KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 305
Category Work Time: 768 Hours
 Date
Hours
Work Log Summary

Details

 10-09-2021
6.00
AWC inspection with Jon Blosser DAR
       

 10-08-2021
3.00
Rewire copilot control stick

 09-26-2021
3.00
Brian Hoover drops out to assist with engine issue
       

 09-19-2021
3.00
Add fuel, engine start
       

 09-15-2021
2.00
Apply N numbers, decals, prepare for AWC,
       

 09-08-2021
1.00
Avionics check, prepare for AWC

 07-14-2021
2.50
Weight&Balance
       

 07-07-2021
2.00
Finish air dams
       

 06-30-2021
2.50
Cowling, install baffles
       

 06-29-2021
2.00
Cowling, air inlet ramps
       

 06-28-2021
2.00
Install air inlet ramps
       

 06-27-2021
4.00
Add oil, turn engine over,
       

 06-26-2021
1.50
Set timing
       

 06-12-2021
2.50
Repair wingtips, Hinge pin door
       

 05-23-2021
3.00
Cowling, oil door
       

 05-19-2021
2.50
Cowling
     

 05-16-2021
3.00
Cowel fitting issues
       

 05-09-2021
4.00
Drill Coweling
       

 05-02-2021
3.50
Cowel hinges
       

 04-28-2021
2.00
Cowel
       

 04-25-2021
5.00
Cowel
       

 04-21-2021
2.00
Work on cowling
       

 04-18-2021
4.00
Work on cowling
       

 04-14-2021
2.00
Start on cowling
       

 04-11-2021
4.00
Finish fuel calibration,FAA registration comes
       

 04-10-2021
2.00
Fuel calibration issues
     

 04-07-2021
3.00
Fuel callibration issues
       

 04-03-2021
4.00
Problems calibrating fuel tanks
     

 03-31-2021
2.00
ARINC 429 error, resolution
     

 03-21-2021
2.00
GPS working, Nav 1 issue
       

 03-18-2021
2.00
No GPS signal, change antenna ends
       

 03-14-2021
4.00
Fuel guage issues, GPS issues
       

 03-07-2021
4.00
Calibrate fuel
       

 03-03-2021
2.00
Calibrate flaps, assess cowel, Brian Hoover helps
       

 02-28-2021
3.00
Work on install interior
       

 02-21-2021
4.00
Calibrate pitot static on G3X
Details
       

 02-07-2021
3.00
Sticks wiring, test switches
       

 02-03-2021
2.00
Prayer before the switch flipped, no smoke!!!
       

 01-24-2021
4.00
Start grips, interior,canopy latch
       

 01-20-2021
1.00
Pitot heat AOA wiring
       

 01-17-2021
3.50
Finish engine wiring
       

 01-13-2021
2.00
Wiring firewall foreward,
       

 01-10-2021
4.50
Wiring firewall foreward, e mags
       

 01-06-2021
2.00
Wiring firewall foreward, vpx issue
       

 01-03-2021
3.00
Canopy harness, clean up wiring
       

 01-02-2021
4.00
LED light strip, wiring glareshield, fans, canopy
       

 12-30-2020
2.75
Wiring seat heaters,panel wiring , engine monitori
       

 12-27-2020
4.00
Routing wire harnesses,and wiring
Details
     

 12-20-2020
5.00
Install vents, brake lines, and panel
Details
       

 12-06-2020
4.00
Seat backs, and wiring
       

 11-29-2020
4.00
Seat belts, flap trim motor linkage
       

 11-27-2020
2.00
Antennas, close up tailcone
       

 11-25-2020
2.50
Install GPS antennas
       

 11-18-2020
2.50
GPS antenna attach plates
       

 11-15-2020
3.50
OAT probe and wiring,pitot static lines
       

 11-08-2020
3.00
Install radio antenna's
       

 11-04-2020
2.50
Autopilot servo's, antenna install
       

 11-01-2020
3.00
Sart on autopilot servo's

 10-28-2020
2.00
Wire ELT,GMU 22 install
       

 10-25-2020
3.00
Install VOR antenna, ELT
       

 10-18-2020
4.00
Refit snorkle, start to run wire harness's,antenna
       

 10-11-2020
2.00
Finish control cables
       

 10-04-2020
1.50
Install control cables,
       

 09-30-2020
1.50
Airflow induction bracket, order brake lines
     

 09-13-2020
3.50
Panel out,avionics trays install
       

 09-07-2020
2.50
Panel switch's , mixture control
     

 09-02-2020
2.00
Preliminary panel fit
     

 08-30-2020
3.00
Controls panel mount bracket, avionic planning
     

 08-29-2020
3.00
Sniffle valve,oil cooler, avionics planning
       

 08-19-2020
2.00
Panel arrives, inventory, exhaust brace
       

 08-16-2020
3.50
Install exhaust
       

 08-12-2020
2.00
Baffles
       

 08-09-2020
3.00
Alt air door install, on snorkel
       

 07-30-2020
1.00
Jon Blosser DAR, progress inspection
     

 07-26-2020
2.00
Flox snorkle to air filter frame
       

 07-22-2020
1.50
Interior kit inventory
       

 07-19-2020
4.00
Wiring, snorkel test fit
       

 07-16-2020
2.00
Safety wire prop
       

 07-11-2020
3.00
Tension rods, baffles

 07-08-2020
2.00
Engine baffles
       

 07-05-2020
3.00
Right forward baffle, air filter frame
       

 06-23-2020
2.00
Sealant baffles, air filter frame
       

 06-10-2020
2.00
Torque prop, cylinder baffles
Details
       

 06-03-2020
2.00
Start on engine baffles
       

 05-27-2020
2.50
Install prop,
Details
       

 05-17-2020
3.50
Engine prep, alternator
       

 05-13-2020
2.50
Engine prep fuel system
       

 05-06-2020
2.00
Hang engine
       

 05-03-2020
3.00
Engine prep, prop governer install
     

 04-25-2020
2.00
Install master relay and starter solenoid
       

 04-22-2020
1.00
Battery install
     

 04-04-2020
1.00
Prop comes
       

 03-12-2020
2.00
Engine arrives
       

 01-05-2020
2.00
Plan avionics
     

 12-05-2019
5.00
Tail fairing
       

 11-24-2019
1.50
Empennage tail fairing
       

 11-17-2019
1.00
Wheel pants
     

 11-14-2019
2.50
Empannege fairing trim
       

 11-02-2019
4.00
Gear leg fairings
       

 10-24-2019
2.00
Wheel pants
     

 10-13-2019
3.00
Wheel pants
       

 10-10-2019
2.00
Wheel pants
       

 10-02-2019
1.50
Wheel pants
     

 09-07-2019
0.50
Wheel pants
     

 07-20-2019
3.00
Guide pin install,
       

 07-14-2019
3.00
install canopy pin
       

 07-07-2019
3.00
Rear fairing
     

 06-30-2019
3.00
Close out wings, light lens
       

 06-20-2019
2.00
Canopy clips
     

 06-13-2019
2.00
Canopy seals

 06-05-2019
2.00
Canopy seals

 05-15-2019
1.00
Rear seal issues on canopy

 05-09-2019
1.50
Canopy on
       

 05-04-2019
3.00
Canopy fairing
       

 04-27-2019
3.00
Canopy fairing,
       

 04-20-2019
4.00
Canopy fairing layup
       

 03-30-2019
2.00
Canopy fairing
       

 03-24-2019
4.00
Canopy
       

 03-21-2019
1.50
Rear seal
       

 03-10-2019
3.50
Canopy
       

 03-02-2019
3.50
Install steps
       

 02-27-2019
1.50
Work on Canopy
     

 02-09-2019
3.00
Work on wing root
       

 02-06-2019
2.50
Install,flaps
       

 02-03-2019
3.50
Install wings
       

 01-30-2019
2.00
Close up wings,
     

 01-23-2019
2.00
Drill canopy
       

 01-15-2019
2.00
Drill canopy
       

 01-09-2019
2.00
Weightedbags for canopy, sand contact areas
       

 01-06-2019
3.00
Canopy install, supper at the hanger!
       

 12-22-2018
3.00
Paint baggage compt. sidewall, finish rear window
       

 12-16-2018
3.00
Re-install rear window
       

 12-13-2018
2.00
Canopy
       

 12-09-2018
3.50
Canopy assembly
       

 12-06-2018
2.50
Canopy forward closeout
Details
       

 11-25-2018
3.00
Canopy assembly
       

 11-21-2018
2.00
Canopy skin
       

 11-18-2018
2.00
Canopy handle, skin prep
       

 11-15-2018
2.50
Canopy side skins, rails
       

 11-07-2018
1.50
Canopy rails, side skins
     

 11-04-2018
3.00
Canopy frame, close out, rails
       

 10-27-2018
3.00
Canopy skin
       

 10-24-2018
2.50
Canopy parts
       

 10-21-2018
1.50
Rear canopy install difficulties, canopy latch sys
       

 10-02-2018
2.50
Canopy latch pushrod assembly
       

 09-30-2018
3.00
Install air vents, latchbellcrank assembly
       

 09-22-2018
2.00
Rear window install
       

 09-19-2018
2.50
Air vents, start rear window
       

 09-16-2018
3.00
Seatback assembly
       

 09-12-2018
2.50
Install tail gear spring, start seatbacks
       

 09-09-2018
3.50
Install axle, wheels, brakes, brake lines
       

 09-08-2018
4.00
Main wheel,tire assembly, install gear
       

 09-06-2018
2.50
Engine mount
       

 08-30-2018
2.50
Aileron trim servo install
       

 08-18-2018
3.00
Aireron trim
Details
       

 08-15-2018
3.50
Start aileron trim
       

 08-12-2018
3.50
Finish wiring landing lights, install pitot
       

 07-22-2018
2.00
Wire landing lights
     

 07-18-2018
1.50
Wingtip closeout ribs
       

 07-15-2018
3.00
Wing tip, landing lights
       

 07-11-2018
1.50
Install lens, wing tips
       

 07-05-2018
1.50
Landing light assembly
       

 07-01-2018
2.00
Install tail light, start other lens
       

 06-21-2018
2.00
Install wing tip position lights
       

 06-13-2018
3.00
Wing tip nutplates,end rib attachment
       

 06-10-2018
1.50
Wing tip nut plates,
       

 06-06-2018
1.00
Lens attachment
     

 06-03-2018
1.00
Wing tip lens
       

 05-12-2018
4.00
Startwing tips
       

 05-10-2018
1.50
Install ailerons
       

 04-24-2018
1.50
Install pitot
       

 04-22-2018
3.00
Bottom left skin,
       

 04-14-2018
3.00
Rivet bottom skins
       

 04-12-2018
2.00
Start left bottom skins
       

 04-08-2018
3.00
Inventory finish kit-Amanda, Lynette help
       

 03-31-2018
2.00
Finish right bottom skin
       

 03-22-2018
2.00
Rivet bottom skins
       

 03-18-2018
4.50
Start to rivet bottom skins
       

 03-15-2018
0.50
Finish kit arrives
       

 03-08-2018
2.00
Trim skin for pitot install
       

 03-05-2018
2.00
Bottom skin, prep,J channels, order pitot
       

 03-01-2018
2.50
Bellcrank pushrod installation
       

 02-21-2018
2.00
Finish torque tubes
       

 02-17-2018
2.50
Torque tube sub assembly
       

 02-11-2018
3.50
Aileron pushrods, bell crank
       

 02-08-2018
2.00
Run wiring wings, help from Dan's Dad
       

 01-31-2018
1.50
Torque tube to bell crank fabrication
       

 01-20-2018
3.00
Finish lens, install fuel tank float
       

 01-17-2018
1.50
Install light lens,
       

 01-13-2018
2.50
Install flap gap fairing, fuel sump
       

 01-10-2018
1.50
Reinstall fuel left fuel tank
     

 01-06-2018
4.50
Install aileron gap seals
       

 01-02-2018
2.00
Install fuel leval sender, finish lens
       

 12-27-2017
3.00
Install stall warning device, start running wiring
       

 12-23-2017
3.00
Access door install, remove fuel tank, for stall w
Details
       

 12-20-2017
1.50
Install powder coated rollbar
       

 12-13-2017
1.50
Stiffner side wall attach
     

 12-10-2017
4.00
Finish roll bar,
Details
       

 12-02-2017
3.50
Roll Bar
       

 11-29-2017
1.50
Start Roll Bar
       

 11-26-2017
3.50
Finish and install control sticks
Details
       

 11-18-2017
3.00
Bell crank assembly, drill control sticks
       

 11-15-2017
2.50
Elevator pushrod assembly
       

 11-11-2017
1.50
Install flap actuator motor, prep air vents
       

 11-04-2017
3.00
Flap torque arm install, correct rudder pedals
       

 11-02-2017
2.00
Route install rudder cables
       

 10-22-2017
4.50
Install brake lines
       

 10-14-2017
3.00
Attach brake pedal assemblies
       

 10-07-2017
1.00
Prime and paint firewall
       

 10-04-2017
2.00
Rudder pedals

 10-01-2017
2.00
Rudder pedal assembly
       

 10-01-2017
2.00
Baggage side skins, fuel lines, valve filter line
       

 09-20-2017
2.00
Finish center brace, left fuel line install
       

 09-16-2017
3.00
Flap motor bracket, baggage floor splice
       

 09-14-2017
3.00
Baggage floors, seat hinges
       

 09-07-2017
1.50
Baggage floor install, fuel selector
       

 09-04-2017
3.00
Baggage floor install
       

 09-02-2017
3.00
Fuel valve install,install bushings, seatback hing
       

 08-22-2017
1.50
Rivet center bottomskin
     

 08-17-2017
2.00
Bulkhead installation
       

 08-09-2017
1.50
Fuselage bulkhead install, rivet skins
       

 07-26-2017
2.50
Bulkhead install, rivet fuselage top
       

 07-23-2017
3.50
Attach fusulage, bulkhead
       

 06-29-2017
3.00
Rudder bottom fairing, gap covers empennage
       

 06-20-2017
1.50
Rear fairing prep on rudder bottom
       

 06-17-2017
4.00
Rudder bottom fairing prep work
       

 06-14-2017
1.00
Tip fairing, and rudder bottom match drilling
       

 06-08-2017
2.00
Fiberglass fabrication for tip fairing
       

 06-04-2017
2.50
Horizontal stabilizer tip fairing-fiberglass
       

 05-09-2017
1.50
Elevator tip
       

 05-06-2017
2.00
Elevator tip- prep work
     

 04-29-2017
3.00
Rudder cable attach, rudder tip install
       

 04-26-2017
2.50
Vertical stab attach, rudder attach, horizontal st
       

 04-23-2017
3.00
Match drill elevator horn, elevator installation
       

 04-19-2017
2.00
Leading edge close out, rod end install
       

 04-17-2017
1.50
Aft fusulage close out
       

 04-12-2017
2.00
Top side skins assembly
       

 04-09-2017
3.00
Side skins prep
       

 04-08-2017
1.50
Top skin prep, Match drill
       

 03-30-2017
2.00
Aft deck installation
       

 03-22-2017
2.00
Inventory quickbuild wings, fusulage parts
Details
       

 03-14-2017
1.50
Phone cable, aft deck install
     

 03-12-2017
3.50
Rudder cable guides,pitot static lines
       

 03-09-2017
2.00
Rudder stops, and nut plates
       

 02-28-2017
1.50
Rivet tail cone , challenging night! Quit early...
     

 02-20-2017
2.00
Rivet skins fuselage
       

 02-18-2017
2.00
Rivet skins fusulage
Details
       

 02-15-2017
2.00
Rivet bottom skins aft fuselage
     

 02-12-2017
5.00
Lower aft fusalage installation, prep for riveting
       

 02-05-2017
2.00
Wiring harness install,prepare side skins for rive
Details
       

 01-28-2017
5.00
Aft fuselage assembly, dimple,prepare parts
Details
       

 01-26-2017
2.50
Bottom skin and bulkhead riveting
Details
       

 01-17-2017
2.50
Battery angle and bellcrank assembly,bottom skin
       

 01-14-2017
2.50
Bulkhead assembly, prepare bottom skin
Details
       

 01-10-2017
2.50
Bulkhead prep
       

 01-08-2017
2.50
Bulkhead
       

 01-05-2017
1.50
bulkhead prep
       

 01-02-2017
4.00
parts prep, rudder stops, drill vertical stab,star
       

 12-31-2016
4.00
install elevator weights, start parts prep for nex
       

 12-29-2016
2.00
final elevator close out,
       

 12-15-2016
2.50
counter sink trailing edge , finish rib installati
       

 12-11-2016
2.00
trim tab trailing edge, rib installation
       

 11-27-2016
3.00
elevator pitch trim harness and servo install
       

 11-22-2016
1.50
trim tab
       

 11-20-2016
2.50
finish up right elevator, apart from trailing edge

 11-17-2016
1.50
right elevator assembly, back rivet ribs
       

 11-09-2016
1.50
right elevator assembly-spar assembly, rib assembl
       

 11-06-2016
2.00
right elevator skin prep, dimple parts, skin
       

 11-05-2016
1.50
prepwork right elevator
       

 10-26-2016
1.50
left elevator, finish up
Details
       

 10-22-2016
3.00
left elevator rear spar, inboard closeout
Details
       

 10-16-2016
4.00
rib&rear spar assembly, left elevator assembly
       

 10-12-2016
3.00
elevator spar assembly
       

 10-05-2016
2.00
tip rib and access doubler preperation
     

 10-04-2016
2.25
dimple elevator skins, prepare edges
       

 09-28-2016
2.00
elevator tim
       

 09-25-2016
2.00
trim tab hinge, dimple skins, tip ribs
       

 09-21-2016
2.00
ribs and spars cleco elevator skins
Details
       

 09-21-2016
2.00
front spar elevator
       

 09-14-2016
2.00
trim tabs
       

 09-01-2016
2.00
finish elevator
       

 08-18-2016
2.00
rivet elevator skins

 08-07-2016
3.00
rivet elevator skins
       

 07-10-2016
2.50
Rivet skins elevator
Details
       

 06-25-2016
2.00
prep ribs, rib tip assembly
       

 06-22-2016
2.00
stringer assembly,nose ribs, inspar ribs,
Details
       

 06-19-2016
4.00
Horizontal stab skin prep,dimple, finish front spa
Details
       

 06-16-2016
2.00
nose ribs, front spar assembly
       

 06-09-2016
2.00
front spar assembly
       

 05-26-2016
2.50
front spar assembly, hinge bracket
       

 05-15-2016
4.50
finish rudder, start horizontal stab, rear spar
       

 05-11-2016
1.00
rivettrailing edge rudder, make templates
       

 05-07-2016
2.00
joining skins leading edge , start trailing edge
       

 05-04-2016
3.50
attaching ribs, joining skins
Details
       

 05-01-2016
2.50
Rudder assembly,
Details
       

 04-10-2016
5.00
Rudder skins stiffners dimple prepare for riveting
Details
       

 04-02-2016
3.00
Rudder assembly
Details
       

 03-31-2016
1.50
rudder assembly
       

 03-23-2016
1.50
Rudder assembly
Details
       

 03-16-2016
2.00
Work on rudder
       

 02-28-2016
2.00
Prepare rudder skins, for riveting
       

 02-21-2016
2.00
Rudder assembly, prepare parts
       

 02-16-2016
3.00
Dimple and Rivet Vertical stabilizer
Details
       

 01-30-2016
2.00
Start tail section, debur, dimple
       

 12-23-2015
1.50
Open and Inventory Tail Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.