Work Logs Found: 557
Category Work Time: 1277 Hours
 Date
Hours
Work Log Summary

Details

 02-10-2017
0.40
PAP - G9 - Placards Check
Details
       

 02-10-2017
1.60
PAP - G8 - Calibrated Fuel Qty System
Details
       

 02-09-2017
3.10
PAP - G7 - Weighed Airplane
Details
       

 02-07-2017
4.10
Measured & Corrected Play in Wings
Details
       

 01-29-2017
0.20
Apply Instrument Panel N Number
Details
       

 01-28-2017
0.40
Install Anti-Slip Wing Walk
Details
       

 01-28-2017
1.70
Complete Canopy Seals
Details
       

 01-21-2017
2.60
Install Canopy Front & Side Seals
Details
       

 01-18-2017
3.10
Installed Upholstery
Details
       

 01-16-2017
4.20
PAP - G5 - Pitot Static Leak Check
Details
       

 01-14-2017
1.10
SB 13-12-12 Seal Avionics Bay
Details

 01-12-2017
0.30
Install Aircraft Data Plate
Details
       

 01-02-2017
0.80
Fab & Install Canopy Seal Frame Extensions
Details
       

 12-29-2016
0.30
Add Servos to MM Installed Equipment List
Details

 12-29-2016
0.30
Add Panels to MM Installed Equipment List
Details

 12-29-2016
0.30
Add ADS-B to MM Installed Equipment List
Details

 12-27-2016
2.60
PAP - G6 - Check For Debris
Details
       

 12-25-2016
7.90
PAP - G6 - Adjust Prop
Details

 11-16-2016
2.70
PAP - G6 - Engine Run
Details
       

 11-14-2016
2.60
PAP - G4 - Engine Check
Details
       

 11-14-2016
0.30
PAP - G3 - Seats and Belts
Details
     

 11-14-2016
1.10
PAP - G2 - Flight Controls
Details
       

 11-14-2016
4.10
PAP - G1 - System Checks
Details
     

 11-11-2016
1.30
Install Seats & Seat Belts
Details
       

 11-09-2016
2.60
Tensioned Stabilator Cables
Details
       

 11-03-2016
1.20
Make Tow Bar
Details
       

 10-24-2016
2.10
Install Placards
Details
       

 10-24-2016
1.10
Install Air Filters
Details
       

 10-23-2016
3.80
Re-Seated Cable Grommet & Sealed
Details
     

 10-22-2016
2.50
Finished Cooling System Installation
Details
       

 10-20-2016
1.50
Install Crotch Strap & Seat Ramp Cover
Details
       

 10-19-2016
1.10
Secure Control Module
Details
       

 10-19-2016
0.90
Cut & Install Cowl Duct Seals
Details
       

 10-19-2016
1.90
Connected Soft Start Wiring
Details
       

 10-19-2016
0.50
Applied RTV to Rub Points
Details
       

 10-17-2016
1.20
Begin Install of Heat Shield
Details
     

 10-16-2016
1.80
Complete Oil Hose Install
Details
       

 10-13-2016
1.60
Installed Oil Hoses
Details
       

 10-12-2016
1.30
Bonded Cooling Duct to Bottom Cowl
Details
       

 10-11-2016
2.20
Install C-1216-1 Gas Struts & Canopy Catch
Details
       

 10-10-2016
2.10
Finish Fitting Cooling Duct
Details
     

 10-09-2016
3.20
Begin Fitting Cooling Duct
Details
       

 10-08-2016
3.90
Heat Exchanger, Hoses, and Heater Cable
Details
       

 10-07-2016
2.00
Filled & Bled Brake System
Details
       

 10-05-2016
1.30
New Parts & Cooler Box Door Install
Details
       

 10-04-2016
1.60
Installed Throttle & Choke Cables (2 of 2)
Details
       

 10-04-2016
2.00
Installed Throttle & Choke Cables (1 of 2)
Details
       

 10-03-2016
6.10
Clamp Heater Cable & Build Oil Cooler
Details
       

 10-02-2016
2.80
Install Oil Tank & Heater Cable
Details
       

 10-01-2016
1.20
Cowling Complete
Details
       

 09-30-2016
0.70
RTV'd Exhaust Springs
Details
       

 09-30-2016
2.30
Cooling Hoses and Cooler Box Door - CRAP!
Details
       

 09-29-2016
1.90
Installed Exhaust System
Details
       

 09-29-2016
4.30
Install Oil Door & Finalize Cowl Install
Details
       

 09-28-2016
6.20
Finished Cowl Fitting
Details
       

 09-26-2016
2.50
Started Top Cowl Fit
Details
       

 09-23-2016
8.20
Fit Bottom Cowl
Details
       

 09-16-2016
0.70
SB 16-08-24 Complete
Details
       

 09-14-2016
1.50
More Cowling Trim Work
Details
       

 09-01-2016
1.70
Mark and Install Hinges
Details
       

 08-31-2016
1.50
Cowling Hinges & Pins (Oh My!)
Details
       

 08-31-2016
2.60
Adjusted Propeller Blade Pitch
Details
       

 08-30-2016
4.20
Start Trimming Cowls
Details
       

 08-27-2016
1.10
Finish Spinner & Reinstall Propeller
Details
       

 08-26-2016
4.20
Installed Propeller Spinner
Details
       

 08-24-2016
2.20
Adjust Position of Spinner
Details
       

 08-23-2016
1.10
Propeller On!
Details
       

 08-22-2016
2.60
Finish Engine Installation
Details
       

 08-22-2016
2.20
Began Propeller Install
Details
       

 08-21-2016
2.20
Wired Up Engine
Details
       

 08-20-2016
2.80
Hang Engine & Connect Fuel/Ignition
Details
       

 08-18-2016
1.30
Install Drip Trays
Details
       

 08-17-2016
3.30
Reassemble Top of Engine
Details
       

 08-16-2016
1.80
Install Engine Mount & Cooling Shroud
Details
       

 08-15-2016
2.60
Starter Lug Cut & Start Cooling Shroud Fit
Details
       

 08-14-2016
2.10
Began Engine Teardown
Details
       

 08-13-2016
1.80
Installed Fuel Neck
Details
       

 08-12-2016
1.00
Install Fuel Tank
Details
       

 08-12-2016
6.30
Finish Tank Install (SB 13-12-19)
Details
       

 08-12-2016
0.20
Complete N 16-08-10 (Isolators Correct)
Details
     

 08-05-2016
0.60
Installed Wings & Repositioned Aircraft in Hanger
Details
       

 08-04-2016
1.30
Complete Wing AOA Installation
Details
       

 08-04-2016
1.90
Complete SB 14-11-03 - RH Wing
Details
       

 08-03-2016
2.10
Complete SB 14-11-03 - LH Wing
Details
       

 08-01-2016
3.60
Finish Aft Window Install
Details
       

 07-30-2016
2.80
Prepped Aft Window For install
Details
       

 07-30-2016
1.50
Finish ELT Install
Details
       

 07-29-2016
2.20
Sealed Up Fuel Tank (SB 13-12-19)
Details
       

 07-29-2016
1.20
Finished Riveting Turtle Deck
Details
       

 07-28-2016
0.40
Install ELT Batteries (Cockpit Remote & Audio Aler
Details
       

 07-27-2016
0.20
Sealed Rivets
Details
       

 07-27-2016
1.10
Installed and Sealed Doublers (SB 13-12-19)
Details
       

 07-27-2016
0.10
Installed ADSB Spare Fuse
Details
     

 07-27-2016
0.20
Install Fuse Holder
Details
     

 07-27-2016
0.40
Finished Map Box Install
Details
       

 07-25-2016
0.20
ELT GPS Data Wire Good (N 14-09-10)
Details
     

 07-20-2016
1.80
Wired Up ELT DIN Connector
Details
       

 07-20-2016
3.50
Begin Rear Window & Turtle Deck Install
Details
       

 07-18-2016
0.20
Installed Split Bulkhead
Details
     

 07-18-2016
0.20
Installed Split Baggage Floor Panels
Details
     

 07-18-2016
1.50
Install ELT Tray & Antenna
Details
       

 07-18-2016
2.60
Complete Tank Vent Install
Details
       

 07-17-2016
0.30
Installed Vent Fluid Fitting & Cap
Details
       

 07-17-2016
0.40
Installed Anti-Rotation Bracket & Fitting
Details
       

 07-17-2016
4.10
Cleaned Tank & Then Bad Day (SB 13-12-19)
Details
       

 07-15-2016
7.00
Remove Sealant & Prep Doublers (SB 13-12-1
Details
       

 07-15-2016
0.40
Fuel Tank Vent Mod Holes
Details
       

 07-15-2016
0.20
Drilled Anti-Rotation Plate
Details
     

 07-14-2016
2.10
Started Fuel Tank Attach Mod (SB 13-12-19)
Details
       

 07-13-2016
1.30
Prep Baggage Floor Covers
Details
     

 07-13-2016
4.80
Install Spar Pin Switch Mod (N 15-09-15)
Details
       

 07-13-2016
1.10
Built Split Baggage Bulkhead Cover
Details
     

 07-12-2016
1.10
Finished Eyeball Light Install
Details
       

 07-12-2016
3.30
Finish Canopy Latch Switch Install (N 14-05-22)
Details
       

 07-11-2016
1.20
Complete Tailcone Fairing Install
Details
       

 07-10-2016
4.40
Fitted Tailcone Fairing
Details
       

 07-10-2016
1.50
Connected Stabilator Cables
Details
       

 07-09-2016
3.40
Reassemble Center Tunnel
Details
       

 07-09-2016
0.30
Finished Riveting Baggage Floor
Details
       

 07-08-2016
7.90
Update Trim Servo & Install Stabilator
Details
       

 07-08-2016
0.20
Complied with Notification 14-05-14
Details

 07-06-2016
7.90
Wired Up Firewall Forward
Details
       

 07-06-2016
0.10
Riveted Tab to Rudder
Details
     

 07-05-2016
0.80
Install Rectifier Regulator
Details
       

 07-05-2016
0.30
Install AP Disconnect Button
Details
       

 07-05-2016
0.20
AP Disconnect Harness
Details
     

 07-05-2016
2.20
Antennas Installed
Details
       

 07-04-2016
1.10
Installed ADS-B Receiver
Details
       

 07-04-2016
2.60
Install GTR200 Radio
Details
       

 07-04-2016
3.30
Install Center Panel
Details
       

 07-04-2016
2.20
Install Autopilot & Knobs Panels
Details
       

 07-03-2016
5.30
Damage Repair Done!
Details
       

 07-02-2016
0.60
Swap Comm Coax Connector
Details
       

 07-02-2016
1.10
Install Skyview & Start Panel
Details
       

 07-02-2016
1.10
Control Module Miscellaneous
Details
       

 07-02-2016
0.90
Compressor Woes & Noise Filter
Details
       

 07-02-2016
0.10
Center Panel Prep
Details
     

 06-30-2016
0.50
Prepped ELT Angle & Bracket
Details
       

 06-30-2016
0.60
Prep ADS-B Mount Brackets
Details
       

 06-30-2016
1.20
Prep & Install Stack Angles & Com Support Brackets
Details
       

 06-30-2016
7.50
Begin Avioincs Install
Details
       

 06-27-2016
4.40
Floor Panels & Major Fuselage Joints Riveted
Details
       

 06-26-2016
6.10
Fuselage Skin Riveting Session
Details
       

 06-25-2016
4.90
Installed F-1282-L & -R Bottom Skins
Details
       

 06-25-2016
1.20
Install ADS-B Antenna
Details
       

 06-24-2016
0.30
Wrong ADAHRS Fittings
Details
       

 06-23-2016
3.20
Prep Lower Tailcone Skins
Details
       

 06-22-2016
0.80
Rudder Trim Tab
Details
     

 06-22-2016
4.60
Primed Cleaned Areas
Details
       

 06-22-2016
3.30
Installed ADAHRS & Stiffener
Details
       

 06-22-2016
0.80
Finalized AOA Tubing Install in Tailcone
Details
     

 06-22-2016
1.80
Finalized ADS-B Coax Run
Details
       

 06-20-2016
8.60
Cleaned & Treated Tailcone
Details
       

 06-09-2016
1.10
Tailcone Damage Assessment
Details
       

 06-08-2016
6.10
Bottom Skin On - Tail Skin Off
Details
       

 06-07-2016
2.80
LH Corner Skins Installed
Details
       

 06-06-2016
4.30
Primed New Skins
Details
       

 06-05-2016
5.20
Prep Bottom Skins
Details
       

 05-29-2016
0.50
Routed Fuselage AOA Tubing
Details
       

 05-29-2016
3.10
Routed ADS-B Coax Cable
Details
       

 05-26-2016
0.60
Drill ADSB Cable Panel Base Hole
Details
       

 05-22-2016
1.20
Drilled Holes in Bulkheads F-1204A & B
Details
       

 05-22-2016
0.90
Complete & Adjust Flaperon Control Rods
Details
       

 05-21-2016
1.10
Fabricated New Flaperon Control Rod
Details
       

 05-21-2016
2.40
Completed Bearing Bracket Mod (SB 14-12-06)
Details
       

 05-20-2016
6.60
Primed Cleaned Areas
Details
       

 05-18-2016
5.60
Chemically Treated Cleaned Areas
Details
       

 04-29-2016
4.60
Install Canopy Latch Switch Wiring (N 14-05-22)
Details
       

 04-28-2016
1.30
Eyeball Cockpit Light
Details

 04-26-2016
6.80
Inventoried PP and Avionics Kits
Details
       

 03-27-2016
0.60
Remove Old Bearing Bracket Brace (SB 14-12-06)
Details
       

 03-27-2016
2.60
Partial Disassembly RH Baggage Floor
Details
       

 03-20-2016
11.50
Cleaning Bottom Flanges
Details
       

 03-17-2016
1.60
Removed Baggage Corner Skins
Details
       

 03-14-2016
5.50
Removed Control Rods & Corner Skins
Details
       

 02-28-2016
2.50
Cleaned P/CP Seats & Floors
Details
       

 02-23-2016
4.50
Started Clean Up Process
Details
       

 02-15-2016
7.50
Bottom Skin Panel Removed
Details
       

 02-14-2016
3.10
Started Removal of Bottom Skin Rivets
Details
       

 01-17-2016
1.10
Securing Fuselage Prior to Bottom Skin Removal
Details
       

 01-07-2016
0.00
Mice Mussings
Details
       

 01-05-2016
1.80
Moved Aircraft from Storage to Hangar
Details
       

 12-20-2013
0.00
Moved Wings to Trion
Details
       

 12-19-2013
0.00
Move Airplane to Trion
Details
       

 12-17-2013
2.60
Adjusted Canopy Latch
Details
       

 12-16-2013
0.00
Fabricated and Installed False Spars
Details
       

 07-11-2013
0.80
Riveted Stiffeners
Details
       

 07-10-2013
1.50
Reattached Fwd Skin Stiffeners
Details
       

 07-10-2013
0.50
Primed & Riveted MOD Rib (SB 13-04-05)
Details
     

 07-08-2013
1.20
Drilled Stiffener Holes
Details
       

 07-07-2013
2.40
Started Stiffener Retrofit
Details
       

 06-29-2013
1.10
Drilled Holes for Oil Tank Mod Rib (SB 13-04-05)
Details
       

 06-07-2013
0.50
Swapped Wires for Skyview V4.0 Update
Details

 03-13-2013
0.30
Drilled Hole for Autopilot Disconnect
Details
     

 03-11-2013
0.80
Scuffed Instrument Panel Parts
Details
       

 03-10-2013
2.10
Prepped Instrument Panels
Details
       

 02-26-2013
3.40
Built Map Box
Details
       

 02-24-2013
0.40
Installed Steps
Details
       

 02-24-2013
2.60
Install Wings & Trim Wing Skins (SB 12-11-09)
Details
       

 02-16-2013
1.10
Back on the Gear! (SB 12-11-09)
Details
       

 02-09-2013
2.80
Re-Installed Landing Gear (SB 12-11-09)
Details
       

 02-05-2013
2.10
Fixed Rogue CHERRYMAX Rivet (SB 12-11-09)
Details
       

 02-02-2013
3.60
RH Skin & Outb Doubler/Wear Plates (SB 12-11-09)
Details
       

 01-31-2013
2.00
Riveted LH Side Skin Doubler (SB 12-11-09)
Details
       

 01-30-2013
0.80
Installed LH Skin Attach Flanges (SB 12-11-09)
Details
       

 01-29-2013
2.20
Installed RH Skin Attach Flanges (SB 12-11-09)
Details
       

 01-28-2013
0.90
Masked Off Airframe (SB 12-11-09)
Details
       

 01-27-2013
1.20
Prepared Parts to be Primed (SB 12-11-09)
Details
       

 01-21-2013
1.40
Countersunk Outboard Wear Plates (SB 12-11-09)
Details
       

 01-20-2013
1.60
Additional Holes in Center Section (SB 12-11-09)
Details
       

 01-19-2013
1.80
Chamfered Outbd Main Gear Brackets (SB 12-11-09)
Details
       

 01-15-2013
1.50
Skin Attach Flanges (SB 12-11-09)
Details
       

 01-14-2013
2.60
Match Drilled Side Skin Doublers (SB 12-11-09)
Details
       

 01-12-2013
4.20
Removed Landing Gear & Rivets (SB 12-11-09)
Details
       

 01-11-2013
3.00
Started Center Section Mod (SB 12-11-09)
Details
       

 01-10-2013
4.20
Built Maintenance Stands
Details
       

 12-07-2012
0.80
Received and Inventoried Kit (SB 12-11-09)
Details

 08-14-2012
0.50
Triimed Bottom Forward Corner of Canopy Fairing
Details
       

 08-13-2012
1.30
Trimmed Forward Edge of Canopy Fairing
Details
       

 08-12-2012
1.40
Trimmed Canopy Fairing
Details
       

 08-08-2012
1.10
Removed Canopy from Fuselage
Details
       

 08-07-2012
8.00
Continued Shaping Canopy Fairing
Details
       

 07-17-2012
1.90
Began Shaping Canopy Fairing
Details
       

 07-14-2012
2.60
Applied Center Fiberglass Portion
Details
       

 07-13-2012
3.20
Applied Fibergass on Sides of Canopy
Details
       

 07-09-2012
2.30
Cut Fiberglass Plies
Details
       

 07-08-2012
1.30
Finished Masking Off Fuselage
Details
       

 07-07-2012
6.20
Shaped Foam & Installed Templates
Details
       

 07-06-2012
3.20
Installed Canopy Foam
Details
       

 07-03-2012
0.80
Installed New F-1254-R Support Frame
Details
     

 07-02-2012
1.20
Bought Fiberglass & Replaced RH Support Frame
Details
     

 06-26-2012
1.80
Installed Guide Blocks
Details
       

 06-25-2012
1.10
Completed Canopy Latch
Details
       

 06-24-2012
3.90
Canopy On!
Details
       

 06-22-2012
2.30
Re-welded and Primed Canopy Frame
Details
       

 06-20-2012
1.10
Crack in Canopy Frame
Details
       

 06-19-2012
1.70
Match Drilled Guide Plates & Lift Handles
Details
     

 06-18-2012
2.60
Final Drilled Canopy Holes
Details
       

 06-17-2012
3.60
Match Drilled Canopy Sides
Details
       

 06-16-2012
4.80
Drilled Canopy at Front and Aft Bows
Details
       

 06-14-2012
6.50
Trimmed Canopy & Drilled Front Bow
Details
       

 06-06-2012
1.50
Trial Fit Canopy
Details
       

 06-05-2012
1.10
Temporarily Installed Turtle Deck & Aft Window
Details
       

 06-05-2012
1.50
Attached Canopy Frame
Details
     

 06-04-2012
2.20
Connected Roll Servo Pushrod
Details
       

 06-03-2012
4.60
Installed Flaperon Torque Tube
Details
       

 05-24-2012
2.20
Finished RH Wing Connector Update
Details
       

 05-22-2012
2.70
Connected RH Nav/Strobe Light
Details
       

 05-21-2012
1.80
Pulled Wires Through RH Wing
Details
       

 05-20-2012
1.20
Started RH Wing Connector Update
Details

 05-19-2012
2.30
Finished Extra Wires - LH Wing
Details
       

 05-18-2012
3.10
Pulled Wires Through LH Wing
Details
       

 05-15-2012
1.70
Airplane Sitting on its Own Gear
Details
       

 05-14-2012
1.80
Continued Fitting Tailcone Fairings
Details
       

 05-13-2012
2.20
Continued Working on Tailcone Fairings
Details
       

 05-12-2012
2.80
Installed Main Gear Brake Lines
Details
       

 05-11-2012
3.10
Installed Nose Gear Wheel & Tire Assy
Details
       

 05-09-2012
0.50
Installed LH Main Gear Axle Shim
Details
       

 05-06-2012
2.20
Installed Main Gear Axles & Nose Gear
Details
       

 05-05-2012
8.60
Built Wheel Assy & Installed Main Gear Legs
Details
       

 05-04-2012
1.60
Connect Rudder Cables to Rudder Pedal Horns
Details
     

 04-30-2012
2.80
Rudder Pedal Links Fabricated
Details
       

 04-29-2012
2.20
Installed Rudder & Installed Stabilator Cables
Details
       

 04-27-2012
4.30
Installed Autopilot Servos
Details
       

 04-26-2012
1.80
Inventory & Fabricate Pushrods
Details
       

 04-23-2012
2.30
Installed Rudder Cables
Details
       

 04-22-2012
6.20
Started Flight Control Installation
Details
       

 04-22-2012
0.40
Finalized Rudder/Brake Pedal Installation
Details
     

 04-21-2012
1.10
Wiring - Spar Pin Switches - Wiring Complete
Details
       

 04-21-2012
1.50
Leak Checked Fuel Lines
Details
       

 04-21-2012
1.60
Installed Flaperon Mixer Arms & Flap Handle
Details
     

 04-20-2012
1.80
Wiring - PTT Wiring
Details
       

 04-19-2012
0.90
Wiring - Control Stick PTT
Details
       

 04-19-2012
1.20
Installed Control Sticks
Details
     

 04-17-2012
1.90
Wiring - System Blocks & Tie Wraps
Details
       

 04-16-2012
0.80
Wiring - Wireway Bracket Flange
Details
       

 04-16-2012
1.20
Corrected Rudder Pedal Installation
Details
     

 04-15-2012
1.60
Wiring - Tie Wrapped Harnesses & Wireway
Details
       

 04-15-2012
1.60
Installed Rudder Pedals
Details
     

 04-14-2012
6.30
Wiring - Wing Connectors & Aft Fuselage Harness
Details
       

 04-14-2012
0.80
Seat Pan Electrical Bracket Holes
Details
       

 04-13-2012
3.60
Wiring - ELT Bracket & Copilot Headset Jacks
Details
       

 04-12-2012
1.30
Wiring - Fuel Pump Noise Filter
Details
       

 04-09-2012
0.90
Wiring - Installed Pitot Line
Details
       

 04-08-2012
1.50
Wiring - Pitch Trim Wires
Details
       

 04-08-2012
4.80
Body Mate!!
Details
       

 04-07-2012
5.20
Wiring - Control Sticks & Headset Jacks
Details
       

 04-06-2012
1.60
Wiring - OAT Probe & Headset Jacks
Details
       

 04-05-2012
3.40
Wiring - Wing Connectors & Autopilot Connectors
Details
       

 04-04-2012
1.20
Wiring - Power Outlet
Details
       

 04-03-2012
3.20
Wiring - ELT, Fuel Pump, & Options Harness
Details
       

 04-02-2012
3.20
Wiring - Fuel Flow, Fuel level, ELT, Stall, and AP
Details
       

 04-01-2012
5.30
Wiring - Conduit, Cooling Fans, Fuselage Harness,
Details
       

 03-31-2012
0.00
Completed SkyView Structural Updates (2 of 2)
Details
       

 03-31-2012
6.20
Completed SkyView Structural Updates (1 of 2)
Details
       

 03-30-2012
2.10
Started SkyView Update
Details
       

 03-30-2012
1.80
Inventoried Finishing Kit Subkit #5-1
Details

 03-25-2012
1.30
Built Rudder Pedal Rigging Stop
Details
       

 03-24-2012
1.50
Installed Spacers in Flaperon Torque Tubes
Details
       

 03-23-2012
2.60
Fitted Flap Handle Fork and Knob
Details
       

 03-22-2012
1.30
Trial Fit Flap Handle & Adjust Fuel Line
Details
       

 03-17-2012
0.80
Assembled Fuselage Pin
Details
     

 03-16-2012
0.50
Riveted Flange Bearings to Flaperon Mixer Bellcran
Details
     

 03-16-2012
2.50
Primed Parts & Installed Nutplates
Details
       

 03-13-2012
1.20
Pile of Parts Scuffed
Details
     

 03-11-2012
0.40
Installed String Through Control Sticks
Details
       

 03-06-2012
0.80
Corrected Flaperon Mixer Assy Bolt
Details
     

 03-04-2012
2.60
Trial Fitted Control Sticks
Details
       

 03-04-2012
1.10
Torqued Engine Mount Standoff
Details
     

 03-03-2012
0.80
Replaced Nutplate & Attempted to Tighten Flaperon
Details
       

 03-03-2012
0.80
Installed Engine Mount Standoff
Details
     

 02-26-2012
4.10
Trial Fit Wings & Installed Flaperons
Details
       

 02-25-2012
0.80
Verified No Tank Leaks & Drill Fuel Cap
Details
       

 02-21-2012
0.80
Balloon Deflated - Leak Identified
Details
       

 02-20-2012
1.10
Soapy Solution Leak Check of Fuel Tank
Details
     

 02-19-2012
1.60
Trimming Tailcone Fairing
Details
       

 02-19-2012
0.20
Started leak Check of Fuel Tank
Details
     

 02-18-2012
3.80
Started F-1294 Tailcone Fairing Assembly
Details
       

 02-17-2012
1.20
Canopy Guide Blocks & Lift Handles
Details
       

 02-16-2012
4.30
Continued Working on Canopy Frame
Details
       

 02-12-2012
3.20
Started the Canopy Frame
Details
       

 02-10-2012
1.10
Reworked Static Lines for SkyView
Details
       

 02-04-2012
4.40
Fabricated Misc Flight Control Parts
Details
       

 02-03-2012
3.10
Sealed Up Fuel Tank
Details
       

 01-29-2012
1.50
Sealed & Riveted Top Tank Skin
Details
       

 01-27-2012
1.70
Completed T-1204A Top Tank Skin
Details
       

 01-19-2012
1.40
Prepped for Install of Moeller Mechanical Fuel Gag
Details
       

 01-16-2012
1.10
Miscellaneous Flight Control Stuff
Details
       

 01-13-2012
2.30
Prepared Flap Handle Parts
Details
       

 01-13-2012
0.50
Dimpled Nutplate Rivet Holes in Seat Floor Cover
Details
     

 01-13-2012
1.70
Assembled Fuselage Spar Pins
Details
     

 01-08-2012
0.90
Sealed Inside Corners of Tank
Details
       

 01-07-2012
1.50
Fabricated Fuel Return Line and Clips
Details
       

 01-02-2012
2.40
Fitted Fuel Neck
Details
       

 01-01-2012
3.80
Adjusted Float Arm & Temp Installed Fuel Tank
Details
       

 12-31-2011
2.20
Installed Fuel Window
Details
       

 12-30-2011
0.80
Corrected Rivet Direction in Attach Angle
Details
       

 12-28-2011
4.20
Installed Tank Bracket, Baffles, & Aft Bulkhead
Details
       

 12-27-2011
2.70
Started Building Fuel Tank
Details
       

 12-26-2011
4.20
Prepped Fuel Tank Parts
Details
       

 12-09-2011
4.60
Inventoried Finishing Kit HW & Organized Parts
Details
       

 12-05-2011
4.50
Finishing Kit Arrival & Inventory
Details
       

 11-18-2011
0.00
Fuselage Inspection
Details
       

 11-08-2011
0.00
Fuselage Kit Complete For Now
Details
       

 11-08-2011
2.60
Completed Seatbacks
Details
       

 11-07-2011
1.80
Deburred Seatback Parts
Details

 11-04-2011
2.80
Trial Fit Seat Assemblies
Details
       

 11-03-2011
2.80
Installed Upper Fwd Skin and Panel Attach Strips
Details
       

 11-01-2011
2.30
Riveted Panel Base & Canopy Ribs
Details
       

 10-30-2011
0.50
Riveted Oil Tank Side Braces & Battery Mount Brace
Details
       

 10-28-2011
3.30
Started Section 29 Assembly
Details
       

 10-27-2011
1.90
Prepped Remaining Section 29 Parts
Details
       

 10-25-2011
1.80
Match Drilled Panel Base to Longerons
Details
       

 10-24-2011
2.80
Riveted Mid Cowl Hinges and Prepped Canopy Ribs
Details
       

 10-21-2011
4.10
Riveted Upper Firewall to Fuselage Assembly
Details
       

 10-19-2011
1.50
Drilled, Dimpled, CS Upper Fuselage Doubler
Details
       

 10-18-2011
1.50
Started Section 29 Fwd Upper Fuselage
Details
       

 10-17-2011
3.10
Completed Roll Over Structure
Details
       

 10-16-2011
1.40
Finished Roll Bar Components
Details
       

 10-15-2011
4.80
Riveted Roll Bar & Match Drilled to Base
Details
       

 10-14-2011
2.40
Match Drilled Bulkheads to Tailcone Shear Clips
Details
       

 10-13-2011
2.60
Drilled and Countersunk Roll Bar
Details
       

 10-10-2011
1.80
Clecoed Roll Bar Assembly
Details
       

 10-09-2011
4.60
Completed Fuselage Side Skins
Details
       

 10-08-2011
4.80
Installed Fuselage Side Skins
Details
       

 10-07-2011
0.80
Prepped Side Skins
Details
       

 10-07-2011
3.30
Completed Fuel System
Details
       

 10-04-2011
1.80
Deburred Section 23 Parts
Details
       

 10-03-2011
2.20
Prepped Fuselage Side Skins
Details
       

 10-01-2011
3.20
Drilled Longerons
Details
       

 09-30-2011
6.50
Bent Longerons
Details
       

 09-29-2011
2.40
Installed Brake Lines
Details
       

 09-26-2011
2.00
Built Rudder Pedal Assembly
Details
       

 09-25-2011
2.00
Drilled Brake Pedals
Details
       

 09-24-2011
2.20
Installed Fwd Fuel Return Line
Details
       

 09-23-2011
2.50
Finished Installing Fuel Supply Lines
Details
       

 09-22-2011
1.80
Fabricated Fuel Supply Lines
Details
       

 09-20-2011
2.10
Started Installing Fuel System
Details
       

 09-17-2011
1.80
Mated Lower Fwd & Lower Mid Fuselage
Details
       

 09-16-2011
5.90
Completed Fwd Lower Fuselage
Details
       

 09-13-2011
2.20
Fabricated & Drilled Firewall Spacers
Details
       

 09-12-2011
1.90
Fabricated F-1201L Bracket
Details
       

 09-11-2011
2.10
Started Prep Work on Sec 22 Parts
Details
       

 09-08-2011
0.80
Finished Section 21
Details
       

 09-07-2011
1.20
Installed Steps & Step Floors
Details
       

 09-07-2011
0.60
Installed Roll Autopilot Servo Brackets
Details
     

 09-06-2011
2.10
Primed Remaining Parts in Sec 21
Details
       

 09-05-2011
6.10
Installed Fuselage Skin
Details
       

 09-04-2011
3.60
Prepped & Partially Installed Fuselage Skins
Details
       

 09-03-2011
3.10
Ramp Floors, Step Ribs, and Bushings Installed
Details
       

 09-02-2011
3.10
Completed Installed F-1203S Bulkead
Details
       

 09-01-2011
1.80
Control Column Bearing Binding
Details
       

 08-31-2011
3.90
Dimpled and Countersunk Step Floor Components
Details
       

 08-29-2011
1.60
Prepped F-1203A Bulkhead and Seat Ramp Floors
Details
       

 08-28-2011
1.30
Prepping Control Column Brackets
Details
       

 08-27-2011
0.80
Installed Pitch Autopilot Servo Bracket
Details
     

 08-27-2011
11.40
Assembled & Installed Seat Assemblies
Details
       

 08-26-2011
2.60
Prepped Parts to Build Seat Assemblies
Details
       

 08-25-2011
1.80
Bulkhead, Nutplates & Bearing Bracket Assembled
Details
       

 08-24-2011
2.40
Riveted Baggage Ribs, Floor, and Bulkhead
Details
       

 08-22-2011
3.10
Assembled Miscellaeous Parts
Details
       

 08-21-2011
1.00
Riveted Baggage Floors
Details
       

 08-21-2011
3.50
Completed Center Section
Details
       

 08-20-2011
4.10
Baggage Floor Components Primed
Details
       

 08-19-2011
2.50
Primed Center Section Parts
Details
       

 08-02-2011
1.80
Countersinking, Dimpling, & Deburring
Details
       

 08-01-2011
2.00
Match Drilled New Center Section
Details
       

 07-16-2011
3.10
Miscellaneous Dimpling and Countersinking
Details
       

 07-10-2011
2.40
More Deburring
Details
     

 07-09-2011
2.30
Partial Assembly (Part 2 of 2)
Details
     

 07-09-2011
2.20
Partial Assembly (Part 1 of 2)
Details
       

 07-05-2011
2.00
Match Drilled Aft Bulkhead to Center Section
Details
       

 07-03-2011
0.90
Finish Organizing Fuselage Kit Parts
Details
       

 07-02-2011
4.10
Finished Fuselage Kit Inventory
Details
       

 06-30-2011
2.50
Began Fuselage Kit Inventory
Details
       

 06-29-2011
1.10
Fuselage Kit Delivery
Details
       

 06-17-2011
0.00
Wing Kit With Lighting Complete
Details
       

 06-17-2011
3.60
Finished Flaperons
Details
       

 06-16-2011
1.30
Riveted Indb and Outbd RH Flaperon Skins
Details
       

 06-15-2011
0.90
Completed RH Flaperon Skeleton
Details
       

 06-14-2011
2.10
Prepped RH Flaperon Skins
Details
     

 06-13-2011
1.40
Prepped RH Flaperon Parts
Details
       

 06-12-2011
4.30
LH Flaperon Complete (Almost)
Details
       

 06-11-2011
6.30
Prepped LH Flaperon Parts
Details
       

 06-09-2011
1.80
Drilled LH Counterbalance
Details
       

 06-06-2011
2.60
Screwed Up Outbd Nose Skin
Details
       

 06-05-2011
2.10
Started LH Flaperon
Details
       

 06-04-2011
1.50
Finished Nav/Strobe Lights
Details
       

 06-02-2011
0.50
Resolved Oval Cutout Issue - RH Extension
Details
       

 06-01-2011
0.30
Lighting Issues
Details
       

 06-01-2011
0.30
Flaperon Pivot Bracket Issue
Details
     

 05-30-2011
1.90
Prepped RH Wing Light Extension for Final Installa
Details
       

 05-29-2011
1.60
Cut Extension Hole and Prepped Extension for Right
Details
       

 05-28-2011
2.00
RH Wing Tip Skins
Details
       

 05-28-2011
6.60
LH Wing Light Extension
Details
       

 05-26-2011
2.90
Trimmed and Floxed LH Wing Light Extension
Details
       

 05-24-2011
1.60
Riveted Left Wing Close Out
Details
       

 05-24-2011
0.80
Cut Nav/Strobe Light Oval
Details
       

 05-23-2011
2.40
Partially Installed Wing Tip Skins
Details
       

 05-22-2011
3.10
Prepped Wing Tip Skins
Details
       

 05-21-2011
4.30
Finished Skinning Right Wing
Details
       

 05-20-2011
2.00
Riveted RH Upper Inbd Wing Skin
Details
       

 05-20-2011
5.20
Finished Landing Light
Details
       

 05-19-2011
2.80
Prepared Landing Light
Details
       

 05-16-2011
1.80
Cut Landing Light Opening and Drilled Holes
Details
       

 05-15-2011
2.50
Riveted Right Lower Mid Skin, Leading Edges, and F
Details
       

 05-14-2011
3.50
Oubd/Inbd Lower Skins Riveted
Details
       

 05-14-2011
1.00
Built/Installed RH Wing Light Wires
Details
       

 05-13-2011
2.00
Primed Right Wing Skins
Details
     

 05-08-2011
0.00
Built Wing Stand
Details
       

 05-05-2011
1.90
Completed Access Hatch
Details
       

 05-04-2011
2.00
Finished Left Wing Main Skins
Details
       

 05-03-2011
1.90
Riveted Left Upper Mid Skin and Prepped Doubler
Details
       

 05-02-2011
2.40
Riveted Inbd & Outbd Upper Wing Skins
Details
       

 05-01-2011
1.50
Left Wing Inspection
Details
       

 04-30-2011
6.10
Riveted Left Lower Skins and Hinge Brackets
Details
       

 04-27-2011
1.90
Riveted Left Lower Inbd Skin
Details
       

 04-26-2011
1.30
Left Wing Wiring & First Skin Clecoed
Details
       

 04-26-2011
0.50
Built/Installed LH Wing Light Wires
Details
       

 04-23-2011
0.90
Riveted Landing Light Components
Details
       

 04-23-2011
1.00
Finished Prepping Left Wing Skins
Details
       

 04-22-2011
2.60
Started Prepping Wing Skins
Details
       

 04-21-2011
2.20
More Deburring Wing Skins
Details
       

 04-20-2011
0.00
Rivets Installed Wrong Direction
Details
       

 04-19-2011
2.10
Continue Deburring Wing Skins
Details
       

 04-18-2011
1.80
Began Deburring Wing Skins
Details
       

 04-17-2011
2.10
Installed Stall Warning System
Details
       

 04-16-2011
3.60
Built Right Wing Skeleton
Details
       

 04-16-2011
1.00
Assembled Stall Warning Assy & Terminal Block
Details
       

 04-15-2011
5.80
Built Left Wing Skeleton
Details
       

 04-14-2011
1.60
Finished Nose RIbs
Details
       

 04-13-2011
4.60
Built Right Wing Skeleton
Details
       

 04-12-2011
0.50
Primed Stall Warning Parts
Details
     

 04-12-2011
0.40
Primed Parts
Details
     

 04-11-2011
1.40
Prepped Landing Light Mount Parts
Details
       

 04-10-2011
1.60
Started Stall Warning Prep
Details
       

 04-10-2011
1.30
Nose Ribs Primed
Details
     

 04-09-2011
2.20
Lightly Scuffed Nose Ribs
Details
       

 04-08-2011
1.70
Dimple and Final Drill Nose Ribs
Details
       

 04-04-2011
2.10
Primed Left Main Ribs
Details
       

 03-25-2011
1.80
Primed Right Main Ribs and Hinge Ribs
Details
       

 03-22-2011
0.90
Match Drilled Main Rib Doublers and Hinge Brackets
Details
       

 03-20-2011
4.30
Completed Deburring and Fluting Main Ribs
Details
       

 03-15-2011
0.80
Finished Deburring Left Nose Ribs
Details
       

 03-14-2011
0.90
Finished Deburring Right Nose Ribs
Details
       

 03-12-2011
2.50
More Deburring!
Details
       

 03-11-2011
2.00
Trimmed Main Ribs and Started Deburring
Details
       

 03-09-2011
1.30
Completed Right Rear Spar
Details
       

 03-08-2011
0.50
Prepared New Flaperon Hinge Brackets
Details
     

 03-07-2011
1.60
Deburring!
Details
     

 03-05-2011
2.90
Trimmed and Started Deburring Nose Ribs
Details
       

 03-03-2011
2.10
Built Left Rear Spar Assy
Details
       

 03-02-2011
2.60
Built Stub Spar Assemblies and Flaperon Hinge Brac
Details
       

 03-01-2011
2.20
Prepped and Primed Stub Spar Channels and Rear Spa
Details
       

 02-28-2011
1.20
Primed Forward and Aft Spar Parts
Details
       

 02-27-2011
2.80
Prepared Forward and Aft Spar Parts
Details
       

 02-25-2011
2.20
Riveted Attach Angles to Complete Wing Spars
Details
       

 02-24-2011
4.30
Prepped Attach Angles and Doublers
Details
       

 02-18-2011
2.40
Wing Kit Arrival Inventory
Details
       

 12-22-2010
0.90
Safetied AST Hinge Pins
Details
     

 12-22-2010
2.60
Riveted Tip Fairings
Details
     

 12-22-2010
0.00
Empennage Kit Complete
Details
       

 12-20-2010
2.60
Installed Stabilator and Trim Servo Assembly
Details
       

 12-18-2010
2.10
Trim Tip Fairing
Details
       

 12-18-2010
0.90
Installed Rudder
Details
     

 12-18-2010
0.10
AST Hinge Problem & Rebuild
Details
       

 12-16-2010
1.00
Prepped Tip Fairings
Details
       

 12-16-2010
1.90
Installed V-Stab
Details
       

 12-11-2010
2.20
Completed Servo Wiring and Bushings
Details
       

 11-27-2010
3.60
Completed Pitch Trim/Servo Assembly
Details
       

 11-26-2010
1.20
Prepped Parts for Pitch Trim/Servo Assy
Details
     

 11-24-2010
3.50
Completed Tail Cone
Details
       

 11-23-2010
4.20
Riveted Upper Skins and Clecoed Top Skin
Details
     

 11-19-2010
1.60
Riveted Right Side Skin to Frames and Upper Skin
Details
       

 11-18-2010
1.90
Riveted Left Side Skin to Frames and Upper Skin
Details
       

 11-17-2010
1.60
Installed Upper Skin & Snap Bushing Brackets
Details
       

 11-16-2010
2.10
Finished Trim Wires and Static System
Details
       

 11-15-2010
1.20
Side Skins, Static Ports, & Trim Wires Installed
Details

 11-14-2010
3.20
Riveted Tail Cone Bottom and Lower Skins
Details
       

 11-13-2010
3.30
Trial Fit Aft Bulkhead and Began Tail Cone Build
Details
       

 11-12-2010
3.10
Primed Tail Cone Skins
Details
       

 11-09-2010
3.20
Deburred Tail Cone Skins
Details

 11-07-2010
2.00
Broke Edges of Fuselage Skins
Details
       

 11-05-2010
2.80
Completed Aft Bulkhead (F-1211 Assy)
Details
       

 11-04-2010
1.10
Riveted Fuselage Frames Together
Details
       

 11-01-2010
2.20
Prepared and Primed Fuselage Frames
Details
       

 10-31-2010
1.50
Primed Tail Cone Parts
Details
       

 10-30-2010
2.00
Fabricated Tail Skid Bracket
Details
     

 10-29-2010
2.60
Prepare Tail Cone Parts
Details
       

 10-25-2010
2.00
Finished Stabilator
Details
       

 10-24-2010
4.00
Finished Stabilator Main Skin and Aft Surface
Details
       

 10-23-2010
6.30
Skinned Stabilator
Details
       

 10-22-2010
6.20
Completed Stabilator Skeleton
Details
       

 10-20-2010
4.90
Spar Prep and Parts Primed Ready For Assy
Details
       

 10-18-2010
2.90
Spar Box Assembly and Drilled Counterbalance
Details
       

 10-09-2010
2.00
Machine Countersink Spars and Prime
Details
       

 10-07-2010
1.30
Prepared Stabilator Spars, Brackets, and Doublers
Details
       

 10-05-2010
1.70
Completed Vertical Stabilizer
Details
       

 10-04-2010
2.10
Replaced Tip Rib and Clecoed V Stab Main Skin
Details
       

 10-02-2010
6.40
Rudder Complete
Details
       

 10-01-2010
5.70
Anti-Servo Tabs Complete
Details
       

 09-30-2010
2.10
Prepared Anti Servo Tabs (AST)
Details
       

 09-28-2010
1.00
Attempted V Stab Skin Installation
Details
       

 09-27-2010
4.20
Assembled V Stab Assembly
Details
       

 09-26-2010
3.40
Finished Rudder Hinges and V Stab Skin Nutpplates
Details
       

 09-25-2010
2.40
Rudder Spar, Spar Caps, and Rudder Hinge
Details
       

 09-24-2010
1.20
Primed Internal V Stab Components
Details
       

 09-21-2010
1.60
Dimpled Forward Skin and Main Skin
Details
       

 09-18-2010
0.50
Countersink #40 Holes in Vertical Stablilizer Spar
Details
       

 09-17-2010
3.40
Match Drilled Vertical Stabilizer Spar and Caps
Details
       

 09-13-2010
0.70
Prepared Vertical Stabilizer Spar Caps
Details
       

 09-12-2010
2.00
Build Rudder Hinges
Details
       

 09-02-2010
3.70
Finished Inventory of Empennage kit
Details
     

 08-31-2010
1.00
Inventory Empennage Kit
Details
       

 08-27-2010
0.50
Delivery of Empennage Kit
Details
       

 08-17-2010
0.00
Visit to Vans and purchase of empennage kit.
Details
       

 07-17-2010
0.00
Blue Mountain Air Park
Details
       