Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
All
Work Logs Found:
193
Category Work Time:
692 Hours
Date
Hours
Work Log Summary
Details
02-05-2008
1.00
More finished pictures
Details
02-04-2008
1.00
Finished Plane Pictures
Details
02-03-2008
2.00
Weighed the Plane and did W&B Calculations
Details
02-02-2008
3.00
Installed Windshield
Details
01-26-2008
4.00
Reinstalled jury struts and started gap cover
Details
01-13-2008
2.00
Mounting Wings
Details
01-05-2008
1.50
Attached left aileron
Details
01-04-2008
1.00
Wired and mounted the left position light/strobe
Details
01-02-2008
2.00
Installed Wing Strut attach brackets
Details
12-20-2007
2.00
Transporting left wing home for finishing touches
Details
12-20-2007
3.00
Assembled the empenage and connected linkage
Details
12-02-2007
4.00
Transport of fuselage to the hangar
Details
11-22-2007
6.00
Miscellaneous re-installation and waxed wing strut
Details
11-21-2007
2.00
Hung engine and wet sanded ailerons
Details
11-20-2007
4.00
Painting the ailerons through silver
Details
11-19-2007
3.00
Misc. metal and plastic parts epoxy primered
Details
11-18-2007
4.00
Odds and ends
Details
11-17-2007
6.00
Installation and re-insatallation - fusealge
Details
11-16-2007
4.00
Took Ailerons for paint, re-installed landing gear
Details
11-04-2007
6.00
Sprayed Gray
Details
11-03-2007
3.00
Spraying Red
Details
11-01-2007
3.00
Masking Tail Surfaces
Details
10-28-2007
4.00
Re-assembly
Details
10-17-2007
3.00
Removed All Masking from Fuselage
Details
10-17-2007
0.00
More pictures
10-14-2007
4.00
Masked and Sprayed Gray Stripe
Details
10-13-2007
3.00
Sprayed Red on Fuselage
Details
10-12-2007
3.00
Readied for Red
Details
10-11-2007
5.00
Taping for Trim and Stripes
Details
10-10-2007
3.00
White
Details
10-06-2007
3.00
Wet Sanding the Fueslage
Details
10-03-2007
7.00
Transported Fuselage for Paint and Masked
Details
07-29-2007
7.00
Poly-Brush fueslage and apply finishing tapes
Details
07-28-2007
7.00
Finished covering and shrinking fabric on fuselage
Details
07-22-2007
6.00
Bottom of Front Panels, Bottom Finishing Tapes & P
Details
07-21-2007
6.00
Bottom of Rear Side Panels
Details
07-20-2007
5.00
Covering right Rear Panel
Details
07-15-2007
6.00
Left Rear Fabric Attaching and Shrinking
Details
07-14-2007
5.00
Started covering the fuselage Sides
Details
07-01-2007
4.00
Preparation of upper fueslage for cover
Details
06-30-2007
6.00
Covered Belly
Details
06-10-2007
8.00
Covered gussets w/ batting and covered the Fin
Details
06-09-2007
3.00
Painting the control rods and struts
Details
05-27-2007
4.00
Painting peripheral parts
Details
05-26-2007
8.00
Prepping the Fuselage
Details
05-13-2007
4.00
Instrument Panel Redo
Details
05-12-2007
5.00
Fabricated and Installed Access Panel
Details
05-06-2007
4.00
Panel Access Cover
Details
05-05-2007
3.00
Landing light window
Details
04-29-2007
4.00
Fill and test brake lines
Details
04-28-2007
2.00
Small Stuff
Details
04-21-2007
2.00
Strobe wiring - final
Details
04-14-2007
4.00
Brake Installation
Details
04-07-2007
2.00
Brought Fuselage Home
Details
03-25-2007
5.00
Left Wing Rib Rivets and Finishing Tapes
Details
03-24-2007
8.00
Left Wing Poly-Brush and Longitudinal Tapes
Details
03-18-2007
8.00
Rib and wing tip finishing tapes
Details
03-17-2007
8.00
Finishing tapes and Rib rivets
Details
03-10-2007
8.00
Applied First Coat of Poly Brush
Details
02-10-2007
8.00
Finished the Left wing covering
Details
02-04-2007
4.00
Readied the Left Wing for Top Fabric
Details
02-03-2007
5.00
Covered Bottom of Left Wing
Details
01-28-2007
5.00
Finishing the Right Wing
Details
01-27-2007
2.00
Attaching the Top Fabric
Details
01-21-2007
3.00
Preparations for Right Wing Top Fabric
Details
01-20-2007
4.00
Attached and Ironed Right Wing Bottom.
Details
01-14-2007
4.00
Started Covering Right Wing
Details
01-07-2007
0.00
Lost Weekend
Details
12-31-2006
0.00
More pictures
12-31-2006
8.00
Did wing preparation for covering
Details
12-30-2006
5.00
Covered Right aileron
Details
11-25-2006
5.00
Recovered Left Aileron
Details
11-24-2006
2.00
Botched covering left aileron
Details
11-22-2006
4.00
Aileron surface preparation
Details
11-21-2006
2.00
Removal and preparations for covering Ailerons
Details
11-20-2006
2.00
Painted three fiberglas Gap Cover segments
Details
10-21-2006
4.00
Rear Gap Cover installation
Details
10-20-2006
4.00
Gap Cover continued
Details
10-08-2006
4.00
Installation of Gap Cover Center Section
Details
09-30-2006
3.00
Front Gap Cover Installation
Details
09-10-2006
4.00
Aileron Control Rods
Details
09-03-2006
1.00
Seat Cushions
Details
09-03-2006
2.00
Antenna Ground Plane
Details
09-02-2006
2.00
Mounted Comm Antenna
Details
08-26-2006
4.00
Jury Struts continued
Details
08-13-2006
5.00
Jury Struts continued
Details
08-12-2006
6.00
Jury Struts
Details
08-05-2006
4.00
Installed wing strut fairings
Details
07-30-2006
3.00
Notched streamlined strut fairings for install
Details
07-29-2006
2.00
Installed wings
Details
07-09-2006
0.00
Took wings to hangar for assembly and fitting
Details
07-07-2006
2.00
Covered tailfeathers - Part 2
Details
07-06-2006
4.00
Covering Tailfeathers - Part 1
Details
07-05-2006
2.00
Taped gussets and rivet heads for covering
Details
07-03-2006
1.00
Prepaired tailfeather tubing for covering
Details
07-01-2006
3.00
Covered Rudder with Mike's help
Details
05-29-2006
4.00
Installation of right aileron
Details
05-28-2006
5.00
Installed right wing ribs and fiberglass wing tip
Details
05-27-2006
8.00
Boxing in right wing root and tip
Details
05-23-2006
2.00
Drilled rib rivet holes
Details
05-21-2006
0.00
More Pictures
05-21-2006
5.00
Finished left wing and aileron
Details
05-20-2006
3.00
Installing Hoerner wing tip
Details
05-14-2006
0.00
More pictures
05-14-2006
5.00
Fabrication of strobe mounts on wingtips
Details
05-13-2006
6.00
Left wing rib installation
Details
05-07-2006
7.00
Completion of wing tip and root boxes
Details
05-06-2006
8.00
Started on wing tip and root boxes
Details
04-22-2006
0.00
Wing rib miters continued
04-22-2006
0.00
Wing rib miters
04-22-2006
4.00
Dressed wing rib end miters
Details
04-15-2006
3.00
Preparation for wing building
Details
03-25-2006
8.00
Rotax 503 DCDI Break-in Procedure
Details
03-13-2006
0.00
Built a Utility Trailer to Transport Plane
Details
02-26-2006
6.00
Troubleshooting the temp gauges
Details
02-25-2006
5.00
Running the engine
Details
02-08-2006
1.00
Troubleshooting Com antenna
Details
02-05-2006
2.00
Installed Rear Control Stick PTT and Mod. plug
Details
02-04-2006
2.00
Installed Front Control Stick PTT button
Details
01-15-2006
2.00
PTT fabrication and Brake Lever pre-install
Details
01-14-2006
2.00
Installed Redrive
Details
12-26-2005
7.00
Painted some parts with self-etching primer
Details
12-26-2005
0.00
More 12/26 pictures
12-24-2005
6.00
Wired overhead switches and Landing Light
Details
12-24-2005
0.00
More pictures for this day
12-18-2005
5.00
Wired fused power to Avionics
Details
12-18-2005
0.00
More wiring pictures
12-17-2005
5.00
Complete firewall wiring
Details
12-03-2005
3.00
Finished door latches and started throttle cables
Details
11-29-2005
7.00
Continued on the wiring
Details
11-27-2005
5.00
Door rear windows
Details
11-26-2005
6.00
Throttle and Enricher cables
Details
11-26-2005
0.00
More pictures of Throttle and Enricher routing
11-25-2005
0.00
Throttle Levers
11-25-2005
6.00
Throttle cable installation, Mechanical fuel pump
Details
11-24-2005
4.00
Battery Connections, Transponder Antenna
Details
11-20-2005
5.00
More wiring and intercom installation
Details
11-19-2005
5.00
Connect up Battery
Details
11-10-2005
8.00
Ran wires and wired quick disconnects at firewall
Details
10-29-2005
2.50
Transponder Antenna Installation
Details
10-29-2005
2.50
Securing the Transponder Tray
Details
10-25-2005
0.00
Muffler Bracket Part 2
10-25-2005
1.00
Muffler bracket
Details
10-23-2005
2.00
Wiring Harness and Quick Disconnects
Details
10-23-2005
2.00
Partially Installed Muffler Assembly
Details
10-22-2005
3.00
Transponder Supports
Details
10-22-2005
2.50
Exhaust Manifold amd Carburetors
Details
10-20-2005
0.25
Hung the engine on the root tube
Details
10-15-2005
5.00
Installed Engine Mount and Starter Relay
Details
09-10-2005
2.00
Installed GPL Starter
Details
09-04-2005
3.00
Instrument panel installation
Details
09-03-2005
5.00
Door rear panels and latches
Details
08-06-2005
4.00
Left side door glass
Details
07-30-2005
5.00
Right side door glass
Details
07-26-2005
3.00
Spark plug wire shielding
Details
06-24-2005
12.00
Quick disconnect panel wiring
Details
06-14-2005
0.00
Hand Surgery - Right hand (CTS) release
Details
06-05-2005
7.00
Building the doors - day 2
Details
06-04-2005
8.00
Building the doors - day 1
Details
05-29-2005
2.00
Fuel sender installation
Details
05-28-2005
4.00
Misc.
Details
05-22-2005
5.00
Firewall wiring connectors
Details
05-21-2005
4.00
Misc.
Details
05-17-2005
1.00
Finished carry-thru
Details
05-15-2005
5.00
High side rail modification
Details
05-14-2005
2.00
Elevator control horn carry-thru
Details
05-11-2005
1.00
Dorsal Fin part 1
Details
05-08-2005
6.00
Landing gear part 2
Details
05-07-2005
3.00
Gear installation part 1 and misc.
Details
05-07-2005
3.00
Floor board and Rudder pedals
Details
05-05-2005
1.00
Installed belly cross-mdmbers and steering head br
Details
05-04-2005
2.00
Steering head brace - Belly cross-members
Details
04-24-2005
6.00
Empennage rigging completion
Details
04-23-2005
3.00
Started rigging empanage
Details
04-17-2005
3.00
Bottom firewall plate
Details
04-16-2005
2.00
Installed landing light
Details
04-10-2005
5.00
Rudder pedal modified with bike pedals
Details
03-29-2005
0.00
Hand Surgery - Left hand (CTS release)
Details
03-20-2005
4.00
Finished floorboard
Details
03-13-2005
2.00
Floorboard fabrication
Details
03-09-2005
1.00
Flaperon control adjustments
Details
03-06-2005
1.00
Rudder pedal attachment and planning
Details
03-05-2005
4.00
Misc.
Details
02-26-2005
5.00
Fabric attach plates and battery box
Details
02-20-2005
3.00
Vertical stabilizer and door frame
Details
02-19-2005
2.00
Fuel tank box installation
Details
02-06-2005
2.00
Fuel tank box
Details
02-05-2005
4.00
Nose wheel, tailwheel, seat rivets
Details
01-25-2005
1.00
Receipt of remainder of kit -engine
Details
10-27-2004
2.00
Suplemental Hinges
Details
10-23-2004
3.00
Mounting Hinges
Details
10-22-2004
1.00
Hinge Location
Details
10-20-2004
2.00
Sanding Gussets
Details
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.