Powered By Kitlog Pro v2.0
Scot's RV-7A Builder's Log
RV- 7A
All
Work Logs Found:
336
Category Work Time:
1518 Hours
Date
Hours
Work Log Summary
Details
05-30-2022
8.00
Right Step Intalll
Details
05-29-2022
8.00
Installed Main Gear
Details
05-15-2022
1.00
Moving Day
Details
12-01-2021
8.00
Finalized Panel Design
Details
11-05-2021
8.00
SteinAir Visit
Details
10-01-2021
1.00
Ordered Engine and Prop
Details
09-27-2021
1.00
Stein Air
Details
02-03-2021
1.00
Ordered Weather Stipping
Details
01-20-2021
1.00
Panel Quote
Details
02-04-2018
4.00
Canopy Lock
Details
02-03-2018
8.00
Nose Gear
Details
01-27-2018
6.00
Nosegear Pin
Details
01-15-2018
7.00
Firewall penetrations
Details
01-14-2018
5.00
Engine Mount
Details
01-13-2018
6.00
Parking Brake & Ground Wire
Details
01-01-2018
7.00
Heater & Fuel Lines
Details
12-23-2017
7.00
Pressure Mainifold
Details
12-17-2017
5.00
Firewall Forward Tasks
Details
12-16-2017
3.00
Riveted aft skins
Details
12-16-2017
5.00
Battery Bracket and Solinoids
Details
12-03-2017
4.00
Battery Box
Details
12-02-2017
6.00
Aft Canopy Latch
Details
11-18-2017
4.00
Fairing Sanding
Details
11-12-2017
4.00
Fiberglass Fairing
Details
11-11-2017
3.00
Filled the gap, Cut Plys
Details
11-10-2017
3.00
Shot Aft Skins
Details
10-29-2017
4.00
Clips & prep for fiberglass
Details
10-09-2017
8.00
Final Paint
Details
10-08-2017
5.00
Final Riveting Canopy
Details
10-07-2017
7.00
Final Assembly
Details
10-01-2017
5.00
Paint Canopy parts
Details
09-30-2017
8.00
Canopy Prep
Details
09-19-2017
1.00
Classic Aero Seats
Details
09-17-2017
4.00
Aft Canopy
Details
09-16-2017
8.00
Side Skirts
Details
09-05-2017
6.00
Side Skirts
Details
09-03-2017
6.00
Canopy Braces
Details
09-02-2017
5.00
Canopy Skin
Details
08-27-2017
5.00
Canopy Latch
Details
08-26-2017
9.00
Canopy Latch
Details
08-22-2017
2.50
Aft Canopy
Details
08-21-2017
3.00
Rear Window
Details
08-20-2017
5.00
Rear Window
Details
08-15-2017
3.00
Canopy Strut Mounts
Details
08-13-2017
4.00
Canopy Strut Mount
Details
07-29-2017
8.00
Drilled Forward Canopy
Details
07-23-2017
2.00
Canopy Prep
Details
07-22-2017
6.00
Canopy Fitting
Details
07-16-2017
4.00
The Big Cut
Details
07-15-2017
8.00
Canopy Frame
Details
07-12-2017
2.00
Canopy Frame
Details
07-04-2017
8.00
Canopy Rail Drilling
Details
07-03-2017
7.00
Canopy Rails
Details
07-02-2017
3.00
Canopy Release
Details
07-01-2017
8.00
Canopy Deck
Details
06-28-2017
2.00
Canopy Frame
Details
06-26-2017
3.00
Canopy Frame
Details
06-25-2017
5.00
Canopy Hinges
Details
06-24-2017
7.00
Forward Deck
Details
06-18-2017
5.00
Forward Deck
Details
06-17-2017
8.00
Forward Deck
Details
06-14-2017
4.00
Forward Deck
Details
06-13-2017
8.00
Cabin Frame Channel
Details
06-12-2017
1.00
Seat Leather Samples
Details
06-12-2017
8.00
Cabin Frame
Details
06-11-2017
4.00
Elevator Pushrods
Details
06-09-2017
7.00
Details
06-06-2017
4.00
Primed Cabin Frame
Details
06-06-2017
1.00
Elevator Push Rod
Details
06-05-2017
2.00
Elevator Pushrods
Details
06-05-2017
3.00
Cabin Frame
Details
05-31-2017
6.00
Cabin Frame
Details
05-30-2017
8.00
Cabin Frame
Details
05-22-2017
2.00
Cabin Frame
Details
05-21-2017
6.00
Cabin Frame
Details
05-20-2017
6.00
Cabin Frame Start
Details
05-13-2017
2.00
Shop Setup
Details
04-26-2017
1.00
Hooker Harness
Details
04-11-2017
1.00
Picked up Firewall Forward Kit
Details
04-09-2017
1.00
Avionics Quote
Details
04-08-2017
1.00
Sun N Fun
Details
04-02-2017
1.00
Ordered Firewall Forward Kit
Details
01-13-2016
1.00
Left Fuel Line
Details
01-03-2016
6.00
Right Wing
Details
01-02-2016
10.00
Left Wing
Details
01-01-2016
6.00
Brake Pedals and Lines
Details
12-31-2015
2.50
Fuel Lines
Details
12-30-2015
1.50
Fuel Lines
Details
12-22-2015
1.50
Flap Trimming
Details
12-20-2015
7.00
Flap rod holes
Details
12-19-2015
8.00
Wing Fairings
Details
12-18-2015
2.00
Fuel Tank Attach Brackets
Details
12-15-2015
1.50
Lower Flange Drilled
Details
12-14-2015
3.00
Drilled rear spar
Details
12-13-2015
2.00
Wing Mating
Details
12-12-2015
8.00
Left Wing
Details
12-11-2015
5.00
Mated Right Wing
Details
12-10-2015
2.50
Right Flap
Details
12-09-2015
2.50
Drilled Right Flap
Details
12-07-2015
1.50
Aileron
Details
12-03-2015
2.00
Flaps/Ailerons
Details
12-02-2015
2.50
Pushrods
Details
12-01-2015
1.50
Pushrods
Details
11-30-2015
2.00
Pushrods
Details
11-29-2015
8.00
Bottom Skins
Details
11-28-2015
3.00
Prepped for Wing Mating
Details
11-27-2015
8.00
Upper Forward Fuselage
Details
11-16-2015
2.00
Forward Fuselage
Details
11-15-2015
6.00
Vent Line
Details
11-14-2015
4.00
Vent Lines
Details
11-12-2015
2.00
Random Nut Plates
Details
11-11-2015
8.00
Gear Mounts
Details
11-10-2015
2.50
Landing Gear Mounts
Details
11-08-2015
8.00
Fuel Pump
Details
11-05-2015
2.50
Fuel Pump Cover
Details
11-04-2015
2.50
Fuel Selector
Details
11-03-2015
2.50
Flap Motor
Details
11-02-2015
2.50
Flap motor cover painting
Details
11-01-2015
8.00
Electric Flap Motor
Details
10-25-2015
6.00
Seat and Flaps
Details
10-24-2015
2.00
Shoulder Harness Guides
Details
10-14-2015
3.00
Seat Hinges
Details
10-13-2015
2.00
Seat Backs
Details
10-12-2015
8.00
Baggage area assembly
Details
10-11-2015
8.00
Primmed and painted
Details
10-10-2015
8.00
Prepped Parts
Details
10-07-2015
2.00
Flap Motor
Details
10-06-2015
3.00
Channel Tube
Details
10-04-2015
5.00
Seat Backs
Details
10-03-2015
5.00
Seat Backs
Details
10-01-2015
2.00
Seat Backs
Details
09-29-2015
3.50
Seat Backs
Details
09-28-2015
5.00
Seat Hinges
Details
09-27-2015
4.00
Conduit and seatbelts
Details
09-26-2015
4.00
706 Bulkhead
Details
09-23-2015
2.00
Baggage Area
Details
09-22-2015
2.00
Baggage Area
Details
09-21-2015
2.00
Baggage Area
Details
09-20-2015
5.00
Tops Skins
Details
09-19-2015
8.00
Gussets, misc fuselage
Details
09-16-2015
2.00
Canopy Rails
Details
09-07-2015
8.00
Canopy Rails
Details
09-06-2015
6.00
Aft Deck Riveting
Details
09-05-2015
4.00
Flipped the Canoe
Details
09-04-2015
4.00
Baggage Compartment
Details
08-30-2015
4.00
Fuselage Rivets
Details
08-29-2015
5.00
Bottom Rivets
Details
07-26-2015
4.00
Forward Fuselage Riveting
07-18-2015
6.00
Firewall
Details
06-28-2015
2.50
Side Skin Riveting
06-27-2015
4.00
Center Fuselage Rivets
04-29-2015
2.00
Fuselage Assembly
04-25-2015
8.00
Final Fuselage Assembly
04-21-2015
3.00
Paint
04-20-2015
3.00
Fuselage Prep
04-19-2015
8.00
Primed Painted Fuselage
04-18-2015
3.00
Prepped Forward Fuselage
04-15-2015
3.00
Finish Kit Arrived
Details
04-04-2015
8.00
Forward Fuselage Prep
04-02-2015
3.00
Disassembled Fuselage
03-31-2015
3.00
Tank Brackets
03-30-2015
3.00
Drilling
03-29-2015
6.00
Baggage Area
03-28-2015
8.00
Forward Fuselage Stiffeners
03-22-2015
6.00
Rudder Pedals
03-21-2015
12.00
Landing Gear Mount Web
03-16-2015
3.00
Forward Fuselage Stiffeners
03-15-2015
8.00
Forward Fuselage
03-14-2015
12.00
Forward Fuselage
03-04-2015
2.00
Firewall
03-03-2015
2.00
704 L Brackets
02-28-2015
5.00
Drilled Right Longeron
02-23-2015
2.00
LongeronDrilling
02-22-2015
8.00
02-21-2015
8.00
Attached Aft and Center Fuselage
02-06-2015
1.00
Center Fuselage
02-05-2015
1.50
02-04-2015
1.00
Center Fuselage Riveting
02-03-2015
3.00
Center Fuselage
02-01-2015
8.00
Center Fuselage
01-31-2015
8.00
Center Fuselage Prep and Prime
01-29-2015
3.00
Center Fuselage Prep
01-22-2015
2.00
Center Fuselage Prep
01-20-2015
3.00
Center Fuselage Prep
01-19-2015
6.00
Crotch Harness
01-17-2015
8.00
Center Fuselage Work
01-13-2015
3.00
Bottom Skins
01-12-2015
3.00
Fuselage Bottom Skin
01-11-2015
3.00
Seat Ribs
01-10-2015
3.00
Seat Ribs
01-07-2015
3.00
Aft Fuselage
01-06-2015
2.00
Aft Fuselage Riveting
01-05-2015
4.00
Aft Fuselage Skins
01-04-2015
10.00
Aft Fuselage Riveting
01-03-2015
14.00
Aft Fuselage Prep
01-02-2015
8.00
Drilled J Stiffeners
01-01-2015
8.00
J Stiffeners
12-31-2014
8.00
Longeron Bending
12-30-2014
8.00
Bulkheads and Longerons
12-29-2014
8.00
Alumiprep 33 and Primer
12-28-2014
4.00
Prep Bulkheads
12-27-2014
8.00
Bulkhead
12-26-2014
8.00
706 707 Bulkhead
12-25-2014
8.00
Finished 705v Bulkhead
12-23-2014
3.00
705 G Brackets
12-21-2014
8.00
Control stick Assy and 705 Bulkhead
12-20-2014
8.00
Finished Spar
Details
12-20-2014
8.00
Finished Spar
12-17-2014
2.50
Details
12-16-2014
3.00
Cover Support Ribs
Details
12-14-2014
10.00
Started Center Spar
Details
12-13-2014
8.00
Finished Firewall
Details
12-11-2014
3.00
Primer
Details
12-10-2014
3.00
Counterskink
Details
12-09-2014
2.00
Counter Sink
Details
12-08-2014
3.00
Dimpled Firewall
Details
12-07-2014
8.00
Details
12-06-2014
6.00
Inventory
Details
12-05-2014
1.00
Fuselage Arrived
Details
10-24-2014
1.00
Ordered Fuselage Kit
04-03-2012
1.00
Shop setup
Details
01-28-2012
0.10
Moving Day
Details
08-10-2011
1.00
A&P
Details
12-13-2010
1.00
Powerplant and General Comp Testing
Details
12-12-2010
1.00
Powerplant License
Details
08-18-2009
1.00
Registered to take A&P Courses today
Details
07-11-2007
5.00
Completed Right Wing
Details
07-10-2007
7.00
Flaps
Details
07-09-2007
7.00
Flaps
Details
07-08-2007
12.00
Aileron
Details
07-07-2007
4.00
Wing Box
Details
07-04-2007
9.00
ER Tank Install
Details
07-02-2007
2.50
Top Skins
Details
06-29-2007
4.00
Leading Edge Assembly
Details
06-28-2007
4.00
Landing Light (R)
Details
06-27-2007
3.00
Rear Spar
Details
06-26-2007
3.50
Leading Edge
Details
06-25-2007
3.50
Rivet Main Ribs on
Details
06-24-2007
6.00
Priming Right Wing
Details
06-23-2007
7.00
Right Wing Prep
Details
06-20-2007
2.50
Prep
Details
06-19-2007
4.00
Prep
Details
06-18-2007
1.00
Tank Testing
Details
06-17-2007
4.00
Sealed up Tank
Details
06-14-2007
1.50
Tank Sealing
Details
06-12-2007
2.00
Fuel Tank Sealing
Details
06-11-2007
2.00
Right Tank Sealing
Details
06-10-2007
8.00
Right Fuel Tank
Details
06-09-2007
12.00
Fuel Tank
Details
06-07-2007
3.00
More Match Drilling
Details
06-05-2007
2.50
Z Brackets (R)
Details
06-04-2007
2.50
Z-Brackets Right Wing
Details
06-02-2007
8.00
Right Wing
Details
05-30-2007
3.00
Ribs
Details
05-29-2007
2.50
Started Rear Spar
Details
05-28-2007
8.00
Started Right Wing
Details
05-22-2007
2.50
Build Wing Holder
Details
05-21-2007
3.00
Wing Stand
Details
05-08-2007
4.00
ER tank install
Details
04-22-2007
4.00
ER Tanks
Details
04-21-2007
4.00
ER Tanks
Details
04-08-2007
6.00
Pitot Tube
Details
04-06-2007
3.00
Shot Top Skin
Details
04-04-2007
2.00
Met with Kevin Faris
Details
03-31-2007
4.00
Riveted Left aileron
Details
03-29-2007
3.00
Backriveted and Bent Aileron
Details
03-27-2007
2.00
Aileron Primer
Details
03-25-2007
4.00
Aileron
Details
03-21-2007
4.00
ER Tanks Arrived
Details
03-20-2007
5.00
Leading Edge and skins
Details
03-19-2007
3.00
Finished Landing Light and leading edge
Details
03-18-2007
5.00
Landing Light
Details
03-17-2007
4.00
Leading Edge Work
Details
03-16-2007
4.00
Riveted Rear Spar
Details
03-15-2007
4.00
Riveted Main Ribs
Details
03-14-2007
8.00
Primed Ribs
Details
03-13-2007
6.00
Dimpled Skins
Details
03-12-2007
4.00
More Prepping
Details
03-11-2007
1.00
03-09-2007
4.00
More Prep
Details
03-08-2007
4.00
Prepping (Still)
Details
03-07-2007
1.00
Fuel Tank Pressure Test
Details
03-06-2007
4.00
Prep
Details
03-05-2007
4.00
Prepping
Details
03-04-2007
7.00
Wing Prep
Details
03-01-2007
12.00
Closing up Left Fuel Tank
Details
02-28-2007
4.00
Outboard end of Fuel Tank
Details
02-27-2007
4.00
Fuel Tank Inspection Plate
Details
02-26-2007
4.00
Tank Sealing
Details
02-25-2007
5.00
Tank Sealing
Details
02-24-2007
5.00
Prep work on the tank
Details
02-22-2007
4.00
Fuel Tank Work
Details
02-21-2007
4.00
Fuel Senders
Details
02-20-2007
5.00
Tank Work
Details
02-19-2007
6.00
Fuel Tank "Z" Brackets
Details
02-16-2007
0.50
Avery Tools
Details
02-15-2007
4.00
Leading Edge Joiner
Details
02-14-2007
5.00
Skins and Leading Edge
Details
02-13-2007
4.00
Attached Lower Skins
Details
02-12-2007
2.00
Drilled Ribs to Spar
Details
02-11-2007
5.00
Rear Spar and Ribs
Details
02-09-2007
5.00
Rear Spar
Details
02-04-2007
5.00
Tie Down Bracket
Details
02-03-2007
5.00
Countersink Spar
Details
02-02-2007
5.00
Started on spar
Details
02-01-2007
6.00
Wings Arrived
Details
01-28-2007
1.00
Set up Web Cam
Details
01-27-2007
4.00
Wing Jig
Details
01-25-2007
1.00
Cleveland Tool Order
Details
01-22-2007
1.00
Half Size Rivets
Details
01-15-2007
1.00
Tail kit at Home Plastic off
Details
01-13-2007
6.00
Trim Tab, Roll Rudder Skin
Details
01-12-2007
14.00
Rudder, VS, Elevator Skins
Details
01-11-2007
14.00
Elevator and Skins
Details
01-10-2007
18.00
Rudder and Horizontal Stab
Details
01-09-2007
10.00
Vertical Stab
Details
01-08-2007
12.00
HS Front and Rear Spar
Details
01-07-2007
1.00
Alexander Technical Center
Details
12-27-2006
3.00
More Tools
Details
12-26-2006
2.00
Purchased Sander
Details
12-26-2006
2.00
Purchased Band Saw
Details
12-26-2006
1.00
Primer
Details
12-25-2006
4.00
Shop SetUp
Details
12-23-2006
2.00
Bought Drill Press
Details
12-17-2006
8.00
Built EAA 1000 Tables
Details
11-30-2006
0.00
Tail Kit Arrived
Details
11-27-2006
1.00
Ordered Wings
Details
11-25-2006
1.00
Reserved N number
Details
11-25-2006
1.00
MoreTools
Details
11-25-2006
0.50
Intalled KitLog Pro v 2.0
Details
11-24-2006
3.00
Research and Purchased Air Compressor
Details
11-24-2006
1.00
Bench Grinder
Details
11-20-2006
1.00
Ordered Empennage
Details
11-17-2006
1.00
Purchased Tool Box
Details
11-16-2006
3.00
Researched and Purchased Tool Kit
Details
11-12-2006
1.00
Preview Plans
Details
SITE NAVIGATION
Contact Builder
RV- 7A Home
Category
# Logs
# Hours
All
336
1518
A&P
4
4
Avionics
5
19
Canopy
35
178
Cockpit
3
6
Empennage
10
79
Engine
1
1
Firewall Forward
12
62
Fuselage
143
704
Miscellaneous
12
16
Shop Supplies
5
14
Tools
10
20
Wings
96
415
Copyright © 2001-2024 Matronics. All Rights Reserved.