Powered By Kitlog Pro v2.0
BARRY'S WEB SITE
Pulsar III
All
Work Logs Found:
50
Category Work Time:
1557 Hours
Date
Hours
Work Log Summary
Details
11-26-2005
50.00
Final Assembly
11-06-2005
550.00
11 Months of body work and paint prep
12-28-2004
12.50
Wing Tip Installation Left Wing
Details
12-21-2004
12.25
Tank Closing Left Wing
Details
12-11-2004
38.00
Control Mechanisms and Closing Right Wing
Details
10-18-2004
12.25
Wing Tip Installation Right Wing
Details
10-12-2004
12.75
Tank Closing Right Wing
Details
09-25-2004
39.50
Control Mechanisms and Closing Left Wing
Details
08-24-2004
12.50
Wing Installation
Details
08-22-2004
6.00
Prop Installation
Details
08-22-2004
11.00
Cowling Installation
Details
08-19-2004
29.00
Flap and aileron Installation RIGHT Wing
Details
07-19-2004
12.00
Intake Manifold Spacers
Details
06-20-2004
16.00
Engine Wiring
Details
06-12-2004
8.00
Oil Cooller Installation
Details
06-10-2004
2.00
Lubrication System
Details
05-23-2004
5.00
Engine Mount Installation
Details
05-18-2004
8.00
Firewall Installation
Details
05-15-2004
16.00
Static pressure System Installation
Details
05-15-2004
2.00
Seat Belt Installation
Details
05-15-2004
6.00
Brake Plumbing
Details
04-30-2004
120.00
Instrument Panel
Details
04-30-2004
10.00
Electric Flap Installation
Details
01-10-2004
75.00
Cooling System
Details
12-28-2003
11.00
Initial Details
Details
12-11-2003
29.50
Flap And Aileron Installation LEFT wing.
Details
11-13-2003
5.50
Pitch Trim System
Details
11-04-2003
6.00
Elevator Controls
Details
11-03-2003
4.50
Control Stick Installation
Details
10-26-2003
12.50
Preparation
Details
10-23-2003
11.00
Rear Window Installation
Details
10-12-2003
84.00
Horizontal Stabilizer and Elevators
Details
07-26-2003
6.00
Splice Tube Installation
Details
07-16-2003
33.30
Baggage Compartment
Details
06-24-2003
27.25
Rudder Pedals and Floorboards
Details
06-01-2003
8.50
Center Console Fab and Installation
Details
06-01-2003
19.50
Cabin Bulkheads and Flap Torque Tube
Details
05-18-2003
5.75
Engine Mount Bracket Installation
Details
05-11-2003
14.00
Nose Gear Support Structure
Details
05-06-2003
11.00
Occupant Restraint Structure
Details
03-30-2003
89.00
Canopy Construction
Details
02-25-2003
22.50
Rudder Assembly and Installation
Details
02-22-2003
3.00
Tail Skid Installation
Details
02-10-2003
13.00
Vertical Stabilizer Installation
Details
02-05-2003
6.50
Rear access cover
Details
01-28-2003
14.00
Vertical Stabilizer Assembly
Details
01-19-2003
33.00
Main Gear Installation
Details
01-12-2003
2.00
Rudder Cable Guide Tube Installation
Details
01-10-2003
14.50
Bulkhead Installation
Details
12-20-2002
4.40
Taping Fuselage Seems
Details
SITE NAVIGATION
Contact Builder
Pulsar III Home
Category
# Logs
# Hours
All
50
1557
Avionics
1
120
Body Work and Paint
1
550
Engine
5
43
Fuselage
30
566
Miscellaneous
1
50
Prop
1
6
Wings
11
222
Copyright © 2001-2024 Matronics. All Rights Reserved.