Date
|
Hours
|
Work Log Summary
|
Details
|
08-24-2018
|
27.00
|
Misc.prep for airworthy inspection.
|
Details
|
|
|
08-14-2018
|
8.00
|
Interior
|
Details
|
|
|
08-10-2018
|
10.00
|
Interior
|
Details
|
|
|
07-31-2018
|
35.00
|
Misc. prep
|
|
|
|
06-30-2018
|
26.00
|
Misc. prep
|
|
|
|
06-07-2018
|
5.50
|
Misc.
|
|
|
|
06-04-2018
|
5.00
|
Getting ready for final inspection
|
|
|
|
05-25-2018
|
6.00
|
Misc.
|
|
|
|
05-22-2018
|
65.00
|
Misc. stuff getting ready for flight!
|
Details
|
|
|
05-03-2018
|
1.50
|
Worked on Skyview setup.
|
Details
|
|
|
05-02-2018
|
2.50
|
Configure Dynon, installed right wingtip.
|
Details
|
|
|
04-30-2018
|
5.00
|
Misc prep.
|
Details
|
|
|
04-29-2018
|
5.00
|
Worked on rigging and flap installation.
|
Details
|
|
|
04-28-2018
|
7.00
|
Installed rudder, ailerons and left flap.
|
Details
|
|
|
04-27-2018
|
4.00
|
Installed HS, VS.
|
Details
|
|
|
04-26-2018
|
4.50
|
Installed wings!
|
Details
|
|
|
04-25-2018
|
2.50
|
Prepped wing for installation.
|
Details
|
|
|
04-24-2018
|
2.80
|
Installed pitot tube and ADAHRS in left wing.
|
Details
|
|
|
04-23-2018
|
3.00
|
Moved fuselage to hanger!
|
Details
|
|
|
03-24-2018
|
7.00
|
Bled brakes, and misc items.
|
Details
|
|
|
03-23-2018
|
6.00
|
Installed fron floor pans items removed for painti
|
Details
|
|
|
02-03-2018
|
3.00
|
Finished rudder and panels.
|
Details
|
|
|
02-02-2018
|
4.00
|
Masked rudder for stripes and painted access panel
|
Details
|
|
|
02-01-2018
|
4.00
|
Painted rudder white.
|
Details
|
|
|
01-30-2018
|
4.50
|
Painted wheel fairings and rudder white.
|
Details
|
|
|
01-29-2018
|
2.30
|
Primed wheel pants.
|
Details
|
|
|
01-28-2018
|
2.00
|
Finished fuesalge!
|
Details
|
|
|
01-27-2018
|
3.50
|
Removed masking.
|
Details
|
|
|
01-26-2018
|
4.50
|
Painted black stripe.
|
Details
|
|
|
01-25-2018
|
9.00
|
Layed out fuselage strips and painted blue.
|
Details
|
|
|
01-24-2018
|
4.00
|
Finished white.
|
Details
|
|
|
01-23-2018
|
7.00
|
Prepped and primed fuselage.
|
Details
|
|
|
01-10-2018
|
5.00
|
Finished wing striping.
|
Details
|
|
|
01-09-2018
|
6.00
|
Painted wing stripes.
|
Details
|
|
|
01-08-2018
|
4.00
|
Primered wings.
|
Details
|
|
|
10-06-2017
|
2.00
|
Stripped both ailerons due to orange peel and runs
|
Details
|
|
|
10-05-2017
|
10.00
|
Painting
|
Details
|
|
|
09-28-2017
|
4.00
|
Prep and primed ailerons and flaps.
|
Details
|
|
|
09-25-2017
|
4.50
|
Prepped Umps garage for painting!
|
Details
|
|
|
09-24-2017
|
2.00
|
Striped VS & rudder for template.
|
Details
|
|
|
09-05-2017
|
4.00
|
Installed yaw damper.
|
Details
|
|
|
08-24-2017
|
6.50
|
Installed wings to fit root fairings.
|
Details
|
|
|
08-23-2017
|
1.00
|
Installed canopy hinge covers.
|
Details
|
|
|
08-20-2017
|
2.50
|
Canopy covers.
|
Details
|
|
|
08-19-2017
|
2.00
|
Finished wing root fairings.
|
Details
|
|
|
08-16-2017
|
2.00
|
41-05 Wing root fairings.
|
Details
|
|
|
08-09-2017
|
3.50
|
Made template for wingtips.
|
Details
|
|
|
07-21-2017
|
3.00
|
First power up!
|
Details
|
|
|
07-17-2017
|
3.00
|
Misc.
|
Details
|
|
|
07-13-2017
|
7.00
|
Finished panel! with few exceptions.
|
Details
|
|
|
07-12-2017
|
4.00
|
Installed switches etc.
|
Details
|
|
|
07-09-2017
|
3.50
|
Panel hook up etc.
|
Details
|
|
|
07-07-2017
|
7.00
|
Started panel install.
|
Details
|
|
|
06-04-2017
|
2.00
|
Wiring plus fitting canopy T handle.
|
Details
|
|
|
05-31-2017
|
7.00
|
Wiring plus.
|
Details
|
|
|
05-25-2017
|
4.00
|
Wiring
|
Details
|
|
|
05-22-2017
|
3.00
|
Wiring
|
Details
|
|
|
05-21-2017
|
4.00
|
Finished rear fiberglass fairing.
|
Details
|
|
|
05-19-2017
|
4.50
|
Fitted empennage fairing.
|
Details
|
|
|
05-17-2017
|
3.50
|
Wiring
|
Details
|
|
|
05-10-2017
|
4.50
|
Wiring
|
Details
|
|
|
05-08-2017
|
6.00
|
Wiring
|
Details
|
|
|
05-07-2017
|
2.50
|
Wiring
|
Details
|
|
|
05-06-2017
|
5.00
|
Wiring
|
Details
|
|
|
04-29-2017
|
7.50
|
Wiring
|
Details
|
|
|
04-27-2017
|
2.00
|
Wiring
|
Details
|
|
|
04-26-2017
|
8.00
|
Wiring
|
Details
|
|
|
04-25-2017
|
3.00
|
Wiring
|
Details
|
|
|
04-22-2017
|
8.00
|
Wiring
|
Details
|
|
|
04-20-2017
|
3.00
|
Wiring
|
Details
|
|
|
04-18-2017
|
2.00
|
Wiring
|
Details
|
|
|
04-17-2017
|
4.50
|
Wiring!
|
Details
|
|
|
04-10-2017
|
4.50
|
Wiring
|
Details
|
|
|
04-09-2017
|
3.50
|
Wiring
|
Details
|
|
|
04-07-2017
|
4.50
|
Connecting wires!
|
Details
|
|
|
04-06-2017
|
2.50
|
Installed speaker and seat heater wiring.
|
Details
|
|
|
03-04-2017
|
3.00
|
Installed seat cushions to check panel layout.
|
Details
|
|
|
02-26-2017
|
1.50
|
Installed parking brake & rudder trim assy.
|
Details
|
|
|
02-23-2017
|
3.00
|
Avionics wire bundle install in aircraft.
|
Details
|
|
|
02-20-2017
|
4.00
|
Installed all antenna coax wires.
|
Details
|
|
|
02-19-2017
|
4.00
|
Installed Garmin GPS antenna and parking brake.
|
Details
|
|
|
02-18-2017
|
6.00
|
Installed canopy harness.
|
Details
|
|
|
02-02-2017
|
5.00
|
Constructed speaker installation.
|
Details
|
|
|
01-20-2017
|
3.00
|
Finished engine electrical connections.
|
Details
|
|
|
01-19-2017
|
5.00
|
Wired up engine.
|
Details
|
|
|
01-02-2017
|
3.00
|
Installed pitch servo and finished ELT wiring.
|
Details
|
|
|
12-21-2016
|
4.00
|
Fitted and installed Dynon avionics boxes.
|
Details
|
|
|
12-14-2016
|
4.00
|
Built stand for avionics wiring and test.
|
Details
|
|
|
10-20-2016
|
3.00
|
Installed Ameri-king ELT.
|
Details
|
|
|
10-19-2016
|
3.00
|
Installed right wire harness in fuselage.
|
Details
|
|
|
10-18-2016
|
3.00
|
Installed left fuselage harness.
|
Details
|
|
|
10-17-2016
|
2.00
|
Putzzed around to get ready for electrical.
|
Details
|
|
|
10-16-2016
|
2.50
|
Heater tubes, sniffle line etc.
|
Details
|
|
|
10-13-2016
|
4.00
|
Messing with heater ducts and throttle linkage.
|
Details
|
|
|
10-11-2016
|
2.00
|
Worked on exhaust heater connections.
|
Details
|
|
|
10-10-2016
|
5.00
|
Installed throttle, mixture and prop controls.
|
Details
|
|
|
10-06-2016
|
2.00
|
Finished oil cooler door and worked on lower cowl
|
Details
|
|
|
10-04-2016
|
2.50
|
Worked on oil door and front cowl openings.
|
Details
|
|
|
10-03-2016
|
2.00
|
Worked on exhast.
|
Details
|
|
|
10-02-2016
|
5.00
|
Worked on exhaust system installation.
|
Details
|
|
|
09-30-2016
|
9.50
|
Hooked up engine instrumentation etc.
|
Details
|
|
|
09-29-2016
|
3.00
|
Glassed nose entrance and lower cowl.
|
Details
|
|
|
09-28-2016
|
3.00
|
Fiberglassed lower cowl nose bowls.
|
Details
|
|
|
09-25-2016
|
1.50
|
Started oil door & drilled bottom cowl screws.
|
Details
|
|
|
09-22-2016
|
1.00
|
Fiberglassed cowl inlets, top cowl.
|
Details
|
|
|
09-21-2016
|
4.00
|
Installed furnace in garage!
|
Details
|
|
|
09-14-2016
|
1.50
|
Fiberglassed cowl ramps.
|
Details
|
|
|
09-13-2016
|
2.00
|
Glassed cowl pin covers.
|
Details
|
|
|
09-08-2016
|
5.00
|
Rivited cowl hinges on cowl.
|
Details
|
|
|
08-19-2016
|
3.50
|
Worked on cowl side hinges.
|
Details
|
|
|
08-18-2016
|
3.50
|
Cowl work.
|
Details
|
|
|
08-17-2016
|
4.50
|
Worked on upper and lower cowl.
|
Details
|
|
|
08-16-2016
|
8.00
|
Fitted top cowl.
|
Details
|
|
|
08-15-2016
|
2.50
|
Cut cowl lines.
|
Details
|
|
|
08-10-2016
|
2.00
|
Started top cowl.
|
Details
|
|
|
08-09-2016
|
6.50
|
Installed prop & started on cowl.
|
Details
|
|
|
08-08-2016
|
1.75
|
Installed baffle seals.
|
Details
|
|
|
08-07-2016
|
1.50
|
Snorkel again!
|
Details
|
|
|
08-06-2016
|
4.00
|
Worked on snorkel and alternator.
|
Details
|
|
|
08-05-2016
|
4.25
|
Worked on snorkel and baffleing.
|
Details
|
|
|
08-03-2016
|
6.50
|
Engine connections and started installing baffle.
|
Details
|
|
|
08-02-2016
|
2.50
|
Hung engine on airframe!
|
Details
|
|
|
07-31-2016
|
5.00
|
Front baffle work
|
Details
|
|
|
07-10-2016
|
6.50
|
Worked on wheel pants.
|
Details
|
|
|
07-06-2016
|
3.50
|
Worked on wheel pants.
|
Details
|
|
|
06-17-2016
|
2.00
|
Worked on oil cooler installation.
|
Details
|
|
|
06-13-2016
|
5.50
|
Worked on engine baffles.
|
Details
|
|
|
06-12-2016
|
1.00
|
Worked on baffels.
|
Details
|
|
|
06-10-2016
|
6.50
|
Started firewall and baffles.
|
Details
|
|
|
06-09-2016
|
8.00
|
Finished wheel pants!
|
Details
|
|
|
06-08-2016
|
1.50
|
Nose fairings.
|
Details
|
|
|
06-07-2016
|
4.00
|
Nose fairing again.
|
Details
|
|
|
06-06-2016
|
4.00
|
Fitted nose pant.
|
Details
|
|
|
06-05-2016
|
2.50
|
Worked on nose wheel fairing.
|
Details
|
|
|
06-04-2016
|
1.50
|
Worked on fairings, again!
|
Details
|
|
|
06-03-2016
|
15.00
|
Engine prep and run on dyno.
|
Details
|
|
|
06-01-2016
|
5.00
|
Fiberglass strut work, mains.
|
Details
|
|
|
05-31-2016
|
2.00
|
Worked on right wheel fairings.
|
Details
|
|
|
05-30-2016
|
2.00
|
Worked on strut fairings.
|
Details
|
|
|
05-30-2016
|
5.00
|
Ran engine on dyno for first time!
|
Details
|
|
|
05-29-2016
|
2.50
|
Started strut fairings.
|
Details
|
|
|
05-21-2016
|
2.00
|
Installed spring doors on wheel pants.
|
Details
|
|
|
05-10-2016
|
2.00
|
Worked on left wheel pant.
|
Details
|
|
|
05-04-2016
|
3.50
|
Completed mounting of left pant.
|
Details
|
|
|
05-03-2016
|
2.50
|
Fitted right wheel pant.
|
Details
|
|
|
05-02-2016
|
3.50
|
Started main gear fairings.
|
Details
|
|
|
04-23-2016
|
6.50
|
Installed rear window and stair struts.
|
Details
|
|
|
04-21-2016
|
7.00
|
Prepped rear window for installation.
|
Details
|
|
|
04-20-2016
|
2.50
|
Moved engine from basement to garage!
|
Details
|
|
|
04-11-2016
|
2.50
|
Installed key latch for canopy.
|
Details
|
|
|
04-10-2016
|
7.00
|
Installed seals on canopy and side studs.
|
Details
|
|
|
04-09-2016
|
5.50
|
Brake lines & misc. items
|
Details
|
|
|
03-31-2016
|
2.00
|
Installed axle shims and tire assemby on left side
|
Details
|
|
|
03-30-2016
|
9.00
|
Put wheels together, installed nose wheel.
|
Details
|
|
|
03-28-2016
|
2.00
|
Removed tabl stand and measured camber.
|
Details
|
|
|
03-24-2016
|
3.00
|
Installed engine mount and nose gear.
|
Details
|
|
|
03-23-2016
|
3.00
|
Installed right & left gear legs.
|
Details
|
|
|
03-21-2016
|
1.50
|
Reconfigured garage into shop again today!
|
Details
|
|
|
01-10-2016
|
1.00
|
Finished canopy except for paint!
|
Details
|
|
|
01-07-2016
|
1.00
|
Canopy sanding again!
|
Details
|
|
|
01-06-2016
|
1.00
|
Canopy fairing again...
|
Details
|
|
|
01-05-2016
|
1.00
|
Canopy fairing work.
|
Details
|
|
|
01-03-2016
|
1.50
|
Continued sanding canopy!
|
Details
|
|
|
12-30-2015
|
1.50
|
Worked on canopy fairing.
|
Details
|
|
|
12-29-2015
|
2.00
|
started to sand canopy to frame.
|
Details
|
|
|
12-26-2015
|
2.50
|
Initial fiberglass of canopy to frame.
|
Details
|
|
|
12-20-2015
|
3.00
|
Installed void filler on canopy.
|
Details
|
|
|
11-16-2015
|
2.00
|
Reversed rudder cables due to mistake.
|
Details
|
|
|
11-15-2015
|
3.00
|
Reset canopy on fuselage for tightning.
|
Details
|
|
|
11-13-2015
|
3.00
|
Installed bubble canopy on frame.
|
Details
|
|
|
10-31-2015
|
7.00
|
Finished painting on canopy frame and roll bar.
|
Details
|
|
|
10-30-2015
|
1.00
|
Second coat on canopy frame.
|
Details
|
|
|
10-29-2015
|
2.00
|
Started painting canopy frame and associated parts
|
Details
|
|
|
10-26-2015
|
3.50
|
Prepped inside of fuselage for painting roll bar.
|
Details
|
|
|
10-03-2015
|
1.00
|
Removed bubble. Frame prepped for paint.
|
Details
|
|
|
10-01-2015
|
4.50
|
Taped fwd edge of canopy.
|
|
|
|
09-29-2015
|
3.50
|
Countersunk and drilled canopy to frame.
|
Details
|
|
|
09-28-2015
|
6.50
|
Fitted canopy to frame.
|
Details
|
|
|
09-17-2015
|
2.50
|
Fitted canopy on airframe!
|
Details
|
|
|
09-16-2015
|
3.50
|
Rivited canopy frames and intercoastal.
|
Details
|
|
|
09-15-2015
|
4.50
|
Rivited canopy skin.
|
Details
|
|
|
09-13-2015
|
3.50
|
Canopy up to 38-15.
|
Details
|
|
|
09-12-2015
|
2.00
|
Worked on canopy rails.
|
Details
|
|
|
09-12-2015
|
3.50
|
Started to prime interior parts. Worked on side r
|
Details
|
|
|
09-09-2015
|
2.50
|
Started on side rails.
|
Details
|
|
|
09-06-2015
|
4.50
|
Worked on forward canopy assembly.
|
Details
|
|
|
09-05-2015
|
2.00
|
Started on canopy front metal work.
|
Details
|
|
|
08-29-2015
|
1.50
|
Worked on canopy latch assembly.
|
Details
|
|
|
08-28-2015
|
3.00
|
Totally finished rear window!
|
Details
|
|
|
08-26-2015
|
3.50
|
Worked on rear window.
|
Details
|
|
|
08-25-2015
|
2.75
|
Drilled rear window to fuselage.
|
Details
|
|
|
08-24-2015
|
2.00
|
Finished seat backs.
|
Details
|
|
|
08-24-2015
|
2.50
|
Completed 98% of section 42.
|
Details
|
|
|
08-23-2015
|
4.00
|
Started section 39, seat backs.
|
Details
|
|
|
08-23-2015
|
4.50
|
Finished Fuselage kit!
|
Details
|
|
|
08-22-2015
|
2.50
|
Installed roll bar.
|
Details
|
|
|
08-21-2015
|
2.50
|
Finished control sticks. Started on roll bar attac
|
Details
|
|
|
08-20-2015
|
1.50
|
Ground elevator stops to get correct clearence.
|
Details
|
|
|
08-19-2015
|
5.00
|
Installed elevator belcrank and tubes.
|
Details
|
|
|
08-17-2015
|
5.50
|
Odds and ends. Finished roll bar assembly.
|
Details
|
|
|
08-16-2015
|
1.50
|
Sealed top of canopy edge.
|
Details
|
|
|
08-13-2015
|
3.00
|
Worked on roll bar.
|
Details
|
|
|
08-12-2015
|
2.50
|
Worked on elevator pushrods etc.
|
Details
|
|
|
08-11-2015
|
2.00
|
Started section 34.
|
Details
|
|
|
08-10-2015
|
3.50
|
Installed rudder pedals.
|
Details
|
|
|
08-09-2015
|
4.00
|
Nailed on front top skin.
|
Details
|
|
|
08-07-2015
|
2.00
|
Routed rudder cables.
|
Details
|
|
|
08-07-2015
|
5.00
|
Finishing kit came today!
|
Details
|
|
|
08-05-2015
|
2.00
|
Worked on section 33.
|
Details
|
|
|
08-05-2015
|
2.00
|
Redid brake pedals!
|
Details
|
|
|
08-04-2015
|
1.50
|
Moved fuselage back to my garage.
|
Details
|
|
|
08-03-2015
|
2.00
|
Painted inside of fuselage.
|
Details
|
|
|
08-02-2015
|
3.50
|
Painted primer on inside.
|
Details
|
|
|
08-01-2015
|
4.00
|
Worked on forward top panel.
|
Details
|
|
|
07-31-2015
|
2.00
|
Completed section 35-18.
|
Details
|
|
|
07-30-2015
|
5.00
|
Completed up to 35-18.
|
Details
|
|
|
07-29-2015
|
4.50
|
Completed up to 35-14.
|
Details
|
|
|
07-28-2015
|
4.00
|
Installed side rails.
|
Details
|
|
|
07-27-2015
|
2.50
|
Worked on upper fuselage.
|
Details
|
|
|
07-25-2015
|
2.00
|
Section 35-07.
|
Details
|
|
|
07-24-2015
|
1.00
|
Page 35-04 & 05.
|
Details
|
|
|
07-23-2015
|
1.00
|
Completed page 35-02 & 03.
|
Details
|
|
|
07-15-2015
|
2.00
|
Started sec 35.
|
Details
|
|
|
07-07-2015
|
2.00
|
Completed rudder pedals.
|
Details
|
|
|
07-04-2015
|
3.00
|
Started brake pedals and finished up odds and ends
|
Details
|
|
|
07-03-2015
|
3.50
|
Finished Baggage floor and sides!
|
Details
|
|
|
07-01-2015
|
4.00
|
Finished baggage floor.
|
Details
|
|
|
06-30-2015
|
4.00
|
Rivited baggage floor to structure.
|
Details
|
|
|
06-29-2015
|
3.00
|
Worked on baggage floors, prepped!
|
Details
|
|
|
06-28-2015
|
4.00
|
Completed section 31 fuel system.
|
Details
|
|
|
06-25-2015
|
2.50
|
Finished riviting bottom ribs for floor.
|
Details
|
|
|
06-24-2015
|
5.50
|
Rivited fwd and aft fuselage together!
|
Details
|
|
|
06-23-2015
|
3.00
|
Clecoed aft baggage bulkheads.
|
Details
|
|
|
06-21-2015
|
2.00
|
Joined the front and aft fuselage.
|
Details
|
|
|
06-20-2015
|
1.00
|
Moved fwd fuselage from basement to garage.
|
Details
|
|
|
06-19-2015
|
3.00
|
Set up garage workshop!
|
Details
|
|
|
04-25-2015
|
2.00
|
Installed spider.
|
Details
|
|
|
04-13-2015
|
3.00
|
Finshed section 29.
|
Details
|
|
|
04-12-2015
|
1.60
|
Completed page 29-20.
|
Details
|
|
|
04-08-2015
|
1.50
|
Page 29-20.
|
Details
|
|
|
04-07-2015
|
4.50
|
Page 29-19 & 20.
|
Details
|
|
|
04-06-2015
|
2.00
|
Completed page 29-18.
|
Details
|
|
|
04-03-2015
|
2.00
|
Tore down one bench and reconfigured basement shop
|
Details
|
|
|
04-02-2015
|
8.00
|
Completed riviting both sides.
|
Details
|
|
|
03-30-2015
|
5.00
|
Finished riviting left side skin!
|
Details
|
|
|
03-29-2015
|
4.00
|
Started to rivit left side.
|
Details
|
|
|
03-27-2015
|
2.00
|
Worked on left side skin formers and associated pa
|
Details
|
|
|
03-26-2015
|
4.00
|
Sections 29-12 & 13.
|
Details
|
|
|
03-25-2015
|
6.50
|
Preped and Worked on side skins and associated par
|
Details
|
|
|
03-24-2015
|
2.00
|
Left side panel prep.
|
Details
|
|
|
03-22-2015
|
4.50
|
Fitted side skins and through section 29-08.
|
Details
|
|
|
03-21-2015
|
4.00
|
Sections 29-6 & 7.
|
Details
|
|
|
03-16-2015
|
3.00
|
Section 29-5.
|
Details
|
|
|
03-15-2015
|
2.50
|
Finished riviting bottom of fuselage fwd section.
|
Details
|
|
|
03-13-2015
|
1.50
|
Started to rivit spar line.
|
Details
|
|
|
03-09-2015
|
1.50
|
Worked on section 29-03 & 04.
|
Details
|
|
|
03-07-2015
|
2.00
|
Repaired mistake.
|
Details
|
|
|
03-06-2015
|
5.50
|
Started section 29, joined front and rear!
|
Details
|
|
|
03-05-2015
|
8.00
|
Completed section 28!
|
Details
|
|
|
03-04-2015
|
7.00
|
Completed firewall.
|
Details
|
|
|
03-03-2015
|
3.00
|
|
Details
|
|
|
03-02-2015
|
3.00
|
Finished section 27.
|
Details
|
|
|
02-28-2015
|
4.00
|
Section 27-4.
|
Details
|
|
|
02-26-2015
|
4.50
|
Started section 27 firewall.
|
Details
|
|
|
02-25-2015
|
5.50
|
Completed section 26!
|
Details
|
|
|
02-24-2015
|
3.50
|
Worked on baggage area floor ribs.
|
Details
|
|
|
02-23-2015
|
7.50
|
Rivited fwd section 26-14 thru 16.
|
Details
|
|
|
02-22-2015
|
3.00
|
Started riviting bottom skin to crotch strap.
|
Details
|
|
|
02-21-2015
|
3.00
|
Worked on section 26-13.
|
Details
|
|
|
02-19-2015
|
1.50
|
Worked on gear brace, sect 26-12.
|
Details
|
|
|
02-19-2015
|
3.00
|
Dimpled lower skin.
|
Details
|
|
|
02-18-2015
|
2.50
|
Started to prep bottom skin.
|
Details
|
|
|
02-17-2015
|
5.00
|
Continued on section 26.
|
Details
|
|
|
02-16-2015
|
6.00
|
Worked on baggage floor area of fwd fuselage.
|
Details
|
|
|
02-15-2015
|
4.00
|
Prepared baggage area ribs.
|
Details
|
|
|
02-14-2015
|
2.00
|
Worked on spar box.
|
Details
|
|
|
02-12-2015
|
6.00
|
Section 25 pages 3 thru 4
|
Details
|
|
|
02-12-2015
|
1.50
|
Finished section 25!
|
Details
|
|
|
02-11-2015
|
3.00
|
Started forward fuselage section!
|
Details
|
|
|
02-10-2015
|
40.00
|
Engine 95% complete. Waiting on parts, hoses and i
|
Details
|
|
|
12-11-2014
|
0.00
|
Picked up engine parts from LyCon (Conway was ship
|
Details
|
|
|
12-11-2014
|
0.00
|
Fuselage kit recieved today!
|
Details
|
|
|
11-12-2014
|
0.50
|
Fabricated new elevator trim pushrod from Vans
|
Details
|
|
|
09-07-2014
|
5.00
|
Finished empennage!
|
Details
|
|
|
09-06-2014
|
7.00
|
Worked on HS and VS.
|
Details
|
|
|
09-05-2014
|
5.00
|
Worked on HS attachment.
|
Details
|
|
|
09-01-2014
|
1.00
|
Dimpled top piece.
|
Details
|
|
|
08-29-2014
|
4.50
|
Dimpled sides and prepped top.
|
Details
|
|
|
08-28-2014
|
6.00
|
Finished bottom section and turtle deck.
|
Details
|
|
|
08-24-2014
|
1.50
|
Installed pitot line.
|
Details
|
|
|
08-22-2014
|
3.00
|
Routed electrical.
|
Details
|
|
|
08-17-2014
|
1.50
|
Nailed on side skin stringers.
|
Details
|
|
|
08-17-2014
|
2.50
|
Fitted sides on bottom.
|
Details
|
|
|
08-16-2014
|
2.00
|
Primed side skins
|
Details
|
|
|
08-12-2014
|
3.00
|
Prepped side skins on bottom fitted stringers.
|
Details
|
|
|
08-10-2014
|
4.50
|
Dimpled sides & stringers.
|
Details
|
|
|
07-11-2014
|
2.50
|
Preped lower skin.
|
Details
|
|
|
07-05-2014
|
4.50
|
Preped and rivited bulkheads.
|
Details
|
|
|
07-02-2014
|
3.00
|
worked on bulkheads
|
Details
|
|
|
05-23-2014
|
1.00
|
Debur continued.
|
Details
|
|
|
05-22-2014
|
1.50
|
Started fusalage tail.
|
Details
|
|
|
04-13-2014
|
1.00
|
Boxed up lower end to send out.
|
Details
|
|
|
04-09-2014
|
1.00
|
Split case!
|
Details
|
|
|
04-09-2014
|
1.00
|
Finished elevators!
|
Details
|
|
|
04-08-2014
|
1.00
|
Installed tab.
|
Details
|
|
|
04-06-2014
|
3.50
|
Finished riviting both elevators.
|
Details
|
|
|
03-30-2014
|
2.50
|
Removed oil sump and accessory case.
|
Details
|
|
|
03-29-2014
|
2.00
|
Started tear down of engine.
|
Details
|
|
|
03-29-2014
|
3.00
|
Glued ribs on trailing edge of elevators.
|
Details
|
|
|
03-25-2014
|
2.00
|
Riveted right elevator.
|
Details
|
|
|
03-24-2014
|
1.50
|
Work on left elevator.
|
Details
|
|
|
03-23-2014
|
5.00
|
Started to rivit left and right elevator.
|
Details
|
|
|
03-22-2014
|
3.00
|
Primed parts.
|
Details
|
|
|
03-19-2014
|
1.50
|
Rivited right and left front spar outer attachment
|
Details
|
|
|
03-16-2014
|
2.00
|
Dimpled inside ribs.
|
Details
|
|
|
03-15-2014
|
5.50
|
Finished left elevator trim tab.
|
Details
|
|
|
03-12-2014
|
6.00
|
Elevator prep.
|
Details
|
|
|
03-12-2014
|
1.00
|
Brought engine downstairs from garage.
|
Details
|
|
|
03-06-2014
|
2.50
|
Preped left elevator.
|
Details
|
|
|
03-04-2014
|
2.50
|
Started on elevator, left side.
|
Details
|
|
|
03-01-2014
|
3.00
|
Finished HS!
|
Details
|
|
|
02-28-2014
|
1.50
|
Continued riveting HS.
|
Details
|
|
|
02-26-2014
|
2.00
|
Rivet HS.
|
Details
|
|
|
02-25-2014
|
3.00
|
Started to rivet skins on HS.
|
Details
|
|
|
02-23-2014
|
2.50
|
Dimpled and primed skins.
|
Details
|
|
|
02-20-2014
|
3.50
|
Primed interior ribs and spars.
|
Details
|
|
|
02-18-2014
|
4.50
|
More spar prep and formers.
|
Details
|
|
|
02-17-2014
|
3.00
|
Worked on HS spars.
|
Details
|
|
|
02-16-2014
|
2.00
|
Started HS.
|
Details
|
|
|
02-13-2014
|
1.00
|
Cleaned shop for H stabalizer.
|
Details
|
|
|
02-11-2014
|
2.00
|
Worked on rudder fairings.
|
Details
|
|
|
02-09-2014
|
6.00
|
Finished rudder!
|
Details
|
|
|
02-08-2014
|
2.50
|
Continued with rudder assembly.
|
Details
|
|
|
02-06-2014
|
3.00
|
Primed skins and riveted skin stiffners.
|
Details
|
|
|
02-05-2014
|
4.00
|
Prepped rudder skin and ribs.
|
Details
|
|
|
02-02-2014
|
3.00
|
Started rudder. Deburred parts for spar.
|
Details
|
|
|
02-02-2014
|
1.00
|
Mounted support for control storage on ceiling.
|
Details
|
|
|
02-01-2014
|
2.50
|
Finished VS!
|
Details
|
|
|
01-31-2014
|
3.50
|
Riveted frame on VS. Primed VS skin and parts.
|
Details
|
|
|
01-29-2014
|
2.50
|
Installed Aero LED nav lights in wingtips.
|
Details
|
|
|
01-28-2014
|
2.00
|
Repaired left wing tip, fiberglass.
|
Details
|
|
|
01-25-2014
|
6.00
|
Started VS.
|
Details
|
|
|
01-25-2014
|
2.00
|
Completed both wings!
|
Details
|
|
|
01-24-2014
|
2.00
|
Worked on securing wiring for pitot tube.
|
Details
|
|
|
01-23-2014
|
1.00
|
Putzz in shop combined extra hardware.
|
Details
|
|
|
01-22-2014
|
3.50
|
Installed and fitted left wing tip.
|
Details
|
|
|
01-21-2014
|
2.00
|
Installed nutplates on left wing tip.
|
Details
|
|
|
01-20-2014
|
3.50
|
Finished right wing tip!
|
Details
|
|
|
01-19-2014
|
6.50
|
Finished right aileron. Started right wing tip.
|
Details
|
|
|
01-18-2014
|
5.00
|
Worked on right aileron. Trailing edge left to do
|
Details
|
|
|
01-17-2014
|
1.50
|
Continued to assemble right aileron.
|
Details
|
|
|
01-16-2014
|
2.50
|
Started to assemble right aileron.
|
Details
|
|
|
01-12-2014
|
4.00
|
Rivited left aileron.
|
Details
|
|
|
01-11-2014
|
8.00
|
Worked on left aileron.
|
Details
|
|
|
01-08-2014
|
2.00
|
Started work on control rods, just need to prime.
|
Details
|
|
|
01-06-2014
|
4.00
|
Started to prepare deburr aileron parts.
|
Details
|
|
|
01-05-2014
|
3.50
|
Finished right flap and started to prepare left ai
|
Details
|
|
|
01-04-2014
|
2.00
|
Prepared to rivit bottom of right flap.
|
Details
|
|
|
01-02-2014
|
3.00
|
Riveted bottom skin on right flap.
|
Details
|
|
|
12-31-2013
|
2.50
|
Rivited right flap spar attachments.
|
Details
|
|
|
12-29-2013
|
4.00
|
Worked on Rt flap
|
Details
|
|
|
12-15-2013
|
4.00
|
Took inventory of tail kit with Dad.
|
Details
|
|
|
12-14-2013
|
5.00
|
Empanage kit arrived!
|
Details
|
|
|
11-03-2013
|
1.50
|
Finished left flap!
|
Details
|
|
|
10-20-2013
|
2.00
|
Continued riveting left flap.
|
Details
|
|
|
10-19-2013
|
5.00
|
Started to rivet left flap together.
|
Details
|
|
|
10-18-2013
|
2.00
|
Started to rivet left flap.
|
Details
|
|
|
10-17-2013
|
7.50
|
Dimpled and preped left flap for riveting.
|
Details
|
|
|
10-15-2013
|
2.50
|
Finished rt lower wing skins!
|
Details
|
|
|
10-13-2013
|
1.50
|
Finished riveting rt outboard lower wing skin.
|
Details
|
|
|
10-11-2013
|
2.50
|
Started to rivet rt wing lower outboard skin.
|
Details
|
|
|
10-10-2013
|
2.00
|
Finished riveting rt wing lower inboard panel.
|
Details
|
|
|
10-07-2013
|
1.50
|
Started to prep right lower wing panels.
|
Details
|
|
|
10-06-2013
|
1.00
|
cleaned up shop!
|
Details
|
|
|
10-03-2013
|
5.00
|
Finished riveting lower skins and access panels!
|
Details
|
|
|
10-02-2013
|
3.00
|
Started riveting on left wing lower outboard skin.
|
Details
|
|
|
09-26-2013
|
3.00
|
Started to rivit left outboard bottom skin.
|
Details
|
|
|
09-25-2013
|
2.00
|
finished left inbd bottom wing skin.
|
Details
|
|
|
09-24-2013
|
3.00
|
Started to rivit left inbd bottom skin
|
Details
|
|
|
09-21-2013
|
5.00
|
Nailed on flap fairings and prepared left wing ski
|
Details
|
|
|
09-20-2013
|
2.00
|
Installed flap fairing on left wing.
|
Details
|
|
|
09-19-2013
|
2.50
|
Left wing wiring and AOA tube installation.
|
Details
|
|
|
09-17-2013
|
2.00
|
Installed left wing tank on spar.
|
Details
|
|
|
09-13-2013
|
4.00
|
Installed Gretz Areo Pitot tube kit.
|
Details
|
|
|
09-08-2013
|
5.00
|
Attached rt fuel tank then installed wirng harness
|
Details
|
|
|
09-06-2013
|
1.00
|
Pressure tested left tank, held OK.
|
Details
|
|
|
09-01-2013
|
2.00
|
Big day! Pressure checked fuel tanks.
|
Details
|
|
|
08-28-2013
|
1.00
|
Installed left tank vent tube and end.
|
Details
|
|
|
08-27-2013
|
1.00
|
Final seal on right tank.
|
Details
|
|
|
08-25-2013
|
5.00
|
Installed baffel on right tank.
|
Details
|
|
|
08-22-2013
|
4.00
|
Installed rear baffel on left tank.
|
Details
|
|
|
08-04-2013
|
6.00
|
Sealed/assembled right fuel tank
|
Details
|
|
|
08-02-2013
|
5.50
|
Sealed and clecoed right tank
|
Details
|
|
|
07-25-2013
|
1.00
|
Started right tank initial fit.
|
Details
|
|
|
07-21-2013
|
2.50
|
Installed tank vent and end rib on left tank.
|
Details
|
|
|
07-18-2013
|
3.50
|
Rivited left tank.
|
Details
|
|
|
07-16-2013
|
3.50
|
Sealed and clecoed left tank.
|
Details
|
|
|
07-11-2013
|
1.00
|
Resealed stiffners, right & left tanks.
|
Details
|
|
|
07-10-2013
|
3.00
|
Rivited stiffners right tank.
|
Details
|
|
|
07-09-2013
|
4.00
|
Installed stiffners on left tank!
|
Details
|
|
|
07-07-2013
|
2.50
|
First day with PRC!
|
Details
|
|
|
07-01-2013
|
2.00
|
Clecoed left tank for fit.
|
Details
|
|
|
06-29-2013
|
3.50
|
tank brackett
|
Details
|
|
|
06-20-2013
|
2.00
|
Dimpled tank skins, L & R
|
Details
|
|
|
06-14-2013
|
7.00
|
prep tank skins
|
Details
|
|
|
06-13-2013
|
1.00
|
tank prep
|
Details
|
|
|
06-11-2013
|
1.00
|
Tank prep
|
Details
|
|
|
06-09-2013
|
1.00
|
Prep
|
Details
|
|
|
06-08-2013
|
1.00
|
Cut out stencils for flaps and preped rt tank ribs
|
Details
|
|
|
06-07-2013
|
1.00
|
Deburr right wing tank
|
Details
|
|
|
05-11-2013
|
1.50
|
deburred left fuel tank ribs
|
Details
|
|
|
04-27-2013
|
3.00
|
Rivited leading edges on both wings.
|
Details
|
|
|
04-26-2013
|
5.00
|
Landing light lenses.
|
Details
|
|
|
04-25-2013
|
6.00
|
Preped skin and started riviting on rt wing leadin
|
Details
|
|
|
04-24-2013
|
2.50
|
Started rt outboard leading edge
|
Details
|
|
|
04-23-2013
|
1.00
|
Worked on stall warning assemble.
|
Details
|
|
|
04-21-2013
|
3.50
|
Nailed skin on left wing leading edge.
|
Details
|
|
|
04-19-2013
|
3.00
|
Leading edge skin, left wing.
|
Details
|
|
|
04-12-2013
|
6.00
|
Started left wing leading edge
|
Details
|
|
|
04-07-2013
|
4.50
|
Finished top skins, right wing.
|
Details
|
|
|
04-06-2013
|
4.00
|
Prep right top skins
|
Details
|
|
|
04-05-2013
|
3.00
|
Dimpled rt top skins.
|
Details
|
|
|
04-04-2013
|
2.00
|
Skin prep rt top wing.
|
Details
|
|
|
04-03-2013
|
3.00
|
Started top skins on Rt. wing.
|
Details
|
|
|
04-02-2013
|
4.50
|
Nailed top wing skin on left wing
|
Details
|
|
|
03-30-2013
|
3.50
|
Started riveting top skins, left wing.
|
Details
|
|
|
03-27-2013
|
2.50
|
started top skin on left wing
|
Details
|
|
|
03-26-2013
|
2.00
|
Started to rivet rear spar on rt wing
|
Details
|
|
|
03-24-2013
|
6.00
|
Rear spar right wing
|
Details
|
|
|
03-23-2013
|
5.00
|
Finished ribs, rt wing
|
Details
|
|
|
03-22-2013
|
5.00
|
fabricated flap and aileron brackets
|
Details
|
|
|
03-20-2013
|
2.50
|
Finished section 13 left wing!
|
Details
|
|
|
03-19-2013
|
5.00
|
Prep rear spar, left wing
|
Details
|
|
|
03-16-2013
|
5.50
|
Ribs to spar
|
Details
|
|
|
03-15-2013
|
2.00
|
Rib work
|
Details
|
|
|
03-13-2013
|
3.50
|
Flap brackets & rib prep
|
Details
|
|
|
03-12-2013
|
2.00
|
worked on ribs, left wing
|
Details
|
|
|
03-11-2013
|
2.00
|
Left wing rib prep
|
Details
|
|
|
03-09-2013
|
3.00
|
completed section 11!
|
Details
|
|
|
03-07-2013
|
3.00
|
Right spar nut plates
|
Details
|
|
|
03-06-2013
|
3.50
|
Started right spar
|
Details
|
|
|
03-05-2013
|
1.50
|
Finished riveting nut plates on L spar
|
Details
|
|
|
03-02-2013
|
7.50
|
Spar nutplates, left spar
|
Details
|
|
|
03-01-2013
|
4.00
|
finished L spar J stringers
|
Details
|
|
|
02-26-2013
|
3.00
|
Wing kit arrived today. Uncrated kit.
|
Details
|
|
|
01-25-2013
|
15.00
|
Completed shop set up.
|
Details
|
|