|
|
|
|
Harteveld, Chinook Plus 2
Work
Logs
Found:
37
|
Category Work Time: 179 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
05-28-2017
|
8.00
|
Finished Vert Stabilizer
|
Details
|
|
|
05-27-2017
|
8.00
|
Vertical Stab Cover
|
Details
|
|
|
05-14-2017
|
2.00
|
Finished Elevator, started Vertical Stabilizer
|
Details
|
|
|
05-11-2017
|
2.00
|
Seam Taping Elevator
|
Details
|
|
|
04-30-2017
|
5.00
|
Rotax Arrival! + Elevator Covering
|
Details
|
|
|
04-23-2017
|
7.00
|
Covering Elevator + Engine Mount
|
Details
|
|
|
04-02-2017
|
5.00
|
Covering Rudder + Doodads
|
Details
|
|
|
03-26-2017
|
4.00
|
Horiz Stab, Rudder, and Engine Mount
|
Details
|
|
|
03-25-2017
|
4.00
|
More Stab Covering, and Engine Mount
|
Details
|
|
|
03-05-2017
|
2.00
|
Shrinking Horizontal Stab
|
Details
|
|
|
02-26-2017
|
8.00
|
Covering Horizontal Stabilizer
|
Details
|
|
|
02-12-2017
|
3.00
|
Cover Test, Phase 2
|
Details
|
|
|
02-05-2017
|
3.00
|
Frame for covering test
|
Details
|
|
|
01-01-2017
|
12.00
|
Final empennage control hookups
|
Details
|
|
|
12-10-2016
|
4.00
|
Tailwheel Debugging & Rudder Cable Secutiry
|
Details
|
|
|
11-13-2016
|
18.00
|
Control Systems
|
Details
|
|
|
11-06-2016
|
3.00
|
Rudder Post bearing and Elevator
|
Details
|
|
|
11-05-2016
|
4.00
|
Cabin Side Down Tubes, Rudder Pedals
|
Details
|
|
|
10-30-2016
|
11.00
|
Front Seat Window Frames and Floor
|
Details
|
|
|
10-23-2016
|
4.00
|
Front Seat Floor and Sides
|
Details
|
|
|
10-16-2016
|
4.00
|
Control Sticks and Pushrods
|
Details
|
|
|
10-02-2016
|
2.00
|
Differential Plate and Control Stick Asspmblies
|
Details
|
|
|
09-24-2016
|
5.00
|
Seat Installation and Flaperon Handle
|
Details
|
|
|
09-17-2016
|
7.00
|
Rear seat cieling and floor
|
Details
|
|
|
09-14-2016
|
2.00
|
Pylon Side Braces
|
Details
|
|
|
09-04-2016
|
8.00
|
Pylon and Tire Installation
|
Details
|
|
|
09-02-2016
|
2.00
|
Steps 9, 10, and 11
|
Details
|
|
|
08-21-2016
|
2.00
|
Implementing advice on Root Tube assembly, and jum
|
Details
|
|
|
08-20-2016
|
6.00
|
Top keel, down tubes, and bungees
|
Details
|
|
|
08-14-2016
|
5.00
|
Gear and Uprights
|
Details
|
|
|
08-13-2016
|
3.50
|
Axle assembly
|
Details
|
|
|
07-24-2016
|
3.00
|
Landing Gear; Axles
|
Details
|
|
|
07-18-2016
|
1.50
|
Rudder cable pulleys
|
Details
|
|
|
07-10-2016
|
6.00
|
Undercarriage Spreader bar
|
Details
|
|
|
07-06-2016
|
3.00
|
Unboxing
|
Details
|
|
|
07-06-2016
|
1.00
|
Garage Workshop
|
Details
|
|
|
07-06-2016
|
1.00
|
Factory Tour
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |