Steven's RV-9A
RV-9A
All
Work Logs Found:
200
Category Work Time:
1015 Hours
Date
Hours
Work Log Summary
Details
06-03-2018
3.00
Installed lighting lenses on wings
Details
06-02-2018
1.00
obtained radio licenses from FCC
Details
06-02-2018
4.00
interior panels and seat belts
Details
05-30-2018
3.00
nut-plates - hate em'
Details
05-26-2018
20.00
memorial day getting ready for DAR
Details
05-23-2018
4.00
Calibrated Avionics
Details
05-18-2018
3.00
Adele to engine mount
Details
05-16-2018
4.00
Re-installed right magneto
Details
05-11-2018
8.00
Swapped out brake lines
Details
05-07-2018
6.00
Attempted to start engine
Details
04-27-2018
8.00
Fuel Injector Servo
Details
04-20-2018
8.00
Continued work on Fuel Injector Servo
Details
04-13-2018
50.00
missed a bunch of log entries
Details
03-13-2018
30.00
avionics/prop/flght surfaces
Details
02-28-2018
4.00
Installed flaps
Details
02-24-2018
10.00
Mounted rudder
Details
02-18-2018
26.00
Misc.
Details
02-04-2018
6.00
Mounted vertical stabilizer
Details
02-03-2018
12.00
wings on the plane
Details
01-28-2018
16.00
Move the wings to the airport, set up shop in the
Details
01-24-2018
5.00
Odds and ends to finish wings
01-21-2018
5.00
riveted on right bottom wing skin
Details
01-20-2018
4.00
started setting up shop at the airport
Details
01-19-2018
2.00
riveted bottom skin
Details
01-18-2018
15.00
punch list before the airport
Details
01-12-2018
3.00
labeled and tested wing wiring
Details
01-09-2018
2.50
Wired left wing tip, started wiring wings
Details
01-07-2018
12.00
Misc. wing wiring
Details
01-04-2018
1.00
Reworked a grounding nutplate I didn't like
Details
01-03-2018
2.00
Finished landing light in right wing
Details
01-02-2018
1.25
made up landing light lens and brackets
Details
01-01-2018
6.00
Started to wire up the wings
Details
12-30-2017
8.00
Moved the fuselage to the airport
Details
12-26-2017
1.50
Tying up odds and ends before the airport
Details
12-25-2017
4.00
getting ready to travel
Details
12-23-2017
6.00
Getting ready to leave the garage
Details
12-19-2017
8.00
Installed engine sensors and avionics
12-18-2017
2.00
Gettting shop ready for sensor wiring
Details
12-17-2017
5.00
Odds and ends to get the airplane out of the garag
Details
12-16-2017
6.00
Misc. finish up work to get out of the garage
Details
12-14-2017
2.00
ran strobe control wires to tail and wings
Details
12-13-2017
2.00
ran fuel guage wires to each wing area
Details
12-12-2017
2.50
Odds and ends to finish engine
Details
12-10-2017
2.00
Engine odds and ends
Details
12-06-2017
2.00
Permanent riviting of baffle gaskets
Details
12-03-2017
6.00
Misc. Engine Accessories
Details
12-02-2017
5.00
Baffle detailing
Details
11-30-2017
1.50
fabricated oil cooler brace
Details
11-29-2017
1.50
prepped all the parts of the oil cooler
Details
11-28-2017
3.00
Baffle tension rods
Details
11-26-2017
8.00
Working on engine baffles
Details
11-21-2017
15.00
slowly working on baffles
Details
11-06-2017
2.00
cylinder #1 and #2 baffles
Details
11-05-2017
12.00
Started baffles
Details
10-26-2017
9.00
Completing loose ends
Details
10-16-2017
6.00
Finishing FAB and cowling
Details
10-12-2017
3.00
FAB box test fitting
Details
10-11-2017
4.00
Still trying to figure out mixture arm
Details
10-03-2017
3.50
Continued work on FAB
Details
10-02-2017
8.00
Working on the fit of the Fresh Air Box
Details
09-24-2017
13.00
Misc. cowling work
Details
09-21-2017
1.50
Still filling the cowling
Details
09-19-2017
1.00
More fiberglass on the cowling
Details
09-18-2017
10.00
continue to fill/sand/fit/refit cowling
09-13-2017
3.00
Attaching skybolt recepticles
Details
09-10-2017
8.00
Horizontal skybolts
Details
09-09-2017
8.00
Starting to do final attachment of cowling
Details
08-19-2017
8.00
Engine is on the plane
Details
08-14-2017
6.00
Odds and ends before the engine
Details
08-08-2017
1.50
Extended canopy tracks for supertracks
Details
08-07-2017
5.00
Buttoning up odds and ends before engine mount
Details
08-02-2017
1.50
copilot stick
Details
08-01-2017
2.00
getting ready to hang engine
Details
07-24-2017
2.00
cleaning up odds and ends before oshkosh
Details
07-22-2017
8.00
Finished canopy fairing and reopened canpy
Details
07-19-2017
1.50
canopy fairing
Details
07-18-2017
1.50
Fiberglass canopy fairing
Details
07-17-2017
10.00
Prep and start fiberglass
Details
07-14-2017
3.00
final adjustments before fiberglass
Details
07-11-2017
1.00
canopy lift tabs
Details
07-10-2017
2.50
put canopy back on airplane
Details
07-09-2017
12.00
Final assembly of canopy
Details
07-05-2017
1.50
paint repairs
07-03-2017
7.00
Took everything apart and painted
Details
06-05-2017
1.50
installed right canopy skirt
Details
06-03-2017
8.00
finished laying out the skirts
Details
05-13-2017
3.00
Started fabrication of side skirts
Details
05-10-2017
0.50
Details
05-08-2017
2.00
finishing windscreen
Details
05-07-2017
6.00
A lot of misc. canopy tasks
Details
05-06-2017
6.00
misc canopy work
Details
05-05-2017
1.75
Installed c-665 canopy stop blocks
Details
05-04-2017
1.25
started to final fit canopy
Details
05-03-2017
1.75
canopy tracks and odds and ends
Details
05-02-2017
2.00
canopy tracks
Details
05-01-2017
1.50
finished riveting forward top skin
Details
04-29-2017
8.00
misc - pre caonopy tasks
Details
04-18-2017
24.00
odds and ends before the canopy
Details
04-03-2017
0.75
sanded bevel on forward edge of windscreen
Details
04-02-2017
10.00
prepped/primed/dimplesed and set top skin
Details
03-29-2017
1.25
deburred and prepped top skin
Details
03-28-2017
0.25
Looking for antennas
Details
03-27-2017
0.50
Screwed down GPS antennas
Details
03-25-2017
5.00
Sprayed the interior of the airplane
Details
03-24-2017
6.00
continued to mask off interior
Details
03-23-2017
1.50
Changing color of interior
Details
03-22-2017
1.50
Tied in wiring
Details
03-21-2017
1.50
Installed air vents
Details
03-20-2017
1.50
LED lighting in footwells and cargo
Details
03-16-2017
1.50
Prepped airplane to get ready to work
Details
03-15-2017
9.00
Transported Airplane
Details
03-13-2017
2.50
Nose gear wheel pants
Details
03-12-2017
2.00
cut/riveted/countersunk and set hinges in nosegear
Details
03-11-2017
1.50
Redrilled wheel pants and installed plate nuts
Details
03-10-2017
1.50
applied body compound to flash wheel pant tranisit
Details
03-09-2017
1.50
split transition fairings and glued to wheel pants
Details
03-08-2017
1.50
prep shop to start fiberglass
Details
03-07-2017
4.00
Took plane to leesburg airport
Details
03-06-2017
2.00
Loaded airplane onto trailer for trip to Leesburg
Details
03-01-2017
8.00
Misc. wheel pants work and shrink wrap
Details
03-01-2017
1.00
continued to shink wrap airplane
Details
02-18-2017
5.00
Set wheel pants and transition fairings
Details
02-15-2017
1.00
cut out the right wheel pant
Details
02-14-2017
0.75
cut notches in wheel pants
Details
02-13-2017
1.25
Laying out wheel pants
Details
01-29-2017
5.00
Main gear fairings continue
Details
01-28-2017
5.50
Started on landing gear wheel fairings
Details
01-27-2017
2.00
cut out and sanded main gear fairings
Details
01-25-2017
1.25
Added anti-splat device to nose gear strut
Details
01-24-2017
1.25
Bagage area led lights
Details
01-23-2017
1.25
Made some brackets for LED lights for the baggage
Details
01-22-2017
15.00
cleaned up electrical problems, installed gear
Details
01-18-2017
2.00
Rewired headphone jacks and installed
Details
01-17-2017
2.00
wired up headset and mike jacks
Details
01-15-2017
10.00
Put together three landing gear legs
Details
01-09-2017
1.00
Started the landing gear
Details
01-08-2017
6.00
Misc. tasks
Details
01-05-2017
1.00
started drilling plexiglass slider
Details
01-04-2017
1.00
misc small stuff
Details
01-02-2017
1.00
odds and ends
Details
01-01-2017
4.00
final sizing the canopy
Details
12-31-2016
2.00
The "Big Cut"
Details
12-30-2016
7.00
cutting
Details
12-29-2016
2.00
Ordered the panel
Details
12-28-2016
3.00
Riveted on rear top deck
Details
12-26-2016
2.00
first cuts on canopy
Details
12-24-2016
3.00
Puzzled by canopy instructions
Details
12-20-2016
0.50
Some minor top skin riviting
Details
12-18-2016
12.00
set up the canopy slide
Details
12-15-2016
1.00
cleaned up some wiring
Details
12-14-2016
1.50
struggled with roll bar bolts
Details
12-13-2016
1.50
made spaces and blind drilled roll bar
Details
12-12-2016
1.00
Made roll bar spacers and located roll bar
Details
12-11-2016
16.00
Finishing up odds and ends
Details
11-28-2016
15.00
Finishing up wiring
Details
11-21-2016
7.00
continued wiring
Details
11-17-2016
1.00
continued wiring rough in
Details
11-16-2016
2.50
still working wiring harness
Details
11-14-2016
12.00
Pulling wire to rough in everything
Details
11-11-2016
3.00
Misc wiring
Details
11-07-2016
1.75
Wired in flaps for flap switch
Details
11-06-2016
12.00
Main electrical harness
Details
11-02-2016
2.50
GSA 28 and heater box
Details
10-30-2016
8.00
Misc. finishing before wiring
Details
10-29-2016
2.00
finished battery box
Details
10-27-2016
1.50
battery box
Details
10-26-2016
1.50
Installed flap positioner
Details
10-25-2016
1.00
continued to finish riveting the front deck
Details
10-24-2016
12.00
Cleaning up front deck
Details
10-21-2016
2.00
Installed EMT bracket
Details
10-20-2016
1.00
Battery box and strap
Details
10-18-2016
1.50
Installed ELT bracket and strap
Details
10-16-2016
20.00
Finishing up the fuselage
Details
09-17-2016
7.00
Control sticks and bell crank
Details
09-14-2016
3.00
Ran rudder and seat belt cables
Details
09-11-2016
13.00
Wrapping up the fuselage kit
Details
09-08-2016
1.00
Set up firewall penetrations
Details
09-06-2016
1.00
Fuel line for fuel injected engines not on drawing
Details
09-05-2016
18.00
Working on plumbing
Details
08-11-2016
2.00
Painted removable cockpit elements
Details
08-08-2016
1.00
set up for plumbing
Details
08-07-2016
9.00
main gear mounts and crotch straps
Details
08-06-2016
2.00
set first main gear bracket
Details
07-13-2016
2.00
continued work on the flaps
Details
07-11-2016
1.50
Scuffed and primed
Details
07-10-2016
6.00
Utility tunnel cover and flap controller
Details
07-09-2016
8.00
Put seats together
Details
07-08-2016
3.00
Utility tunnel cover
Details
07-04-2016
5.00
cabin floor panels
Details
07-02-2016
6.00
Baggage area and rear skins
Details
07-01-2016
1.50
alligned baggage compartment barn door
Details
06-30-2016
2.00
Nut plates on F-706
Details
06-29-2016
1.50
Fitted and drilled rear baggage panel
Details
06-27-2016
1.00
Working on corregated back panel
Details
06-26-2016
6.00
Installed baggage floor and side panels
Details
06-23-2016
2.00
Installed port and starboard steps
Details
06-20-2016
1.00
Ordered Finish Kit
Details
06-19-2016
5.00
fitted steps
Details
06-14-2016
2.00
Test fitted top skins
Details
06-13-2016
2.50
Fitting fuselage forward top deck
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
200
1014
Avionics
12
54
Empennage
2
16
Engine
22
116
Fuselage
86
367
Miscellaneous
62
356
None
1
12
Shop Supplies
2
20
Wings
13