KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
Work Logs Found: 389
Category Work Time: 1537 Hours
 Date
Hours
Work Log Summary

Details

 05-24-2018
0.00
odds and ends
Details
       

 05-18-2018
0.00
gust locks and lens seal
Details
       

 05-14-2018
0.00
phase 1 flights cont.
Details

 05-10-2018
0.00
reinstall gear fairings and fly!
Details
       

 05-09-2018
0.00
paint remaining parts
Details
       

 05-08-2018
0.00
sqwaks and cosmetics
Details
       

 05-05-2018
0.00
sqwak and upgrade work
Details
       

 05-05-2018
0.00
replace pilot stick
Details
     

 05-04-2018
0.00
First Flight
Details
       

 05-03-2018
0.00
prepare for first flight
Details
     

 05-02-2018
0.00
DAR sign off!
       

 05-01-2018
0.00
finalize pre-inspection details
Details
     

 04-30-2018
0.00
engine run, odds n ends
Details
 

 04-29-2018
0.00
final install ailerons and flaps
Details
     

 04-28-2018
0.00
weight and balance
Details
       

 04-27-2018
0.00
test and configure panel and avionics
Details

 04-26-2018
0.00
install and power up panel
Details
       

 04-25-2018
0.00
elevator and rudder final assy
Details
     

 04-24-2018
0.00
wiring, VPX, AOA
Details
       

 04-23-2018
0.00
sub panel wiring cont.
Details

 04-20-2018
0.00
sub panel wiring
Details
     

 04-19-2018
0.00
finish panel, airframe wiring cont.
Details
       

 04-18-2018
0.00
complete panel labeling
Details
       

 04-17-2018
3.75
panel labels
Details
       

 04-10-2018
1.00
powdercoat brackets
     

 04-10-2018
5.50
finalize seat heat and stick wiring
Details
     

 04-07-2018
5.50
mags, dataplate, wiring and more
Details
     

 04-07-2018
2.50
install prop and set pitch
Details
     

 04-06-2018
4.00
R wing wire routing
Details
       

 04-06-2018
3.00
prep, prime and paint panel
       

 04-05-2018
2.00
test fit panel, begin paint prep
Details

 04-05-2018
3.00
paint and clearcoat spinner
Details
     

 04-05-2018
2.50
complete wing mounting
Details
     

 04-04-2018
8.00
complete panel wiring
Details
       

 04-03-2018
4.00
bose jack wiring
     

 04-03-2018
2.50
audio wiring cont.
Details
     

 04-02-2018
1.50
wing attach cont.
Details
     

 04-02-2018
3.50
audio wiring
Details
     

 03-31-2018
7.00
wing spar bolts
Details
     

 03-30-2018
8.75
complete engine/ems wiring, start on audio
Details
       

 03-29-2018
8.50
EMS / engine wiring
Details
       

 03-28-2018
7.50
panel wiring cont.
Details
       

 03-27-2018
9.50
panel wiring
Details
     

 03-26-2018
2.00
making network cables
     

 03-26-2018
4.00
bolt removal work
Details
     

 03-25-2018
5.50
final mount wings
Details
     

 03-24-2018
6.00
final assy wings
Details
     

 03-23-2018
7.50
VPX & load analysis
Details
     

 03-23-2018
1.50
swapped rivets for bolts
Details
       

 03-22-2018
5.50
panel wiring cont.
       

 03-21-2018
6.50
panel wiring
Details
       

 03-21-2018
2.50
complete map box
Details
       

 03-20-2018
3.00
map box
Details
     

 03-19-2018
8.50
panel mechanicals
Details
       

 03-16-2018
7.50
pants/fairings finsihing
Details
       

 03-15-2018
8.50
L wheel pant and fairings
     

 03-14-2018
8.00
finish construction R pants and fairings
Details
       

 03-13-2018
7.00
gear leg and intersection fairings, wheel pants
Details
       

 03-12-2018
4.00
gear leg fairings cont.
Details
     

 03-12-2018
3.00
final install HS VS, brakes
Details
       

 03-10-2018
6.50
mixed bag
       

 03-09-2018
6.00
wheel pants
Details
       

 03-09-2018
1.50
install alternator, starter and ground cables
Details
     

 03-08-2018
1.00
oil & adapter
Details
     

 03-08-2018
7.00
main gear fairings
Details
       

 03-07-2018
8.00
main gear leg fairings
Details
       

 03-06-2018
3.50
FWF cleanup
Details
       

 03-05-2018
5.50
finish exhaust
Details
       

 03-03-2018
7.00
exhaust and GPS puck
Details
       

 03-02-2018
4.50
heater and plug wiires
Details
       

 03-01-2018
8.00
final rig FWF plumbing
Details
       

 02-28-2018
9.25
FWF plumbing
Details
       

 02-27-2018
5.00
FI controls cont.
Details
       

 02-26-2018
8.75
throttle and mixture bracket
Details
       

 02-24-2018
3.00
intake and FI
Details
       

 02-23-2018
4.00
FAB and prime cowl
Details
       

 02-22-2018
4.50
FAB cont.
Details
     

 02-20-2018
4.00
filtered air box and throttle bracket
Details
       

 02-19-2018
6.00
FI and FAB
Details
       

 02-12-2018
1.75
finish up baffles and plenum
Details
     

 02-10-2018
7.25
baffles, plenum and panel
       

 02-09-2018
6.00
plenum and powdercoat
Details
       

 02-08-2018
4.00
plenum
Details
       

 02-07-2018
7.00
baffles cont.
Details
       

 02-06-2018
3.00
trim moulding and install seal
Details
       

 02-05-2018
7.50
plenum
Details
       

 02-04-2018
1.00
reinforce plenum
Details
     

 02-03-2018
0.00
panel mock up
Details
       

 02-03-2018
7.50
baffles cont. cont.
Details
       

 02-02-2018
1.00
windscreen cont.
Details
     

 02-02-2018
6.75
baffles and preheat
Details
       

 02-01-2018
2.00
sika trim
Details
     

 02-01-2018
6.00
baffles cont.
Details
     

 01-31-2018
8.50
plenum
Details
       

 01-30-2018
5.50
baffles cont.
Details
       

 01-29-2018
7.50
baffles cont.
Details
       

 01-27-2018
7.00
panel, targa and baffles
Details
       

 01-26-2018
8.50
cowl...
Details
     

 01-25-2018
1.25
sand cowl
     

 01-24-2018
2.00
oil cooler
Details
       

 01-23-2018
8.50
baffles cont.
Details
       

 01-22-2018
5.50
cowl and plenum
Details
       

 01-20-2018
6.50
cooling tin and plenum
Details
       

 01-19-2018
3.00
oil cooler mount
Details
     

 01-18-2018
6.00
sand and surface cowl and nose fairings
Details
       

 01-17-2018
6.00
apply sika to windscreen - fuse intersection
Details
       

 01-16-2018
1.00
oil door cont.
Details
     

 01-16-2018
4.50
finish fuse cut n buff
Details
     

 01-15-2018
7.00
fuselage cut & buff cont.
Details
       

 01-12-2018
1.50
cowl cont.
Details
     

 01-12-2018
3.50
color sand fuse
Details
     

 01-11-2018
5.50
oil door
Details
       

 01-10-2018
4.00
paint fuselage
Details
       

 01-08-2018
7.00
prime fuselage
Details
       

 01-06-2018
6.50
prep fuse for paint
Details
       

 01-05-2018
5.25
nose glass fill and sand cont.
       

 01-04-2018
9.25
front gear glass
Details
       

 01-03-2018
2.50
complete construction nosegear fairing
       

 01-02-2018
8.00
nose wheel pant and fairing cont.
Details
       

 12-30-2017
5.00
front wheel pants
Details
       

 12-29-2017
5.00
finish cowl skybolts, add filler
Details
     

 12-28-2017
6.50
horizontal skybolts
Details
       

 12-27-2017
1.00
fill extra holes in top cowl
     

 12-26-2017
7.00
cowl cont....
Details
       

 12-23-2017
6.00
cowl
Details
       

 12-22-2017
6.25
cowl cont.
Details
       

 12-21-2017
5.00
skybolts cont.
Details
     

 12-20-2017
5.00
cowl cont.
Details
     

 12-19-2017
6.00
cowl installation
Details
     

 12-16-2017
1.50
rivet map box
Details
       

 12-15-2017
2.00
apply sika caulk as canopy trim
       

 12-13-2017
2.25
unwrap canopy and begin latch fitting
Details
       

 12-13-2017
2.50
koger shade
Details
       

 12-13-2017
2.50
cut & buff canopy skirts
     

 12-11-2017
4.25
prime and paint canopy skirts
Details
     

 12-11-2017
2.50
begin cowl
Details
     

 12-09-2017
5.00
canopy skirt sand and fill and sand and fill.....
Details
       

 12-08-2017
3.00
canopy cont.
Details
       

 12-07-2017
4.50
prime canopy and targa
Details
     

 12-05-2017
5.00
prep canopy for paint
Details
       

 12-01-2017
6.50
hang engine
Details
       

 11-30-2017
7.00
canopy finishing
Details
       

 11-28-2017
7.00
landing gear
Details
       

 11-27-2017
3.50
targa strip cont.
Details
     

 11-27-2017
4.00
Main gear / wheels
Details
     

 11-25-2017
5.00
lay up targa strip
Details
       

 11-24-2017
3.00
skirt sand and fill and sand and fill......
       

 11-24-2017
1.00
prep landing gear
Details
     

 11-23-2017
4.00
On the Gear
Details
     

 11-22-2017
5.50
canopy skirt cont..
Details
       

 11-21-2017
6.00
canopy skirt cont.
Details
       

 11-20-2017
6.50
layed up canopy skirt
Details
       

 11-18-2017
4.50
canopy cont.
Details
       

 11-13-2017
4.50
unmask windscreen, add filets
Details
       

 11-12-2017
5.00
Bond windscreen to frame
Details
       

 11-11-2017
6.50
final windscreen prep before bonding
Details
       

 11-10-2017
7.00
finish rear anchor blocks, prep windscreen for bon
Details
       

 11-08-2017
6.00
adjust and tune canopy, fab anchor blocks
Details
       

 11-07-2017
0.00
reconstruct slider rails and powdercoat
Details
       

 11-06-2017
0.00
rewire and upgrade powdercoat oven
Details
       

 11-04-2017
5.50
Sika joint trimming and dressing, inspect canopy
Details
       

 11-03-2017
1.50
add filets to Sika joints
Details
     

 11-02-2017
7.00
bonded canopy to frame
Details
       

 11-01-2017
6.00
prep canopy for bonding
Details
       

 10-30-2017
0.00
last try recoat slider rails
Details

 10-30-2017
5.00
cut the canopy
Details
       

 10-28-2017
3.25
powdercoat supertracks and slider rails
Details
       

 10-27-2017
0.00
powdercoat oven
Details
     

 10-26-2017
5.00
supertracks complete
Details
       

 10-25-2017
3.50
supertracks cont.
     

 10-25-2017
7.50
cut and fit canopy
Details
       

 10-24-2017
2.00
supertracks
Details
     

 10-23-2017
6.00
initial fit rear canopy frame
Details
       

 10-20-2017
4.00
wheels
Details
       

 10-19-2017
3.00
supertracks
Details
       

 10-18-2017
5.00
canopy frame cont.
Details
     

 10-18-2017
5.00
canopy / supertracks
       

 10-14-2017
0.00
reconfigure rotisserie
Details
     

 10-13-2017
5.50
grab handles, finish roll bar
Details
       

 10-12-2017
6.50
roll bar
Details
       

 10-11-2017
3.00
finish stick wiring and USB outlet
       

 10-10-2017
8.00
seat heat and removeable copilot stick
Details
       

 10-09-2017
0.00
ran gas line for new hangar
Details
     

 10-08-2017
0.00
interior test fit
       

 10-07-2017
7.00
flaps, sticks, USB
Details
       

 10-06-2017
7.00
aileron trim / controls installation
Details
       

 10-05-2017
2.00
caulk firewall
Details
       

 10-04-2017
4.00
aileron trim
       

 10-03-2017
6.00
finish riveting top fwd skin
Details
       

 09-30-2017
2.00
top skin riveting
Details
     

 09-30-2017
3.00
ELT and pitch servo
Details
       

 09-28-2017
3.50
top skin installation
Details
     

 09-27-2017
4.00
rivet sub panel structure in place
Details
       

 09-27-2017
2.00
Mount VPX and run wire harnesses
     

 09-26-2017
2.50
prep, prime and paint final interior items
Details
     

 09-26-2017
3.00
prep fuse for top skin
Details
     

 09-23-2017
1.00
powdercoat vent aned map box parts
     

 09-23-2017
4.50
complete fwd sub panel and prime
     

 09-22-2017
4.00
uppper fuse structure / skin cont.
Details
     

 09-22-2017
4.00
map box
Details
     

 09-21-2017
7.50
top skin cont.
Details
       

 09-20-2017
4.00
top fuse and skin cont.
Details
       

 09-19-2017
5.50
top fuse and skin cont.
       

 09-16-2017
1.25
powdercoat brake res and battery hold down
Details
       

 09-15-2017
4.50
upper top structure cont.
Details
       

 09-15-2017
1.50
finalize high current wiring
Details
       

 09-14-2017
2.00
begin work on FWD upper fuse structure
     

 09-13-2017
7.00
more firewall stuff
Details
       

 09-12-2017
7.00
firewall electrics
Details
       

 09-11-2017
7.50
Finish interior brake plumbing
Details
       

 09-09-2017
0.00
glasair engine delivery
Details
       

 09-08-2017
7.00
fuel vent, pedals, brakes
       

 09-07-2017
5.50
rudder pedals and fuse
Details
       

 09-06-2017
0.00
glasair move cont.
       

 09-06-2017
0.00
finish concrete and move glasair
       

 09-05-2017
0.00
concrete pour
Details
     

 09-01-2017
6.50
fuel / vent plumbing
Details
       

 08-31-2017
0.00
roofing crew also removed bad sidewalk
       

 08-31-2017
0.00
roof was finished today
       

 08-31-2017
8.25
relays, brake res, landing gear
Details
       

 08-30-2017
1.25
touch up canopy weldments
     

 08-30-2017
0.00
new roof
Details
       

 08-30-2017
6.25
brake line attach and battery box
Details
       

 08-29-2017
5.50
prep and paint powdercoated canopy weldments
Details
       

 08-29-2017
3.00
heater box and battery box
       

 08-28-2017
5.25
cut & buff R wing
     

 08-26-2017
4.50
odds and ends
Details
       

 08-25-2017
7.50
main gear weldments and com antenna
Details
       

 08-24-2017
7.50
fuel line plumbing
Details
       

 08-23-2017
4.50
paint R wing
Details
     

 08-22-2017
8.00
prep and prime R wing
Details
       

 08-21-2017
5.25
L wing cut & buff
Details
       

 08-19-2017
0.00
In!
       

 08-19-2017
4.50
cut & buff ailerons and flaps
     

 08-18-2017
7.50
etch, prime, paint L wing
Details
       

 08-16-2017
4.50
prep L wing for paint
Details
       

 08-16-2017
3.00
pitot tube cont.
Details
     

 08-15-2017
4.50
Heated pitot tube installation
Details
       

 08-14-2017
0.00
interior finished
Details
       

 08-12-2017
0.00
clear coat floor
     

 08-11-2017
0.00
layed down epoxy floor
Details
     

 08-10-2017
0.00
finish electrical, prep floor
Details
     

 08-09-2017
0.00
wiring
Details
     

 08-08-2017
0.00
finished interior steel
Details
       

 08-07-2017
0.00
interior steel
       

 08-05-2017
0.00
lights and door
       

 08-04-2017
0.00
begin steel installation, hang new heater
Details
       

 08-03-2017
0.00
tube heater removal
       

 08-03-2017
0.00
start finish work
       

 08-02-2017
5.50
prep, prime, paint wingtips
Details
       

 08-01-2017
6.00
paint flaps and ailerons; prep wingtips
       

 07-31-2017
8.00
prep and prime ailerons and flaps
Details
       

 07-29-2017
1.00
apply filler to wing tip leading edges
     

 07-26-2017
1.75
wing tips cont....
Details
       

 07-26-2017
2.50
install AOA probe
Details
       

 07-25-2017
2.00
wingtip cont.
Details
       

 07-24-2017
4.00
wingtips cont.
Details
       

 07-24-2017
4.00
wingtip wiring
Details
       

 07-21-2017
2.50
wingtip nutplates cont.
     

 07-21-2017
1.00
install pigtail on VOR antenna
Details
     

 07-20-2017
4.00
wing tips cont.
Details
       

 07-19-2017
5.25
trim and fit wing tips
Details
       

 07-18-2017
3.00
wingtip lens attach
Details
       

 07-17-2017
4.00
wingtips cont.
Details
       

 07-07-2017
1.75
final trim and fit lenses, mount lights
     

 07-06-2017
3.75
wingtip nav lights
Details
       

 07-06-2017
3.50
cut & buff horizontal stab
     

 07-05-2017
2.50
wing follow ups
       

 07-03-2017
4.75
cut & buff emp
Details
     

 06-28-2017
2.25
color sand and buff rudder
     

 06-27-2017
7.50
prep, prime, paint HS and elevators
     

 06-24-2017
4.50
emp paint cont.
Details
       

 06-23-2017
8.00
begin painting emp
Details
       

 06-22-2017
3.25
prime emp fairing
Details
       

 06-21-2017
4.00
emp fairing ready for prime and paint
Details
       

 06-19-2017
5.25
emp fairing cont.
Details
       

 06-19-2017
1.75
custom rudder cable fairings
Details
     

 06-17-2017
3.50
inspection covers & aft bulkhead
       

 06-17-2017
3.00
empennage electrical connections
       

 06-16-2017
2.25
emp fairing cont., elevator prep for paint
       

 06-16-2017
5.25
emp assembly
Details
       

 06-15-2017
4.00
emp fairing
Details
       

 06-14-2017
3.50
rudder bottom cap cont.
Details
       

 06-13-2017
3.50
rudder work
Details
       

 06-13-2017
4.00
rudder caps, emp fairing
Details
       

 06-12-2017
2.00
fit rudder and caps
     

 06-10-2017
5.00
mount vertical stab
Details
       

 06-09-2017
3.00
finish HS mounting, begin VS
Details
       

 06-08-2017
6.00
horizontal stab mounting
Details
       

 06-06-2017
1.25
finish roll servo install
Details
     

 06-06-2017
4.50
finish flap attach mod L wing
     

 06-05-2017
3.25
prime emp fairing
Details
       

 06-05-2017
7.25
flap attach cont.
Details
       

 06-02-2017
2.50
flap attach rework
Details
       

 06-02-2017
3.00
fill and prime HS and elevator caps
Details
       

 05-31-2017
7.50
finalize wing wire runs, install roll servo
Details
       

 05-30-2017
0.00
reconfigure shop
Details
       

 05-27-2017
2.25
emp caps cont.
     

 05-25-2017
4.00
install elevator trim
Details
       

 05-25-2017
3.50
elevator / HS caps cont.
Details
       

 05-24-2017
1.75
sanded HS and elevator glass, applied #2 coat to e
     

 05-24-2017
5.00
flap ripple and attach alignment
Details
       

 05-23-2017
2.50
HS / elevator caps cont.
Details
       

 05-23-2017
3.50
flap mod
Details
       

 05-22-2017
8.00
HS and elevator caps
Details
       

 05-19-2017
6.50
final assembly counterweight arm rework
Details
       

 05-18-2017
6.00
finish counterweight arm fab, + primw
     

 05-17-2017
5.00
R elevator countersink arm
Details
     

 05-16-2017
7.25
elevator counterweight arms rework cont.
Details
       

 05-15-2017
5.50
flap and elevator rework
       

 05-13-2017
5.00
finish inventory, begin flap trailing edge repair
Details
       

 05-11-2017
4.00
unpack and inventory finish and FF kit
Details
       

 05-11-2017
0.00
hangar addition done!
       

 04-19-2017
0.00
hangar addition update
       

 03-25-2017
3.50
work on elevator, flap, and el. trim

 03-25-2017
4.00
cut and buff fuse bottom
       

 03-17-2017
4.00
prime and paint fuse exterior bottom
Details
     

 03-16-2017
1.25
airbrush touch up a few interior areas
     

 03-10-2017
7.00
sprayed inerior with primer and paint
Details
       

 03-09-2017
7.50
mask and prep interior for paint
Details
       

 03-08-2017
0.00
moved paint booth, put fuse inside
Details
     

 03-07-2017
4.00
scotchbrite, clean, mask fuse bottom
Details
       

 03-07-2017
3.00
mask fuse for interior paint
     

 03-02-2017
1.75
prep and prime pushrods
     

 02-27-2017
2.50
interior panel paint
Details

 02-25-2017
6.00
interior prime and paint
Details
       

 02-24-2017
7.50
prep and paint panels
Details
       

 02-22-2017
1.50
prep and prime elevator tube and wing attach brack
Details
     

 02-21-2017
1.50
drill elevator horn @ pushrod
Details
       

 02-20-2017
5.50
empennage rigging cont.
Details
     

 02-18-2017
5.00
begin empenage fitting
Details
       

 02-13-2017
1.00
model dual fuel filter setup
     

 02-11-2017
8.00
rig flaps and ailerons
Details
       

 02-10-2017
3.50
fab and fit fwd wing attach braackets
Details
       

 02-08-2017
0.00
complete paint booth setup
Details
     

 02-05-2017
0.00
paint booth setup cont
Details
     

 02-04-2017
7.00
test fit wings, check alignment, rear spar attach
Details
       

 02-01-2017
2.00
finish seat backs and support bracket
       

 01-31-2017
1.50
seat backs rivet
     

 01-28-2017
7.00
pitch servo installation
Details
       

 01-27-2017
0.00
setting up paint booth
Details
     

 01-24-2017
1.25
flap position senor linkage
Details
     

 01-14-2017
4.00
flap position sensor
     

 01-10-2017
7.00
complete flap actuator tower
Details
       

 12-30-2016
2.75
flap actuator housing cont.
Details
       

 12-29-2016
5.00
finish console, start on flap actuation
       

 12-28-2016
7.00
firewall & center console work
       

 12-17-2016
4.00
fuel system doghouse cont.
Details
       

 12-16-2016
4.00
assemble fuel pump and selector doghouses
Details
       

 12-10-2016
4.00
flap actuator
Details
       

 11-25-2016
8.00
seat backs and floor tunnel cover
Details
       

 11-20-2016
5.00
complete aft seat floors
Details
       

 11-19-2016
6.00
aft floor and baggage walls
Details
       

 11-11-2016
4.25
fab and install bulkhead doubler
Details
       

 11-06-2016
2.50
prep and prime all remaining sheet metal parts
Details
       

 11-04-2016
5.50
finish upper baggage bulkhead
       

 11-02-2016
1.50
cut, lay out, and initial fit upper baggage bulkhe
     

 10-24-2016
1.25
begin aft baggage bulkheads
Details
       

 10-22-2016
6.00
R step & baggage panels
       

 10-11-2016
2.00
install L boarding step
       

 10-10-2016
6.25
skin riveting, duburring
Details
       

 10-01-2016
4.00
aft skin brace fabrication
Details
       

 09-29-2016
3.00
rivet aft top skin
Details
     

 09-26-2016
1.25
unwrap and debur cont.
     

 09-23-2016
6.50
complete riveting Rear top skin
Details
       

 09-21-2016
1.00
remove plastic and debur several interior panels

 09-19-2016
1.50
complete fit of R step
Details
       

 09-16-2016
5.50
boarding steps
Details
       

 09-12-2016
1.00
rivet prep, boarding step
       

 09-05-2016
9.00
finish tail wiring, begin riveting top rear skin
Details
       

 08-27-2016
3.50
fab antenna doublers, tail wiring cont.
       

 08-20-2016
7.00
install adars, tail wiring, rudder cables, static
       

 08-05-2016
3.50
complete aft skin and support prep and prime
       

 08-03-2016
5.50
aft skins & structure cont., ELT relocate
Details
       

 08-01-2016
4.50
fit and drill aft top skin
       

 07-15-2016
4.75
rear fuse work cont.
       

 07-14-2016
6.00
fit and drill rear top skin, j-stringers and gusse
       

 07-12-2016
7.50
bellcrank, support, ELT
Details
       

 07-08-2016
7.00
forward fuse construction
       

 07-07-2016
4.50
fuse side rails and gussets
Details
       

 07-06-2016
6.50
rivet bottom skins
       

 07-05-2016
6.00
mount fuse to rotisserie, prep for bottom skin riv
       

 07-01-2016
6.50
rivet R skin and rear top plate
       

 06-30-2016
4.75
fuse skin work
Details
       

 06-29-2016
1.00
mark and stuff rivets R side fuse
     

 06-25-2016
7.45
rivet L side fuse skins
       

 06-24-2016
3.00
skin rivet prep
     

 06-21-2016
1.00
rivet armrests, skin rivet prep cont.
     

 06-20-2016
1.50
fwd fuse work
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.