Powered By Kitlog Pro v2.0
Dick's Web site
Tri gear
All
Work Logs Found:
74
Category Work Time:
189 Hours
Date
Hours
Work Log Summary
Details
06-10-2007
2.00
Flirst Flight
Details
06-08-2007
1.00
General clean up
Details
06-06-2007
2.00
Taxi and run up
Details
06-05-2007
2.00
Adjust mixture and idle controls.
Details
06-04-2007
4.00
Preparing to adjust mixture and idle control
Details
06-03-2007
4.00
Sunday, brake and mixture problems.
Details
06-02-2007
10.00
Inspect and correct errors in construction
Details
06-01-2007
3.00
It's legal!!
Details
05-25-2007
0.10
Schedule AC inspection
Details
05-24-2007
2.00
Adjust & test brakes and remove storage basket
Details
05-23-2007
1.50
I installed the storage basket in luggage area
Details
05-21-2007
0.50
Measure structure behind pilot for storage
Details
05-15-2007
2.00
Run fuel flow test
Details
05-11-2007
1.00
Familiarization
Details
05-10-2007
4.00
Installed ELTantenna and TAXIED
Details
05-08-2007
3.50
Install ELB support in N365SX
Details
05-07-2007
2.00
Scope out ELT and fab shelf
Details
05-04-2007
3.00
Pick up charger from Aircraft Spruce
Details
05-03-2007
1.00
minor scut work, find ELT
Details
05-01-2007
5.00
Rivet bottom aft skin
Details
04-30-2007
3.00
Fitting aft bottom skin
Details
04-27-2007
2.00
Fit bottom aft skin
Details
04-26-2007
5.00
Fit bottom aft skin and drill to size
Details
04-25-2007
5.00
TAXI TESTS!
Details
04-24-2007
3.00
Plumb pitot, install cowling, place N #
Details
04-23-2007
2.00
Flap pins in, airleron connections made. These are
Details
04-20-2007
1.00
Installing the ID plate
Details
04-19-2007
5.00
The pins are in!
Details
04-18-2007
4.00
Installing wings
Details
04-13-2007
3.00
Fitting wings to fuselage.
04-12-2007
2.00
Matching holes in the spars
Details
04-06-2007
4.00
Fitting canopy and reaming spar pin holes
Details
04-03-2007
1.00
The wings are at Flabob!
Details
04-02-2007
1.00
Move fuselage to Flabob!
Details
03-29-2007
3.00
It's done!
Details
03-27-2007
2.00
Drill, C/S and screw canopy to fore and aft bows
Details
03-26-2007
3.00
Drill & C/S holes to hold canopy to bow
Details
03-23-2007
3.00
Finish right (hinge) side and start left lside
Details
03-22-2007
3.00
Drilll, tap and assemble the hinge side of the can
Details
03-20-2007
2.00
Prep drill canopy to frame
Details
03-18-2007
2.50
Final trimming of the canopy
Details
03-17-2007
3.00
This was the day to tackle the canopy
Details
03-15-2007
3.00
Remove protective coating from left & right airle
Details
03-14-2007
2.00
Remove plastic protective coating from airlerons
Details
03-11-2007
2.00
The wings are off
Details
03-10-2007
2.00
Remove protective coating from left & right airler
Details
02-16-2007
4.00
Rivet canopy frame
Details
02-14-2007
1.00
Locating and drilling the corner angles for the ca
Details
02-10-2007
1.00
Cleco left and right root doublers in place.
Details
02-09-2007
4.00
Drilling to #30 and deburring root doublers
Details
02-08-2007
2.00
Fitting right & Left root doublers
Details
02-07-2007
3.00
Fitting Canopy frame
Details
02-06-2007
3.00
Fitting the canopy frame.
Details
02-02-2007
1.00
Fitting canopy frame
Details
02-01-2007
2.00
Install fire extinguisher
Details
01-26-2007
2.00
Tow bar
Details
01-24-2007
2.00
Fabricate main gear fairings
Details
01-22-2007
5.00
Make main gear fairing and canopy attach hook
Details
01-21-2007
1.00
Design hook angle to allow ventilation
Details
01-19-2007
2.50
Fabbing metal parts for canopy
Details
01-11-2007
1.00
Rivet left wing tip in place
Details
01-10-2007
1.50
Make canopy cross tie and gussets
Details
01-09-2007
1.50
Prep left wing tip for rivetting
Details
01-08-2007
3.00
Install airleron pushrods and prep strobe lights
Details
01-05-2007
2.00
Install strobe light in right wing tip
Details
01-02-2007
1.00
Order parts for strobe install
Details
12-29-2006
3.00
Fit tip and locate strobe light on right wing
Details
12-28-2006
3.00
Fitting flap and wing tip on right wing
Details
12-26-2006
3.00
Install pitot tube and airleron push rods
Details
12-21-2006
3.00
Bringing #365 home
Details
12-20-2006
3.00
Organize the space for 365 build
12-13-2006
1.00
Built a tow bar for moving #365
Details
12-13-2006
3.00
Assembling a portable garage for #868
Details
12-12-2006
1.00
Purchase Sonex #365
Details
SITE NAVIGATION
Contact Builder
Tri gear Home
Category
# Logs
# Hours
All
74
803
40 Hour Fly off
1
2
Canopy
16
38
Engine
1
7
Final Prep
30
89
Fuselage
3
390
Inital kit cost
1
1
Miscellaneous
8
60
Wings
14
216
Tri Gear Aerovee Home
Copyright © 2001-2024 Matronics. All Rights Reserved.