KitLog pro

Powered By Kitlog Pro v2.0

Chad's Challenger II Site
Work Logs Found: 193
Category Work Time: 692 Hours
 Date
Hours
Work Log Summary

Details

 02-05-2008
1.00
More finished pictures
Details
       

 02-04-2008
1.00
Finished Plane Pictures
Details
       

 02-03-2008
2.00
Weighed the Plane and did W&B Calculations
Details
       

 02-02-2008
3.00
Installed Windshield
Details
       

 01-26-2008
4.00
Reinstalled jury struts and started gap cover
Details
       

 01-13-2008
2.00
Mounting Wings
Details
       

 01-05-2008
1.50
Attached left aileron
Details
       

 01-04-2008
1.00
Wired and mounted the left position light/strobe
Details
       

 01-02-2008
2.00
Installed Wing Strut attach brackets
Details
       

 12-20-2007
2.00
Transporting left wing home for finishing touches
Details
       

 12-20-2007
3.00
Assembled the empenage and connected linkage
Details
       

 12-02-2007
4.00
Transport of fuselage to the hangar
Details
       

 11-22-2007
6.00
Miscellaneous re-installation and waxed wing strut
Details
       

 11-21-2007
2.00
Hung engine and wet sanded ailerons
Details
     

 11-20-2007
4.00
Painting the ailerons through silver
Details
     

 11-19-2007
3.00
Misc. metal and plastic parts epoxy primered
Details
       

 11-18-2007
4.00
Odds and ends
Details
       

 11-17-2007
6.00
Installation and re-insatallation - fusealge
Details
       

 11-16-2007
4.00
Took Ailerons for paint, re-installed landing gear
Details
     

 11-04-2007
6.00
Sprayed Gray
Details
       

 11-03-2007
3.00
Spraying Red
Details

 11-01-2007
3.00
Masking Tail Surfaces
Details

 10-28-2007
4.00
Re-assembly
Details
       

 10-17-2007
3.00
Removed All Masking from Fuselage
Details
       

 10-17-2007
0.00
More pictures
       

 10-14-2007
4.00
Masked and Sprayed Gray Stripe
Details
       

 10-13-2007
3.00
Sprayed Red on Fuselage
Details
       

 10-12-2007
3.00
Readied for Red
Details
       

 10-11-2007
5.00
Taping for Trim and Stripes
Details
       

 10-10-2007
3.00
White
Details
       

 10-06-2007
3.00
Wet Sanding the Fueslage
Details
       

 10-03-2007
7.00
Transported Fuselage for Paint and Masked
Details
       

 07-29-2007
7.00
Poly-Brush fueslage and apply finishing tapes
Details
       

 07-28-2007
7.00
Finished covering and shrinking fabric on fuselage
Details
       

 07-22-2007
6.00
Bottom of Front Panels, Bottom Finishing Tapes & P
Details
       

 07-21-2007
6.00
Bottom of Rear Side Panels
Details
       

 07-20-2007
5.00
Covering right Rear Panel
Details

 07-15-2007
6.00
Left Rear Fabric Attaching and Shrinking
Details
       

 07-14-2007
5.00
Started covering the fuselage Sides
Details
       

 07-01-2007
4.00
Preparation of upper fueslage for cover
Details

 06-30-2007
6.00
Covered Belly
Details
       

 06-10-2007
8.00
Covered gussets w/ batting and covered the Fin
Details
       

 06-09-2007
3.00
Painting the control rods and struts
Details
     

 05-27-2007
4.00
Painting peripheral parts
Details
       

 05-26-2007
8.00
Prepping the Fuselage
Details
       

 05-13-2007
4.00
Instrument Panel Redo
Details
     

 05-12-2007
5.00
Fabricated and Installed Access Panel
Details
       

 05-06-2007
4.00
Panel Access Cover
Details
       

 05-05-2007
3.00
Landing light window
Details
       

 04-29-2007
4.00
Fill and test brake lines
Details

 04-28-2007
2.00
Small Stuff
Details
     

 04-21-2007
2.00
Strobe wiring - final
Details
       

 04-14-2007
4.00
Brake Installation
Details
     

 04-07-2007
2.00
Brought Fuselage Home
Details
     

 03-25-2007
5.00
Left Wing Rib Rivets and Finishing Tapes
Details
       

 03-24-2007
8.00
Left Wing Poly-Brush and Longitudinal Tapes
Details
       

 03-18-2007
8.00
Rib and wing tip finishing tapes
Details
       

 03-17-2007
8.00
Finishing tapes and Rib rivets
Details
       

 03-10-2007
8.00
Applied First Coat of Poly Brush
Details
       

 02-10-2007
8.00
Finished the Left wing covering
Details
       

 02-04-2007
4.00
Readied the Left Wing for Top Fabric
Details
       

 02-03-2007
5.00
Covered Bottom of Left Wing
Details
       

 01-28-2007
5.00
Finishing the Right Wing
Details
       

 01-27-2007
2.00
Attaching the Top Fabric
Details
       

 01-21-2007
3.00
Preparations for Right Wing Top Fabric
Details
       

 01-20-2007
4.00
Attached and Ironed Right Wing Bottom.
Details
       

 01-14-2007
4.00
Started Covering Right Wing
Details
       

 01-07-2007
0.00
Lost Weekend
Details

 12-31-2006
0.00
More pictures
       

 12-31-2006
8.00
Did wing preparation for covering
Details
       

 12-30-2006
5.00
Covered Right aileron
Details
     

 11-25-2006
5.00
Recovered Left Aileron
Details
       

 11-24-2006
2.00
Botched covering left aileron
Details

 11-22-2006
4.00
Aileron surface preparation
Details
     

 11-21-2006
2.00
Removal and preparations for covering Ailerons
Details

 11-20-2006
2.00
Painted three fiberglas Gap Cover segments
Details
       

 10-21-2006
4.00
Rear Gap Cover installation
Details
       

 10-20-2006
4.00
Gap Cover continued
Details
       

 10-08-2006
4.00
Installation of Gap Cover Center Section
Details
       

 09-30-2006
3.00
Front Gap Cover Installation
Details
     

 09-10-2006
4.00
Aileron Control Rods
Details
     

 09-03-2006
1.00
Seat Cushions
Details
     

 09-03-2006
2.00
Antenna Ground Plane
Details
       

 09-02-2006
2.00
Mounted Comm Antenna
Details
       

 08-26-2006
4.00
Jury Struts continued
Details
       

 08-13-2006
5.00
Jury Struts continued
Details

 08-12-2006
6.00
Jury Struts
Details

 08-05-2006
4.00
Installed wing strut fairings
Details
       

 07-30-2006
3.00
Notched streamlined strut fairings for install
Details
     

 07-29-2006
2.00
Installed wings
Details
       

 07-09-2006
0.00
Took wings to hangar for assembly and fitting
Details
       

 07-07-2006
2.00
Covered tailfeathers - Part 2
Details
     

 07-06-2006
4.00
Covering Tailfeathers - Part 1
Details

 07-05-2006
2.00
Taped gussets and rivet heads for covering
Details
       

 07-03-2006
1.00
Prepaired tailfeather tubing for covering
Details
     

 07-01-2006
3.00
Covered Rudder with Mike's help
Details
     

 05-29-2006
4.00
Installation of right aileron
Details
       

 05-28-2006
5.00
Installed right wing ribs and fiberglass wing tip
Details
       

 05-27-2006
8.00
Boxing in right wing root and tip
Details
       

 05-23-2006
2.00
Drilled rib rivet holes
Details
       

 05-21-2006
0.00
More Pictures
       

 05-21-2006
5.00
Finished left wing and aileron
Details
       

 05-20-2006
3.00
Installing Hoerner wing tip
Details
       

 05-14-2006
0.00
More pictures
       

 05-14-2006
5.00
Fabrication of strobe mounts on wingtips
Details
       

 05-13-2006
6.00
Left wing rib installation
Details
       

 05-07-2006
7.00
Completion of wing tip and root boxes
Details
       

 05-06-2006
8.00
Started on wing tip and root boxes
Details
       

 04-22-2006
0.00
Wing rib miters continued
       

 04-22-2006
0.00
Wing rib miters
       

 04-22-2006
4.00
Dressed wing rib end miters
Details
       

 04-15-2006
3.00
Preparation for wing building
Details
     

 03-25-2006
8.00
Rotax 503 DCDI Break-in Procedure
Details
       

 03-13-2006
0.00
Built a Utility Trailer to Transport Plane
Details
     

 02-26-2006
6.00
Troubleshooting the temp gauges
Details
       

 02-25-2006
5.00
Running the engine
Details
       

 02-08-2006
1.00
Troubleshooting Com antenna
Details
     

 02-05-2006
2.00
Installed Rear Control Stick PTT and Mod. plug
Details
       

 02-04-2006
2.00
Installed Front Control Stick PTT button
Details
     

 01-15-2006
2.00
PTT fabrication and Brake Lever pre-install
Details
       

 01-14-2006
2.00
Installed Redrive
Details
     

 12-26-2005
7.00
Painted some parts with self-etching primer
Details
       

 12-26-2005
0.00
More 12/26 pictures
       

 12-24-2005
6.00
Wired overhead switches and Landing Light
Details
       

 12-24-2005
0.00
More pictures for this day
       

 12-18-2005
5.00
Wired fused power to Avionics
Details
       

 12-18-2005
0.00
More wiring pictures
       

 12-17-2005
5.00
Complete firewall wiring
Details
       

 12-03-2005
3.00
Finished door latches and started throttle cables
Details
       

 11-29-2005
7.00
Continued on the wiring
Details
       

 11-27-2005
5.00
Door rear windows
Details
       

 11-26-2005
6.00
Throttle and Enricher cables
Details
       

 11-26-2005
0.00
More pictures of Throttle and Enricher routing
       

 11-25-2005
0.00
Throttle Levers
       

 11-25-2005
6.00
Throttle cable installation, Mechanical fuel pump
Details
       

 11-24-2005
4.00
Battery Connections, Transponder Antenna
Details
     

 11-20-2005
5.00
More wiring and intercom installation
Details
       

 11-19-2005
5.00
Connect up Battery
Details
     

 11-10-2005
8.00
Ran wires and wired quick disconnects at firewall
Details
       

 10-29-2005
2.50
Transponder Antenna Installation
Details
       

 10-29-2005
2.50
Securing the Transponder Tray
Details
       

 10-25-2005
0.00
Muffler Bracket Part 2
       

 10-25-2005
1.00
Muffler bracket
Details
       

 10-23-2005
2.00
Wiring Harness and Quick Disconnects
Details
       

 10-23-2005
2.00
Partially Installed Muffler Assembly
Details
     

 10-22-2005
3.00
Transponder Supports
Details
       

 10-22-2005
2.50
Exhaust Manifold amd Carburetors
Details
       

 10-20-2005
0.25
Hung the engine on the root tube
Details
       

 10-15-2005
5.00
Installed Engine Mount and Starter Relay
Details
       

 09-10-2005
2.00
Installed GPL Starter
Details
       

 09-04-2005
3.00
Instrument panel installation
Details
       

 09-03-2005
5.00
Door rear panels and latches
Details
       

 08-06-2005
4.00
Left side door glass
Details
       

 07-30-2005
5.00
Right side door glass
Details

 07-26-2005
3.00
Spark plug wire shielding
Details
       

 06-24-2005
12.00
Quick disconnect panel wiring
Details
       

 06-14-2005
0.00
Hand Surgery - Right hand (CTS) release
Details
     

 06-05-2005
7.00
Building the doors - day 2
Details
       

 06-04-2005
8.00
Building the doors - day 1
Details

 05-29-2005
2.00
Fuel sender installation
Details
     

 05-28-2005
4.00
Misc.
Details
       

 05-22-2005
5.00
Firewall wiring connectors
Details
       

 05-21-2005
4.00
Misc.
Details
       

 05-17-2005
1.00
Finished carry-thru
Details
     

 05-15-2005
5.00
High side rail modification
Details
       

 05-14-2005
2.00
Elevator control horn carry-thru
Details
     

 05-11-2005
1.00
Dorsal Fin part 1
Details

 05-08-2005
6.00
Landing gear part 2
Details
       

 05-07-2005
3.00
Gear installation part 1 and misc.
Details
       

 05-07-2005
3.00
Floor board and Rudder pedals
Details
       

 05-05-2005
1.00
Installed belly cross-mdmbers and steering head br
Details
       

 05-04-2005
2.00
Steering head brace - Belly cross-members
Details
       

 04-24-2005
6.00
Empennage rigging completion
Details
       

 04-23-2005
3.00
Started rigging empanage
Details
       

 04-17-2005
3.00
Bottom firewall plate
Details
       

 04-16-2005
2.00
Installed landing light
Details
       

 04-10-2005
5.00
Rudder pedal modified with bike pedals
Details
       

 03-29-2005
0.00
Hand Surgery - Left hand (CTS release)
Details
     

 03-20-2005
4.00
Finished floorboard
Details
       

 03-13-2005
2.00
Floorboard fabrication
Details

 03-09-2005
1.00
Flaperon control adjustments
Details
     

 03-06-2005
1.00
Rudder pedal attachment and planning
Details

 03-05-2005
4.00
Misc.
Details
       

 02-26-2005
5.00
Fabric attach plates and battery box
Details
       

 02-20-2005
3.00
Vertical stabilizer and door frame
Details
     

 02-19-2005
2.00
Fuel tank box installation
Details
       

 02-06-2005
2.00
Fuel tank box
Details
       

 02-05-2005
4.00
Nose wheel, tailwheel, seat rivets
Details
       

 01-25-2005
1.00
Receipt of remainder of kit -engine
Details
       

 10-27-2004
2.00
Suplemental Hinges
Details

 10-23-2004
3.00
Mounting Hinges
Details

 10-22-2004
1.00
Hinge Location
Details

 10-20-2004
2.00
Sanding Gussets
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.