Date
|
Hours
|
Work Log Summary
|
Details
|
10-02-2021
|
1.00
|
Performed Weight and Balance
|
Details
|
|
|
09-26-2021
|
8.00
|
Trailered airplane and wings to airport hanger and
|
Details
|
|
|
09-26-2021
|
1.00
|
Applied gap tape to ailerons
|
|
|
|
09-12-2021
|
4.00
|
Manufactured and install Experimental and N-number
|
Details
|
|
|
09-05-2021
|
2.00
|
Installed all placards and information stickers
|
Details
|
|
|
08-28-2021
|
4.00
|
Modified trim spring connection to elevator push r
|
Details
|
|
|
08-23-2021
|
2.00
|
Installed baggage compartment floor and covers.
|
|
|
|
08-22-2021
|
1.00
|
Installed seat belts and seats
|
|
|
|
08-08-2021
|
1.00
|
Installed static and pitot air tubes in baggage co
|
Details
|
|
|
08-07-2021
|
0.25
|
Installed control stick boot covers
|
|
|
|
08-01-2021
|
4.00
|
Installed elevator stops and adjusted travel
|
Details
|
|
|
07-25-2021
|
8.00
|
installed and adjusted all control pushrods
|
Details
|
|
|
07-24-2021
|
2.00
|
Installed RayAllen grips on control sticks
|
Details
|
|
|
07-18-2021
|
1.00
|
Installed gap tape on rudder and elevator
|
|
|
|
07-18-2021
|
0.25
|
Final install of rudder
|
Details
|
|
|
06-06-2021
|
3.00
|
Installed elevator control horn
|
Details
|
|
|
04-26-2020
|
0.50
|
Resolved issue of difficult installation/removal o
|
Details
|
|
|
10-05-2019
|
3.00
|
Added Defoster Fan Breaker to electrical panel
|
Details
|
|
|
09-16-2019
|
8.00
|
Installed aluminum ground plane
|
Details
|
|
|
09-08-2019
|
1.00
|
Added stickers to various controls and installed f
|
Details
|
|
|
09-01-2019
|
2.00
|
Scraped excess silicon rubber from windshield/fuse
|
Details
|
|
|
08-31-2019
|
4.00
|
Installed windshield
|
Details
|
|
|
08-18-2019
|
2.00
|
Wired circuit board on Ray Allen control sticks
|
Details
|
|
|
08-17-2019
|
0.50
|
Started engine and ran util oil temp reached 215 d
|
|
|
|
08-14-2019
|
5.00
|
Routed and connected ELT harness
|
Details
|
|
|
08-13-2019
|
4.00
|
Manufactured ELT cable harness
|
|
|
|
08-13-2019
|
3.00
|
Epoxied carbon fibre to ELT tray
|
Details
|
|
|
08-12-2019
|
2.00
|
Epoxied ELT transmitter tray to inside of fuselage
|
Details
|
|
|
08-12-2019
|
2.00
|
cutout templates for a ground plane under the com
|
|
|
|
08-11-2019
|
2.00
|
Installed com antenna
|
|
|
|
07-28-2019
|
2.00
|
3D routed Ray Allen control stick
|
Details
|
|
|
06-16-2019
|
3.00
|
Re-fit windshield with modified support bars
|
Details
|
|
|
05-28-2019
|
1.00
|
Installed bagage compartment components for markng
|
Details
|
|
|
05-27-2019
|
4.00
|
Installed velcro for seats and Dynon instruments
|
Details
|
|
|
05-26-2019
|
1.00
|
Drilled holes for transponder antenna cable in rea
|
Details
|
|
|
05-11-2019
|
1.00
|
Tested VHF COM Radio
|
Details
|
|
|
05-05-2019
|
2.00
|
Installed windshield support bars.
|
Details
|
|
|
05-04-2019
|
0.50
|
Started Engine
|
|
|
|
05-03-2019
|
1.00
|
Affixed cover over landing gear/brake lines
|
|
|
|
04-28-2019
|
1.00
|
Installed top instrument panel top (dashboard)
|
|
|
|
04-27-2019
|
4.00
|
Zip tied wiring in instrument panel
|
|
|
|
04-21-2019
|
4.00
|
Mounted parking brake and affixed brake lines
|
|
|
|
04-21-2019
|
0.50
|
Affixed fuel lines to bottom of fuselage
|
|
|
|
04-20-2019
|
8.00
|
Determined why brake line leaked and repaired
|
|
|
|
04-13-2019
|
2.00
|
Attached pedal adjustment springs to bottom of fus
|
|
|
|
02-09-2019
|
1.00
|
Tested everything on Power Panel
|
|
|
|
02-09-2019
|
2.00
|
Installed power panel
|
|
|
|
01-26-2019
|
6.00
|
Routed wires in bottom of instrument panel and wir
|
|
|
|
01-12-2019
|
1.00
|
Drilled holes in base of Instrument panel for wire
|
|
|
|
12-29-2018
|
2.00
|
Installed Cockpit light
|
|
|
|
12-21-2018
|
3.00
|
Fit doors on airplane
|
Details
|
|
|
12-16-2018
|
1.00
|
Wired up landing light current limiter harness
|
|
|
|
12-01-2018
|
2.00
|
Connected Landing Light to power panel
|
Details
|
|
|
11-21-2018
|
1.00
|
Started Engine
|
Details
|
|
|
11-18-2018
|
4.00
|
Tested ADSB
|
Details
|
|
|
11-17-2018
|
1.00
|
Ran backup battery tests
|
Details
|
|
|
11-11-2018
|
2.00
|
Configured Dynon so it can find new items on bus
|
Details
|
|
|
11-10-2018
|
3.00
|
Routed, connected general wiring harness connector
|
Details
|
|
|
11-04-2018
|
2.00
|
Leveled turn cordination ball in instrument panel
|
Details
|
|
|
11-03-2018
|
1.00
|
Connected Static and Pitot tube to instruments
|
Details
|
|
|
10-28-2018
|
3.00
|
Manufactured ground planes for ADSB, Transponder
|
Details
|
|
|
10-27-2018
|
1.50
|
Added sheathing to trim position indication wires
|
Details
|
|
|
10-21-2018
|
4.00
|
Added connectors to general power harness
|
Details
|
|
|
10-20-2018
|
3.00
|
Added X83 radio connector to harness, connected
|
Details
|
|
|
10-14-2018
|
6.00
|
Threaded new hardesses through fuselage wire tube
|
Details
|
|
|
10-07-2018
|
4.00
|
Fixed Dynon power wires in supplied harness
|
Details
|
|
|
09-25-2018
|
6.00
|
Mounted ADSB and Transponder Antennas
|
Details
|
|
|
09-15-2018
|
8.00
|
Working on joystick switch solution
|
Details
|
|
|
09-08-2018
|
18.00
|
Designed and manufactured COM wire harness
|
Details
|
|
|
09-01-2018
|
16.00
|
Designed and built general power wire harness
|
Details
|
|
|
08-26-2018
|
4.00
|
Planned electronics location in rear baggage floor
|
Details
|
|
|
08-25-2018
|
2.00
|
Attached connector and cap to Aileron Servo
|
Details
|
|
|
08-25-2018
|
2.00
|
Added cap to Elevator Servo wire harness
|
Details
|
|
|
08-20-2018
|
4.00
|
Manufactured Elevator Servo wire harness
|
Details
|
|
|
08-18-2018
|
3.00
|
Drilled holes on fuselage for Elevator servo
|
Details
|
|
|
07-15-2018
|
0.50
|
Started Engine
|
Details
|
|
|
05-28-2018
|
0.25
|
Installed lock on right door
|
|
|
|
05-28-2018
|
0.50
|
Installed door latching mechanism on right door
|
|
|
|
05-28-2018
|
0.50
|
Finished grinding out hole for latch arm on right
|
Details
|
|
|
05-22-2018
|
0.50
|
Started engine
|
Details
|
|
|
04-29-2018
|
0.50
|
Test fit elevator servo
|
|
|
|
04-28-2018
|
0.50
|
Manufactured elevator servo mounting bracket
|
|
|
|
04-21-2018
|
1.00
|
Made aluminum washers for door locks
|
Details
|
|
|
04-21-2018
|
0.25
|
Installed lock on left door
|
Details
|
|
|
04-14-2018
|
0.50
|
Installed door latching mechanism on left door
|
Details
|
|
|
04-07-2018
|
2.00
|
Installed lexan window opening covers
|
Details
|
|
|
03-31-2018
|
2.00
|
Installed lexan windows on doors
|
Details
|
|
|
03-24-2018
|
2.00
|
Painted edges of lexan windows
|
Details
|
|
|
03-17-2018
|
5.00
|
Installed parachute strap covers
|
Details
|
|
|
03-11-2018
|
2.00
|
Installed parachute cover
|
Details
|
|
|
03-05-2018
|
0.50
|
Fitted parachute cover
|
Details
|
|
|
03-04-2018
|
1.00
|
Installed Cockpit light
|
Details
|
|
|
03-04-2018
|
3.00
|
Installed Aileron Cluch rods and tube link bearing
|
Details
|
|
|
03-03-2018
|
3.00
|
Fixed Hinge pins on elevator
|
Details
|
|
|
02-24-2018
|
2.00
|
Manufactured aileron clutch bolt tightening tool
|
Details
|
|
|
02-18-2018
|
1.00
|
Attached stickers to parachute cover and exhaust
|
Details
|
|
|
02-17-2018
|
2.00
|
Fit and glued in parachute cover
|
Details
|
|
|
02-17-2018
|
3.00
|
Attached parachute to retaining straps and rocket
|
Details
|
|
|
02-10-2018
|
1.00
|
Installed parachute and fuselage straps
|
Details
|
|
|
02-10-2018
|
2.00
|
Attached straps to top of fuselage, cut slots for
|
Details
|
|
|
02-04-2018
|
2.00
|
Installed parachute retaining straps
|
Details
|
|
|
02-03-2018
|
3.00
|
Installed parachute release handle
|
Details
|
|
|
01-28-2018
|
2.00
|
Re-installed rocket
|
Details
|
|
|
01-27-2018
|
5.00
|
Attached exhaust tube to fuselage
|
Details
|
|
|
01-21-2018
|
2.00
|
Drilled hole in fuselage for rocket exhaust tube
|
Details
|
|
|
01-20-2018
|
4.00
|
Fit exhaust tube on rocket
|
Details
|
|
|
01-14-2018
|
2.00
|
Trial fit rocket
|
Details
|
|
|
01-13-2018
|
2.00
|
Unpacked parachute
|
Details
|
|
|
01-10-2018
|
3.00
|
Installed power panel (again) and started engine
|
Details
|
|
|
12-29-2017
|
2.00
|
Re-installed left wing to aux tank fuel lines
|
Details
|
|
|
12-29-2017
|
2.00
|
Installed right wing to aux tank fuel lines
|
Details
|
|
|
12-29-2017
|
1.00
|
Installed locknuts on both ailerons
|
Details
|
|
|
12-29-2017
|
2.00
|
Drilled hole in cockpit bulkhead for pitot lines
|
Details
|
|
|
12-28-2017
|
2.00
|
Ground down right wing hinge
|
Details
|
|
|
12-27-2017
|
3.00
|
Trimmed trailing edge of right aileron
|
Details
|
|
|
12-27-2017
|
3.00
|
Trimmed trailing edge of left aileron
|
Details
|
|
|
12-26-2017
|
2.00
|
Removed wings put back in storage
|
|
|
|
12-16-2017
|
4.00
|
installed air brake and aileron clutches, test fit
|
Details
|
|
|
12-16-2017
|
1.00
|
Ground out nylon air brake centering ring
|
Details
|
|
|
12-02-2017
|
4.00
|
Finished airbrake handle latch
|
Details
|
|
|
12-01-2017
|
2.00
|
Re-drilled hole in air brake handle for latch
|
Details
|
|
|
11-26-2017
|
2.00
|
Filled in hole drill in air brake handle with wood
|
Details
|
|
|
11-25-2017
|
4.00
|
Measured and drilled air brake handle for latch ho
|
Details
|
|
|
11-22-2017
|
2.00
|
Riveted air brake clutches
|
Details
|
|
|
11-22-2017
|
4.00
|
Fit air brake handle and clutches
|
Details
|
|
|
11-21-2017
|
1.00
|
Shortened and riveted left aileron clutch
|
Details
|
|
|
11-20-2017
|
0.50
|
Installed center support for aileron clutches
|
Details
|
|
|
11-20-2017
|
5.00
|
Fit aileron clutches into fuselage holes
|
Details
|
|
|
11-19-2017
|
2.00
|
Installed left fuel lines from wing to aux tank
|
Details
|
|
|
11-18-2017
|
3.00
|
Installed fuel lines and pass-thru plate on right
|
Details
|
|
|
11-18-2017
|
4.00
|
Finished fitting right aileron
|
Details
|
|
|
11-12-2017
|
4.00
|
Finished fitting left aileron
|
Details
|
|
|
11-11-2017
|
6.00
|
Machined wing center bolt spacer
|
Details
|
|
|
11-05-2017
|
16.00
|
Completed power panel wiring
|
Details
|
|
|
11-02-2017
|
1.00
|
Started Engine
|
Details
|
|
|
09-23-2017
|
4.00
|
Finished D1000 main wire harness
|
Details
|
|
|
09-20-2017
|
1.00
|
Made one Headphone Jack wire harness
|
Details
|
|
|
09-16-2017
|
0.50
|
Removed D1000 Instrument wiring harness
|
Details
|
|
|
09-16-2017
|
1.00
|
Installed Pilot/Copilot Headphone Jacks
|
Details
|
|
|
09-10-2017
|
2.00
|
Tested fuel system for leaks
|
Details
|
|
|
09-10-2017
|
2.00
|
Started Engine
|
Details
|
|
|
09-10-2017
|
1.00
|
Setup/Tested engine management page on Dynon
|
Details
|
|
|
09-09-2017
|
2.00
|
installed USB/AUX connectors
|
Details
|
|
|
09-09-2017
|
0.50
|
Installed propeller spinner
|
Details
|
|
|
09-09-2017
|
0.50
|
Installed propeller pitch knob
|
|
|
|
09-09-2017
|
0.25
|
Installed propeller pitch cable
|
Details
|
|
|
09-09-2017
|
1.50
|
Installed power connectors on Dynon cables
|
Details
|
|
|
09-09-2017
|
2.00
|
Installed latest Software/Database on Dynon
|
Details
|
|
|
09-09-2017
|
0.50
|
Installed Instruments
|
Details
|
|
|
09-09-2017
|
2.00
|
Installed Engine RS232 connectors
|
Details
|
|
|
09-09-2017
|
1.00
|
Installed Dynon networking cables
|
Details
|
|
|
09-03-2017
|
0.50
|
Installed Instrument panel
|
Details
|
|
|
09-03-2017
|
4.00
|
Installed nutsert fittings on instrument panel
|
Details
|
|
|
09-02-2017
|
6.00
|
Cut out instrument panel with CNC router
|
Details
|
|
|
08-12-2017
|
2.00
|
Loctited cowl quick release screws
|
|
|
|
08-06-2017
|
0.50
|
Drilled hole in Panel for Propeller pitch knob
|
Details
|
|
|
08-05-2017
|
2.00
|
Installed propeller
|
Details
|
|
|
07-30-2017
|
4.00
|
Added Headphone jacks to breaker panel
|
Details
|
|
|
07-29-2017
|
6.00
|
Fixed cowl release screw in wrong location
|
Details
|
|
|
07-23-2017
|
4.00
|
Installed airfoil on nose gear strut
|
Details
|
|
|
07-22-2017
|
3.50
|
Wire tied hoses and wires in engine compartment
|
|
|
|
07-16-2017
|
1.50
|
Installed wiring for landing light
|
Details
|
|
|
07-15-2017
|
2.50
|
Installed air filter and engine air inlet hose
|
Details
|
|
|
07-09-2017
|
2.00
|
Soldered end of throttle and pitch cables
|
Details
|
|
|
07-08-2017
|
2.50
|
Installed radiator overflow tank
|
Details
|
|
|
06-24-2017
|
1.00
|
Installed radiator hoses
|
|
|
|
06-24-2017
|
2.00
|
Installed foam on radiator inlet
|
Details
|
|
|
06-17-2017
|
3.00
|
Installed foam on engine air inlet baffle
|
Details
|
|
|
06-10-2017
|
4.00
|
Manufactured a radiator baffle, and installed it
|
Details
|
|
|
06-09-2017
|
2.00
|
Installed sealing foam on oil cooler baffles
|
Details
|
|
|
05-27-2017
|
4.00
|
Installed nose wheel centering springs
|
Details
|
|
|
05-20-2017
|
4.00
|
Installed Nose wheel cables
|
|
|
|
05-13-2017
|
1.50
|
Connected sensor wires to DB32 connector on EMS 22
|
Details
|
|
|
05-12-2017
|
1.50
|
Mounted Dynon backup batteries
|
Details
|
|
|
05-06-2017
|
3.00
|
Install fuel pump wiring
|
Details
|
|
|
04-29-2017
|
2.00
|
Installed Instrument panel base
|
Details
|
|
|
04-22-2017
|
16.00
|
Planning, labeling and installing circuit breakers
|
Details
|
|
|
04-15-2017
|
1.00
|
Installed landing light
|
Details
|
|
|
03-17-2017
|
3.00
|
Swapped out incandescent landing light bulb
|
Details
|
|
|
02-25-2017
|
4.00
|
Extended the front air scoop for air cooling the e
|
Details
|
|
|
01-21-2017
|
8.00
|
Routed and connected all the engine wiring
|
Details
|
|
|
01-14-2017
|
8.00
|
Installed oil lines
|
Details
|
|
|
01-07-2017
|
8.00
|
Installed fuel lines
|
Details
|
|
|
12-28-2016
|
2.50
|
Installed large fuel filter
|
Details
|
|
|
12-27-2016
|
0.50
|
Installed quick release screws to attach top cowl
|
Details
|
|
|
12-27-2016
|
0.50
|
Cut out hole in cowl for gascolator
|
Details
|
|
|
11-26-2016
|
4.00
|
Measured and cut out exhaust pipe holes
|
Details
|
|
|
11-25-2016
|
7.00
|
Attached cowl to front of airplane.
|
Details
|
|
|
11-05-2016
|
0.50
|
Installed fuel gascolator
|
Details
|
|
|
11-05-2016
|
4.00
|
Fixed Cowl so it lies flush with fuselage
|
Details
|
|
|
10-22-2016
|
6.00
|
Finished Nose wheel slot in the cowl
|
Details
|
|
|
10-15-2016
|
16.00
|
Fit front cowl on the front of the airplane
|
Details
|
|
|
09-24-2016
|
8.00
|
Cut out slot for nose wheel
|
Details
|
|
|
09-17-2016
|
4.00
|
Fit front cowl halves together and installed quick
|
Details
|
|
|
09-10-2016
|
6.00
|
Installed Engine
|
Details
|
|
|
08-28-2016
|
2.00
|
Replaced main electrical board with updated board
|
Details
|
|
|
08-27-2016
|
6.00
|
Replace fuel selector valve and lines with updated
|
Details
|
|
|
08-06-2016
|
6.50
|
Finished Nose wheel
|
Details
|
|
|
07-31-2016
|
3.00
|
Prepare motor mount for main nose gear
|
Details
|
|
|
07-16-2016
|
24.00
|
Installed new generator mod to the 912is engine
|
Details
|
|
|
04-23-2016
|
4.00
|
Installed Beringer connectors to brake lines
|
Details
|
|
|
04-23-2016
|
4.00
|
Added brake fluid to braking system
|
Details
|
|
|
04-17-2016
|
5.00
|
Installed brake lines in cockpit
|
Details
|
|
|
03-21-2016
|
2.00
|
Removed main gear and appiled silicon as specified
|
Details
|
|
|
03-20-2016
|
1.00
|
Siliconed the right wing tip strobe lens cover on
|
Details
|
|
|
03-19-2016
|
4.00
|
Ran heated pitot tube connections throught the win
|
Details
|
|
|
03-18-2016
|
1.50
|
Attached fuel vent line and attached pass thru cov
|
Details
|
|
|
03-17-2016
|
1.50
|
Attached fuel supply line from wing
|
Details
|
|
|
03-16-2016
|
1.50
|
Siliconed left wing tip strobe lens cover on
|
Details
|
|
|
03-12-2016
|
1.00
|
Layed out fuel line connections to the wing
|
Details
|
|
|
03-09-2016
|
2.00
|
Ground out pocket for right wingtip light and moun
|
Details
|
|
|
03-08-2016
|
2.00
|
Ground out and mounted Left wingtip light
|
Details
|
|
|
03-07-2016
|
4.00
|
Epoxied parts on the wings
|
Details
|
|
|
03-06-2016
|
4.00
|
Assembled and locktited right airbrake assembly
|
Details
|
|
|
03-05-2016
|
8.00
|
Fitted right airbrake cover in wing
|
Details
|
|
|
02-15-2016
|
2.00
|
Riveted left door hinges
|
Details
|
|
|
02-15-2016
|
4.00
|
Fixed rivets on door hinges
|
Details
|
|
|
02-14-2016
|
4.00
|
Fixed rivets on right door hinges
|
Details
|
|
|
02-08-2016
|
1.00
|
Drilled out rivet in right door where rivet pulled
|
Details
|
|
|
02-07-2016
|
6.00
|
Ground Hinge holes in flaperon to meet 28 and 33 d
|
Details
|
|
|
02-06-2016
|
4.00
|
Prepared right flaperon for installation
|
Details
|
|
|
02-03-2016
|
4.00
|
Prepared right wing speed brake
|
|
|
|
02-01-2016
|
6.00
|
Prepared right wing
|
Details
|
|
|
01-31-2016
|
2.00
|
Finished fitting and installed flapperon for left
|
Details
|
|
|
01-28-2016
|
1.00
|
Sanded trailing edge of left wing
|
Details
|
|
|
01-27-2016
|
1.00
|
Finished left airbrake
|
Details
|
|
|
01-24-2016
|
8.50
|
Ground the hinge slots and end of flapperon
|
Details
|
|
|
01-24-2016
|
8.00
|
Fitted flapperons to the wing
|
Details
|
|
|
01-23-2016
|
1.50
|
Used new tool to adjust airbrake torque
|
Details
|
|
|
01-22-2016
|
1.50
|
Made tool for adjusting airbrake torque
|
Details
|
|
|
01-20-2016
|
1.50
|
Assembled airbrake and installed in wing.
|
Details
|
|
|
01-19-2016
|
7.50
|
Fit airbrake cover on left wing
|
Details
|
|
|
01-15-2016
|
1.50
|
fitted left airbrake
|
Details
|
|
|
01-14-2016
|
1.50
|
Trial assembled left airbrake
|
Details
|
|
|
01-13-2016
|
1.50
|
Prepared and test assembled left airbrake
|
Details
|
|
|
01-12-2016
|
1.50
|
Ground top side base of left wing
|
Details
|
|
|
01-04-2016
|
1.50
|
Fitted wing tip light lens to wingtip
|
|
|
|
01-04-2016
|
1.50
|
Drilled holes for mounting wing tip light lens
|
|
|
|
01-04-2016
|
1.00
|
Attached fuel gauge hose to wing tank
|
|
|
|
01-02-2016
|
2.50
|
pulled wires for stobe lights
|
Details
|
|
|
01-02-2016
|
2.00
|
Grinding hole in top of wing for fuel cap
|
Details
|
|
|
01-02-2016
|
2.00
|
Fitting strobe lights into wing
|
|
|
|
01-02-2016
|
2.00
|
Finished grinding wing tank cap opening
|
Details
|
|
|
12-31-2015
|
4.50
|
Ground base of wings and drilled drain holes
|
Details
|
|
|
12-31-2015
|
3.00
|
Cut out wing tips to attach wing tip strobe lights
|
Details
|
|
|
12-31-2015
|
2.00
|
Cleaned basement and setup scaffold and put wings
|
Details
|
|
|
12-28-2015
|
3.00
|
Mounted Left door latch
|
Details
|
|
|
12-26-2015
|
3.00
|
Sanded door lexan windows to correct size
|
Details
|
|
|
12-26-2015
|
1.00
|
marked lock key cylinders in the door windows
|
Details
|
|
|
12-26-2015
|
1.50
|
Attached locking latches to door latch rods
|
Details
|
|
|
12-13-2015
|
6.50
|
Attached doors to fuselage
|
Details
|
|
|
12-12-2015
|
5.50
|
Drilling holes for door latch bars for right door
|
Details
|
|
|
12-07-2015
|
1.00
|
Temporarily installed door latch
|
Details
|
|
|
12-06-2015
|
6.00
|
Attached windows to right and left doors
|
Details
|
|
|
11-30-2015
|
4.00
|
Fitted right door
|
Details
|
|
|
11-27-2015
|
2.00
|
Layed out instrument panel in cad program
|
Details
|
|
|
11-24-2015
|
1.00
|
ran static line to adhrs unit
|
Details
|
|
|
11-24-2015
|
2.00
|
Ran remaining brake lines from parking brake to ru
|
|
|
|
11-24-2015
|
1.00
|
Drilled holes in base of fuselage for main gear br
|
Details
|
|
|
11-23-2015
|
1.50
|
Installed Main gear
|
|
|
|
11-23-2015
|
0.50
|
Epoxied static air tube fittings to sides of fusel
|
|
|
|
11-23-2015
|
1.50
|
Epoxied main gear support washers to bottom of fus
|
|
|
|
11-22-2015
|
1.00
|
Setup fuselage on host
|
Details
|
|
|
11-22-2015
|
3.00
|
Repaired holes in fuselage
|
Details
|
|
|
11-22-2015
|
1.00
|
Moved wings to basement, setup workarea
|
Details
|
|
|
11-22-2015
|
2.00
|
Inserted brake lines into landing gear strut
|
Details
|
|
|
11-22-2015
|
2.00
|
Drilled holes for static air
|
Details
|
|
|
11-21-2015
|
2.00
|
Marked and sanded left door
|
|
|
|
11-20-2015
|
1.00
|
Drilled center hole in wing spar
|
Details
|
|
|
11-17-2015
|
2.00
|
Ground off excess carbon fiber on ailerons
|
Details
|
|
|
11-16-2015
|
0.50
|
Marked wing root for sanding
|
Details
|
|
|
11-16-2015
|
2.00
|
Finished triming the wing roots
|
Details
|
|
|
11-16-2015
|
1.50
|
Continued grinding wing spar pin
|
Details
|
|
|
11-15-2015
|
6.00
|
Trial fit wings to fuselage again
|
Details
|
|
|
11-15-2015
|
2.00
|
Ground right spar pin bushing
|
Details
|
|
|
11-15-2015
|
1.50
|
Ground out wing root pin
|
Details
|
|
|
11-15-2015
|
2.00
|
Got the stuck pin out
|
Details
|
|
|
11-14-2015
|
0.50
|
Updrilled holes in Windshield and deburred
|
|
|
|
11-14-2015
|
2.00
|
Unpacked Wings, removed ailerons, Prepared area fo
|
|
|
|
11-14-2015
|
2.00
|
Trial fit wings to fuselage.
|
Details
|
|
|
11-08-2015
|
2.00
|
Sanded Windshield to fit opening
|
|
|
|
11-08-2015
|
2.00
|
Drilled out holes for windshield and windshield su
|
|
|
|
11-04-2015
|
2.00
|
Marked windshield for sanding and painting
|
Details
|
|
|
11-01-2015
|
4.00
|
Attached windshield to fuselage and drilled rivet
|
Details
|
|
|
10-25-2015
|
2.00
|
Mounted center supports for front windshield
|
Details
|
|
|
10-20-2015
|
6.00
|
fixed axle on main gear
|
Details
|
|
|
10-17-2015
|
2.00
|
Updrilled holes in top window to 4.5mm
|
Details
|
|
|
10-10-2015
|
2.00
|
Sanded top window to be at least 2mm from edges
|
|
|
|
10-03-2015
|
3.00
|
Attached weather stripping to left door and fit it
|
Details
|
|
|
09-23-2015
|
2.00
|
Fitted and drilled top window to fusalage
|
|
|
|
09-13-2015
|
1.00
|
Installed the nose wheel faring strut cover
|
Details
|
|
|
09-13-2015
|
2.00
|
Installed nose wheel and wheel fairing on strut
|
Details
|
|
|
09-12-2015
|
4.00
|
Installed Tanis engine heater to my Rotax 912 is S
|
Details
|
|
|
09-08-2015
|
1.00
|
Ran wire for ADAHRS unit to front of cockpit
|
Details
|
|
|
09-07-2015
|
2.00
|
Wired the trim controller and trim motor
|
Details
|
|
|
09-07-2015
|
2.00
|
Installed trim control motor and springs
|
|
|
|
09-07-2015
|
1.00
|
Drilled countersink holes for main gear washers
|
|
|
|
09-06-2015
|
4.00
|
Installed and swaged rudder pedal cables
|
|
|
|
09-05-2015
|
1.00
|
Attempted to install Static Air Vents
|
Details
|
|
|
09-04-2015
|
2.00
|
Installed OAT Probe
|
|
|
|
09-04-2015
|
1.00
|
Installed Dynon GPS Unit
|
|
|
|
09-04-2015
|
3.00
|
Installed Dynon ADAHRS unit
|
|
|
|
09-02-2015
|
2.00
|
Installed rudder pedals for final time
|
Details
|
|
|
09-02-2015
|
1.00
|
Installed Rotax electronics to Pipistrel firewall
|
|
|
|
08-30-2015
|
2.00
|
Cut holes in firewall upholstery and firewall heat
|
Details
|
|
|
08-30-2015
|
1.00
|
Attached the main 12volt distribution board
|
Details
|
|
|
08-29-2015
|
2.00
|
Installed the forward side upholstery
|
Details
|
|
|
08-29-2015
|
2.00
|
Applied the insulated firewall upholstery to the c
|
Details
|
|
|
08-28-2015
|
4.00
|
Wired the main 12 volt bus with key box
|
Details
|
|
|
08-24-2015
|
2.00
|
Drilled/Cut holes in firewall for electronics
|
Details
|
|
|
08-23-2015
|
1.00
|
Mounted Radiator
|
Details
|
|
|
08-23-2015
|
1.00
|
Mounted Oil reservoir bracket
|
Details
|
|
|
08-22-2015
|
4.00
|
Studied Pipistrel Schematics
|
Details
|
|
|
08-09-2015
|
5.00
|
Installed parking brake and cut remaining brake li
|
Details
|
|
|
08-08-2015
|
3.00
|
Assembled Instrument panel
|
Details
|
|
|
07-31-2015
|
3.00
|
Installed electric trim servo
|
Details
|
|
|
07-30-2015
|
6.00
|
Installed elevator control rods
|
Details
|
|
|
07-29-2015
|
4.00
|
Installed and swaged rudder cables
|
Details
|
|
|
07-28-2015
|
6.00
|
Mounted rudder hinge pin.
|
Details
|
|
|
07-27-2015
|
6.00
|
Rudder Jig
|
Details
|
|
|
07-19-2015
|
4.00
|
Fitted and mounted the horizontal stab
|
Details
|
|
|
07-19-2015
|
4.00
|
fitted and mounted the elevator
|
Details
|
|
|
07-18-2015
|
2.50
|
Installed tubing to hold wire for rear rudder moun
|
Details
|
|
|
07-17-2015
|
2.00
|
Fixed Flap Handle
|
Details
|
|
|
07-12-2015
|
10.00
|
Finished routing and installing fuel lines
|
Details
|
|
|
07-06-2015
|
4.00
|
Attached anti flutter weights and tail strobe ligh
|
|
|
|
07-04-2015
|
4.00
|
Assembled rudder hardware and test fit rudder
|
|
|
|
07-03-2015
|
4.00
|
Cut and fit baggage area pieces and attached them
|
|
|
|
07-01-2015
|
1.00
|
Fitted baggage compartment pieces
|
Details
|
|
|
06-28-2015
|
8.00
|
Installed interior upholstery
|
Details
|
|
|
06-21-2015
|
1.00
|
Installed fuel pump and fuel boost pump in baggage
|
Details
|
|
|
06-21-2015
|
4.00
|
Installed control sticks and control hardware unde
|
|
|
|
06-21-2015
|
4.00
|
Finished rudder cable outer installation
|
|
|
|
06-18-2015
|
1.50
|
Installing rudder cable outers
|
|
|
|
06-17-2015
|
1.50
|
Finished rudder pedal adjustment install. Started
|
|
|
|
06-15-2015
|
2.00
|
Drilling holes for rudder cables and rudder pedal
|
Details
|
|
|
06-14-2015
|
2.00
|
Glued Firewall heat shield in place
|
Details
|
|
|
06-08-2015
|
1.00
|
Drilled holes in firewall for engine controller ca
|
|
|
|
06-07-2015
|
4.50
|
Mounted Secondary Fuel tanks
|
Details
|
|
|
06-07-2015
|
1.50
|
Fit the firewall heat shield
|
Details
|
|
|
06-04-2015
|
2.50
|
Installed Rudder Pedals
|
Details
|
|
|
06-03-2015
|
1.00
|
Drilled holes for brake lines, Broke axle nut
|
Details
|
|
|
05-30-2015
|
6.00
|
Installed then removed elevator/aileron control sy
|
Details
|
|
|
05-29-2015
|
0.50
|
Fixed throttle quadrant
|
Details
|
|
|
05-28-2015
|
1.00
|
Fit the wheel faring mounting bracket on the main
|
Details
|
|
|
05-26-2015
|
1.00
|
Installed fuel tank selector and fuel line
|
Details
|
|
|
05-25-2015
|
5.00
|
Mounted trim control and throttle quadrant
|
Details
|
|
|
05-25-2015
|
8.00
|
Cut holes for fuel valve, parachute, and aileron c
|
Details
|
|
|
05-25-2015
|
1.00
|
Cut hole in firewall for nose gear steering arm an
|
|
|
|
05-24-2015
|
2.00
|
Painted front defroster channel
|
|
|
|
05-24-2015
|
2.00
|
Cut hole for flap control bar. Layed out and teste
|
Details
|
|
|
05-23-2015
|
4.00
|
Drilled and bolted axles to the landing gear
|
Details
|
|
|
05-23-2015
|
1.00
|
Cut hole in firewall and attached source and retur
|
|
|
|
05-20-2015
|
2.00
|
Cut holes for windshield support bars
|
Details
|
|
|
05-17-2015
|
4.00
|
Cut holes for windshield defroster Painted fuselag
|
|
|
|
05-16-2015
|
2.00
|
Painted Windshield channel
|
|
|
|
05-16-2015
|
1.00
|
Painted door lexan channel
|
|
|
|
05-03-2015
|
4.00
|
Sanding and preping interior for painting
|
Details
|
|
|
05-01-2015
|
1.00
|
Unpack Fuselage
|
Details
|
|
|
04-14-2015
|
0.00
|
Recieved and Unloaded kit
|
|
|