KitLog pro

Powered By Kitlog Pro v2.0

Harteveld, Chinook Plus 2
Work Logs Found: 37
Category Work Time: 179 Hours
 Date
Hours
Work Log Summary

Details

 05-28-2017
8.00
Finished Vert Stabilizer
Details
       

 05-27-2017
8.00
Vertical Stab Cover
Details
       

 05-14-2017
2.00
Finished Elevator, started Vertical Stabilizer
Details
       

 05-11-2017
2.00
Seam Taping Elevator
Details
     

 04-30-2017
5.00
Rotax Arrival! + Elevator Covering
Details
       

 04-23-2017
7.00
Covering Elevator + Engine Mount
Details
       

 04-02-2017
5.00
Covering Rudder + Doodads
Details
       

 03-26-2017
4.00
Horiz Stab, Rudder, and Engine Mount
Details
       

 03-25-2017
4.00
More Stab Covering, and Engine Mount
Details
       

 03-05-2017
2.00
Shrinking Horizontal Stab
Details
       

 02-26-2017
8.00
Covering Horizontal Stabilizer
Details
       

 02-12-2017
3.00
Cover Test, Phase 2
Details
       

 02-05-2017
3.00
Frame for covering test
Details
     

 01-01-2017
12.00
Final empennage control hookups
Details
       

 12-10-2016
4.00
Tailwheel Debugging & Rudder Cable Secutiry
Details
       

 11-13-2016
18.00
Control Systems
Details
       

 11-06-2016
3.00
Rudder Post bearing and Elevator
Details
       

 11-05-2016
4.00
Cabin Side Down Tubes, Rudder Pedals
Details
       

 10-30-2016
11.00
Front Seat Window Frames and Floor
Details
       

 10-23-2016
4.00
Front Seat Floor and Sides
Details
       

 10-16-2016
4.00
Control Sticks and Pushrods
Details
       

 10-02-2016
2.00
Differential Plate and Control Stick Asspmblies
Details
       

 09-24-2016
5.00
Seat Installation and Flaperon Handle
Details
       

 09-17-2016
7.00
Rear seat cieling and floor
Details
       

 09-14-2016
2.00
Pylon Side Braces
Details
       

 09-04-2016
8.00
Pylon and Tire Installation
Details
       

 09-02-2016
2.00
Steps 9, 10, and 11
Details
       

 08-21-2016
2.00
Implementing advice on Root Tube assembly, and jum
Details
       

 08-20-2016
6.00
Top keel, down tubes, and bungees
Details
       

 08-14-2016
5.00
Gear and Uprights
Details
       

 08-13-2016
3.50
Axle assembly
Details

 07-24-2016
3.00
Landing Gear; Axles
Details
       

 07-18-2016
1.50
Rudder cable pulleys
Details
     

 07-10-2016
6.00
Undercarriage Spreader bar
Details
       

 07-06-2016
3.00
Unboxing
Details
       

 07-06-2016
1.00
Garage Workshop
Details
       

 07-06-2016
1.00
Factory Tour
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.