JEFFREY'S WEB SITE
Work Logs Found: 238
Category Work Time: 891 Hours
 Date
Hours
Work Log Summary

Details

 10-24-2017
5.00
Fuel gauges
Details

 10-21-2017
3.00
Misc.
Details

 10-18-2017
4.00
Stabilizer gap seals, seats, weighed
Details
       

 10-17-2017
3.00
Velcro, inspection covers, seatbelts
Details

 10-16-2017
4.00
Throttles, stick boots, wingtip lights
Details
       

 10-15-2017
3.50
Brake lines
Details

 10-14-2017
4.00
Wiring, seatbelts, controls
Details

 10-13-2017
3.00
Flaps and ailerons
Details

 10-12-2017
7.00
Tail, nose
Details
       

 10-11-2017
3.50
Rudder, ailerons and flaps
Details
       

 10-10-2017
4.50
Rudder paint and aileron
Details
     

 10-09-2017
1.50
Rudder paint
Details
       

 10-08-2017
1.00
Aileron pushrods
Details

 10-07-2017
2.50
Jury struts
Details
       

 10-06-2017
3.00
Main wing struts
Details

 10-04-2017
0.75
Jury struts
Details

 09-29-2017
2.50
Avionics and empenage
Details

 09-28-2017
1.00
GPS mount
Details
     

 09-27-2017
1.50
Left horizontal
Details
     

 09-25-2017
2.00
Right horizontal
Details
     

 09-20-2017
2.00
Wing gap fairings
Details
       

 09-04-2017
2.50
Misc
Details
     

 09-03-2017
3.50
Flaps, ailerons and rudder
Details

 09-02-2017
3.50
Flaps, ailerons and rudder
Details

 09-01-2017
3.50
Gap fairings
Details

 08-31-2017
2.00
Wing gap fairings
Details
     

 08-30-2017
6.00
Flaps, ailerons, rudder, wing gap fairings
Details
     

 08-25-2017
2.00

Details

 08-24-2017
5.50
horizontal stabs and eloevators
Details
       

 08-23-2017
5.00
Stabilizers
Details

 08-22-2017
2.00

Details
     

 08-21-2017
2.50
Elevator
Details

 08-20-2017
4.00
Prep and prime
Details
     

 08-19-2017
3.00
More fabric finishing
Details

 08-17-2017
4.00
Access hatches for gascolators
Details

 08-16-2017
6.00
Continued fabric finishing work
Details

 08-14-2017
4.00
Left elevator
Details

 08-13-2017
3.00
Gascolator access
Details

 08-11-2017
3.00
Install left wing
Details
       

 08-10-2017
2.00
fiberglass parts
Details

 08-09-2017
3.00
Prepped left wing
Details

 08-08-2017
3.00
Fiberglass tips
Details

 08-07-2017
4.50
Mounted the right wing to the fuselage
Details
       

 07-06-2017
4.00
Wing struts
Details
       

 06-22-2017
3.00
Float steps and ADAHRS
Details

 06-17-2017
2.00
Wing struts
Details

 06-16-2017
3.00
Wing walk
Details

 06-15-2017
3.00

Details
       

 06-14-2017
6.00
Mounted the floats
Details
       

 06-10-2017
2.00

Details

 06-09-2017
6.00
Rigging the floats
Details
     

 06-08-2017
10.00
Floats
Details
     

 06-03-2017
2.00
Calper seals
Details

 06-02-2017
2.50
Lifting bracket
Details

 06-01-2017
3.00
ELT and engine
Details

 05-31-2017
3.00
Autopilot and engine
Details

 05-30-2017
3.00
Roll control for the autopilot
Details
     

 05-29-2017
3.00
Elevator counter weight and auto pilot
Details
       

 05-10-2017
3.00
Rigging
Details
     

 05-09-2017
4.00
Rigging
Details
     

 05-03-2017
4.00
Misc.
Details

 05-02-2017
7.00
First engine start
Details

 05-01-2017
5.00
Prep for starting
Details

 04-29-2017
3.00
Misc.
Details

 04-29-2017
4.50
Engine monitor
Details
     

 04-27-2017
4.00
Left wing
Details

 04-26-2017
1.50
Skyview
Details

 04-26-2017
2.00
Right wing
Details

 04-25-2017
1.00
Intercom
Details

 04-25-2017
2.00
Installed ribs
Details
       

 04-24-2017
3.00

Details

 04-20-2017
4.00
Trouble shooting
Details

 04-19-2017
4.00
Wing ribs and audio testing
Details

 03-27-2017
7.60
Connections, wiring, props
Details
       

 03-26-2017
10.00
Misc. engine connections
Details

 03-21-2017
3.00
Right engine and Skyview
Details
     

 03-18-2017
3.00
Instrument panel
Details
       

 03-17-2017
3.50
Instrument panel, interior panels and wing fitting
Details
     

 03-16-2017
3.00
Carb heat and autopilot
Details

 03-13-2017
4.50
Left engine carb heat, primer, electrical
Details

 03-12-2017
3.00
Carb heat and wiring
Details
     

 03-11-2017
3.00
Exhaust and carb heat
Details
       

 03-10-2017
5.00
Engine and control stick
Details

 03-08-2017
2.50
Engine monitor
Details

 03-07-2017
1.50
Engine sensors
Details
     

 03-06-2017
3.50
Engine sensors
Details
     

 03-03-2017
4.00
Engine monitor
Details

 03-02-2017
1.50
Engine monitor module
Details

 02-27-2017
3.00
Oil lines
Details
       

 02-23-2017
3.50
Radiator and throttle
Details
       

 02-22-2017
2.50
ADHRS and control sticks
Details
     

 02-21-2017
4.50
wiring and engine
Details
     

 02-18-2017
3.50
Continued wiring
Details

 02-17-2017
5.50
Misc
Details
     

 02-16-2017
5.00
Wiring/engine
Details

 02-15-2017
3.00
Moved
Details

 02-11-2017
5.00
Mounted the engines
Details
       

 02-06-2017
2.50
Avionics
Details

 01-31-2017
4.50
Programing the VPX/Work on the control stick wirin
Details
       

 01-29-2017
2.50
Grounds
Details
       

 01-28-2017
2.00
Screens/wiring
Details
       

 01-24-2017
4.00
Intercom/vents
Details
       

 01-22-2017
1.00
Ventilation
Details
     

 01-21-2017
3.50
Continues wiring
Details

 01-20-2017
3.00
Continued wiring
Details

 01-19-2017
6.00
Continued wiring
Details

 01-18-2017
3.50
Continued wiring
Details
     

 01-16-2017
3.50
Continued wiring
Details

 01-12-2017
3.00
Continued wiring
Details

 01-11-2017
4.50
Continued wiring
Details
       

 01-10-2017
5.00
Wiring
Details
       

 01-09-2017
4.00
Misc.
Details

 01-06-2017
5.00
Misc.
Details

 01-05-2017
3.50
Misc.
Details
     

 01-04-2017
5.00
Misc.
Details

 01-03-2017
4.00
Continue wiring
Details
       

 01-02-2017
4.00
Continued wiring
Details
       

 01-01-2017
3.00
Rear instrument pedestal and avionic tray
Details
     

 12-30-2016
4.50
Continued electrical work
Details

 12-29-2016
5.50
Wiring
Details
       

 12-27-2016
4.00
Wiring
Details
       

 12-26-2016
4.50
Wire runs
Details
       

 12-21-2016
1.00
Stick grips/buttons
Details
     

 12-20-2016
3.00
Wire runs
Details
       

 12-18-2016
4.00
Rear avionic panel
Details
       

 12-17-2016
2.00
Misc. electronic work
Details
       

 12-16-2016
3.50
Received the floats
Details
       

 12-16-2016
3.50
Panel
Details

 12-13-2016
4.00
Panel
Details
       

 12-09-2016
3.00
Rudder system, Wiring
Details

 12-07-2016
5.50
Fuel system and paint
Details
     

 12-05-2016
3.50
Radiator and oil cooler mounts
Details
     

 12-03-2016
2.00
Lines and valve
Details
     

 12-02-2016
2.50
Fuel lines and valves
Details

 12-02-2016
4.00
Elevator pushrod
Details

 11-28-2016
2.00
Attach engine mounts
Details
       

 11-27-2016
2.00
Remounted the center section
Details
       

 11-26-2016
4.00
Misc, fuel lines.
Details
       

 11-25-2016
2.50
Throttle and struts
Details

 11-22-2016
3.00
Applied logo and moved.
Details
     

 11-21-2016
3.00
Continued paint
Details
       

 11-20-2016
2.00
Continued paint
Details

 11-18-2016
6.00
Paint layout
Details
       

 11-14-2016
3.00
Moved to paint shop
Details
     

 11-09-2016
3.00
Throttle parts
Details
     

 11-08-2016
2.50
Seats, misc.
Details
     

 11-07-2016
2.00
Prepping for paint
Details

 10-31-2016
3.00
Firewalls
Details
       

 10-29-2016
5.00
Mount verticle stab
Details
       

 10-26-2016
4.00
Moved parts
Details
       

 10-22-2016
3.00
Paint firewalls
Details
     

 10-21-2016
5.00
Landing gear, throttle
Details
       

 10-19-2016
8.50
Fuselage interior
Details
       

 10-17-2016
3.50
Paint
Details
       

 10-16-2016
2.00
Rear interior bulkhead
Details
     

 10-12-2016
3.00
Remove center section
Details
       

 10-04-2016
3.50
Riveted lower skins
Details
     

 10-03-2016
4.00
Fit and rivet the skins
Details
       

 10-02-2016
3.50
Priming
Details

 09-30-2016
7.50
Priming
Details
     

 09-29-2016
2.00
Priming prep
Details

 09-27-2016
2.50
Misc.
Details

 09-23-2016
4.00
Autopilot servo
Details
     

 09-20-2016
3.50
Autopilot roll servo
Details
       

 09-19-2016
2.00
Fuel tanks
Details

 09-14-2016
3.50
Cowl work
Details
       

 09-12-2016
4.50
Fuel vents and nisc.
Details
       

 09-11-2016
5.50
Skins and fuel tanks
Details
       

 09-08-2016
4.50
Radiator cowls
Details
       

 09-07-2016
1.50
Prime parts
Details
       

 09-06-2016
5.50
Radiator bulkhead
Details
       

 09-05-2016
3.50
Inventory
Details

 09-05-2016
1.00
Install nut plates
Details
     

 09-04-2016
3.00
Deburring and priming
Details
       

 09-03-2016
2.50
Disassembly and deburring
Details

 09-02-2016
1.50
Drilling to final size
Details

 06-24-2016
2.50
Drilling
Details
       

 06-21-2016
5.50
Skins
Details
       

 06-20-2016
3.00
Inspection panels
Details

 06-17-2016
8.50
Center section
Details
       

 06-16-2016
1.00
Aileron push rods
Details
     

 06-14-2016
6.00
Roght wing
Details
     

 06-13-2016
8.00
Left wing
Details
     

 06-12-2016
4.00
Inboard rib
Details
       

 06-07-2016
1.50
Tensioning rib
Details
       

 06-07-2016
4.50
Left elevator
Details
     

 06-05-2016
5.00
Left elevator
Details
       

 06-03-2016
3.50
Right elevator
Details
     

 06-02-2016
4.00
Right elevator
Details
     

 06-01-2016
5.00
Left horizontal stabilizer, right elevator
Details
       

 05-31-2016
6.00
Left horizontal Stabilizer
Details
     

 05-30-2016
3.00
Left horizontal stabilizer
Details
       

 05-29-2016
2.50
Right horizontal stabilizer
Details
     

 05-28-2016
7.00
Right verticle stabilizer
Details
       

 05-27-2016
2.50
Rudder
Details
       

 05-26-2016
7.50
Rudder
Details
     

 05-24-2016
1.50
Rudder
Details
     

 05-24-2016
4.00
Ailerons
Details
     

 05-23-2016
6.00
Flaps and ailerons
Details
     

 05-16-2016
3.00
Flaps
Details

 05-15-2016
2.50
Flaps
Details
     

 05-14-2016
6.00
Flaps and ailerons
Details
       

 05-13-2016
6.50
Ailerons
Details
       

 05-11-2016
2.00
Flaps and ailerons
Details
       

 05-11-2016
6.00
Elevators/trim tab
Details
       

 05-10-2016
1.50
Flaps and ailerons
Details

 05-10-2016
5.00
Elevators
Details

 05-09-2016
7.00
Flaps and ailerons
Details
       

 05-07-2016
5.00
Assembly
Details
       

 05-06-2016
6.00
Priming
Details
     

 05-05-2016
4.00
Disassembly, deburring
Details
     

 05-04-2016
5.50
Center section
Details
       

 05-03-2016
3.00
Rudder
Details
     

 05-02-2016
4.00
Rudder
Details
     

 05-02-2016
3.50
Forward spar
Details
     

 04-30-2016
2.50
Front and rear spar
Details
     

 04-28-2016
2.00
Rudder
Details
       

 04-28-2016
4.00
Right horizontal
Details
       

 04-27-2016
7.50
Right Horizontal
Details
     

 04-27-2016
8.50
Horizontal stabilizer
Details
       

 04-25-2016
6.00
Horizontal Stabilizer
Details
       

 04-24-2016
7.50
Horizontal stabilizer
Details
       

 04-23-2016
1.00
Verticle Stabilizer
Details

 04-22-2016
8.50
Verticle stabilizer
Details
       

 04-20-2016
3.50
Verticle Stabilizer
Details
     

 04-18-2016
3.00
Verticle stabilizer
Details

 04-17-2016
5.00
Verticle Stabilizer
Details
     

 04-16-2016
7.00
Verticle Stab
Details
     

 04-02-2016
4.50
Elevators and rudder
Details
       

 04-01-2016
5.00
Verticle and left elevator
Details
       

 03-31-2016
4.30
Verticle Stabilizer
Details
       

 03-30-2016
4.00
Vertcle stabilizer
Details
     

 03-29-2016
1.00
Elevator
Details
     

 03-28-2016
1.00
Elevator
Details
     

 03-27-2016
2.00
Elevators
Details
     

 03-26-2016
5.00
Vertical Stabi;izer
Details

 03-25-2016
6.00
Inventory
Details
       

 03-23-2016
0.00
Delivery
Details