Powered By Kitlog Pro v2.0
Scott's Osprey
Osprey 2
All
Work Logs Found:
17
Category Work Time:
59 Hours
Date
Hours
Work Log Summary
Details
06-11-2016
7.00
framed up front and gunnel
Details
06-08-2016
3.00
started forming out the fuselage
Details
06-07-2016
2.00
put fuselage sides back in jigs
Details
06-06-2016
2.00
Set jigs back up
Details
06-05-2016
4.00
repaired left side bottom longeron
Details
06-05-2016
4.00
bent sides of fuselage
Details
06-02-2016
6.00
finished both sides of fuselage
06-01-2016
4.00
finished second side bracing
Details
05-31-2016
2.00
Made scarf joints on second side of fuselage
Details
05-31-2016
2.00
Added vertical braces on second side of fuselage
Details
05-31-2016
2.00
.063 4130 parts
Details
05-30-2016
3.00
Formed top and bottom longerons for second side of
Details
05-29-2016
8.00
started drawing metal parts to be cut out
Details
05-29-2016
2.00
finished putting the vertical braces in the first
Details
05-28-2016
3.00
starting putting in the vertical braces in the f
Details
05-28-2016
3.00
Made scarf joints on one of the fuselage sides
05-27-2016
2.00
Formed upper and lower longeron for first side of
Details
SITE NAVIGATION
Contact Builder
GP-4 Home
Osprey 2 Home
Category
# Logs
# Hours
All
17
76
Fuselage
15
49
Miscellaneous
2
27
Copyright © 2001-2025 Matronics. All Rights Reserved.