ANDREW'S WEB SITE
Work Logs Found: 89
Category Work Time: 686 Hours
 Date
Hours
Work Log Summary

Details

 01-01-2016
4.00
Throttle quadrant
Details
     

 12-26-2015
8.00
Adapter
Details
     

 12-19-2015
8.00
Gear doors
Details

 12-12-2015
8.00
Spinner
Details

 12-05-2015
8.00
Fuel system
Details
     

 11-28-2015
8.00
Baffles
Details
     

 11-21-2015
8.00
Antenna
Details

 11-14-2015
8.00
Hoses.
Details
     

 11-07-2015
8.00
Toe brakes.
Details
     

 10-31-2015
8.00
Installed components.
Details
     

 10-24-2015
8.00
Installed components.
Details
     

 10-17-2015
8.00
Sensors
Details
       

 10-10-2015
8.00
Wiring
Details
     

 10-03-2015
8.00
Wiring.
Details
     

 09-26-2015
9.00
Wiring.
Details
       

 09-19-2015
8.00
Wiring
Details
     

 09-12-2015
10.00
Fabricated a battery box from 1/2" faom and West S
     

 09-05-2015
8.00
Fabricated the exhaust pipe for the right side.
Details
     

 08-29-2015
8.00
Fabricated the exhaust pipe for the left side.
     

 08-22-2015
8.00
Installed the hydraulic pump in the rear fuselage.
     

 08-15-2015
8.00
Fabricated the left side dash panel and installed
     

 08-08-2015
8.00
Installed the windshield with structural adhesive
       

 08-01-2015
10.00
Installed the Dynon 100 on the pilot site of the d
       

 07-25-2015
32.00
Intalled the upper wing skins on the outer wing pa
       

 07-18-2015
8.00
Outer wings
Details
       

 07-05-2015
8.00
Inner wing leading edge
Details
       

 07-04-2015
6.00
Closed up the tanks with the top skins
Details
       

 07-03-2015
4.00
Installed fuel senders in outer wing tanks
Details
       

 06-27-2015
10.00
Finished forming the cowling
       

 06-20-2015
8.00
Started work on the engine cowling. Put foam arou
       

 01-09-2015
11.00
Re-built the engine mount
Details
       

 10-24-2014
14.00
Build the wiring panels
Details
       

 10-11-2014
23.00
Constructed the flaps
Details
       

 06-20-2013
6.00
Moved the aircraft to a new hangar I just finshed

 05-15-2011
4.00
Began fabricating brackets and misc harware for at
     

 12-23-2010
4.00
Gluing up stringers over the main gear and fabrica

 06-28-2010
6.00
Various items on the aircraft (small things). It'

 10-02-2009
8.00
Fabricated the aluminum covers for the hinge holes

 09-18-2009
4.50
Installed the side fuselage skins permanently. Th
       

 09-04-2009
6.00
Fabricated engine mounts and installed the engine.

 08-17-2009
4.00
Worked on engine mount.

 08-16-2009
6.00
Worked on engine mount.

 07-26-2009
8.00
Manufacturing the engine mount (now that I have th
       

 07-25-2009
6.00
Engine
Details
       

 06-28-2009
10.00
Tidying up little details all over the aircraft.

 05-15-2009
8.50
Began fabrication of the engine rubber mounts.
Details
     

 04-16-2009
4.50
Cabin doors
Details
     

 03-26-2009
6.50
Cabin doors
Details

 03-25-2009
8.00
Cabin doors.
Details

 03-23-2009
6.00
Installed the rear windows.
Details
     

 02-28-2009
4.00
Fabricated and installed the anchor cables.
Details

 02-26-2009
8.50
Fabricated the canopy door frames (curved layups).

 02-12-2009
3.50
Installed upholstery in the baggage compartment.

 02-11-2009
8.00
Fitted rear windows in the fuselage.
Details
     

 11-05-2008
4.00
Fabricated the up-hook.
Details

 11-03-2008
6.00
Fabricated firewall upper panel.
Details

 10-29-2008
9.00
Installed flap motor.
Details
       

 10-28-2008
4.00
Fitted the trim motor.
Details

 10-04-2008
4.50
Fabricated and fitted the control sticks.
     

 09-28-2008
3.00
Shaving and sanding foam on the tail.

 09-21-2008
10.00
Fabricated tie down.
Details

 09-20-2008
8.00
Varnished.
Details

 09-13-2008
6.50
Brake lines.
Details

 09-12-2008
8.00
Completed installation of the control cables.
Details

 09-11-2008
8.00
Continued installing control cables.
Details

 09-10-2008
4.00
Fabricating and mounting control cables.
     

 09-07-2008
3.00
Comm antenna.
Details
     

 08-15-2008
2.00
Made a list.
Details

 07-19-2008
2.00
MDRA inspection.
Details

 07-16-2008
4.00
Worked on the tail, mounting the elevator and alli

 07-06-2008
2.50
Fitting components to the firewall. Fabricating b
     

 07-01-2008
2.00
Firewall.
Details

 06-28-2008
1.00
Filled out and sent request for inspection from MD

 06-18-2008
4.00
Sorted out the hardware.
Details
     

 06-18-2008
6.50
Finished engine mount and installed the front gear
     

 06-17-2008
9.50
Assembled wood structure.
Details
       

 06-16-2008
7.00
Worked on the wood structure for the tail.
     

 06-16-2008
8.00
Trimmed the openings.
Details

 06-15-2008
2.00
Trimmed windows.
Details

 06-14-2008
8.00
Trimmed plexiglass for windows.

 06-13-2008
1.00
Installed shimmy damper on front gear.

 06-12-2008
8.00
Manufactured brake lines.
Details

 06-11-2008
7.50
Manufactured hydraulic lines.

 06-10-2008
6.50
Fabricated hydraulic lines.
     

 06-08-2008
8.00
Attached the landing gear.
     

 06-08-2008
53.00
Assembly
Details
       

 06-07-2008
8.00
Assembling parts.
Details

 05-20-2008
8.00
Inventoried all of the parts I just purchased.

 05-15-2008
10.00
Purchased partial kit (parts)
Details
       