Greg's Bearhawk Build
Work Logs Found: 85
Category Work Time: 437 Hours
 Date
Hours
Work Log Summary

Details

 03-05-2017
7.50
Left Elevator
Details
       

 03-04-2017
6.00
Covering tail parts.
Details
       

 02-25-2017
15.00
kitlog is pissing me off
Details

 02-14-2017
6.00
lots of little things
Details
     

 02-13-2017
6.50
bulkhead pass through
Details
     

 02-06-2017
5.50
ELT wiring
Details
     

 02-05-2017
4.50
fuel valve and fuel lines
Details
     

 02-04-2017
6.00
fuel lines, fuel valve
Details
     

 01-31-2017
6.00
ELT antenna, pitot static, fuel pump
Details
       

 01-27-2017
7.00
Hard lines
Details
       

 01-23-2017
5.00
stand offs
Details

 01-22-2017
7.00
vent line, brake lines
Details

 01-21-2017
6.50
Fuel lines
Details

 01-15-2017
5.00
misc.
Details

 01-15-2017
4.50
Cables
Details
       

 01-14-2017
7.00
Putting stuff back in!
Details
       

 01-13-2017
6.50
Painting the interior
Details

 01-12-2017
8.50
More tear down
Details

 01-07-2017
5.00
Priming
Details

 01-02-2017
6.50
Sanding rust
Details

 12-27-2016
8.00
Welding
Details

 12-05-2016
6.00
Hoist welding
Details
     

 10-14-2016
6.00
tear down
Details

 08-21-2016
6.50
Cowling riveting
Details

 08-14-2016
3.50
Oil door
Details
       

 08-13-2016
6.50
Oil Door
Details

 07-30-2016
4.50
baffle seal material
Details
     

 07-29-2016
17.00

Details
       

 07-11-2016
6.00
Baffles.
Details

 07-10-2016
5.00
Baffles
Details

 07-09-2016
5.50
baffles
Details

 07-04-2016
6.50
baffles
Details
     

 07-03-2016
3.50
baffles
Details

 07-02-2016
3.50
baffles
Details

 06-27-2016
2.50
baffles
Details

 06-24-2016
3.50
baffles
Details

 06-23-2016
6.50
um, baffles.
Details

 06-22-2016
4.50
...baffles.... ugh.
Details
       

 06-21-2016
4.50
more baffles
Details

 06-13-2016
3.00
Baffles
Details

 06-12-2016
7.00
Baffles
Details
       

 06-11-2016
6.50
Engine Baffles
Details
     

 05-30-2016
4.00
Cleaning up after the cowl work

 05-29-2016
6.50
Cowl
Details
     

 05-28-2016
4.00
Cowl
Details
     

 05-23-2016
5.50
Cowl
Details

 05-22-2016
6.50
Left side Cowl Doors
Details
       

 05-16-2016
3.50
side cowl doors
Details
     

 05-15-2016
6.50
more cowl work
Details

 05-14-2016
6.50
cowling
Details
       

 05-08-2016
6.00
Cowl
Details
     

 05-07-2016
7.50
Nose bowl
Details
     

 04-04-2016
2.00
rearranged the hangar
Details

 04-03-2016
4.00
skin cleaning
Details

 04-02-2016
6.00
Skin deburring
Details

 03-22-2016
2.00
Cleaning
Details

 03-21-2016
6.00
Uncrating the wings!
Details
       

 03-20-2016
6.00
Top of panel
Details
       

 03-14-2016
6.00
Control cables
Details

 03-13-2016
3.00
trim tab push tube
Details
       

 03-08-2016
1.50
Trim tab push rod
Details

 03-07-2016
1.00
Engine mounted
Details
       

 01-12-2016
3.00
Engine mount
Details

 12-16-2015
0.25
put air in the tailwheel
Details

 12-15-2015
2.50
Boot cowl and tailwheel
Details
       

 12-12-2015
3.50
Pieces of the puzzle
Details
       

 12-08-2015
2.50

Details
     

 12-05-2015
3.00
Riveting!
Details

 11-28-2015
6.50
Floor skins
Details

 11-24-2015
3.50
Floor skins
Details
     

 11-19-2015
3.50
More film removal and left side cargo floor skin w
Details
       

 11-15-2015
4.50
Removing film from floor skins
Details

 11-13-2015
3.50
Rear bulkhead
Details
     

 11-12-2015
6.00
Cleaning and cargo floor
Details
     

 11-10-2015
2.00
Left door
Details
       

 10-28-2015
5.00
Right door
Details
     

 12-31-2014
7.50
Back Seats
Details
     

 12-25-2014
4.00
Back Seat
Details

 12-18-2014
4.50
Seat backs
Details
       

 12-17-2014
4.50
Seat pans
Details
       

 12-16-2014
3.00
Front Seat Pans
Details
       

 12-03-2014
4.00
polishing the firewall part two
Details
       

 12-02-2014
4.00
Polish the Firewall part I
Details
       

 12-01-2014
4.00
Bubble Wrap!
Details
     

 11-26-2014
1.00
Unload the truck
Details
     