Powered By Kitlog Pro v2.0
RICHARD'S WEB SITE
CH 650B
All
Work Logs Found:
149
Category Work Time:
674 Hours
Date
Hours
Work Log Summary
Details
05-02-2020
2.00
Cylinder baffles
Details
04-12-2020
7.00
Assemble cylinders and pistons to case
Details
04-11-2020
3.00
Piston, rings and cylinders
Details
04-04-2020
2.00
Connecting rods
Details
03-31-2020
2.00
Rear engine oil case
Details
03-31-2020
1.00
Harmonic Balancer installation
Details
03-30-2020
1.00
Ring gear, gold hub and safety shaft
Details
03-08-2020
3.00
5th bearing
Details
03-07-2020
3.00
Case assembly
Details
03-01-2020
4.00
Check oil clearances
Details
02-29-2020
4.00
Cleaning and case prep
Details
12-08-2019
4.75
Center counsole
Details
11-30-2019
2.00
Rudder Fairing
Details
11-29-2019
3.00
Corvair Engine Case Assembly Stand
Details
11-24-2019
3.25
Corvair Engine Mount
Details
10-15-2019
7.50
Rudder cables
Details
09-20-2019
4.50
Rudder Cable
Details
09-15-2019
2.00
Vertical stabilizer
Details
09-02-2019
12.75
Elevator cables
Details
08-26-2019
6.50
Horizontal Stabilizer
Details
08-24-2019
5.50
Horizontal Stabilizer mount
Details
08-19-2019
9.50
Top, rear skin
Details
08-13-2019
2.00
Cable fairleads
Details
08-09-2019
7.00
Flap drive
Details
08-08-2019
8.25
Rivet seat
Details
08-04-2019
6.75
Control Yoke and Seat belt mounts
Details
08-04-2019
1.50
Center Console
Details
07-06-2019
9.50
Control yoke mount
Details
07-04-2019
3.50
Torque Tube mount
Details
06-28-2019
5.00
Flap Motor Mount
Details
06-25-2019
1.50
Seat Back
Details
06-23-2019
8.25
Seat Pan
Details
06-21-2019
2.25
Main Landing Gear
Details
06-21-2019
2.00
Landing gear fairings
Details
06-19-2019
1.50
Main Landing gear
Details
06-18-2019
5.75
Left landing gear mount
Details
06-16-2019
8.25
Left landing gear Mount
Details
06-07-2019
3.75
Left landing gear mount
Details
06-06-2019
3.75
Landing gear mount
Details
05-30-2019
10.00
Right side landing gear mount
Details
05-19-2019
2.00
Landing gear
Details
05-14-2019
3.00
Fuselage sides
Details
05-12-2019
3.50
Wheel Spindles
Details
05-01-2019
2.00
Fuselage sides- Gear Mounts
Details
04-29-2019
4.00
Fuselage Sides
Details
02-03-2019
5.00
Bottom Longerons
Details
02-02-2019
2.00
Tires
Details
01-24-2019
4.25
Rivet side skins
Details
12-30-2018
8.25
Center Spar
Details
12-19-2018
14.00
Baggage Floor and supports
Details
12-16-2018
8.25
Center Skin Brace
Details
12-11-2018
2.25
Front forward skin - LH side
Details
12-10-2018
5.00
Fuselage forward skin - RH side
Details
12-09-2018
5.75
Wing rear channel bracket and Baggage support
Details
12-04-2018
3.00
Verified straightness
Details
12-03-2018
5.00
Engine mount steel supports
Details
12-02-2018
4.00
Forward top longerons
Details
12-01-2018
8.25
Fuselage - Firewall
Details
11-26-2018
6.50
Fuselage off the bench
Details
11-23-2018
8.25
Fuselage front floor
Details
11-18-2018
9.00
Rudder pedals
Details
11-17-2018
8.50
Fuselage front floor
Details
11-10-2018
4.25
Fuselage front floor
Details
11-04-2018
6.75
Forward Fuselage
Details
10-27-2018
6.00
Firewall Assembly
Details
10-26-2018
6.50
Tailwheel
Details
10-25-2018
4.50
Fuselage sides
Details
10-22-2018
2.50
Tailwheel bracket
Details
10-21-2018
1.75
Fuselage sides
Details
10-20-2018
1.75
Fuselage sides
Details
10-11-2018
0.50
Machined Engine parts arrive
Details
10-10-2018
9.25
Rear Fuselage Sides
Details
09-08-2018
3.75
Lower Rudder Hinge
Details
09-06-2018
2.75
Fuselage Bottom Hatch
Details
09-04-2018
5.75
Bottom skin riveting
Details
09-02-2018
4.75
Fuselage bottom skin bracing
Details
08-26-2018
3.50
Bulkheads and nylon parts
Details
08-22-2018
14.00
Fuselage Kit parts
Details
08-18-2018
4.00
Crate Engine parts to ship for machining
Details
05-05-2018
4.00
Wiring diagram
Details
04-29-2018
2.00
Wings complete
Details
04-28-2018
3.00
Landing light lens
Details
04-28-2018
0.25
Fuel tank access cover
Details
04-03-2018
2.00
Rivet top skin and top side of nose skin
Details
04-02-2018
1.00
Pitot Static tubing
Details
04-01-2018
1.50
Aileron linkage and control cables
Details
03-21-2018
2.25
Attached left aileron
Details
03-20-2018
1.50
Install fuel tank and wire level sender
Details
03-18-2018
5.25
Left wing fuel tank
Details
03-10-2018
1.25
Landing lights wiring
Details
03-09-2018
3.75
Landing Light wing cutout and frame
Details
02-20-2018
2.25
Install Fiberglass wing tip
Details
02-17-2018
2.25
Left wing Nav Lights
Details
01-17-2018
2.25
Formed, Drilled nose skin
Details
12-30-2017
4.50
Drill top skin - Left Wing
Details
12-19-2017
2.00
Aileron Bellcrank access cover
Details
12-17-2017
5.25
Rivet the bottom skin and the bottom of the nose s
Details
12-10-2017
1.75
Left wing nose ribs
Details
11-26-2017
2.75
Left wing, bottom rear skin
Details
11-04-2017
5.00
Left Wing Top rear skin
Details
10-26-2017
2.50
Left wing Rear Channel
Details
10-15-2017
3.50
Left wing nose ribs
Details
10-07-2017
4.00
Disassemble core engine
Details
09-18-2017
4.00
Left wing spar and rear ribs
Details
09-10-2017
6.00
Right wing tip
Details
09-03-2017
5.75
Rivet the top skin on the right wing
Details
08-29-2017
2.50
Fuel Tank Sender
Details
08-25-2017
2.25
Wing tips
Details
08-13-2017
1.25
Nav lights wiring
Details
08-03-2017
4.50
Aileron controls
Details
07-15-2017
3.50
Nose skin, right wing
Details
07-12-2017
7.75
Top rear sking - right wing
Details
06-24-2017
6.50
Rivet the bottom skins
Details
06-11-2017
5.75
Fixture the wing/inspect for flatness and twist
Details
06-06-2017
3.00
Wing storage/transport rack
Details
05-30-2017
4.75
Right Wing skins
Details
05-30-2017
0.50
Inspect the right fuel tank
Details
05-29-2017
2.75
Skins on the right wing
Details
05-19-2017
0.50
N Number Reserved
Details
05-11-2017
9.00
Wing Construction
Details
04-28-2017
6.00
Wing Spars
Details
04-24-2017
9.50
Wing Ribs
Details
04-16-2017
12.25
Wing Ribs
Details
03-25-2017
5.00
Nose Ribs
Details
03-23-2017
1.00
Flanging Die Test flange
Details
03-22-2017
7.00
Flanging Die
Details
02-28-2017
11.00
Wing ribs
Details
02-27-2017
4.50
Wing rib blanks
Details
02-24-2017
0.25
Wing spars
Details
02-23-2017
4.25
Finished 2nd Aileron
Details
02-16-2017
4.50
Aileron
Details
02-04-2017
1.25
Corvair Engine disassembly
Details
02-04-2017
6.50
Ailerons
Details
01-30-2017
9.25
Flaps
Details
01-12-2017
4.00
Flap ribs
Details
12-27-2016
1.50
Rib form blocks
Details
12-26-2016
3.00
Corvair Engine Disassembly
Details
12-23-2016
2.00
Workbench
Details
11-30-2016
4.50
Flap ribs
Details
11-04-2016
1.75
Complete Horizontal stab and elevator
Details
11-01-2016
4.25
Elevator
Details
10-29-2016
1.50
Rudder tail light
Details
10-28-2016
8.00
Pick up Corvair Engine
Details
10-24-2016
16.75
Elevator and Stablizer tips
Details
09-18-2016
4.00
Horizontal Stabilizer Skin
Details
09-16-2016
5.50
Horizontal Stab Skeleton
Details
09-10-2016
5.00
Rudder completed
Details
09-02-2016
6.00
Rudder Assembly
Details
08-24-2016
0.25
Tail Kit Arrival
Details
SITE NAVIGATION
Contact Builder
CH 650B Home
Category
# Logs
# Hours
All
149
674
Electrical System
1
4
Empennage
9
45
Engine
17
53
Fuselage
64
339
Miscellaneous
2
10
Shop Supplies
2
5
Tools
2
10
Wings
52
208
Copyright © 2001-2024 Matronics. All Rights Reserved.