Date
|
Hours
|
Work Log Summary

|
Details

|
06-11-2020
|
2.00
|
Re-Install Cowl & Covers after A/C Charging
|
Details
|
  |
|
06-10-2020
|
1.00
|
Charge A/C System
|
Details
|
  |
|
06-09-2020
|
3.50
|
A/C Final Hookup (Continued)
|
Details
|
  |
|
06-08-2020
|
5.50
|
Final A/C Hook-up
|
Details
|
  |
|
05-26-2020
|
4.00
|
Oil Change & Service Bulletins
|
Details
|
  |
|
05-19-2020
|
1.50
|
Auto Pilot Ground Tests, Adjust Oil Press Alarm
|
Details
|
  |
|
05-13-2020
|
6.50
|
Installed Wheel Fairings
|
Details
|
  |
|
04-24-2020
|
3.00
|
Oil Door, Inspection Plate, Avionics Update
|
Details
|
  |
|
04-22-2020
|
5.25
|
Oil Door Latch
|
Details
|
  |
|
04-13-2020
|
4.50
|
Remedy Issues From First Flights
|
Details
|
  |
|
04-01-2020
|
6.00
|
First 3 Flights
|
Details
|
  |
|
03-30-2020
|
2.50
|
Revised Top Cowl Firewall Pin Clip
|
Details
|
  |
|
03-30-2020
|
2.50
|
Misc. Prep for First Flight
|
Details
|
  |
|
03-25-2020
|
3.75
|
Cowl Re-Fitting
|
Details
|
  |
|
03-23-2020
|
4.50
|
Modified Left Cooling Air Inlet Ramp
|
Details
|
  |
|
03-20-2020
|
5.00
|
Removable Snorkle - Part 3
|
Details
|
  |
|
03-19-2020
|
3.00
|
Snorkle Removal Part 2
|
Details
|
  |
|
03-17-2020
|
3.25
|
Lower Cowl Snorkle Removal
|
Details
|
  |
|
03-13-2020
|
4.25
|
Installed Top Baggage Bulkhead. Fire Ext.
|
Details
|
  |
|
03-13-2020
|
2.00
|
Aircraft Review by Rich Jankowski
|
Details
|
  |
|
03-11-2020
|
6.00
|
Installed Front Seats & Lower Baggage Bulkhead
|
Details
|
  |
|
03-10-2020
|
5.00
|
Installed Fairings & Data Plate. Modified Seats
|
Details
|
  |
|
03-09-2020
|
5.25
|
Reinstalled Covers, Console, & Fuel Selector
|
Details
|
  |
|
03-05-2020
|
6.25
|
Installed covers & console. Changed Fuel Valve Po
|
Details
|
  |
|
03-04-2020
|
3.75
|
Tested For Brake Leaks & Reinstalled Seat Rails
|
Details
|
  |
|
03-03-2020
|
4.00
|
Fixed Brake Fluid Leak. Adjusted Right Aileron
|
Details
|
  |
|
02-26-2020
|
4.00
|
Airworthiness Inspection Corrections
|
Details
|
  |
|
02-24-2020
|
4.00
|
DAR Inspection
|
Details
|
  |
|
02-23-2020
|
8.00
|
Final Prep for DAR Inspection
|
Details
|
  |
|
02-22-2020
|
7.75
|
Install Inlet Seals, Seat Belts; RTV Baffle Sealin
|
Details
|
  |
|
02-21-2020
|
6.75
|
Trouble Shoot & Calibrate. Seal Firewall
|
Details
|
  |
|
02-20-2020
|
4.25
|
Installed Labels, Entered Set Points and Ranges
|
Details
|
  |
|
02-19-2020
|
6.50
|
Engine Start, Calibrated AHARS & Magnetometer
|
Details
|
  |
|
02-18-2020
|
6.00
|
Engine Trouble Shooting
|
Details
|
  |
|
02-17-2020
|
6.00
|
Trouble Shooting Engine Start Problem
|
Details
|
  |
|
02-16-2020
|
4.00
|
Avionics Trouble Shooting
|
Details
|
  |
|
02-15-2020
|
3.25
|
Unsuccessful First Engine Start
|
Details
|
  |
|
02-14-2020
|
3.50
|
Purged Fuel Injectors
|
Details
|
  |
|
02-13-2020
|
4.00
|
Completed Fuel Flow Tests
|
Details
|
  |
|
02-12-2020
|
5.00
|
Configuring I/O Channels. Diagnosing Elev. Trim P
|
Details
|
  |
|
02-11-2020
|
4.25
|
Updated Avionics Software. Started Calibration.
|
Details
|
  |
|
02-10-2020
|
3.00
|
Removed Van's Weatherstripping from Right Door
|
Details
|
  |
|
02-04-2020
|
4.00
|
Replaced Left Door Seal. Installed Wing Walk Tape
|
Details
|
  |
|
02-03-2020
|
3.00
|
Re-installed Rudder Trim. Removed Van's Left Door
|
Details
|
  |
|
01-30-2020
|
3.25
|
Weigh Airplane
|
Details
|
  |
|
01-29-2020
|
4.25
|
Preparing for Weighing
|
Details
|
  |
|
01-28-2020
|
4.50
|
Getting Ready to Weigh
|
Details
|
  |
|
01-16-2020
|
6.75
|
ELT Install, Cowl Support Bracket, Exhaust Pipes
|
Details
|
  |
|
01-15-2020
|
6.25
|
Mag Timing. Brake Bleeding
|
Details
|
  |
|
01-14-2020
|
8.00
|
Installed Wing Tips and Wing Lights
|
Details
|
  |
|
01-13-2020
|
8.25
|
Door Seals. Installed Flaps
|
Details
|
  |
|
01-10-2020
|
3.50
|
Installing Door Weather Seals
|
Details
|
  |
|
01-10-2020
|
4.00
|
Cleaned oil screen, lower plugs, refilled engine o
|
Details
|
  |
|
01-09-2020
|
6.25
|
Rudder Trim, Door Seal, Preservative Oil Drain
|
Details
|
  |
|
01-08-2020
|
5.00
|
Install Left Door Seal
|
Details
|
  |
|
01-07-2020
|
4.25
|
Cut Mats, Installed Covers, "Experimental" Label I
|
Details
|
  |
|
01-06-2020
|
6.50
|
Installed Inside Access Covers
|
Details
|
  |
|
12-16-2019
|
5.50
|
Fuel Level Wiring, Fuel & Vent Lines, Lower Wing R
|
Details
|
  |
|
12-13-2019
|
7.25
|
Installed Pitot/AOA and Fuel Level Transmitters
|
Details
|
  |
|
12-12-2019
|
3.00
|
Modify Right Front Seat Adjuster
|
Details
|
  |
|
12-12-2019
|
3.25
|
Installed GTP 59 OAT. Begin fitting Pitot Tube
|
Details
|
  |
|
12-11-2019
|
7.25
|
Fixed Aileron Trim, Installed Seat Nutplates & Sea
|
Details
|
  |
|
12-10-2019
|
6.50
|
Install GMU 11 & Stick Grips
|
Details
|
  |
|
12-09-2019
|
5.50
|
Nameplate, Seat Floors, Aileron Trim Servo
|
Details
|
  |
|
11-26-2019
|
3.25
|
Updated Drawings to As Built
|
Details
|
  |
|
10-25-2019
|
6.50
|
Install Wing Root Fairing Supports
|
Details
|
  |
|
10-24-2019
|
7.00
|
Wing Fairing Nutplates, Tank Attach Bracket
|
Details
|
  |
|
10-23-2019
|
7.00
|
Cut Left Stick, Installed Antennas & Baggage Seal
|
Details
|
  |
|
10-22-2019
|
7.75
|
Fuel Caps, Heater Cable Safety Wire, Stick Cutting
|
Details
|
  |
|
10-18-2019
|
7.00
|
Upper Wing Root Fairing
|
Details
|
  |
|
10-17-2019
|
7.50
|
Wing Root Fairings
|
Details
|
  |
|
10-16-2019
|
7.00
|
Aileron Rigging, Attached Fuel Lines
|
Details
|
  |
|
10-15-2019
|
7.50
|
Installed Roll Servo and Wings
|
Details
|
  |
|
10-14-2019
|
6.75
|
Install Yaw Servo, F-1025 Rear Seat Side Covers
|
Details
|
  |
|
10-11-2019
|
5.50
|
Installed Pitch Servo for Autopilot
|
Details
|
  |
|
10-10-2019
|
6.50
|
Install Rudder Lower Fairing & Empennage Fairing
|
Details
|
  |
|
10-09-2019
|
7.00
|
Wing Root Fairings, Fuel Strainers
|
Details
|
  |
|
10-08-2019
|
6.50
|
Installed Rudder Cable Fairings. Wing Root Fairin
|
Details
|
  |
|
10-07-2019
|
7.50
|
Empennage Fairing
|
Details
|
  |
|
10-04-2019
|
6.75
|
Fairing Nutplates Installation
|
Details
|
  |
|
10-03-2019
|
7.75
|
Drill & Trim Stab Fairing, Drilling for Nutplates
|
Details
|
  |
|
10-02-2019
|
6.75
|
Re-attached & Adj. Trim Tabs, Fairing Fitting
|
Details
|
  |
|
10-01-2019
|
4.25
|
Cut Shelves and Cleaned Out Richmond Shop
|
Details
|
  |
|
09-30-2019
|
6.00
|
Re-Install Rudder & Elev. Trim Cables
|
Details
|
  |
|
09-26-2019
|
7.25
|
Reinstall Horiz & Vert. Stab, Elev., Nav Antenna
|
Details
|
  |
|
09-25-2019
|
5.25
|
Shop Unpacked; Reinstalled Gear Pants Brackets
|
Details
|
  |
|
09-24-2019
|
4.50
|
Moved Shelves to Airport
|
Details
|
  |
|
09-23-2019
|
8.50
|
Moved Shop to KARM Airport
|
Details
|
  |
|
09-20-2019
|
5.00
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-19-2019
|
2.00
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-17-2019
|
5.50
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-16-2019
|
3.50
|
Moved Fuselage to Wharton Airport KARM
|
Details
|
  |
|
09-13-2019
|
6.00
|
Right Seat Rails, Front Ovhd Lights, Heat Shld
|
Details
|
  |
|
09-12-2019
|
4.00
|
Front Seats
|
Details
|
  |
|
09-11-2019
|
7.75
|
Long SCAT for Heater, Installed Left Seat Rails.
|
Details
|
  |
|
09-10-2019
|
5.25
|
Left Heat Inlet, G5 Install, Vent Fan Trim Rings
|
Details
|
  |
|
09-09-2019
|
7.50
|
Reinstall Panels, Wired Sure Start, Install Heater
|
Details
|
  |
|
09-06-2019
|
6.50
|
Installed GTP 59 ; Installed Throttle Quadrant
|
Details
|
  |
|
09-05-2019
|
7.75
|
Install Right Wing Connector, Add Lighting Pot Gro
|
Details
|
  |
|
08-26-2019
|
7.75
|
Complete Brake & Alt Air Cables, Install Right Win
|
Details
|
  |
|
08-23-2019
|
4.00
|
Parking Break Cable & Paint Inside Lower Cowl
|
Details
|
  |
|
08-21-2019
|
7.00
|
Re-Installed Heater Controls Mount Sure Start
|
Details
|
  |
|
08-20-2019
|
6.75
|
Seat Belt Bolts, Side Console Labels
|
Details
|
  |
|
08-12-2019
|
5.00
|
Completed G5 Wiring, Epoxy Sealed Lower Cowl
|
Details
|
  |
|
08-09-2019
|
7.00
|
G5 Mounting & Wiring
|
Details
|
  |
|
08-08-2019
|
6.25
|
G5 Bracket Design, Glare Shield Cover
|
Details
|
  |
|
08-07-2019
|
5.25
|
GMU Mount & Connectors for GMU and GSA 28
|
Details
|
  |
|
08-06-2019
|
7.25
|
Fix Overhead Lights, Seat Heaters; Worked on G5 Mo
|
Details
|
  |
|
08-05-2019
|
8.00
|
Overhead Cabin Lights Wiring
|
Details
|
  |
|
08-02-2019
|
7.00
|
Instrument Lights, Overhead Lights
|
Details
|
  |
|
08-01-2019
|
3.50
|
Software Updates, Com Tests, Config Checks
|
Details
|
  |
|
07-19-2019
|
3.00
|
Installed Stick Switch Connectors
|
Details
|
  |
|
07-18-2019
|
6.00
|
Trouble Shoot Seat Heat & Switch Lights
|
Details
|
  |
|
07-17-2019
|
7.25
|
CAN Bus Trouble Shooting & Repair
|
Details
|
  |
|
07-16-2019
|
7.00
|
CAN Bus Trouble Shooting
|
Details
|
  |
|
07-15-2019
|
7.25
|
Reviewing Config. Requirements
|
Details
|
  |
|
07-11-2019
|
7.25
|
CAN Bus Trouble Shooting
|
Details
|
  |
|
07-10-2019
|
7.00
|
Installed GDUs & GTN. First Power to Panel
|
Details
|
  |
|
07-09-2019
|
7.25
|
Center Breakers, Close Center Panel, Replace Coax
|
Details
|
  |
|
07-08-2019
|
5.50
|
Closed Right Section Panel, Started Center Breaker
|
Details
|
  |
|
07-05-2019
|
7.75
|
Right Side Breakers & Avionics Tray
|
Details
|
  |
|
07-02-2019
|
7.50
|
Cut Right Avionics Tray, Removed heater cables, wi
|
Details
|
  |
|
07-01-2019
|
8.00
|
Coax Connections, Stick Grip Wires, Right Air Vent
|
Details
|
  |
|
06-28-2019
|
7.25
|
Transponder Antenna. Heater SCAT tubing Install
|
Details
|
  |
|
06-26-2019
|
7.00
|
Right Side Panel Wiring
|
Details
|
  |
|
06-25-2019
|
7.25
|
Right Panel: GAD 27 & GEA 24
|
Details
|
  |
|
06-24-2019
|
7.75
|
Left Side Completion, GAD 27 Connectors
|
Details
|
  |
|
06-21-2019
|
7.25
|
Left Panel Finalization
|
Details
|
  |
|
06-20-2019
|
7.25
|
ELT Wiring, Left Tray Modification
|
Details
|
  |
|
06-19-2019
|
7.00
|
ELT Install, Coax Connectors, Revised GTR 20 Locat
|
Details
|
  |
|
06-18-2019
|
7.75
|
Rudder Trim, Heater Cables
|
Details
|
  |
|
06-17-2019
|
7.75
|
Fitting Center Side Panels to Control Panel
|
Details
|
  |
|
06-14-2019
|
2.25
|
Control Panel Center Console Sides
|
Details
|
  |
|
06-13-2019
|
7.25
|
Continued Left Panel Wiring Work
|
Details
|
  |
|
06-12-2019
|
7.25
|
GMA 245 Wiring Completed, Alternator and Battery C
|
Details
|
  |
|
06-11-2019
|
7.25
|
Rear Headset Jacks, Audio Wiring Prep.
|
Details
|
  |
|
06-10-2019
|
4.25
|
Notched Sub-Panel for GTN 650
|
Details
|
  |
|
06-07-2019
|
7.50
|
Re-Installed LRU Cages and Installed Main Harness
|
Details
|
  |
|
06-06-2019
|
7.00
|
Mag Wiring & Seat Heaters
|
Details
|
  |
|
05-14-2019
|
5.50
|
Completed GEA 24 P243 Connector
|
Details
|
  |
|
05-13-2019
|
7.00
|
Began Panel Install, Completed P242 GEA 24
|
Details
|
  |
|
05-10-2019
|
2.00
|
Re-install Cabin Brace
|
Details
|
  |
|
05-10-2019
|
3.25
|
Alternator Connections, Static Connection
|
Details
|
  |
|
05-09-2019
|
4.75
|
Primary Alternator, Solidnoid Diodes, Avionics Fan
|
Details
|
  |
|
05-07-2019
|
4.75
|
Large AWG Wire Connections; Seat Heater Wiring
|
Details
|
  |
|
05-06-2019
|
1.00
|
Large AWG Crimper Test, Painted Cabin Brace
|
Details
|
  |
|
05-03-2019
|
6.50
|
Routed Engine Sensor Wires
|
Details
|
  |
|
05-02-2019
|
6.00
|
Engine Sensors
|
Details
|
  |
|
05-01-2019
|
7.00
|
Glare Shield Cover Sides, EGT/CHT Wiring
|
Details
|
  |
|
04-30-2019
|
5.00
|
Glare Shield Cover; EGT/CHT Wire
|
Details
|
  |
|
04-29-2019
|
4.50
|
Began Install of Glare Shield Cover; EGT/CHT Wire
|
Details
|
  |
|
04-26-2019
|
4.50
|
Completed G5 Case Frame
|
Details
|
  |
|
04-25-2019
|
7.50
|
Creating Case for G5 Mounting
|
Details
|
  |
|
04-24-2019
|
7.00
|
CAN Bus Connections, Ign Switch Wiring
|
Details
|
  |
|
04-23-2019
|
6.50
|
Switch & Breaker Wiring; CAN-Bus Wiring
|
Details
|
  |
|
04-22-2019
|
6.25
|
Power & Switch Wiring, Seat Heater Switches
|
Details
|
  |
|
04-19-2019
|
5.00
|
Wired Panel Lights; CO Detector and Switch LEDs
|
Details
|
  |
|
04-18-2019
|
5.00
|
Ground Blocks; Lighted PushButtons
|
Details
|
  |
|
04-17-2019
|
6.75
|
IBBS Connector; Breakers; Power Leads
|
Details
|
  |
|
04-16-2019
|
7.75
|
CO Det; IBBS
|
Details
|
  |
|
04-10-2019
|
6.25
|
GTR 20 and GTX 45R Wiring
|
Details
|
  |
|
04-09-2019
|
3.75
|
GAD 29; GSU 25 Wiring
|
Details
|
  |
|
04-08-2019
|
8.25
|
GAD 29; GEA 24 P241; GMC 305 Wiring
|
Details
|
  |
|
04-05-2019
|
7.25
|
GAD 27 - P271 Connector Wiring
|
Details
|
  |
|
04-04-2019
|
6.50
|
GMA 245 Wiring
|
Details
|
  |
|
04-03-2019
|
3.50
|
GMA 245 Wiring Started
|
Details
|
  |
|
04-02-2019
|
8.25
|
Completed Wiring for GTN 650
|
Details
|
  |
|
04-01-2019
|
7.50
|
GTN 650 Wiring
|
Details
|
  |
|
03-29-2019
|
4.75
|
MFD & PFD2 Wiring
|
Details
|
  |
|
03-28-2019
|
6.75
|
PFD-1 & MFD Wiring
|
Details
|
  |
|
03-27-2019
|
3.50
|
PFD-1 Wiring
|
Details
|
  |
|
03-26-2019
|
7.00
|
PFD-1 Wiring Harness Fabrication Begins
|
Details
|
  |
|
03-25-2019
|
4.25
|
Determine CAN Bus Order & Document
|
Details
|
  |
|
03-22-2019
|
6.00
|
Measure & Create Harness Layout Board
|
Details
|
  |
|
03-21-2019
|
4.50
|
Avionics Relay, Switches, Measured Sub-Panel
|
Details
|
  |
|
03-20-2019
|
1.50
|
Sketched Wire Bundle Routing Diagream with Distanc
|
Details
|
  |
|
03-20-2019
|
5.00
|
Installing Breakers & ELT Control Head
|
Details
|
  |
|
03-19-2019
|
2.50
|
Determininng Breakers Install & Req'd Crimp Connec
|
Details
|
  |
|
03-18-2019
|
1.50
|
Enlarging Panel Holes
|
Details
|
  |
|
03-15-2019
|
5.50
|
Preparing Panel for Wiring
|
Details
|
  |
|
03-14-2019
|
5.00
|
Completed Wiring Diagrams
|
Details
|
  |
|
03-13-2019
|
6.75
|
Added Wire Numbers to Wiring Diagrams
|
Details
|
  |
|
03-12-2019
|
7.00
|
Wiring Diagrams Refinement
|
Details
|
  |
|
03-11-2019
|
8.50
|
Wiring Diagrams Development/Refinement
|
Details
|
  |
|
03-09-2019
|
1.50
|
Rivet Firewall Penetrations
|
Details
|
  |
|
03-08-2019
|
5.25
|
Installed & Wired Shunts, Wired Voltage Reg.
|
Details
|
  |
|
03-07-2019
|
6.00
|
Installed Voltage Regulators
|
Details
|
  |
|
03-06-2019
|
3.00
|
Reviewed & Marked-up Wiring Diagrams
|
Details
|
  |
|
03-05-2019
|
8.50
|
Revised Wiring Diagrams, Added A/C and Seat Heater
|
Details
|
  |
|
03-04-2019
|
5.50
|
Mounted IBBS, Prepared Firewall Holes
|
Details
|
  |
|
02-28-2019
|
5.50
|
Revised Electrical Diagrams, Added IBBS Page
|
Details
|
  |
|
02-27-2019
|
6.50
|
Mounted LRUs to Panel Trays
|
Details
|
  |
|
02-26-2019
|
7.75
|
Mounting Voltage Regulators, GSU 25, CO Detector
|
Details
|
  |
|
02-25-2019
|
6.50
|
Determining LRU Mounting Locations
|
Details
|
  |
|
02-22-2019
|
6.50
|
Mounting GTX 45R Transponder Rack
|
Details
|
  |
|
02-20-2019
|
7.25
|
Mounting GTN650 Cage to Panel
|
Details
|
  |
|
02-18-2019
|
6.00
|
Preparing Avionics Cage Mounting
|
Details
|
  |
|
02-15-2019
|
8.00
|
Panel Installation
|
Details
|
|
|
02-14-2019
|
6.75
|
Power Distribution Diagrams
|
Details
|
  |
|
02-13-2019
|
4.50
|
Oil Door, AC Bump-Out, Center Console
|
Details
|
 |
|
02-12-2019
|
6.00
|
Tunnel Access Panel, Control Panel Prep
|
Details
|
|
|
02-11-2019
|
5.25
|
Tunnel Access Plate Install
|
Details
|
  |
|
02-08-2019
|
6.75
|
Tunnel Side Access Install
|
Details
|
  |
|
02-06-2019
|
3.75
|
FWF A/C Hoses Installation
|
Details
|
|
|
02-06-2019
|
2.50
|
Begin Fitting GTN 650 & Audio Panel to Aircraft
|
Details
|
|
|
02-05-2019
|
5.00
|
Avionics Inventory, Fuel Valve Extension
|
Details
|
  |
|
02-04-2019
|
5.00
|
Ground Straps, Throttle Quadrant, Fiberglass Bump-
|
Details
|
  |
|
02-01-2019
|
6.50
|
Fitting the Central Console
|
Details
|
  |
|
01-31-2019
|
3.75
|
Fitting the Center Console
|
Details
|
  |
|
01-30-2019
|
5.25
|
Review & Check Wiring Diagrams
|
Details
|
  |
|
01-29-2019
|
4.75
|
Developing Wiring Diagrams
|
Details
|
  |
|
01-28-2019
|
5.75
|
Wiring for Starter, Alternator, & Compressor
|
Details
|
  |
|
01-25-2019
|
5.75
|
Cushion Clamps for Engine Plug Wires, Grounding
|
Details
|
  |
|
01-24-2019
|
3.00
|
Seat Heater Wiring
|
Details
|
  |
|
01-23-2019
|
7.00
|
Avionics LRU Wiring Diagrams
|
Details
|
  |
|
01-22-2019
|
4.75
|
Propeller Install, Seat Heater Wires, Cowl Bumpout
|
Details
|
  |
|
01-21-2019
|
5.75
|
Cowl, Exhaust, Seat Heaters
|
Details
|
  |
|
01-18-2019
|
5.50
|
Oil Door, Cowl Bump-outs, A/C Hose
|
Details
|
  |
|
01-17-2019
|
5.00
|
Attaching Rear Seat Backs
|
Details
|
 |
|
01-16-2019
|
2.75
|
Lower Cowl Bump-Outs
|
Details
|
 |
|
01-15-2019
|
4.50
|
Wiring Diagrams
|
Details
|
  |
|
01-14-2019
|
4.75
|
Engine Cowl Fiberglass Work
|
Details
|
|
|
01-11-2019
|
5.00
|
Cowl Modifications & Heated Seats
|
Details
|
 |
|
01-10-2019
|
2.00
|
Oil Door and Cowl Modification
|
Details
|
  |
|
01-09-2019
|
5.25
|
Oil Door Hinge and Latch
|
Details
|
 |
|
01-08-2019
|
3.25
|
Installed EGT Probes
|
Details
|
 |
|
01-07-2019
|
3.75
|
Installed Mufflers/Heat Muffs
|
Details
|
|
|
10-28-2018
|
4.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
10-23-2018
|
7.00
|
Electrical Diagrams Creation
|
Details
|
  |
|
10-22-2018
|
5.00
|
Continued Development of Electrical Diagrams
|
Details
|
  |
|
10-03-2018
|
3.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
09-15-2018
|
3.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
09-14-2018
|
5.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-14-2018
|
5.50
|
Continued Development of Avionics Wiring Diagrams
|
Details
|
  |
|
06-13-2018
|
2.50
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-12-2018
|
4.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-11-2018
|
3.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-07-2018
|
2.00
|
Avionics Wiring Diagrams
|
Details
|
  |
|
06-06-2018
|
5.00
|
Avionics Wiring Diagrams Creation
|
Details
|
  |
|
05-31-2018
|
3.00
|
Develop Draft LRU Pages in PowerPoint
|
Details
|
  |
|
05-30-2018
|
2.00
|
Organize Previous Avionics Work in Preparation
|
Details
|
  |
|
03-25-2018
|
0.00
|
Fractured Foot - Work Will Be Delayed
|
Details
|
  |
|
03-23-2018
|
6.75
|
FAB Install & Exhaust Headers
|
Details
|
|
|
03-22-2018
|
7.75
|
Filtered Air Box Baffling
|
Details
|
  |
|
03-21-2018
|
1.75
|
Air Box Inlet Work
|
Details
|
  |
|
03-20-2018
|
6.00
|
Engine Control Cables Installed
|
Details
|
  |
|
03-19-2018
|
1.75
|
Filtered Air Box Inlet Fiberglass Fab
|
Details
|
  |
|
03-06-2018
|
1.50
|
Cowl to Filtered Air Box Fab
|
Details
|
  |
|
03-05-2018
|
3.00
|
Cowl To Filtered Air Box
|
Details
|
  |
|
03-02-2018
|
4.75
|
Air Box to Cowl Connection Fab
|
Details
|
  |
|
03-01-2018
|
4.00
|
Filtered Air Box
|
Details
|
  |
|
02-28-2018
|
7.25
|
Filtered Air Box Creation
|
Details
|
  |
|
02-27-2018
|
7.00
|
Filtered Air Box
|
Details
|
  |
|
02-26-2018
|
4.00
|
Filtered Air Box
|
Details
|
  |
|
02-23-2018
|
7.00
|
Determing Control Cable Lengths & Routings
|
Details
|
  |
|
02-22-2018
|
7.50
|
Fitting Control Panel & Center Console
|
Details
|
  |
|
02-21-2018
|
7.25
|
Started Fitting Control Panel to Aircraft
|
Details
|
  |
|
02-20-2018
|
6.75
|
Throttle Body Install & Cowl Pin Cover Plates
|
Details
|
  |
|
02-19-2018
|
7.00
|
Cowl Pin Covers
|
Details
|
  |
|
02-16-2018
|
7.50
|
Rivet Baffle Seals; Installed Oil Cooler & CHT Pro
|
Details
|
  |
|
02-15-2018
|
7.25
|
Fabricating Baffle Seals
|
Details
|
  |
|
02-14-2018
|
6.00
|
Installing Baffle Seals
|
Details
|
  |
|
02-13-2018
|
8.00
|
Baffle Tension Rods & Spark Plug Top Wires
|
Details
|
  |
|
02-12-2018
|
7.25
|
Finished Trimming Baffles
|
Details
|
  |
|
02-09-2018
|
5.50
|
Trimming Baffles
|
Details
|
  |
|
02-08-2018
|
7.25
|
Baffle Trimming
|
Details
|
  |
|
02-07-2018
|
7.25
|
Front Inlet Ramp Baffles - Continued
|
Details
|
  |
|
02-06-2018
|
1.25
|
Unpacked & Inventoried Panel & Parts
|
Details
|
  |
|
02-06-2018
|
6.75
|
Left Inlet Ramp Baffles
|
Details
|
  |
|
02-05-2018
|
8.00
|
Left Inlet Ramp Fitting and Front Baffles
|
Details
|
  |
|
02-02-2018
|
7.00
|
Bottom Cowl & Baffles
|
Details
|
  |
|
02-01-2018
|
7.25
|
Bottom Cowl Louvers
|
Details
|
  |
|
01-31-2018
|
6.50
|
Cowls
|
Details
|
  |
|
01-30-2018
|
6.50
|
Top Cowl Side Hinges
|
Details
|
  |
|
01-29-2018
|
5.25
|
Bottom Cowl Side Hinges Riveted. Oil Door Cut
|
Details
|
  |
|
01-26-2018
|
2.00
|
Bottom Cowl Side Hinges
|
Details
|
  |
|
01-25-2018
|
7.00
|
Cowl Edges
|
Details
|
  |
|
01-23-2018
|
7.50
|
Cowl - Riveting Hinges
|
Details
|
  |
|
01-22-2018
|
7.25
|
Cowl Attachment - New Hinges
|
Details
|
  |
|
01-19-2018
|
2.50
|
Electrical Planning
|
Details
|
  |
|
01-16-2018
|
3.50
|
Updated Breaker List & Discussed with Aerotronics
|
Details
|
  |
|
01-15-2018
|
4.50
|
Confirming Electrical System Breaker Sizes
|
Details
|
  |
|
01-11-2018
|
7.00
|
Electrical Drawings Development
|
Details
|
  |
|
01-10-2018
|
2.50
|
Sanded Epoxy Filled Holes in Cowls
|
Details
|
  |
|
01-09-2018
|
5.75
|
Cowl Fitting - Hinge Drilling Mistake
|
Details
|
  |
|
01-08-2018
|
7.00
|
Fitting Cowl & Drilling for Hinge Riveting
|
Details
|
  |
|
01-05-2018
|
6.75
|
Cowl Fitting
|
Details
|
  |
|
01-04-2018
|
3.00
|
Fitting Cowl
|
Details
|
  |
|
01-03-2018
|
6.50
|
Fitting Bottom Cowl
|
Details
|
  |
|
01-03-2018
|
1.50
|
Final Review of Panel CAD Drawing
|
Details
|
  |
|
01-02-2018
|
5.50
|
Trim Top Cowl
|
Details
|
  |
|
12-12-2017
|
1.00
|
Panel Layout
|
Details
|
  |
|
12-12-2017
|
3.75
|
Left Intake Baffle Modification for Air Conditione
|
Details
|
  |
|
12-11-2017
|
3.75
|
Air box Alternate Air Door and Drain Tube
|
Details
|
  |
|
12-01-2017
|
6.00
|
Air Box Fabrication
|
Details
|
  |
|
11-30-2017
|
1.00
|
Compressor Final Fitting
|
Details
|
  |
|
11-30-2017
|
5.00
|
A/C Compressor Mounting
|
Details
|
  |
|
11-29-2017
|
3.50
|
Door Switch Wiring
|
Details
|
  |
|
11-29-2017
|
3.00
|
A/C Compressor Installation Started
|
Details
|
  |
|
11-28-2017
|
6.50
|
Engine Baffle Prep and Cowling Prep. Door Switch
|
Details
|
  |
|
11-22-2017
|
4.00
|
Baffles Install & Cowl Trim
|
Details
|
  |
|
11-21-2017
|
7.25
|
Baffles Fabrication & Installation
|
Details
|
  |
|
11-20-2017
|
2.00
|
Panel Design
|
Details
|
  |
|
11-20-2017
|
5.50
|
Engine Baffles
|
Details
|
  |
|
11-17-2017
|
7.25
|
Engine Baffles Fabrication
|
Details
|
  |
|
11-16-2017
|
7.25
|
Alternator Install & Baffles
|
Details
|
  |
|
11-15-2017
|
6.50
|
Engine Installation
|
Details
|
  |
|
11-13-2017
|
6.00
|
Prep Rear of Engine For Installation
|
Details
|
  |
|
11-09-2017
|
3.00
|
Panel Planning
|
Details
|
  |
|
11-08-2017
|
6.00
|
Install Backup Alternator onto Engine
|
Details
|
  |
|
11-07-2017
|
1.50
|
Lowered Onto Gear
|
Details
|
  |
|
11-07-2017
|
5.00
|
Began Preping Engine for Mounting
|
Details
|
  |
|
11-06-2017
|
5.50
|
Install Interface Fairings on Main Gear
|
Details
|
  |
|
11-01-2017
|
6.50
|
Nose Gear Fairing
|
Details
|
  |
|
10-31-2017
|
4.75
|
Nose Gear Fairing
|
Details
|
  |
|
10-30-2017
|
4.75
|
Gear Leg Fairings
|
Details
|
  |
|
10-20-2017
|
4.50
|
Main Gear Leg Fairings
|
Details
|
  |
|
10-19-2017
|
7.50
|
Nosewheel Fairing & Gear Leg Fairing
|
Details
|
  |
|
10-18-2017
|
5.50
|
Nose Wheel Fairing
|
Details
|
  |
|
10-17-2017
|
5.50
|
Wheel Fairings
|
Details
|
  |
|
10-16-2017
|
8.00
|
Wheel Fairings
|
Details
|
  |
|
10-13-2017
|
5.00
|
Wheel Fairings
|
Details
|
  |
|
10-12-2017
|
6.50
|
Wheel Fairings
|
Details
|
  |
|
10-11-2017
|
7.50
|
Wheel Fairings
|
Details
|
  |
|
10-10-2017
|
7.25
|
Wheel Fairings
|
Details
|
  |
|
10-09-2017
|
6.00
|
Wheel Fairings
|
Details
|
  |
|
10-06-2017
|
5.50
|
Wheels & Brakes
|
Details
|
  |
|
10-06-2017
|
2.00
|
Nose Gear Assembly
|
Details
|
  |
|
10-05-2017
|
1.50
|
Raised Fuselage Onto Work bench
|
Details
|
  |
|
10-05-2017
|
2.00
|
Installed Landing Gear Legs
|
Details
|
  |
|
10-04-2017
|
3.75
|
Finished Windscreen & Prepared for Fuselage Liftin
|
Details
|
  |
|
10-03-2017
|
4.50
|
Finished Windscreen Fairing
|
Details
|
  |
|
10-02-2017
|
4.75
|
Windscreen Fairing; Window Edge Filler
|
Details
|
  |
|
09-29-2017
|
2.50
|
Epoxy Finish Coat on Windscreen Fairing
|
Details
|
  |
|
09-28-2017
|
3.00
|
Windscreen Fairing Final Shape & Top Coat
|
Details
|
  |
|
09-27-2017
|
2.00
|
4th Thin Layer of Epoxy-Micro on Windscreen Fairin
|
Details
|
  |
|
09-26-2017
|
1.75
|
Added 3rd Layer of Epoxy-Micro to Windscreen Fairi
|
Details
|
  |
|
09-25-2017
|
3.00
|
Second Epoxy/Micro Finishing Layer
|
Details
|
  |
|
09-22-2017
|
1.50
|
First Epoxy Micro Finish Coat on Windscreen Fairin
|
Details
|
  |
|
09-21-2017
|
2.00
|
Filled Door Fab Rivets; Added Fiberglass to Windsc
|
Details
|
  |
|
09-20-2017
|
1.50
|
Added Fiberglass Layers to Windscreen Fairing
|
Details
|
  |
|
09-19-2017
|
4.50
|
Windscreen Fairing; Repair Right Door Strut Mount
|
Details
|
  |
|
09-15-2017
|
5.00
|
Fiberglass Layers on Windscreen & Touch up Paintin
|
Details
|
  |
|
09-14-2017
|
2.00
|
Second Fiberglass Layer on Windscreen
|
Details
|
  |
|
09-13-2017
|
4.50
|
First Fiberglass Layer on Windscreen
|
Details
|
  |
|
09-12-2017
|
5.00
|
Prepared for Windscreen Base Faring Fabrication
|
Details
|
  |
|
09-11-2017
|
4.00
|
Corrected Windscreen Gluing Error
|
Details
|
  |
|
09-08-2017
|
8.25
|
Finalized Left Door Latch Installation
|
Details
|
  |
|
09-07-2017
|
7.75
|
Left Door Mounting
|
Details
|
  |
|
09-06-2017
|
7.00
|
Mounting Right Door
|
Details
|
  |
|
09-05-2017
|
7.25
|
Door Latch Tips & Door Gas Struts
|
Details
|
  |
|
08-23-2017
|
3.50
|
Glued Plexiglass
|
Details
|
  |
|
08-22-2017
|
6.25
|
Preparing for Gluing Plexiglass
|
Details
|
  |
|
08-21-2017
|
8.25
|
Install Door Latches
|
Details
|
  |
|
08-19-2017
|
0.75
|
Paint Touch-up Around Doors
|
Details
|
  |
|
08-18-2017
|
2.50
|
Touch Up Painting Around Doors
|
Details
|
  |
|
08-17-2017
|
1.75
|
Painting Doors
|
Details
|
  |
|
08-16-2017
|
1.00
|
Painting Interior Doors
|
Details
|
  |
|
08-15-2017
|
5.00
|
Prep Doors & Interior for Painting
|
Details
|
  |
|
08-14-2017
|
7.25
|
Prep Doors for Interior Paint
|
Details
|
  |
|
08-11-2017
|
3.00
|
Primed Inside of Doors
|
Details
|
  |
|
08-10-2017
|
5.50
|
Prep Doors for Painting; Prep Windscreen for Gluin
|
Details
|
  |
|
08-09-2017
|
7.00
|
Door Latches
|
Details
|
  |
|
08-08-2017
|
6.50
|
Nose Gear Wheel, Prop Storage, Door Latch Covers
|
Details
|
  |
|
08-07-2017
|
5.50
|
Cabin Doors, Interior touch up, Nose Gear
|
Details
|
  |
|
08-02-2017
|
5.00
|
Planning & Ordering Avionics Equipment
|
Details
|
  |
|
07-31-2017
|
4.50
|
Planning for Panel Avionics Order
|
Details
|
  |
|
07-31-2017
|
2.50
|
Door Latches
|
Details
|
  |
|
07-12-2017
|
5.50
|
Door Latches
|
Details
|
  |
|
07-11-2017
|
7.50
|
Door Latches
|
Details
|
  |
|
07-10-2017
|
4.75
|
Door Latch
|
Details
|
  |
|
07-06-2017
|
2.75
|
Door Latches
|
Details
|
  |
|
07-05-2017
|
7.00
|
Door Latches
|
Details
|
  |
|
07-03-2017
|
7.75
|
Engine Mount Installation; Door Handles
|
Details
|
  |
|
06-30-2017
|
1.75
|
Right Door Window Fitting
|
Details
|
  |
|
06-29-2017
|
7.50
|
Hang Door & Trim Door Window Plexiglass
|
Details
|
  |
|
06-28-2017
|
7.25
|
Door Fitting
|
Details
|
  |
|
06-27-2017
|
7.00
|
Trimming Doors
|
Details
|
  |
|
06-26-2017
|
6.75
|
Trimmed Doors
|
Details
|
  |
|
06-23-2017
|
2.50
|
Bonded Doors Together
|
Details
|
  |
|
06-22-2017
|
4.50
|
Prep for Gluing Doors
|
Details
|
  |
|
06-21-2017
|
6.25
|
Secure Cabin Top at Door Openings
|
Details
|
  |
|
06-20-2017
|
7.25
|
Installing Cabin Top
|
Details
|
  |
|
06-15-2017
|
6.50
|
Final Prep for Cabin Top Attachment
|
Details
|
  |
|
06-14-2017
|
7.50
|
Firewall Riveting & Cowl Hinges
|
Details
|
  |
|
06-13-2017
|
4.00
|
Forward Fuselage Top Assembly
|
Details
|
  |
|
06-12-2017
|
7.50
|
Prep For Closing Fuselage
|
Details
|
  |
|
06-09-2017
|
7.75
|
Tail Cone Wiring Harness
|
Details
|
  |
|
06-08-2017
|
2.00
|
Wiring diagrams Development
|
Details
|
  |
|
06-07-2017
|
5.00
|
Preparation for Tail Cone and Wing Wiring
|
Details
|
  |
|
06-07-2017
|
1.50
|
Cleaned Up From Internal Painting
|
Details
|
  |
|
06-06-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
06-01-2017
|
7.00
|
Creating Avionics Wiring Diagrams
|
Details
|
  |
|
05-31-2017
|
1.50
|
Interior Painting
|
Details
|
  |
|
05-30-2017
|
5.50
|
Interior Painting
|
Details
|
  |
|
05-26-2017
|
0.75
|
Interior Painting
|
Details
|
  |
|
05-25-2017
|
1.50
|
Interior Painting
|
Details
|
  |
|
05-24-2017
|
1.00
|
Interior Painting
|
Details
|
  |
|
05-23-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-19-2017
|
1.25
|
Interior Painting
|
Details
|
  |
|
05-18-2017
|
5.00
|
Inventory
|
Details
|
  |
|
05-18-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-17-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-09-2017
|
1.25
|
Painting Canopy
|
Details
|
  |
|
05-08-2017
|
1.75
|
Painting Canopy Inside
|
Details
|
  |
|
05-01-2017
|
4.25
|
Painting Fiberglass Canopy Interior
|
Details
|
|
|
04-27-2017
|
3.00
|
Cut Opening for USB Power Units & Painted the Pane
|
Details
|
  |
|
04-26-2017
|
1.50
|
Painting Interior Panels
|
Details
|
  |
|
04-25-2017
|
1.75
|
Painting Cover Panels
|
Details
|
  |
|
04-24-2017
|
1.50
|
Painting Cover Panels
|
Details
|
  |
|
04-21-2017
|
1.75
|
Painting Cover Panels
|
Details
|
  |
|
04-20-2017
|
2.50
|
Painted Interior Covers
|
Details
|
  |
|
04-20-2017
|
3.00
|
Installled Headset Jack Recess Panels
|
Details
|
  |
|
04-19-2017
|
3.50
|
Interior Covers Painting
|
Details
|
  |
|
04-14-2017
|
3.25
|
Interior Painting Prep
|
Details
|
  |
|
04-13-2017
|
3.00
|
Primed Inside of Cabin Top
|
Details
|
  |
|
04-13-2017
|
3.50
|
Fabricated Right Side Wire Cover
|
Details
|
  |
|
04-12-2017
|
5.50
|
Lighting Molex Connectors
|
Details
|
  |
|
04-10-2017
|
5.25
|
Molex Connectors Installation
|
Details
|
  |
|
04-05-2017
|
5.75
|
Installed Molex Connectors to Trim Servos
|
Details
|
  |
|
04-04-2017
|
5.00
|
Flap Position Transmitter
|
Details
|
  |
|
03-31-2017
|
1.50
|
Coax Labels
|
Details
|
  |
|
03-29-2017
|
6.25
|
Installed Coax Antenna Connectors, Rung Out Wires
|
Details
|
  |
|
03-28-2017
|
7.00
|
Fiberglass Added R. Wingtip; Installed R. Seat Flo
|
Details
|
  |
|
03-27-2017
|
7.50
|
Right Wing Tip; Re-installed Left Rear Seat Floor
|
Details
|
  |
|
03-24-2017
|
6.75
|
Right Wing Tip Smoothing & Right Main Gear Prep.
|
Details
|
  |
|
03-22-2017
|
8.25
|
Continued Wing Tip Smoothing & Prep for Floor Rein
|
Details
|
  |
|
03-21-2017
|
7.00
|
Left Main Gear Preparation & Left Wingtip Smoothin
|
Details
|
  |
|
03-20-2017
|
1.00
|
Smooth Wing Tip Insert with Epoxy-Micro
|
Details
|
  |
|
03-20-2017
|
7.00
|
Fabricated Bracket for Flap Position Sensor & Pull
|
Details
|
  |
|
03-18-2017
|
2.75
|
Riviting Hard To Reach Locations
|
Details
|
  |
|
03-16-2017
|
4.00
|
Continued Smoothing Cabin Top
|
Details
|
  |
|
03-14-2017
|
5.00
|
Smoothing Inside Cabin Top
|
Details
|
  |
|
03-13-2017
|
7.75
|
Avionics Wiring In Fuselage
|
Details
|
  |
|
03-10-2017
|
7.00
|
Labeling Wires and Terminating
|
Details
|
  |
|
03-09-2017
|
5.00
|
Prepare Wire Labels
|
Details
|
  |
|
03-09-2017
|
4.00
|
Developed Listing of Avionics Wires To Be Installe
|
Details
|
  |
|
03-07-2017
|
5.50
|
Terminated Mid-Fuselage Electrical Wires
|
Details
|
  |
|
03-07-2017
|
2.00
|
Fit Left Wing Tip Rib
|
Details
|
  |
|
03-06-2017
|
3.00
|
Power Wires Run To Mid Fuselage
|
Details
|
  |
|
03-06-2017
|
5.50
|
Left Wing Tip Mounting
|
Details
|
  |
|
03-03-2017
|
6.00
|
Completed Right Wing Tip, Started Left Wing Tip
|
Details
|
  |
|
03-02-2017
|
7.00
|
Right Wing Tip Fitting & Mounting
|
Details
|
  |
|
03-01-2017
|
5.00
|
Cabin Top Finish & Avionics Planning
|
Details
|
  |
|
02-28-2017
|
4.00
|
Primed Inside Cabin Top
|
Details
|
  |
|
02-28-2017
|
2.50
|
Installed Power Wiring - Tailcone to Rear Seats
|
Details
|
  |
|
02-28-2017
|
1.00
|
A/C Hose Completion in fuselage
|
Details
|
  |
|
02-27-2017
|
4.00
|
Wiring Installation - Power Wire To Tailcone
|
Details
|
  |
|
02-27-2017
|
3.25
|
A/C Hose Supports; Condenser Penetration Doublers
|
Details
|
  |
|
02-23-2017
|
7.00
|
Cabin Top Prep; Oil Cooler Box
|
Details
|
  |
|
02-22-2017
|
7.75
|
Primed Parts, Prepared for Wiring
|
Details
|
  |
|
02-20-2017
|
5.00
|
Prepared Cabin Top for Riveting
|
Details
|
  |
|
02-20-2017
|
2.00
|
Crimp A/C Hose Ends
|
Details
|
  |
|
02-19-2017
|
1.00
|
A/C Hose Guides & Drain Fitting
|
Details
|
  |
|
02-17-2017
|
7.75
|
A/C Hose Runs
|
Details
|
  |
|
02-16-2017
|
8.00
|
Plexiglass Trimming; Cabin Top Drilling
|
Details
|
  |
|
02-15-2017
|
3.00
|
Inventoried Parts & Developed Wiring Reqmts
|
Details
|
  |
|
02-14-2017
|
3.00
|
Determined Wiring Required to Back
|
Details
|
  |
|
02-13-2017
|
7.75
|
Wingtip Light Covers & Rear Window
|
Details
|
  |
|
02-10-2017
|
2.50
|
Prepare Wing Tip Light Covers
|
Details
|
  |
|
02-10-2017
|
2.00
|
Practiced Plexiglass Cutting
|
Details
|
  |
|
02-10-2017
|
1.50
|
Cabin Top Vertical Support Post
|
Details
|
  |
|
02-09-2017
|
8.00
|
Drilling Cabin Top
|
Details
|
|
|
02-07-2017
|
7.75
|
Prep for Electrical, A/C Prep
|
Details
|
  |
|
02-06-2017
|
8.50
|
Evap Shelf & Glass Overhead Console
|
Details
|
  |
|
02-02-2017
|
6.25
|
Wiring Prep & Fiberglass Overhead Console
|
Details
|
  |
|
02-01-2017
|
5.25
|
Wiring for Tail Light
|
Details
|
  |
|
01-31-2017
|
7.00
|
Glued Overhead Console to Cabin Top
|
Details
|
  |
|
01-30-2017
|
5.75
|
Prepare Overhead Console
|
Details
|
  |
|
01-24-2017
|
4.50
|
Install Coax to Tail Cone
|
Details
|
  |
|
01-23-2017
|
7.30
|
Prepare Overhead Console for Gluing
|
Details
|
  |
|
01-20-2017
|
6.50
|
Installed Lights in Left Wing Tip
|
Details
|
  |
|
01-19-2017
|
6.00
|
Wing Tip Lights
|
Details
|
  |
|
01-17-2017
|
6.00
|
Cabin LIghts
|
Details
|
  |
|
01-16-2017
|
8.00
|
Antennas, Tail LIght, Bulkhead Repair
|
Details
|
  |
|
12-16-2016
|
1.00
|
Wing Tips Modifications
|
Details
|
  |
|
12-16-2016
|
5.00
|
Install A/C Condenser
|
Details
|
|
|
12-14-2016
|
4.00
|
Installed Gas Strut Attach Doublers
|
Details
|
|
|
12-13-2016
|
6.00
|
Fitting Doors
|
Details
|
 |
|
12-12-2016
|
5.50
|
GPS Antenna Installation
|
Details
|
|
|
12-12-2016
|
2.50
|
Clecoed Doors to Fuselage
|
Details
|
  |
|
12-08-2016
|
3.50
|
Parking Brake Valve
|
Details
|
|
|
12-08-2016
|
2.50
|
Installed Engine Mount
|
Details
|
 |
|
12-07-2016
|
6.00
|
Install Antennas
|
Details
|
  |
|
12-05-2016
|
7.50
|
Door Trimming
|
Details
|
  |
|
12-02-2016
|
7.50
|
Trimmed Outer Door Skins
|
Details
|
  |
|
11-29-2016
|
1.50
|
Seat Floor Access Hatch Fabrication (continued)
|
Details
|
  |
|
11-29-2016
|
0.50
|
Installed the Fuel Flow Transmitter
|
Details
|
  |
|
11-29-2016
|
4.25
|
Complete Finishing Kit Inventor
|
Details
|
  |
|
11-28-2016
|
7.50
|
Unpack and Inventory
|
Details
|
  |
|
11-27-2016
|
1.50
|
Rivet Fuel Flow Transmitter Bracket to Fuselage
|
Details
|
  |
|
11-23-2016
|
1.00
|
Received Finishing Kit
|
Details
|
  |
|
11-21-2016
|
8.00
|
Created Access Hatch in Rear Seat Floor
|
Details
|
  |
|
11-14-2016
|
7.00
|
Wing Tips Modified for Landing Lights
|
Details
|
  |
|
11-11-2016
|
6.75
|
Installed A/C Scoop RivNuts
|
Details
|
  |
|
11-09-2016
|
6.00
|
Cabin Overhead Lights
|
Details
|
  |
|
11-07-2016
|
5.50
|
Located A/C Scoop On Fuselage Bottom
|
Details
|
  |
|
11-03-2016
|
9.00
|
Researching Avionics/Electrical Requirements
|
Details
|
  |
|
10-31-2016
|
6.50
|
Installed Vent Fans In Panel Top
|
Details
|
|
|
10-27-2016
|
7.50
|
Overhead Console Fitting
|
Details
|
  |
|
10-24-2016
|
7.25
|
Removed Seat Covers; Cut Evap Shelf and Installed
|
Details
|
  |
|
10-20-2016
|
5.00
|
Inventory and Study Documents
|
Details
|
  |
|
10-19-2016
|
7.50
|
Aileron Linkages & Trim Servo
|
Details
|
|
|
10-18-2016
|
6.50
|
FT-60 Connection; Aileron Control Linkages
|
Details
|
|
|
10-12-2016
|
6.25
|
Installed Nav Antenna Into Vertical Stabilizer
|
Details
|
|
|
10-10-2016
|
5.00
|
FT-60 & Wing Walk
|
Details
|
  |
|
10-05-2016
|
7.00
|
Fabricated F1099 Wing Fairing Supports & Stiffener
|
Details
|
  |
|
10-04-2016
|
4.00
|
Began Fitting Overhead Console
|
Details
|
  |
|
10-03-2016
|
3.50
|
Fuel System
|
Details
|
  |
|
09-30-2016
|
3.00
|
Fitting Cabin Top
|
Details
|
|
|
09-28-2016
|
8.00
|
Fitting Cabin Top
|
Details
|
  |
|
09-27-2016
|
5.50
|
Cabin Top Fitting
|
Details
|
  |
|
09-26-2016
|
6.00
|
Flap Actuator Assembly Install
|
Details
|
|
|
09-23-2016
|
4.50
|
Elevator Control System Install
|
Details
|
|
|
09-22-2016
|
7.00
|
Fuel Filter & Pump; Fiberglass Top Trim
|
Details
|
|
|
09-21-2016
|
8.00
|
Fiberglass Top; Baggage Door
|
Details
|
|
|
09-20-2016
|
8.75
|
Cutting Down Fiberglass Top; Installing Baggage Do
|
Details
|
|
|
09-19-2016
|
8.25
|
Began Work on Fuselage Top
|
Details
|
  |
|
09-16-2016
|
6.25
|
Rear Seat Backs
|
Details
|
|
|
09-15-2016
|
8.50
|
Flap Bushings; Cowl Attach Hinge Fabrication
|
Details
|
  |
|
09-14-2016
|
8.25
|
Flap System
|
Details
|
  |
|
09-12-2016
|
8.00
|
Control System
|
Details
|
  |
|
09-09-2016
|
7.00
|
Installed Rudder Pedals; Fabricated Elevator Push
|
Details
|
|
|
09-08-2016
|
6.50
|
Static Port Tubing; Brake/Rudder Pedals
|
Details
|
|
|
09-07-2016
|
8.50
|
Anti-Yaw Bracket and Static Air Tubing
|
Details
|
  |
|
09-06-2016
|
8.25
|
Fuel System
|
Details
|
|
|
09-01-2016
|
8.25
|
Yaw Servo Mount, Brake Lines
|
Details
|
|
|
08-31-2016
|
8.25
|
Baggage Door, Pitch Servo, Rear Seat Floor
|
Details
|
  |
|
08-29-2016
|
3.75
|
Baggage Corrugation Wear Blocks & Door
|
Details
|
 |
|
08-26-2016
|
5.50
|
Continued Baggage Area Work
|
Details
|
  |
|
08-25-2016
|
8.50
|
Baggage Area
|
Details
|
  |
|
08-24-2016
|
2.75
|
Install Steps & Prep For Floor Riveting
|
Details
|
|
|
08-23-2016
|
6.50
|
Install Conduit in Fuselage
|
Details
|
|
|
08-22-2016
|
6.25
|
Hinges and Floor for Baggage Area
|
Details
|
  |
|
08-19-2016
|
5.00
|
Rivet Fuselage to Tail Cone
|
Details
|
 |
|
08-18-2016
|
7.50
|
Disconnected Tail Cone and Prepared for Riveting
|
Details
|
  |
|
08-11-2016
|
8.00
|
Tail Cone Mating to Fuselage
|
Details
|
  |
|
08-10-2016
|
7.00
|
Riveted Right Wing
|
Details
|
|
|
08-10-2016
|
1.50
|
Initial Connection of Tail Cone to Fuselage
|
Details
|
  |
|
08-09-2016
|
8.50
|
Riveted Bottom Skin on Left Wing
|
Details
|
  |
|
08-08-2016
|
8.00
|
Front Floor, Brake Lines, Wiring Holes
|
Details
|
  |
|
08-05-2016
|
8.00
|
Wing Wiring & Prep for Closure
|
Details
|
  |
|
08-04-2016
|
6.00
|
Installed Roll Servo Mount & Wing Wiring
|
Details
|
  |
|
08-03-2016
|
8.00
|
Wing & Fuselage Conduit, Aileron Trim Servo
|
Details
|
  |
|
08-02-2016
|
7.50
|
Installed Wing Conduit & Fuselage Floor Insulation
|
Details
|
  |
|
08-01-2016
|
7.50
|
Pitot Mast
|
Details
|
 |
|
07-21-2016
|
7.50
|
Aileron Actuation, Brake Lines
|
Details
|
  |
|
07-20-2016
|
8.00
|
Aileron Actuation
|
Details
|
  |
|
07-19-2016
|
8.00
|
Flap & Aileron Gap Fairings; J-Stiffener Drilling
|
Details
|
  |
|
07-18-2016
|
8.00
|
Filled Leading Edge Guide Holes
|
Details
|
  |
|
07-15-2016
|
7.50
|
Primed Parts; Installed AHRS Bracket in Tail Cone
|
Details
|
  |
|
07-14-2016
|
7.00
|
Preparing for Priming
|
Details
|
  |
|
07-13-2016
|
7.00
|
Access Panels for Step Bolts
|
Details
|
  |
|
07-12-2016
|
8.00
|
Priming & Locating Access Hatch
|
Details
|
  |
|
07-11-2016
|
8.50
|
Continued QB Fuselage Work Against Plans
|
Details
|
  |
|
07-08-2016
|
6.00
|
Continued QB Fuselage Review Against Plans
|
Details
|
  |
|
07-07-2016
|
8.00
|
Began review of QB fuselage against plans
|
Details
|
  |
|
07-06-2016
|
7.50
|
Continued Comparison of QB Wings with Plans
|
Details
|
  |
|
07-05-2016
|
7.80
|
Began fiberglass work on empennage fairings
|
Details
|
  |
|
07-01-2016
|
6.00
|
Began Review of QB Wings for Unfinished Work
|
Details
|
  |
|
06-30-2016
|
7.75
|
Fit Empennage Fairings
|
Details
|
  |
|
06-29-2016
|
8.75
|
Fitting Fiberglass Fairings to Horizontal Stabiliz
|
Details
|
  |
|
06-28-2016
|
5.50
|
Elevator Trim Install
|
Details
|
  |
|
06-27-2016
|
8.25
|
Elevator Trim Servo Install
|
Details
|
  |
|
06-25-2016
|
6.50
|
Elevator Push Rod & Rudder Install
|
Details
|
  |
|
06-24-2016
|
6.50
|
Attached Horiz. & Vert. Stab. to Tail Cone
|
Details
|
|
|
06-23-2016
|
8.00
|
Mounted Horiz. Stabilizer to Tail Cone
|
Details
|
|
|
06-22-2016
|
7.50
|
Completed Tail Cone
|
Details
|
  |
|
06-21-2016
|
7.00
|
Rivet Tail Cone Top Skin
|
|
  |
|
06-20-2016
|
7.25
|
Riveting Tail Cone
|
Details
|
  |
|
06-18-2016
|
3.50
|
Continue Tail Cone Riveting
|
Details
|
  |
|
06-17-2016
|
4.00
|
Riveting Tail Cone Right Side
|
Details
|
  |
|
06-16-2016
|
8.00
|
Tail Cone Riveting Started
|
Details
|
  |
|
06-15-2016
|
7.50
|
Dimple & Countersink Tailcone Components
|
Details
|
  |
|
06-14-2016
|
6.75
|
De-bur Tailcone Components
|
Details
|
  |
|
06-13-2016
|
8.00
|
Complete Tail Cone Drilling & Disassemble
|
Details
|
  |
|
06-10-2016
|
7.00
|
Install & Drill Tail Cone Angle, Install Top
|
Details
|
|
|
06-08-2016
|
5.00
|
Reassembling Tail Cone
|
Details
|
|
|
06-08-2016
|
2.00
|
Built DRDT Platform
|
Details
|
  |
|
06-07-2016
|
3.00
|
Resumed Work On Tail Cone
|
Details
|
  |
|
06-07-2016
|
2.50
|
Inventory Tools
|
Details
|
  |
|
06-06-2016
|
7.50
|
Inventory Quick Build Kits
|
Details
|
|
|
05-30-2016
|
3.00
|
Quick Build Kits Delivered
|
Details
|
|
|
03-25-2016
|
2.00
|
Cut Workbench Lumber
|
Details
|
  |
|
03-24-2016
|
4.25
|
Cut Workbench Legs
|
Details
|
  |
|
03-23-2016
|
3.25
|
Workbench Research & Design
|
Details
|
  |
|
03-09-2016
|
8.00
|
Tailcone Initial Fit-up
|
Details
|
|
|
03-08-2016
|
1.00
|
Roll Elevator Leading Edges
|
Details
|
  |
|
03-08-2016
|
4.00
|
Finish Horizontal Stabilizer Construction
|
Details
|
|
|
03-08-2016
|
3.00
|
Begin Tail Cone Structure
|
Details
|
 |
|
03-07-2016
|
1.00
|
Rudder Completion
|
Details
|
 |
|
03-07-2016
|
3.83
|
Horizontal Stabilizer Build
|
Details
|
|
|
03-07-2016
|
3.00
|
Elevators Trailing Edge
|
Details
|
 |
|
03-06-2016
|
2.75
|
Completed Tailcone Primer Preparation
|
Details
|
  |
|
03-05-2016
|
7.70
|
Tailcone Prep for Primer
|
Details
|
  |
|
03-04-2016
|
4.33
|
Horizontal Stabilizer Skeleton
|
Details
|
|
|
03-04-2016
|
4.00
|
Complete Vertical Stabilizer
|
Details
|
|
|
03-03-2016
|
3.20
|
Vertical Stabilizer Structure Fab
|
Details
|
|
|
03-03-2016
|
3.00
|
Rudder Trailing Edge
|
Details
|
|
|
03-03-2016
|
2.00
|
Horizontal Stabilizer Build
|
Details
|
|
|
03-02-2016
|
8.25
|
Elevator
|
Details
|
|
|
03-01-2016
|
8.17
|
Elevator - Day 1
|
Details
|
|
|
02-29-2016
|
8.00
|
Rudder Construction
|
Details
|
|