KitLog pro

Powered By Kitlog Pro v2.0

Chris's RV-14A Site
Work Logs Found: 458
Category Work Time: 2374 Hours
 Date
Hours
Work Log Summary

Details

 04-17-2019
0.00
Conclusion
Details
       

 12-01-2018
1.00
First oil change
Details
       

 11-30-2018
5.00
Pants on and flight testing
Details
       

 11-26-2018
6.00
paint pants and fairings
Details
       

 11-24-2018
2.00

Details
       

 11-14-2018
6.00
Wheel pants and fairings
Details
     

 11-04-2018
0.10
First flight
Details
     

 10-23-2018
3.00
RV-14 dual time and training
Details
     

 10-18-2018
4.00
Airworthiness Certificate issued
Details
     

 10-05-2018
3.00
Fuse panel and wing tips
Details
       

 10-04-2018
5.00
engine start
Details
       

 10-03-2018
4.00
Install cooler and solenoid
Details
     

 10-02-2018
5.00
Engine oiling
Details
     

 10-01-2018
6.00
Heat muffs / scat tubes
Details
       

 09-30-2018
6.00
GAP 26 pitot install
Details
       

 09-29-2018
6.00
Weight and balance
Details
     

 09-26-2018
4.00
Snorkel and filter
Details
     

 09-25-2018
6.00
Fuel flow testing
Details
       

 09-24-2018
5.00
Engine prep
Details

 09-21-2018
6.00
ailerons
Details
       

 09-20-2018
6.00
Flaps install
Details
       

 09-19-2018
3.00
Wing gap fillers
Details
       

 09-18-2018
5.00
Cowling
Details
       

 09-17-2018
6.00
Cowling paint
Details
     

 09-16-2018
5.00
Installed wings and final torque
Details
 

 09-14-2018
5.00
More tail asssembly
Details
     

 09-13-2018
7.00
Tail assembly
Details
       

 09-12-2018
3.00
Moving part 2
Details
       

 09-11-2018
3.00
Moving part 1
Details
       

 09-07-2018
7.00
Cowling base and other work
Details
       

 08-28-2018
4.00
Fill pinholes in cowling
Details
       

 08-23-2018
4.00
Remove masking and move from paint booth
Details
       

 08-22-2018
8.00
Red and clear applied
Details
       

 08-21-2018
8.00
Layout stripes and paint mask
Details
       

 08-20-2018
7.00
Shoot Primer
Details
       

 08-19-2018
7.00
Prep and masking
Details
     

 08-15-2018
6.00

Details
     

 08-14-2018
6.00
Prepping fuselage for paint
Details
     

 07-30-2018
8.00
Fit tail fairing
Details
       

 07-24-2018
2.00
Seal forward top skin
Details
     

 07-23-2018
7.00
Rivet top cowl skin
Details
       

 07-22-2018
5.00
Cowling work
Details
       

 07-21-2018
3.00
Cowling baffles
Details
       

 07-20-2018
4.00
Exhaust hangars and governnor pushrod
Details
       

 07-19-2018
3.00
More snorkel work
Details

 07-18-2018
6.00
snorkel
Details
       

 07-17-2018
5.00
Snorkel assembly
Details
       

 07-10-2018
6.00
Baffles / cowling oil door
Details
       

 07-09-2018
5.00
Rivet Skybolt flanges
Details
     

 07-08-2018
6.00
Rear window install
Details
       

 07-07-2018
3.00
lower cowl bracket
Details
       

 07-06-2018
5.00
Inlet ramps
Details
       

 07-05-2018
4.00
Cowling and baffle ramps
Details
       

 07-04-2018
6.00
CHT/EGT sensor wiring
Details
       

 07-03-2018
4.00
Vetterman exhaust
Details
       

 06-29-2018
6.00
Bottom cowling fasteners
Details
       

 06-28-2018
5.00
Cowling side flanges
Details
       

 06-27-2018
6.00
Bottom cowling fitting
Details
       

 06-19-2018
7.00
Side cowling flanges / dash work
Details
       

 06-19-2018
6.00
Avionics and wiring
Details
       

 06-17-2018
4.00
Mount boxes and clean up wiring.
Details
       

 06-15-2018
6.00
Mounting boxes and wire clean up
Details
       

 06-08-2018
3.00
Engine sensors
Details
     

 06-07-2018
6.00
EGT/CHT wiring
Details
     

 06-06-2018
5.00
Spark plugs etc
Details
     

 06-05-2018
4.00
More settings
Details

 05-22-2018
6.00
GAD 27 configure
Details
     

 05-21-2018
7.00
Connectors
Details

 05-20-2018
5.00
AP servos
Details
     

 05-19-2018
7.00


 05-18-2018
5.00
Wiring
Details
       

 05-17-2018
6.00

Details

 05-16-2018
7.00
Panel powered up
Details
     

 05-15-2018
5.00
Continue wiring
Details

 05-14-2018
6.00
Panel wiring
Details
     

 05-08-2018
6.00
Top cowling
Details
       

 05-06-2018
7.00
Side flanges and top cowling fitting
Details
       

 05-05-2018
3.00
Skybolt flanges
Details
     

 05-03-2018
3.00
Top cowling
Details
       

 05-03-2018
3.00
Install pushrods
Details
       

 04-27-2018
4.00
Nose strut fairing
Details
     

 04-25-2018
4.00
Nose wheel fairing
Details
     

 04-24-2018
2.00
Nosewheel fairing
Details
       

 04-24-2018
2.00
Air vents
Details
       

 04-20-2018
4.00
Cowling fitting
Details
       

 04-18-2018
7.00
Start cowling trimming
Details
     

 04-17-2018
6.00
Intersection fairings
Details
       

 04-16-2018
6.00
Left wheel pants, start cowling
Details
       

 04-15-2018
7.00
CHT and EGT sensors
Details
       

 04-12-2018
8.00
Finish tail wiring
Details
       

 04-11-2018
6.00
Nose gear pant
Details
       

 04-10-2018
1.00
Reinstall exhaust
Details
     

 04-09-2018
3.00
Finish leg fairings
Details
     

 03-31-2018
5.00
Right wheel pant and fairings
Details
       

 03-30-2018
6.00
Left wheel pant
Details
       

 03-29-2018
5.00
Right wheel pant assembly
Details
       

 03-18-2018
4.00
Wheel pants
Details
     

 03-18-2018
2.00
Finish heater controls
Details
     

 03-17-2018
6.00
Engine controls
Details
       

 03-16-2018
6.00
Hang prop and attach spinner
Details
       

 03-15-2018
5.00
Prep for prop attachment
Details
       

 03-15-2018
3.00


 03-14-2018
5.00


 03-13-2018
6.00


 03-12-2018
3.00


 03-11-2018
4.00


 03-06-2018
4.00


 03-01-2018
5.00


 02-28-2018
8.00
More wiring
Details
       

 02-27-2018
7.00
Wiring
Details
       

 02-26-2018
4.00
CB Panel & ELT
Details
       

 02-25-2018
6.00
Started installing avionics harness
Details
       

 02-24-2018
7.00
Harness completed
Details
       

 02-23-2018
6.00
Finish GAD-27
Details
     

 02-22-2018
5.00
Switch changes
Details
     

 02-17-2018
5.00
Wiring / GAD-27
Details
     

 02-01-2018
7.00
Avionics harness
Details
     

 01-31-2018
6.00
Avionics harness
Details
     

 01-30-2018
7.00
More harness work
Details
     

 01-29-2018
6.00
Avionics harness A/P
Details
     

 01-28-2018
5.00
Clean up center tunnel wires
Details
       

 01-27-2018
6.00
Repair main harness
Details
       

 01-26-2018
6.00
Wire CBs and switches
Details
       

 01-20-2018
4.00
Dimmers and switches
Details
       

 01-19-2018
6.00
Flap switch CB panel
Details
       

 01-18-2018
6.00
Install switches and wire lights
Details
       

 01-13-2018
4.00
GTX-45R mounting
Details
       

 01-12-2018
6.00
Mount GTN rack
Details
       

 01-11-2018
3.00
Finish manifold pressure line
Details
       

 01-10-2018
4.00
Power wires and switches
Details
       

 01-09-2018
4.00
Assemble circuit breaker panel
Details
     

 12-19-2017
6.00
Wiring
Details

 12-13-2017
6.00
More wiring and systems work
Details
       

 12-12-2017
4.00
Finish Flyleds
Details
     

 12-11-2017
6.00
Mount wing light controller
Details
       

 12-10-2017
4.00
Wring and make mount for Flyleds board
Details
     

 12-08-2017
5.00
Wiring
Details

 12-07-2017
7.00
Running wires
Details
       

 12-06-2017
6.00
?? head scratching??
Details
     

 12-05-2017
6.00
Seal up map pocket and mount boxes
Details
       

 12-05-2017
1.00
Remove oil plug
Details
       

 12-04-2017
8.00
Attach busses
Details
       

 12-03-2017
3.00
Hoses
Details
       

 12-02-2017
3.00
Right radio tray build
Details

 11-30-2017
6.00
Change studs and install PMAG
Details
       

 11-29-2017
6.00
Oil and fuel lines
Details
       

 11-14-2017
5.00
Baffles and governor studs
Details
       

 11-13-2017
8.00
Forward baffles and exhaust fitting
Details
       

 11-12-2017
5.00
Baffles and oil filler
Details
       

 11-09-2017
4.00
Fuel flow and some fitting changes
Details
       

 11-03-2017
6.00
Oil cooler and baffles
Details
       

 11-02-2017
8.00
Misc firewall fwd
Details
       

 11-01-2017
7.00
Finish engine mounting and tech Counselor visit
Details
       

 10-31-2017
6.00
Planning and test fitting
Details
       

 10-30-2017
3.00
Baffles
Details
       

 10-29-2017
5.00
Alternator
Details
       

 10-28-2017
7.00
Hang engine
Details
       

 10-27-2017
3.00
Prep engine for installation
Details
     

 10-26-2017
2.00
Unpack and inspect prop
Details
     

 10-18-2017
5.00
Powder coating
Details
       

 10-12-2017
1.00
Dash panel arrives
Details
       

 10-11-2017
3.00
Replace molex connectors in wing tips
Details
     

 10-03-2017
6.00
Cowl baffles
Details
     

 10-02-2017
6.00
Change connectors and start cowl baffles
Details
       

 10-01-2017
0.50
Rudder fairing attach
Details
     

 10-01-2017
3.00
Prep and prime parts
Details
     

 09-25-2017
6.00
FlyLeds
Details
       

 09-24-2017
8.00
Finish lenses and paint tips
Details
       

 09-23-2017
8.00
Left wing tip
Details
       

 09-22-2017
7.00
Right wing tip
Details
       

 09-21-2017
3.00
Trim wing tip and sand seam
Details
       

 09-21-2017
4.00
Finish canopy, rudder fairing and cockpit steps
Details
       

 09-20-2017
3.00
Install G3X sensors
Details
       

 09-20-2017
3.00
Final attach pushrods
Details
       

 09-20-2017
2.00
Canopy primer
Details
       

 09-19-2017
5.00
Prime canopy and misc parts
Details
       

 09-18-2017
2.00
Started FWF
Details
     

 09-18-2017
2.00
Canopy prep
Details
     

 09-17-2017
2.00
Trim canopy rear (again)
Details
     

 09-17-2017
5.00
Rudder fairing
Details
     

 09-15-2017
2.00
New wing cart
Details
     

 09-15-2017
3.00
Finish rudder
Details
     

 09-14-2017
7.00
Rudder and right aileron
Details
       

 09-13-2017
8.00
Painted right wing
Details
       

 09-12-2017
7.00
Right wing primer
Details
       

 09-12-2017
5.00
Epoxy prime parts
Details
       

 09-11-2017
7.00
Left aileron and vertical stabilizer
Details
       

 09-10-2017
8.00
Finish left wing
Details
       

 09-09-2017
7.00
Seal and base coat left wing and aileron
Details
       

 09-08-2017
5.00
Prime left wing
Details
       

 09-08-2017
2.00
Fit right wing tip
Details
     

 09-07-2017
7.00
Wing tips
Details
       

 09-06-2017
6.00
Aileron pushrods and trim
Details
       

 09-05-2017
7.00
Bottom right wing skin
Details
     

 09-04-2017
8.00
Finish left wing and start right bottom
Details
       

 09-03-2017
6.00
Left wing bottom outer skin
Details
       

 09-02-2017
8.00
Bottom left wing skin
Details
       

 08-28-2017
8.00
Aileron torque tubes
Details
       

 08-27-2017
4.00
AP roll servo and OAT probe
Details
       

 08-26-2017
6.00
Magnetometer mount and wire lacing
Details
       

 08-25-2017
6.00
Pitot mast mount and prime bottom skins
Details
       

 08-24-2017
7.00
Right landing light and bottom wing skins
Details
       

 08-23-2017
8.00
Attach right tank
Details
     

 08-22-2017
5.00
Wiring in wings
Details
       

 08-21-2017
6.00
Attach left tank
Details
       

 08-18-2017
6.00
Prepare tank for wing attachment
Details
       

 08-17-2017
6.00
Install aileron bellcranks
Details
       

 08-16-2017
6.00
Wing wiring harness
Details
     

 08-15-2017
5.00
Completing the wings
Details
       

 07-28-2017
5.00
Unpack engine
Details
       

 07-27-2017
3.00
Pick up engne
Details
     

 07-21-2017
5.00
Elevators painted
Details
       

 07-20-2017
6.00
Rudder and fin sealed
Details
       

 07-19-2017
6.00
Ailerons sealed
Details
       

 07-18-2017
2.00
Elevators
Details
     

 07-17-2017
6.00
Paint flaps
Details
       

 07-16-2017
2.00
Paint inspection
Details
       

 07-15-2017
8.00
Painting color
Details
       

 07-10-2017
7.00
Paint booth
Details
       

 07-08-2017
8.00

Details

 07-07-2017
9.00
Epoxy priming parts
Details
       

 07-01-2017
4.00
Retest tanks with manometer
Details
     

 05-28-2017
5.00
Brake lines and fairing parts
Details
       

 05-27-2017
7.00
nose and main wheel installation
Details
       

 05-26-2017
6.00
Nose gear installaition
Details
       

 05-25-2017
5.00
Main gear leg and main wheel axle installation
Details
       

 04-28-2017
5.00
Fiberglass canopy
Details
       

 04-27-2017
3.00
Sand canopy and fill void with epoxy
Details
       

 04-26-2017
4.00
Paint glare shield
Details
       

 04-25-2017
6.00
Drill canopy
Details
       

 04-24-2017
3.00
Interior pieces and canopy trimming
Details
     

 03-17-2017
2.00
fiberglass work
Details
       

 03-16-2017
4.00
Wiring and audio jacks
Details
       

 03-15-2017
4.00
Finish Pitch servo
Details
       

 03-14-2017
4.00
Misc fuselage work
Details
       

 03-01-2017
6.00
Misc painting and fitting
Details
       

 02-27-2017
5.00
Rear window ffitting
Details
     

 02-26-2017
4.00
Finish canopy latch and side skin
Details
       

 02-24-2017
7.00
Rear window drilling
Details
       

 02-19-2017
6.00
Fit and match drill rear window
Details
       

 02-17-2017
7.00
Main wiring harness install
Details
       

 02-16-2017
5.00
Prime and ready parts for assembly
Details
       

 02-15-2017
6.00
Misc work
Details
     

 02-14-2017
4.00
Misc work
Details
       

 02-13-2017
4.00
Misc items
Details
     

 02-12-2017
7.00
Misc work
Details
       

 02-11-2017
6.00
Paint canopy frame
Details
       

 02-10-2017
8.00
Misc fuselage work
Details
       

 02-09-2017
7.00
Install canopy latch
Details
       

 02-07-2017
4.00
Install roll bar
Details
       

 02-06-2017
6.00
Install canopy release mechanism
Details
       

 02-05-2017
6.00
Canopy release / priming
Details
       

 02-04-2017
7.00
Finish rivetting canopy frame
Details
       

 02-03-2017
7.00
Rivet canopy frame
Details
     

 02-02-2017
5.00
More canopy frame assembly
Details
     

 02-01-2017
7.00
Canopy assembly
Details
       

 01-31-2017
6.00
Finish canopy parts then prime
Details
     

 01-30-2017
6.00
Prepare canopy parts and install flap sensor
Details
       

 01-29-2017
7.00
Mock up canopy frame
Details
       

 01-28-2017
4.00
Canopy parts prep
Details
     

 01-27-2017
7.00
Gathering parts to start canopy frame
Details
       

 01-26-2017
7.00
Finish seats and roll bar
Details
       

 01-25-2017
9.00
Misc work
Details
       

 01-24-2017
5.00
Finish seat back assemblies
Details
       

 01-22-2017
5.00
Rudder cables
Details
       

 01-21-2017
6.00
Flap mechanism
Details
       

 01-20-2017
6.00
Run brake lines
Details
       

 01-19-2017
7.00
Assemble brake and rudder pedals
Details
       

 01-18-2017
8.00
Painted fuselage interior
Details
       

 01-17-2017
6.00
Ready interior for painting / finish pushrods
Details
       

 01-16-2017
5.00
Prime parts
Details
       

 01-15-2017
5.00
Elevator pushrods
Details
       

 01-14-2017
7.00
Deburr roll bar parts
Details
       

 01-13-2017
7.00
Canopy deck and roll bar
Details
       

 01-12-2017
7.00
Painting interor parts
Details
       

 01-11-2017
6.00
Deburr and prime interior parts
Details
       

 01-10-2017
4.00
Deburring floor parts
Details

 12-29-2016
4.00
Inventory finish kit
Details

 11-16-2016
4.00
Pick up finish kit and unpack
Details
     

 10-11-2016
4.00
Elevator bellcrank assembly
Details
     

 10-10-2016
8.00
Prepare the canopy deck parts
Details
       

 10-09-2016
6.00
Assemble front dash
Details
       

 10-03-2016
2.00
Mock up dash parts
Details
       

 10-02-2016
8.00
Deburring and priming parts
Details
       

 10-01-2016
7.00
Floor splice and flap motor channel
Details
       

 09-30-2016
6.00
Rivet left baggage floor
Details
       

 09-29-2016
6.00
EAA Tech Counselor / Fuel / Floors
Details
       

 09-28-2016
7.00
Fuel system and starting flap mechanism
Details
       

 09-27-2016
7.00
Finish fuselage mating and starting fuel
Details
       

 09-26-2016
6.00
Riveted more of the tail cone attachment
Details
     

 09-25-2016
9.00
Mated front and rear fuselage parts
Details
       

 09-23-2016
6.00
Preparing parts for future sections
Details
       

 09-23-2016
2.00
Install SB aileron brackets
Details
       

 09-22-2016
4.00
More parts deburred and primed
Details
       

 09-22-2016
4.00
Aileron bracket service bulletin
Details
       

 09-21-2016
8.00
Assemble roll over structure
Details
       

 09-20-2016
4.00
Built rotisserie plate
Details
       

 09-19-2016
7.00
Seat back assembly
Details

 09-18-2016
7.00
Finish right side skin
Details
       

 09-17-2016
8.00
Right side skin attach
Details
     

 09-16-2016
4.00
Complete left side skin
Details
       

 09-15-2016
7.00
Continue left skin
Details
     

 09-14-2016
8.00
Begin left fuselage skin
Details
       

 09-13-2016
8.00
Attaching fuselage skin
Details
       

 09-12-2016
8.00
Dimple side skins and prime
Details
       

 09-09-2016
7.00
Assemble cart for fuselage assembly
Details
       

 09-08-2016
7.00
Assemble longerons and begin deburring side skins
Details
       

 09-07-2016
4.00
Riveting the bottom skin (almost done)
Details
       

 09-06-2016
7.00
More parts prep
Details
     

 09-01-2016
3.00
Prepare longerons
Details
       

 08-31-2016
6.00
rotate fuselage then cleco to rivet
Details
       

 08-30-2016
6.00
Fuselage stand and control column
Details
       

 08-29-2016
8.00
Riveting bottom skin finished
Details
       

 08-22-2016
6.00
Attach firewall to floor
Details
       

 08-18-2016
4.00
build battery box
Details
       

 08-17-2016
5.00
Front floor pan and tunnel work
Details
       

 08-16-2016
7.00
Forward floor assembly started
Details
     

 08-15-2016
7.00
Assembling firewall tunnel sides
Details
       

 08-14-2016
8.00
Deburr and prime parts for the firewall assembly
Details
     

 08-03-2016
8.00
Assemble firewall parts
Details
       

 08-02-2016
8.00
Tunnel assembly
Details
       

 08-01-2016
7.00
Add baggage ribs
Details
       

 07-31-2016
8.00
Begin assembling parts and adding to bottom skin
Details
       

 07-29-2016
7.00
Prime skins and add doublers
Details
       

 07-28-2016
5.00
Dimple bottom skin and make LG cutout
Details
       

 07-21-2016
8.00
Assemble mid section
Details
       

 07-20-2016
7.00
Start mid fuse lower structure
Details
       

 07-19-2016
6.00
Finish part 25
Details
       

 07-18-2016
5.00
Parts prep - deburring and priming
Details
     

 07-09-2016
8.00
Deburr and prime fuselage parts
Details
     

 07-08-2016
7.00
Assemble fuselage parts
Details
       

 07-07-2016
7.00
Prepare parts and then prime fuselage parts
Details
       

 07-06-2016
5.00
Fuselage parts prep
Details
       

 07-05-2016
6.00
Finish left tank close out
Details
       

 07-04-2016
6.00
Close out right tank
Details
       

 06-30-2016
5.00
Assemble right flap
Details
     

 06-27-2016
3.00
Left flap trailing edge
Details
       

 06-26-2016
7.00
Left flap assembly
Details
       

 06-25-2016
7.00
Tank leak and Flaps part deux
Details
       

 06-24-2016
3.00
Right tank leak check
Details
       

 06-23-2016
6.00
Install fuel level senders and test left tank
Details
       

 06-22-2016
5.00
Right tanks
Details
       

 06-21-2016
4.00
Right tank assembly
Details
     

 06-20-2016
6.00
Tank assembly
Details
       

 06-19-2016
4.00
Install the J channel stiffener in laft tank
Details
       

 06-18-2016
5.00
Seal ribs on left tank
Details
     

 06-14-2016
6.00
Rivet ribs into left tank
Details

 06-12-2016
7.00
Back rivet stiffeners and add ribs to left tank
Details
       

 06-11-2016
5.00
Pro seal tank stiffeners
Details
     

 06-10-2016
6.00
Prep tank parts for assembly
Details
       

 06-04-2016
7.00
Inventory fuselage kit
Details
     

 05-26-2016
3.00
Pickup fuselage kit from freight terminal
Details
     

 05-23-2016
6.00
Mocking up the tanks
Details
       

 05-22-2016
6.00
Tank parts cut, deburred
Details
       

 05-21-2016
7.00
Finishing flaps and starting taks
Details
       

 05-20-2016
6.00
Assemble flaps
Details
       

 05-19-2016
5.00
Assemble flaps for riveting
Details
       

 05-14-2016
3.00
Priming flap parts
Details
     

 05-13-2016
3.00
Deburring and priming flap parts
Details
       

 04-28-2016
3.00
Preparing flap parts
Details
     

 03-31-2016
6.00
Prepare flap parts for priming
Details

 03-30-2016
6.00
Right aileron trailing edge and start flaps
Details
     

 03-29-2016
5.00
Left aileron completed.Right aileron started
Details
     

 03-26-2016
4.00
EAA Technichal Counselor inspection
Details
     

 03-25-2016
5.00
Left aileron
Details
       

 03-22-2016
6.00
Assemble aileron counter balances
Details
       

 03-21-2016
5.00
Rivet stiffeners to aileron skins
Details

 03-17-2016
8.00
Deburr and prime aileron parts
Details
     

 03-16-2016
5.00
Finish riveting right leading edge
Details
       

 03-15-2016
4.00
Prepare aileron parts
Details
     

 03-13-2016
6.00
Top skin right wing
Details
     

 03-12-2016
8.00
Finish left wing skin and leading edge attach
Details
       

 03-10-2016
4.00
Continue top skin left wing
Details
     

 03-09-2016
4.00
Start attaching wing skin to left wing
Details
     

 02-22-2016
3.00
Dimple wing skins
Details
     

 02-07-2016
4.00
Finish riveting left leading edge assembly
Details
       

 02-02-2016
3.00
Preparing left wing skin for assembly
Details
     

 02-01-2016
3.00
Dimple right leading edge
Details
     

 01-17-2016
4.00
Begin riveting left leading edge
Details
       

 01-13-2016
4.00
Assemble left leading edge
Details
       

 01-12-2016
4.00
Paint langing light areas
Details
       

 01-11-2016
3.00
Prepared parts for satin paint
Details

 01-10-2016
4.00
deburr leading edge skins
Details
       

 01-06-2016
4.00
Left leading edge assembly
Details
       

 01-05-2016
4.00
Buid wing cart and leading edge holders
Details
       

 01-01-2016
6.00
Right wing assembly
Details
       

 12-31-2015
6.00
Install left rear spar
Details
       

 12-30-2015
4.00
Left leading edge assembly
Details
       

 12-26-2015
6.00
Finished left wing rib attachment
Details
       

 12-25-2015
2.00
Rivet main spar ribs
Details
     

 12-24-2015
5.00
Prime more parts and dimple
Details
     

 12-23-2015
3.00
Assembly of wing parts
Details
       

 12-22-2015
6.00
Priming wing parts
Details
     

 12-21-2015
4.00
Prep parts for primer
Details

 12-20-2015
6.00
Prepare rear spars
Details
     

 12-19-2015
2.00
Dimple ribs and the deburr parts
Details

 12-18-2015
5.00
Finish ribs and begin bolting to spar
Details
       

 12-17-2015
6.00
Begin assembling main spars
Details
       

 12-16-2015
2.00
Dimpled wing ribs
Details

 12-13-2015
7.00
Prime ribs and main spar flangs
Details
     

 12-12-2015
7.00
Finish main spars and prepare parts for primer
Details
       

 12-11-2015
5.00
Main spars continued...
Details
       

 12-10-2015
4.00
Main spars contiinued
Details

 12-09-2015
5.00
Debur parts and match drill J channel
Details
     

 12-08-2015
6.00
Unpack and inventory
Details
       

 12-07-2015
2.00
Pick up wing kit crates
Details
     

 12-06-2015
6.00
FInish rear fuselage and hang tail
Details
       

 12-05-2015
5.00
Back rivet upper side skins
Details
       

 12-02-2015
5.00
Rivet aft deck
Details
       

 12-01-2015
3.00
Working on horizontal stabilizer tips
Details
       

 11-29-2015
4.00
Fniished up the right lower fuselage side
Details
     

 11-28-2015
6.00
Rear fuselage side install
Details
     

 11-27-2015
1.00
Drill control horns for pushrod
Details
     

 11-25-2015
3.00
Match drilling the control horns for the center be
Details
       

 11-24-2015
6.00
Connect elevators to stabilizer
Details
       

 11-23-2015
4.00
Preparing rudder for hanging
Details

 11-22-2015
2.00
Back riveting rear fuselage skins
Details
     

 11-21-2015
1.00
Trim servo connector wiring
Details
       

 11-17-2015
4.00
Add rudder tip
Details
     

 11-16-2015
3.00
Work on elevator finishing
Details
     

 11-12-2015
6.00
Rivet skins to rear fuselage

 11-11-2015
5.00
Running wire harnesses
Details
     

 11-06-2015
4.00
Finish prep on skins
Details

 11-05-2015
4.00
Beginning assembly of rear fuelage
Details
     

 11-04-2015
2.00
Assembly of the bulkheads
     

 11-03-2015
6.00
Prime parts for rear fuselage
Details
     

 11-02-2015
7.00
Deburr and scuff parts for priming
       

 10-31-2015
5.00
Starting on rear fuselage
Details
       

 10-30-2015
4.00
Pro Seal (Flame Master) foam ribs
Details
     

 10-29-2015
3.00
Assembly of right elevator
Details
     

 10-25-2015
6.00
Elevator ribs and rear spar riveting
Details
       

 10-24-2015
4.00
Assembling the fwd and rear elevator spars
Details
     

 10-20-2015
5.00
Priming elevator parts for assembly
Details
     

 10-19-2015
4.00
Prep for primer
Details
     

 10-16-2015
2.00
Dimpling and cuntersinking elevators
Details
     

 10-15-2015
5.00
Prepare elevator parts for priming
Details
     

 10-14-2015
6.00
Beginning to work on the elevators
Details
       

 10-10-2015
5.00
Completed horizontal stabiizer
Details
       

 10-07-2015
3.00
Riveting stabilizer skins
Details
       

 10-06-2015
5.00
Assemble spars then attach to stabilizer ribs
       

 10-05-2015
5.00
Assemble front and rear spars for horizontal stab
Details
     

 10-04-2015
2.00
Prime all parts for horizontal stabilizer
Details
     

 10-03-2015
5.00
Horizontal stabilizer spars
Details
     

 10-02-2015
3.00
Horizontal stabilizer
Details
     

 10-01-2015
5.00
Rudder trailing edge
Details
       

 09-30-2015
6.00
Rudder assembly continues
Details
       

 09-29-2015
4.00
Rudder assembly
Details
     

 09-28-2015
6.00
Continued working on vertical stab and rudder asem
Details
       

 09-27-2015
5.00
Tail assembly continues
Details
     

 09-26-2015
3.00
Starting to rivet parts
Details
       

 09-18-2015
8.00
Prime vertical stabilizer parts and some rudder pa
Details
       

 09-17-2015
6.00
Prepare rudder parts for primer
     

 09-16-2015
6.00
Deburring and dimpling vertical stabilizer
     

 09-15-2015
4.00
vertical stabilizer
Details
     

 09-14-2015
3.00
Vertical stabilizer contruction
     

 09-13-2015
2.00
Empenage inventory
Details
       

 09-11-2015
2.00
Plans review
Details
     

 09-01-2015
4.50
EAA Workbenches
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.