Powered By Kitlog Pro v2.0
Mikes Web Site
Savannah S
All
Work Logs Found:
238
Category Work Time:
643 Hours
Date
Hours
Work Log Summary
Details
05-22-2020
8.00
Cowl doors
Details
05-01-2020
6.00
Sleeker Cowl
Details
04-13-2020
5.00
Cooling Exit Air
Details
04-02-2020
2.00
Cooling Experiment
Details
02-27-2020
4.00
New Cylinder Rings
Details
02-24-2020
4.00
Valve Lapping
Details
02-22-2020
2.00
Valve Inspection
Details
02-21-2020
6.00
Low Compression Issue
Details
01-18-2020
3.00
Internal cowl flap
Details
12-30-2019
0.00
First Cross Country
Details
12-06-2019
2.00
Engine pre-heater
Details
11-02-2019
4.00
Lower Cowl Door
Details
11-02-2019
2.00
Lower cowl door
Details
11-01-2019
6.00
Nosebowl installation
Details
10-25-2019
2.00
Main gear
Details
10-19-2019
4.00
Splitting the Nosebowl
Details
10-18-2019
4.00
Nose bowl sides
Details
10-05-2019
1.00
New valve cover installed
Details
10-05-2019
3.00
Cowl fiberglass work
Details
10-04-2019
2.00
Modified valve cover
Details
10-04-2019
1.00
Modified Cowling
Details
10-04-2019
1.00
Getting Committed
Details
09-28-2019
3.00
Lower Cowl Mod
Details
09-27-2019
2.00
Cabin heat mod
Details
08-26-2019
2.00
Repitch Prop
Details
08-23-2019
1.00
Cooling test flight
Details
08-10-2019
2.00
Cooling Challenges
Details
08-03-2019
4.00
First Flight
Details
08-01-2019
2.00
Airworthiness Inspection
Details
07-27-2019
4.00
Final Details
Details
06-22-2019
2.00
Control Stick Boot
Details
06-22-2019
1.00
Cockpit details
Details
06-14-2019
2.00
Pitot probe installation
Details
06-14-2019
1.00
Final Bearing Torque
Details
06-14-2019
1.00
Cockpit wiring
Details
06-08-2019
1.00
Skylight seal
Details
06-07-2019
2.00
Wire looms
Details
06-07-2019
2.00
N number installation
Details
06-07-2019
1.00
N number installation
Details
06-07-2019
2.00
Elevator cables
Details
06-01-2019
6.00
Coming Soon
Details
05-31-2019
6.00
Electric Pitch Trim
Details
05-24-2019
2.00
2nd W&B attempt
Details
05-17-2019
3.00
Final Panel wiring
Details
05-10-2019
5.00
Headset Jacks
Details
04-27-2019
0.00
Distractions
Details
04-20-2019
2.00
Low Fuel Warning Light
Details
04-20-2019
6.00
Aft Battery move completed
Details
03-23-2019
5.00
Aft Battery tray
Details
03-02-2019
4.00
More W&B Calcs
Details
03-01-2019
6.00
W & B
Details
02-23-2019
4.00
Brake lines
Details
02-22-2019
2.00
Wing/Fuselage close out
Details
02-22-2019
2.00
Nav anntennae installation
Details
02-09-2019
4.00
Finishing the Tail
Details
01-28-2019
4.00
Cowling final installation
Details
01-05-2019
4.00
Painted Cowl parts
Details
10-20-2018
8.00
Cabin heat muff
Details
10-19-2018
1.00
Little things
Details
10-19-2018
1.00
Fuel flow test 2
Details
10-16-2018
1.00
carb heat muff installation
Details
10-15-2018
2.00
Carb heat muff
Details
10-06-2018
3.00
Fuel lines
Details
10-06-2018
1.00
Carb heat muff SS
Details
09-14-2018
4.00
Carb heat muff
Details
08-10-2018
2.00
Cabin heat valve
Details
07-28-2018
3.00
Nosebowl in primer
Details
07-21-2018
2.00
Nosebowl inlet rings
Details
07-20-2018
2.00
Fuel Flow testing
Details
07-14-2018
1.00
Prop Track check
Details
06-09-2018
3.00
passenger door
Details
06-08-2018
4.00
flaperon installation
Details
06-01-2018
8.00
Tail surfaces
Details
05-29-2018
4.00
Cowling access doors and spinner
Details
05-28-2018
14.00
Cowling design and fabrication
Details
05-25-2018
6.00
Panel installation
Details
05-19-2018
4.00
Details
Details
05-18-2018
2.00
Wing Installation
Details
05-14-2018
2.00
First engine run
Details
05-12-2018
1.00
Avionics
Details
05-11-2018
2.00
Temp Air scoop
Details
05-05-2018
2.00
Propellor installation
Details
05-04-2018
2.00
Nosebowl fitting
Details
05-04-2018
1.00
Master solenoid
Details
05-04-2018
3.00
Internal fuel system
Details
04-20-2018
3.00
Fuel delivery system
Details
04-06-2018
4.00
Mixture control
Details
03-31-2018
3.00
Throttle cable installation
Details
03-30-2018
4.00
Avionics rack
Details
03-24-2018
1.00
Transponder & VPX
Details
03-24-2018
2.00
Sub panel fabrication
Details
03-24-2018
1.00
Ignition Coil Cooler
Details
03-17-2018
1.00
Starter wiring
Details
03-17-2018
1.00
EGT probes
Details
03-16-2018
2.00
Oil / Air separator
Details
03-09-2018
3.00
Ignition
Details
03-02-2018
2.00
Door installation
Details
02-16-2018
2.00
Oil line and pre-oil
Details
02-16-2018
1.00
Exhaust manifold
Details
02-15-2018
4.00
Intake manifold and baffles
Details
02-03-2018
1.00
Rear Alternator installation
Details
02-03-2018
1.00
Engine Installation
Details
02-02-2018
2.00
Engine Assembly
Details
01-27-2018
1.00
New head bolt installation
Details
01-12-2018
2.00
Windsheild Installation Complete
Details
12-29-2017
2.00
Windsheild installation
Details
12-16-2017
2.00
engine tear down
Details
12-15-2017
2.00
Head bolt torque failure
Details
12-09-2017
2.00
Cylinder head installation
Details
12-02-2017
2.00
Pistons and Cylinders
Details
12-01-2017
2.00
install piston/cylinder combination
Details
11-18-2017
1.00
Engine core uncrated
Details
11-11-2017
4.00
Rudder and Fin trim
Details
11-08-2017
0.00
Finished combination
Details
11-06-2017
2.00
Horizontal Stabilizer Painted
Details
11-04-2017
0.00
Finished elevator paint
Details
11-04-2017
3.00
Elevator painted
Details
11-03-2017
3.00
Stab/Elevator mask
Details
10-28-2017
2.00
Final Paint for empannage tips
Details
10-27-2017
1.00
empennage tips
Details
10-13-2017
4.00
Priming tail feathers
Details
10-07-2017
0.00
Corvair Assembly Manual
Details
09-29-2017
2.00
carbon fiber panel
Details
09-22-2017
2.00
Outer flaperons painted
Details
09-08-2017
2.00
Flaperons and Instrument Panel
Details
09-04-2017
2.00
Painting the doors
Details
09-01-2017
3.00
More parts to paint
Details
08-12-2017
2.00
Doors
Details
08-11-2017
2.00
Landing lights
Details
08-08-2017
4.00
Final wing topcoat
Details
08-04-2017
3.00
Wing topcoat
Details
07-08-2017
2.00
wingtip top coat
Details
06-27-2017
2.00
wingtips ready to paint
Details
06-23-2017
4.00
Wing tip fiberglass
Details
05-13-2017
4.00
Priming Wings
Details
05-12-2017
2.00
Prepping wings for primer
Details
05-12-2017
1.00
Engine arrival
Details
05-05-2017
1.00
Landing lights
Details
04-08-2017
1.00
power ports
Details
04-08-2017
1.00
Hanger swap
Details
04-01-2017
1.00
Parking brake installation
Details
04-01-2017
2.00
Brake line installation
Details
03-31-2017
2.00
Collector tank install
Details
03-18-2017
0.00
Tuscano Cowl
Details
03-17-2017
0.00
Painting Tuscano parts
Details
03-11-2017
1.00
Dorsal vent
Details
03-10-2017
4.00
Fuselage Paint
Details
03-09-2017
2.00
Fuselage paint prep
Details
02-18-2017
2.00
Instrument Panel
Details
02-18-2017
1.00
Collector tank
Details
01-14-2017
2.00
passenger seat
Details
01-06-2017
4.00
Rudder pedal installation
Details
12-30-2016
2.00
Nose gear installation
Details
12-17-2016
2.00
More cockpit paint
Details
12-16-2016
2.00
Preparing to paint forward section
Details
12-16-2016
4.00
Forward fuselage paint
Details
12-10-2016
1.00
Chart holder install
Details
12-09-2016
2.00
Chart holders
Details
12-03-2016
2.00
Electric flap installation
Details
12-02-2016
1.00
Flaperon Mixer
Details
12-02-2016
2.00
Cockpit painting
Details
11-26-2016
1.00
On its own gear!
Details
11-19-2016
3.00
Main landing gear
Details
11-18-2016
0.00
Hanger taxiway
Details
11-18-2016
3.00
Hanger preparation
Details
11-04-2016
6.00
Painting Fuselage Belly
Details
10-21-2016
15.00
Fuselage in primer
Details
09-17-2016
2.00
Avionics Shelf
Details
08-19-2016
2.00
First Painted Part!
Details
08-13-2016
1.00
Paint booth exhaust
Details
08-05-2016
2.00
Paint booth construction
Details
07-29-2016
1.00
Vertical Stabilizer Fin
Details
07-29-2016
1.00
Vertical Stabilizer
Details
07-16-2016
1.00
Fuselage paint support
Details
07-12-2016
4.00
Milestones
Details
07-04-2016
3.00
forward cockpit
Details
07-02-2016
1.00
Motor mount supports
Details
06-25-2016
1.00
elevator bell crank install
Details
06-25-2016
1.00
Elevator bell crank
Details
06-24-2016
1.00
Belly hatch
Details
06-20-2016
4.00
Belly skin installation
Details
06-18-2016
2.00
Mid section battery box
Details
06-18-2016
2.00
Aft battery box
Details
06-03-2016
4.00
Firewall
Details
05-28-2016
4.00
Cockpit Structure
Details
05-27-2016
2.00
Fuselage progress
Details
05-21-2016
2.00
Flaperon mixer
Details
05-20-2016
0.00
Quality Help
Details
05-20-2016
1.00
Fuselage Skins
Details
05-07-2016
1.00
Baggage Tube 3
Details
05-07-2016
2.00
Baggage Tube 2
Details
05-06-2016
2.00
Extended Baggage tube
Details
05-05-2016
2.00
First Fuselage Skin!
Details
05-03-2016
1.00
Fuselage parts
Details
05-02-2016
1.00
Fuselage corrosion treatment
Details
04-26-2016
2.00
Fuselage stringers
Details
04-26-2016
2.00
Fuselage framework
Details
04-22-2016
4.00
Fuselage frames
Details
04-17-2016
1.00
Empennage frames
Details
04-17-2016
1.00
Box of parts
Details
04-16-2016
0.00
Wing storage
Details
04-16-2016
2.00
Left wingtip
Details
04-16-2016
3.00
Left wing attachments
Details
04-15-2016
3.00
Left wing leading edge
Details
04-15-2016
1.00
Electrical conduit
Details
04-09-2016
1.00
Second wing trailing edge
Details
04-09-2016
4.00
Second Wing Skins
Details
04-01-2016
1.00
Wing storage
Details
04-01-2016
1.00
Spar bolts
Details
04-01-2016
3.00
Second wing fuel plumbing
Details
04-01-2016
2.00
Beginning second wing
Details
03-05-2016
4.00
Leading Edge
Details
02-15-2016
4.00
Top skin completed
Details
02-13-2016
2.00
Sight tube installation
Details
02-13-2016
1.00
Fuel fitting
Details
02-12-2016
4.00
Fuel tank plumbing
Details
02-06-2016
4.00
Fuel tank pressure test
Details
02-05-2016
6.00
Right wing skins
Details
01-30-2016
4.00
Right wing attachments
Details
01-24-2016
1.00
Right Wing assembly
Details
01-23-2016
2.00
Flaperon completion
Details
01-23-2016
8.00
Flaperon closure
Details
01-16-2016
6.00
Flaperons
Details
01-03-2016
1.00
Elevator Trim
Details
01-03-2016
4.00
Elevator skins
Details
01-03-2016
2.00
Elevator Frame
Details
12-29-2015
4.00
Horizontal Stabilizer completion
Details
12-28-2015
6.00
Horizontal Stabilizer
Details
12-26-2015
6.00
Rudder completion
Details
12-19-2015
3.00
Rudder
Details
12-12-2015
15.00
Garage update
Details
12-05-2015
4.00
Vertical Stabilizer Fin
Details
12-01-2015
3.00
And so it begins...
Details
11-25-2015
4.00
My kit is finally here!
Details
11-06-2015
4.00
Corvair core is shipped
Details
02-27-2015
6.00
Bare engine core
Details
07-12-2014
2.00
Engine tear down
Details
06-27-2014
10.00
Engine Core Prep
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Savannah S Home
Category
# Logs
# Hours
All
238
783
Avionics
6
16
Empennage
24
103
Engine
67
195
Fuselage
71
264
Miscellaneous
22
60
None
4
16
Prop
2
4
Shop Supplies
1
2
Tools
2
15
Wings
39
108
Copyright © 2001-2025 Matronics. All Rights Reserved.