
     

 09-04-2008
2.50
HS front spar doubler
Details
     

 09-01-2008
4.00
Front spar caps
Details

 08-30-2008
4.00
Manufacture brakcets and spar caps
Details

 08-28-2008
2.00
Prepare HS Spars
Details

 08-25-2008
1.50
Match drill spar doubler and hinge brackets
Details

 08-23-2008
1.50
Rivet right bottom rib and shear clips
Details
     

 08-23-2008
1.50
Prepare HS 906, HS 1003 and 1004
Details

 08-20-2008
1.00
Rivet stiffeners to skin
Details
     

 08-18-2008
2.00
Rivet reinforcement plates
Details
     

 08-16-2008
1.50
Prime stiffeners
Details
     

 08-12-2008
1.50
Prepare parts and stiffeners for priming
Details

 08-11-2008
2.00
Dimple and deburr skins and stiffeners
Details

 08-07-2008
3.50
Cleco and drill rudder skins
Details
     

 08-06-2008
1.50
Assemble rudder components
Details
       

 08-04-2008
4.00
Work on Rudder parts
Details
       

 08-02-2008
2.50
VS Assembly
Details
     

 08-02-2008
2.00
Prepare rudder ribs and stiffeners
Details
     

 08-02-2008
6.00
Finish VS
Details
       

 08-01-2008
1.50
Prepare parts for riveting
Details
     

 07-31-2008
4.00
Dimple skin and prepare ribs
Details
       

 07-30-2008
1.00
Dimple skin
Details
       

 07-29-2008
4.00
Cleco VS Skeleton
Details
       

 07-28-2008
1.50
Vertical Stab
Details
       

 07-26-2008
2.00
Start building VS
Details
       

 07-07-2008
1.00
Match drill
Details

 08-29-2007
8.00

Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.