Date
|
Hours
|
Work Log Summary
|
Details
|
03-04-2017
|
2.00
|
We began troubleshooting the start issue.
|
Details
|
|
|
03-04-2017
|
2.00
|
Performed the fuel flow tests.
|
Details
|
|
|
03-04-2017
|
1.00
|
Engine start was unsuccessful and the battery quic
|
Details
|
|
|
03-03-2017
|
3.00
|
Boost pump installation nearly complete.
|
Details
|
|
|
03-02-2017
|
2.00
|
More fuel pump installation work, mostly fitting a
|
|
|
|
03-01-2017
|
3.00
|
Painted the bracket and installed the new boost pu
|
Details
|
|
|
02-28-2017
|
3.00
|
Painted and installed the fuel boost pump bracket.
|
Details
|
|
|
02-27-2017
|
1.00
|
Began fabrication of the new fuel boost pump brack
|
|
|
|
02-24-2017
|
1.00
|
Fabricated a new fuel line.
|
Details
|
|
|
02-23-2017
|
1.00
|
Rewired the fuel boost pump to firewall fwd.
|
|
|
|
02-20-2017
|
1.00
|
Where needed resealed the engine compartment with
|
|
|
|
02-20-2017
|
2.00
|
Removed the lower plugs to purge the fuel lines.
|
Details
|
|
|
02-19-2017
|
2.00
|
Secured the fuel sensor wiring in the fwd fuselage
|
Details
|
|
|
02-19-2017
|
4.00
|
Printed and applied all wording and placarding.
|
Details
|
|
|
02-18-2017
|
3.00
|
Found the VPX doesn't accept the fuel sensor wire.
|
Details
|
|
|
02-16-2017
|
2.00
|
More EFIS calibrations Added 10 gals of fuel to t
|
Details
|
|
|
02-11-2017
|
2.00
|
Performed the weight and balance.
|
|
|
|
02-09-2017
|
3.00
|
Cleaned the oil off the engine and saftied the oil
|
Details
|
|
|
02-08-2017
|
1.00
|
Programmed the AFS-4500 for various functions.
|
|
|
|
02-08-2017
|
1.00
|
After the mineral oi was added to the engine -
|
Details
|
|
|
02-07-2017
|
2.00
|
Secured the fuselage skins to the wings.
|
|
|
|
02-07-2017
|
1.00
|
Removed the lower plugs and drained the preservati
|
Details
|
|
|
02-01-2017
|
1.00
|
Resafety wired a pair of prop attach bolts.
|
|
|
|
01-27-2017
|
1.00
|
Began programming the AFS Displays
|
|
|
|
01-26-2017
|
6.00
|
John repainted all paint defects and added the NAS
|
|
|
|
01-25-2017
|
1.00
|
Configured flaps, pitch and roll on the VPX Pro.
|
|
|
|
01-24-2017
|
2.00
|
I had to replace the failed right side cargo LED
|
Details
|
|
|
01-22-2017
|
3.00
|
Seat back hinged riveted in place and seat ba
|
Details
|
|
|
01-21-2017
|
1.00
|
Completed the right side interior panels.
|
|
|
|
01-20-2017
|
3.00
|
Began installing the right side interior side pane
|
|
|
|
01-19-2017
|
2.00
|
Completed fabrication of seat back attach plates a
|
|
|
|
01-18-2017
|
3.00
|
Painted/began repainting seatback attach panel.
|
|
|
|
01-16-2017
|
1.00
|
Completed Left side panel installation.
|
|
|
|
12-29-2016
|
1.00
|
Continued side panel installation.
|
|
|
|
12-28-2016
|
1.00
|
Began installing left side interior panel.
|
|
|
|
12-27-2016
|
5.00
|
Aft floor installation completed.
|
|
|
|
12-26-2016
|
4.00
|
Completed seat belt installation.and front floors
|
|
|
|
12-24-2016
|
1.00
|
Began installation of aileron control rod cuffs.
|
|
|
|
12-22-2016
|
2.00
|
Began seat belt installation.
|
|
|
|
12-21-2016
|
2.00
|
Sunshade installed. Began sanding the prop spinne
|
|
|
|
12-20-2016
|
2.00
|
Began wing tip installtion especially concentratin
|
|
|
|
12-19-2016
|
2.00
|
Conitinued work, fiting the landind lights.
|
|
|
|
12-18-2016
|
2.00
|
Conitinued work, fiting the landind lights and the
|
Details
|
|
|
12-17-2016
|
2.00
|
Conitinued work, fiting the landind lights.
|
|
|
|
12-16-2016
|
1.00
|
Continued working on the landing lights.
|
|
|
|
12-15-2016
|
1.00
|
Began installing the pins for the strobes and nav
|
|
|
|
12-14-2016
|
8.00
|
Talon continues sanding and buffing the paint.
|
|
|
|
12-13-2016
|
2.00
|
Completed smoke system installation and began fitt
|
|
|
|
12-12-2016
|
2.00
|
Fabricated new attach brackets to move tank away f
|
|
|
|
12-11-2016
|
7.00
|
Talon continues sanding and buffing the paint.
|
|
|
|
12-09-2016
|
1.00
|
Secured wire bundles in aft fuselage. Began fitti
|
|
|
|
12-08-2016
|
1.00
|
Installed baggage compartment side pnels.
|
|
|
|
12-07-2016
|
11.00
|
Talon continues sanding and buffing the paint.
|
|
|
|
12-06-2016
|
7.00
|
Talon continues sanding and buffing the paint.
|
|
|
|
12-06-2016
|
1.00
|
Aileron trim installation complete. Flaps connecte
|
|
|
|
12-05-2016
|
7.00
|
Talon continues sanding and buffing the paint.
|
|
|
|
12-05-2016
|
1.00
|
Spinner temporarily installed. Completed prop saf
|
|
|
|
12-03-2016
|
2.00
|
Completed safety wiring the prop and loosley attac
|
|
|
|
12-02-2016
|
7.00
|
Talon started sanding and buffing the paint.
|
|
|
|
12-02-2016
|
1.00
|
Began safety wiring the prop using. 041 wire.
|
|
|
|
11-30-2016
|
4.00
|
Sikafled the canopy and winshield.
|
|
|
|
11-29-2016
|
1.00
|
Flaps attached to the wings.
|
|
|
|
11-28-2016
|
4.00
|
Aileron istallation complete and angles verified -
|
|
|
|
11-26-2016
|
5.00
|
Both ailerons installed to wings, but not to the s
|
|
|
|
11-24-2016
|
2.00
|
Cabin heat installation completed.
|
|
|
|
11-18-2016
|
1.00
|
Installed an aileron.
|
|
|
|
11-17-2016
|
1.00
|
Appled the wing walknon skids.
|
|
|
|
11-16-2016
|
3.00
|
Completed all wing to fuselage line torques. Cott
|
Details
|
|
|
11-15-2016
|
4.00
|
With Alex's help installed the fuel tank tear out
|
Details
|
|
|
11-14-2016
|
2.00
|
Shaped and contoured the canopy latch handle.
|
|
|
|
11-04-2016
|
3.00
|
Installed the wings. Tpared bolts to set the hole
|
Details
|
|
|
11-04-2016
|
2.00
|
Completed nut installation and all nuts are torque
|
Details
|
|
|
11-03-2016
|
4.00
|
Completed nose wheel pant installation. Laid out
|
|
|
|
11-01-2016
|
2.00
|
Tapped te wing tie down attach holes.
|
|
|
|
10-31-2016
|
2.00
|
Installed the rear inspection plates. Secured the
|
Details
|
|
|
10-29-2016
|
5.00
|
Along with Russ we installed the nosewheel strut f
|
Details
|
|
|
10-28-2016
|
6.00
|
Completed the rudder and elevator installation.
|
Details
|
|
|
10-27-2016
|
8.00
|
Along with Russ we installed the rudder and elevat
|
Details
|
|
|
10-26-2016
|
2.00
|
Sanded and reshot the clear on the baggae compartm
|
Details
|
|
|
10-26-2016
|
1.00
|
Buffed out the left wing leading edge. Looks even
|
|
|
|
10-25-2016
|
2.00
|
Sanded and clear coated the aft baggae compartment
|
Details
|
|
|
10-24-2016
|
1.00
|
Istalled underwing fwd access covers.
|
|
|
|
10-23-2016
|
1.00
|
Installed smoke tank bracket nut plates.
|
Details
|
|
|
10-17-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-16-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-15-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-14-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-13-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-12-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-11-2016
|
12.00
|
John paints the airplane.
|
|
|
|
10-10-2016
|
12.00
|
Began painitng the aircraft with John Stahr.
|
|
|
|
09-27-2016
|
2.00
|
Installed the sunshade. Filled the holes in the o
|
|
|
|
09-17-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-16-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-15-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-14-2016
|
1.00
|
Safety wired the pitch servo. Sanded and filled t
|
|
|
|
09-13-2016
|
1.00
|
Super filled the wing tip end ribs. Repaimted the
|
|
|
|
09-12-2016
|
5.00
|
Installed Archer antenna in Lt wing tip.Began wiri
|
Details
|
|
|
09-08-2016
|
4.00
|
Completed smoke system installation, including the
|
Details
|
|
|
09-07-2016
|
4.00
|
Left and center floors installed. Continued worki
|
|
|
|
09-06-2016
|
4.00
|
Installed the vent line to the fitting. Reworked
|
Details
|
|
|
09-05-2016
|
2.00
|
Installed the smoke tank hold down nutplates on th
|
|
|
|
09-05-2016
|
3.00
|
Continued smoke system work, installing the ventli
|
Details
|
|
|
09-03-2016
|
1.00
|
Began installing smoke system
|
|
|
|
08-31-2016
|
3.00
|
Did some filling on the wings nd fuselage. Instal
|
Details
|
|
|
08-30-2016
|
2.00
|
Completed the L & R wing fairing nutplate installa
|
|
|
|
08-29-2016
|
4.00
|
Continued installing nuts, now on the Lt wing.
|
|
|
|
08-28-2016
|
4.00
|
Began installing the wing fuselge fairing nutplate
|
|
|
|
08-27-2016
|
1.00
|
Torqued the left fuel tank selector B-nut after re
|
Details
|
|
|
08-24-2016
|
2.00
|
Verified rudder and elevator limits. Removed aile
|
Details
|
|
|
08-22-2016
|
2.00
|
Removed the flaps, adjusted the ailerons, and fabr
|
Details
|
|
|
08-20-2016
|
3.00
|
Completed flap installation and adjustment with th
|
Details
|
|
|
08-19-2016
|
5.00
|
Cut the flap actuator holes in the fuselage. Began
|
|
|
|
08-18-2016
|
2.00
|
Reinstalled both flaps, sanded and refilled the ca
|
|
|
|
08-17-2016
|
1.00
|
Riveted the aft skirt t the side skirts. Filled th
|
Details
|
|
|
08-17-2016
|
3.00
|
Installed the flaps and trimmed the fuselage ends
|
Details
|
|
|
08-16-2016
|
4.00
|
INstalled, glued (Sika Flex) and screwed aft skirt
|
|
|
|
08-06-2016
|
1.00
|
Sanded and filled the end ribs, again.
|
|
|
|
08-03-2016
|
1.00
|
Sanded and filled the end ribs. Also adjusted the
|
|
|
|
07-22-2016
|
1.00
|
Applied 2nd coat of filler to the end ribs.
|
|
|
|
07-21-2016
|
2.00
|
Filled the ailerons and flap end ribs with foam an
|
Details
|
|
|
07-20-2016
|
2.00
|
Fabricated end rib foam for ailerons and outboard
|
|
|
|
07-19-2016
|
3.00
|
Fabricated the fuel vent lines and temporarily ins
|
Details
|
|
|
07-19-2016
|
2.00
|
Completed wing root fairings. 3/16 clearance all
|
|
|
|
07-18-2016
|
2.00
|
Wing root fairings driled (#30) is complete.
|
|
|
|
07-17-2016
|
2.00
|
Drilled the rear spar holes after checking another
|
Details
|
|
|
07-16-2016
|
3.00
|
Set the wing incidence, sweep, and measured twenty
|
Details
|
|
|
07-15-2016
|
2.00
|
Installed both wings with temporary bolts.
|
Details
|
|
|
07-14-2016
|
1.00
|
Prepped wings for installation. Laid out lower nu
|
|
|
|
07-10-2016
|
2.00
|
RTV'd the bafle/engine areas.
|
|
|
|
07-09-2016
|
3.00
|
Firewall forward - relocated clamps, tie wrapped w
|
Details
|
|
|
07-08-2016
|
3.00
|
Did the same to the left track and sill.
|
|
|
|
07-07-2016
|
3.00
|
Removed and polished the right track. Placed carb
|
Details
|
|
|
07-06-2016
|
2.00
|
Covers were riveted in place.
|
|
|
|
07-05-2016
|
4.00
|
Fitted the right cover. However, fitting was a pr
|
Details
|
|
|
07-04-2016
|
1.00
|
Fitted the 704K center post covers and covred with
|
|
|
|
07-02-2016
|
2.00
|
Completed the aft top wing root nutplates.
|
|
|
|
07-01-2016
|
2.00
|
Began installing wing root nutplates on upper surf
|
|
|
|
06-18-2016
|
1.00
|
Completed the Super Track installation.
|
|
|
|
06-17-2016
|
2.00
|
Installed lft and right rear track supports.
|
|
|
|
06-16-2016
|
2.00
|
Drilled left track - completed.
|
|
|
|
06-15-2016
|
4.00
|
Drilled right track and screwed it in place. Laid
|
|
|
|
06-14-2016
|
3.00
|
Completed rear rail installation. Began track ins
|
|
|
|
06-13-2016
|
3.00
|
Began installing the SuperTrak canopy mod.
|
Details
|
|
|
06-08-2016
|
4.00
|
Sanded the canopy skirt and refilled the new holes
|
Details
|
|
|
06-07-2016
|
2.00
|
Began filling the canopy skirt and continued the s
|
|
|
|
06-06-2016
|
2.00
|
Drilled and counter sunk the holes in the canopy s
|
Details
|
|
|
06-05-2016
|
2.00
|
Began filling the canopy skirt and continued the s
|
|
|
|
06-03-2016
|
2.00
|
Began filling the canopy skirt and continued the s
|
|
|
|
05-31-2016
|
2.00
|
Sanded and filled remaining parts and took them to
|
|
|
|
05-30-2016
|
4.00
|
Filled and sanded other fiberglass parts except th
|
|
|
|
05-28-2016
|
4.00
|
Filled and sanded lower cowl
|
|
|
|
05-26-2016
|
2.00
|
Finished filling and sanding upper cowl and tail f
|
|
|
|
05-24-2016
|
2.00
|
Filled and sanded upper cowl and tail fairings usi
|
|
|
|
05-23-2016
|
1.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-21-2016
|
3.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-19-2016
|
3.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-18-2016
|
3.00
|
Filled and sanded upper cowl
|
|
|
|
05-17-2016
|
4.00
|
Filled and sanded upper cowl
|
|
|
|
05-16-2016
|
4.00
|
Filled and sanded upper cowl
|
|
|
|
05-15-2016
|
3.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-13-2016
|
2.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-11-2016
|
4.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-10-2016
|
6.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-04-2016
|
2.00
|
Began filling the canopy skirt and continued the s
|
|
|
|
04-04-2016
|
2.00
|
Sanded the interior of the cowl halves and applied
|
Details
|
|
|
04-02-2016
|
3.00
|
3 coats of UV prime on the outside of the U & L co
|
|
|
|
04-01-2016
|
2.00
|
Finished 3 coats of UV prime on the interior of th
|
|
|
|
03-31-2016
|
1.00
|
UV primed, one coat on the outside of the upper co
|
|
|
|
03-29-2016
|
2.00
|
Rerouted start cable and secured it. Replaced the
|
|
|
|
03-28-2016
|
4.00
|
Removed /replaced and cleaned the lower left Skybo
|
Details
|
|
|
03-26-2016
|
2.00
|
Continued routing and securing lines, wires, etc.
|
|
|
|
03-24-2016
|
2.00
|
Conitiined routing and securing lines, wires, etc.
|
|
|
|
03-23-2016
|
2.00
|
Secured the oil plenum to the bracket. Fitted the
|
Details
|
|
|
03-22-2016
|
2.00
|
Continued supporting plug wires, Torqued the outsi
|
Details
|
|
|
03-21-2016
|
3.00
|
Attached plenum to the temp control valve, Cut to
|
Details
|
|
|
03-19-2016
|
1.00
|
Attached adel clamps to support the oil lines.
|
|
|
|
03-18-2016
|
2.00
|
Bought new custom made oil line and installed both
|
|
|
|
03-17-2016
|
2.00
|
Attempted to attach oi lines to the cooler. They
|
Details
|
|
|
03-16-2016
|
4.00
|
Completed fabrication of the plenum. Attached the
|
Details
|
|
|
03-15-2016
|
1.00
|
Conitnued riveting.
|
|
|
|
03-14-2016
|
4.00
|
Completed painting of the plenum parts and began r
|
|
|
|
03-12-2016
|
5.00
|
Completed fabrication of the plenum parts.
|
Details
|
|
|
03-11-2016
|
3.00
|
Continued working on the plenum.
|
|
|
|
03-10-2016
|
2.00
|
Continued working on the plenum.
|
|
|
|
03-09-2016
|
1.00
|
Continued working on the plenum.
|
|
|
|
03-08-2016
|
4.00
|
Made first version of the plenum and then scrapped
|
Details
|
|
|
03-07-2016
|
1.00
|
Made template for bending oil cooler plenum.
|
|
|
|
03-05-2016
|
4.00
|
Continued oil cooler bracket work.
|
|
|
|
03-04-2016
|
4.00
|
Redid oil cooler support brackets
|
|
|
|
03-03-2016
|
2.00
|
Surprise. Filled and sanded at canopy fairing.
|
|
|
|
03-01-2016
|
3.00
|
Trimmed and cut the canaopy aft fairing yet again.
|
|
|
|
02-29-2016
|
1.00
|
Continued trimming/ sanding the forward edge of th
|
|
|
|
02-27-2016
|
2.00
|
Trial fit and adjustment of aft canopy fairing.
|
|
|
|
02-26-2016
|
2.00
|
Enlarged the VA-132C filter retainiing bracket hol
|
|
|
|
02-25-2016
|
2.00
|
Sanded and fit the the slider track opening. Cont
|
|
|
|
02-24-2016
|
1.00
|
Started sanding underside of aft fairing.
|
|
|
|
02-23-2016
|
2.00
|
Superfiled the aft canopy fairing low spots exteri
|
Details
|
|
|
02-22-2016
|
4.00
|
Attached the snorkel after a few adjustments of co
|
Details
|
|
|
02-21-2016
|
1.00
|
Completed the bckup ring for the alternate air doo
|
|
|
|
02-19-2016
|
2.00
|
Trimmed the new fairing, applied micro to fill the
|
|
|
|
02-19-2016
|
2.00
|
The Odyssey battery deveoped a case leak that drip
|
Details
|
|
|
02-19-2016
|
2.00
|
Secured the fwd left baffles with safety wire.
|
Details
|
|
|
02-18-2016
|
4.00
|
Trimmed the new fairing, repaired the center secti
|
Details
|
|
|
02-17-2016
|
6.00
|
Gary flew in for 2 days and we created aft canopy
|
Details
|
|
|
02-16-2016
|
2.00
|
Secured lower left baffles with safety wire. Atta
|
|
|
|
02-15-2016
|
3.00
|
Finished painting the snorkel. Rt cowl lip baffle
|
|
|
|
02-13-2016
|
1.00
|
Sanded the lower fairing cuffs.
|
|
|
|
02-13-2016
|
1.00
|
Applied 4 coats of gloss white on the snorkel bott
|
|
|
|
02-12-2016
|
1.00
|
Final sand on the snorkel.
|
|
|
|
02-11-2016
|
2.00
|
Installed th new heat muff on cylinder one exhaust
|
|
|
|
02-10-2016
|
2.00
|
Began finalizing the baffle material, fit the righ
|
|
|
|
02-02-2016
|
2.00
|
More sanding more fiberglass parts - it never ends
|
|
|
|
02-01-2016
|
4.00
|
Sanded many UV primed parts
|
|
|
|
01-31-2016
|
4.00
|
Trimmed baffles, cowling ramps, redid a few baffle
|
|
|
|
01-30-2016
|
4.00
|
Applied 3 coats of UV Smooth prime to the snorkel,
|
Details
|
|
|
01-29-2016
|
1.00
|
Sanded the snorkel, but it looks bad. Too many ru
|
|
|
|
01-28-2016
|
1.00
|
Applied another epoxy coat to the snorkel.
|
|
|
|
01-27-2016
|
2.00
|
Secured all baffle material. Riveted some baffles
|
Details
|
|
|
01-16-2016
|
2.00
|
Cut cowl lips Sanded the snorkel & one wheel pant.
|
|
|
|
01-13-2016
|
1.00
|
Continued installing material.
|
|
|
|
01-12-2016
|
1.00
|
Continued installing material. Need more material
|
|
|
|
01-11-2016
|
2.00
|
Continued installing material.
|
|
|
|
01-09-2016
|
4.00
|
Cut baffle material and installed RT side for fit/
|
Details
|
|
|
01-08-2016
|
7.00
|
Assembled baffles, found a drawing error, called V
|
Details
|
|
|
01-07-2016
|
3.00
|
Completed riveting baffles and began installation.
|
|
|
|
01-06-2016
|
2.00
|
Continued baffle riveting.
|
|
|
|
01-05-2016
|
3.00
|
Installed more nutplates and began riveting baffle
|
|
|
|
01-04-2016
|
1.00
|
Installed more nutplates on the baffles.
|
|
|
|
01-02-2016
|
1.00
|
Paint 50% complete. Some required more paint.
|
Details
|
|
|
01-01-2016
|
1.00
|
Redrilled the semi circle attach holes to #27. Mu
|
Details
|
|
|
12-31-2015
|
5.00
|
Completed all bracket fab for the baffles. All dr
|
Details
|
|
|
12-31-2015
|
1.00
|
Began installing heat muff. After tightening, it'
|
|
|
|
12-30-2015
|
4.00
|
Began painting baffle parts - failed to look good.
|
Details
|
|
|
12-29-2015
|
4.00
|
Continued to make baffle material patterns.
|
|
|
|
12-28-2015
|
7.00
|
Cut baffle access holes for oil cooler duct and ig
|
Details
|
|
|
12-16-2015
|
1.00
|
Laid out baffle hole patterns for material
|
|
|
|
12-15-2015
|
2.00
|
Installed aft support bracket, fabed baffle materi
|
|
|
|
12-14-2015
|
3.00
|
Used clay method to determine baffle cowl interfer
|
Details
|
|
|
12-10-2015
|
1.00
|
More trimming and fitting.
|
|
|
|
12-09-2015
|
5.00
|
Much more trimming and fitting of the baffle to co
|
Details
|
|
|
12-08-2015
|
6.00
|
Fabed more angles, tabs, supports, etc. drilled/d
|
Details
|
|
|
12-05-2015
|
1.00
|
Reinstalled LT floor parts for forward wall and fa
|
|
|
|
12-04-2015
|
3.00
|
More drilling and dimpling. Prepped for painting.
|
|
|
|
12-03-2015
|
3.00
|
Filter supports drilled, deburred, dimpled, etc.
|
|
|
|
12-02-2015
|
1.00
|
Adjusted/trimmed filter support brackets to the sn
|
|
|
|
11-30-2015
|
3.00
|
Enlarged the air intake in the LT floor. Fit the s
|
|
|
|
11-19-2015
|
2.00
|
Reworked snorkel again. cutout areas around alter
|
Details
|
|
|
11-14-2015
|
1.00
|
Glassed the snorkel cutouts made for clearance.
|
|
|
|
11-14-2015
|
3.00
|
Began alternate air door installation. Glassed ho
|
|
|
|
11-13-2015
|
1.00
|
Trimmed the snorkel servo attach area.
|
|
|
|
11-10-2015
|
2.00
|
More snorkel work and cut the air filter opening,
|
|
|
|
10-31-2015
|
3.00
|
Drilled and fitted back baffles and brackets.
|
Details
|
|
|
10-26-2015
|
3.00
|
Fabed more brackets, matched drilled. Fabed new c
|
|
|
|
10-24-2015
|
1.00
|
Fabed 2 new brackets for front RT ramp.
|
|
|
|
10-21-2015
|
2.00
|
Continued front ramp installation.
|
|
|
|
10-20-2015
|
3.00
|
Completed front baffle initial fitting.
|
|
|
|
10-19-2015
|
4.00
|
Continued front baffle fitting.
|
|
|
|
10-14-2015
|
4.00
|
Continued front baffle fitting.
|
|
|
|
10-02-2015
|
1.00
|
Continued front baffle fitting.
|
|
|
|
10-01-2015
|
1.00
|
Continued front baffle fitting.
|
|
|
|
09-30-2015
|
1.00
|
Began fitting. front baffles
|
|
|
|
09-29-2015
|
4.00
|
Removed the prop. Began fitting front baffle ramp
|
|
|
|
09-28-2015
|
2.00
|
Sanded lower cowl. Began engine baffle installati
|
|
|
|
09-25-2015
|
2.00
|
Superfilled Lower Cowl and gear parts.
|
Details
|
|
|
09-24-2015
|
2.00
|
Second coat of UV prime Sanded. Added nutplates
|
|
|
|
09-23-2015
|
3.00
|
UV primed the remaining wheel pants and nose gear
|
Details
|
|
|
09-22-2015
|
2.00
|
Sanded and UV Primed the intersection fairings and
|
|
|
|
09-15-2015
|
1.00
|
Sandable filler painted on intersection fairings.
|
|
|
|
09-14-2015
|
1.00
|
More sanding and filling of horiz stab lower fairi
|
|
|
|
09-12-2015
|
2.00
|
More sanding and filling of the parts.
|
|
|
|
09-11-2015
|
3.00
|
More sanding and filling of gear and horiz stab pa
|
|
|
|
09-10-2015
|
3.00
|
Installed nut plates on wheel pants for main gear
|
|
|
|
09-09-2015
|
2.00
|
More sanding and filling of gear and horiz stab pa
|
|
|
|
09-08-2015
|
2.00
|
Installed 'air fill' doors on both pants.
|
|
|
|
09-07-2015
|
1.00
|
More sanding and filling of gear parts.
|
|
|
|
09-06-2015
|
3.00
|
More sanding and filling of gear parts.
|
Details
|
|
|
09-05-2015
|
3.00
|
More sanding and filling. Filled the nose leg and
|
Details
|
|
|
09-04-2015
|
2.00
|
Sanded the fairings.
|
|
|
|
09-03-2015
|
3.00
|
Sanded and applied Suprfill to Int and nose fairin
|
|
|
|
09-02-2015
|
1.00
|
Cleaned the clay from the new Int fairings.
|
|
|
|
08-29-2015
|
2.00
|
Cleaned both fairings Tried to remove the clay.
|
Details
|
|
|
08-28-2015
|
4.00
|
Removed new Rt fairing. Laid up the Lt fairing.
|
|
|
|
08-27-2015
|
6.00
|
Continued clay molding on the mains.
|
Details
|
|
|
08-26-2015
|
4.00
|
Removed the new glassed fairing and sanded the edg
|
Details
|
|
|
08-25-2015
|
4.00
|
Continued shaping the clay. Cut the glass
|
Details
|
|
|
08-24-2015
|
3.00
|
Removed and sanded nose leg fairing,
|
Details
|
|
|
08-22-2015
|
3.00
|
Laid out grid on main pants. Redrilled
|
Details
|
|
|
08-21-2015
|
4.00
|
Reinstalled nose gear parts. Completed
|
Details
|
|
|
08-20-2015
|
2.00
|
Sanded, filled, etc, on nose gear.
|
|
|
|
08-19-2015
|
6.00
|
Redid the Lt main to 6 3/8 and nose to 6.
|
Details
|
|
|
08-18-2015
|
3.00
|
Redid Rt wheel fairing to provide 6 3/8 inches cle
|
Details
|
|
|
08-17-2015
|
1.00
|
Filled nose gear leg fairing w/superfill.
|
Details
|
|
|
08-15-2015
|
1.00
|
Rough sanded nose leg fairing. Laid out then dril
|
Details
|
|
|
08-08-2015
|
2.00
|
Enlarged the nose gear steering opening
|
Details
|
|
|
07-31-2015
|
5.00
|
Rough sanded the main gear leg fairings.
|
Details
|
|
|
07-30-2015
|
5.00
|
Instaled nutplates on nose gear fairing.
|
Details
|
|
|
07-29-2015
|
3.00
|
Painted wood stiffeners with resin.
|
Details
|
|
|
07-28-2015
|
2.00
|
Installed the upgraded nose wheel asssembly.
|
Details
|
|
|
07-13-2015
|
6.00
|
Aligned all gear leg fairings.
|
Details
|
|
|
07-11-2015
|
3.00
|
Installed wheel pants. Set up for alignment.
|
Details
|
|
|
07-09-2015
|
2.00
|
Trimmed and reinstalled nose gear fairing.
|
Details
|
|
|
07-08-2015
|
2.00
|
Glassed the other half of nose gear leg fairing.
|
Details
|
|
|
07-07-2015
|
2.00
|
Cleaned front halves of pant interiors.
|
Details
|
|
|
07-06-2015
|
2.00
|
Cleaned up the mud shields.
|
Details
|
|
|
07-03-2015
|
4.00
|
Final fit on mud shields.
|
Details
|
|
|
07-02-2015
|
11.00
|
Fitted mud shields on mains.
|
|
|
|
07-01-2015
|
1.00
|
Added 2nd paint coat to nose wheel bracket.
|
Details
|
|
|
06-30-2015
|
2.00
|
Fit nose wheel fairing mud wall.
|
Details
|
|
|
06-29-2015
|
2.00
|
Glued Lt side hinge on nose fairing.
|
Details
|
|
|
06-28-2015
|
1.00
|
Began hinge installation on nose gear fairing.
|
Details
|
|
|
06-27-2015
|
2.00
|
Installed the Antisplat nose job 2 device.
|
|
|
|
06-26-2015
|
22.00
|
The leg fairing is ready for final trim.
|
|
|
|
06-25-2015
|
4.00
|
Ajusted the nose bracket (bent).
|
Details
|
|
|
06-24-2015
|
4.00
|
Redud the bracketss in heavier aluuminum.
|
Details
|
|
|
06-23-2015
|
3.00
|
Continueed to tweak the new brackets.
|
Details
|
|
|
06-22-2015
|
2.00
|
Created 2 new nse pant brackets Fiit is excellent
|
|
|
|
06-19-2015
|
2.00
|
Stilll no success on nosse pant and bracket.
|
Details
|
|
|
06-18-2015
|
3.00
|
Worked on nose pant and bracket.
|
Details
|
|
|
06-17-2015
|
2.00
|
Trimmed nose pant. Drilled attachh holes to brack
|
|
|
|
06-16-2015
|
5.00
|
Continued fiitting Lt pant. Began nose pant
|
Details
|
|
|
06-15-2015
|
4.00
|
Completed fitting Rt pant.
|
|
|
|
06-13-2015
|
2.00
|
Rt pant now aadjusted..Trimmed outside and aft whe
|
Details
|
|
|
06-12-2015
|
3.00
|
Con't adjusting Rttt wheel pant. Laid out pant ce
|
Details
|
|
|
06-11-2015
|
3.00
|
Conttinued Rt ffairing cutouts and fitting.
|
Details
|
|
|
06-10-2015
|
1.00
|
Began Rt main geear legg fairing cutouts.
|
|
|
|
06-09-2015
|
3.00
|
Completed flashing removal. Began fitting pant ha
|
Details
|
|
|
06-08-2015
|
1.00
|
Beggan sanding the sharp flashhing off the wheel p
|
|
|
|
06-03-2015
|
2.00
|
Completed riveting Lt main gear leg fairing.
|
|
|
|
06-02-2015
|
2.00
|
Lt main gear leg fairing hinge driled, deburred, a
|
|
|
|
06-02-2015
|
2.00
|
1st attempt at shrinking aft canopy skirt.
|
Details
|
|
|
06-01-2015
|
2.00
|
Completed fab of Rt main gear leg fairing.
|
|
|
|
05-20-2015
|
3.00
|
Ddrilled and trimmed lower empenage
|
Details
|
|
|
05-19-2015
|
5.00
|
Continued cuttting the main gear fairings.
|
Details
|
|
|
05-18-2015
|
3.00
|
Worked on lower empenage fairings.
|
Details
|
|
|
05-15-2015
|
2.00
|
Began fitting lower empenage fairings.
|
Details
|
|
|
05-14-2015
|
3.00
|
Sanded te superfil. Installed all nutplates.
|
Details
|
|
|
05-13-2015
|
2.00
|
Removed the fairing and rough sanded
|
Details
|
|
|
05-12-2015
|
3.00
|
Applied fiberglasss aand resin and
|
Details
|
|
|
05-11-2015
|
2.00
|
Prepped empenage fairing for fiberglass and
|
Details
|
|
|
05-09-2015
|
2.00
|
Ttrimmed all e-fairing edges. Drilled and
|
Details
|
|
|
05-08-2015
|
2.00
|
More fairing work. Laid out grid lines for trimmin
|
Details
|
|
|
05-07-2015
|
3.00
|
Con't e-fairing fitting. More heat, drilled
|
Details
|
|
|
05-06-2015
|
2.00
|
Continueed e-fairing fit using thge heat gun.
|
Details
|
|
|
05-05-2015
|
4.00
|
Continued e-fairing fit Drilled, tapped,
|
Details
|
|
|
04-28-2015
|
3.00
|
Fit checked nose wheel fairing. Began
|
Details
|
|
|
04-24-2015
|
4.00
|
Finally, air vent riveted and installed peer drawi
|
|
|
|
04-23-2015
|
4.00
|
Air vent work, try number 3.
|
|
|
|
04-22-2015
|
4.00
|
Same as day before pluuus began work on LC air ven
|
Details
|
|
|
04-21-2015
|
3.00
|
More work on nostrils and ramps.
|
Details
|
|
|
04-14-2015
|
1.00
|
Epoxied the nostril nutplates. Filled
|
Details
|
|
|
04-13-2015
|
1.00
|
Epoxied thee ramps in place.
|
|
|
|
04-10-2015
|
2.00
|
Superfilled cowls - nearly all areas.
|
|
|
|
04-09-2015
|
2.00
|
Sanded areas that needed filling oon both cowls ha
|
|
|
|
04-08-2015
|
2.00
|
Drilled openings for LC Skybolt camlocks.
|
Details
|
|
|
04-07-2015
|
1.00
|
Oil door hinge side repair almost complete
|
Details
|
|
|
04-06-2015
|
1.00
|
More oil door hinge side repairs.
|
|
|
|
04-04-2015
|
1.00
|
More oil door hinge side repairs.
|
|
|
|
04-03-2015
|
1.00
|
More oil door hine side repairs.
|
|
|
|
04-01-2015
|
1.00
|
Made oil door hinge side repair work.
|
|
|
|
03-31-2015
|
3.00
|
Sanded filled areas on U&L cowls.
|
Details
|
|
|
03-30-2015
|
3.00
|
Filled UC cowl Rt side flange.
|
Details
|
|
|
03-29-2015
|
1.00
|
Filled innn the LC trailing edge and oul door.
|
Details
|
|
|
03-25-2015
|
3.00
|
Added 2 bids on LC inner nostril.
|
Details
|
|
|
03-24-2015
|
2.00
|
C/S LC rivet holes Fitted backup strips on bottom
|
Details
|
|
|
03-23-2015
|
1.00
|
Installed new lower cowl hinge and drilled rivet h
|
|
|
|
03-21-2015
|
3.00
|
Fabbed shims for oil door hinge. Drilled the oil
|
Details
|
|
|
03-20-2015
|
3.00
|
Sanded filled areas Fillled the nostril areas.
|
Details
|
|
|
03-19-2015
|
2.00
|
Glassed nostrilss annf filled/covered the rivets a
|
|
|
|
03-18-2015
|
1.00
|
ssandded recently filled areas.
|
|
|
|
03-17-2015
|
1.00
|
Superfilled holess,glassed depressions
|
Details
|
|
|
03-16-2015
|
2.00
|
Ttaped andd laid up glass for nostrils and sides..
|
|
|
|
03-12-2015
|
3.00
|
Cut oil door opening in upper cowl. Trimmed and le
|
|
|
|
03-11-2015
|
3.00
|
Added 2 more oooats of UV filler aand resandeed w/
|
|
|
|
03-10-2015
|
2.00
|
More sanding and rolled on first coat of UV annd f
|
|
|
|
03-09-2015
|
1.00
|
Saanded off the bulges on both sides of the lower
|
|
|
|
03-05-2015
|
1.00
|
Continued cleanup of fuselage protectiion.
|
|
|
|
03-03-2015
|
1.00
|
Minor w/s sanding. removed protective covering
|
|
|
|
03-03-2015
|
1.00
|
Installed and drilled 2 holes/L over Rt cowl hiung
|
|
|
|
03-02-2015
|
3.00
|
Retaped windshield and continued final sanding.
|
Details
|
|
|
02-28-2015
|
2.00
|
Applied next coat of smooth prime. Came out lumpy.
|
|
|
|
02-27-2015
|
4.00
|
Rettaped W/S area for smooth prime application.
|
Details
|
|
|
02-26-2015
|
3.00
|
Sanded the gude coat and skimmed with Superfil.
|
|
|
|
02-25-2015
|
2.00
|
Sanded , masked, and applied flat black
|
Details
|
|
|
02-24-2015
|
2.00
|
Sanded and filled
|
|
|
|
02-23-2015
|
5.00
|
Sanded and filled.
|
|
|
|
02-22-2015
|
2.00
|
Sanded and filled.
|
|
|
|
02-21-2015
|
5.00
|
Scrapped off last Superfil coat as it never serup.
|
|
|
|
02-17-2015
|
5.00
|
More of the same.
|
|
|
|
02-16-2015
|
5.00
|
More sanding and more coatss of Superfil on boot c
|
Details
|
|
|
02-15-2015
|
2.00
|
More sanding and filling.
|
|
|
|
02-14-2015
|
33.00
|
Sanded W/S fiberglass and applied 3rd coat Superfi
|
|
|
|
02-13-2015
|
2.00
|
Sanded Lt side of W/S Superfil.
|
|
|
|
02-12-2015
|
2.00
|
Sanded Rt side of W/S Ssuperfil.
|
|
|
|
02-11-2015
|
1.00
|
Cut empenage fairing.and located all
|
Details
|
|
|
02-11-2015
|
1.00
|
Applied 2nd coat over roll bar and fwd cowl.
|
Details
|
|
|
02-10-2015
|
2.00
|
First of many coats of Superfil over roll bar.
|
Details
|
|
|
02-09-2015
|
2.00
|
First of many coats of Superfil on boot cowl.
|
|
|
|
02-07-2015
|
22.00
|
With Alex's help to, fiberglassed the W/S in place
|
|
|
|
02-05-2015
|
2.00
|
Installed new Dynon pitot tube per service bulleti
|
|
|
|
02-05-2015
|
22.00
|
Covered aircraft in prep for fiberglass work.
|
|
|
|
02-02-2015
|
1.00
|
Reemoveed old Dynon pitot tube pper serviice bulle
|
|
|
|
01-23-2015
|
2.00
|
Completed canopy handle/lattch system.
|
|
|
|
01-21-2015
|
1.00
|
Cleaned canopy slider block hholes, cleaned and lu
|
|
|
|
01-20-2015
|
2.00
|
Drilled the cabin frame & rollers for the attach s
|
|
|
|
01-19-2015
|
2.00
|
Favricated to canopy handles and riveted them in p
|
|
|
|
01-10-2015
|
1.00
|
Modified the -6 ss c/s washers for -8 screws.
|
Details
|
|
|
12-27-2014
|
3.00
|
Prepped, cleaned, recleaned wingtip surface.
|
Details
|
|
|
12-23-2014
|
3.00
|
Continued laying out the trim lines.
|
Details
|
|
|
12-19-2014
|
2.00
|
Rivet w/s clips aling cowl edges.
|
Details
|
|
|
12-18-2014
|
3.00
|
Reinstalled and shimmed w/s on rollbar using
|
Details
|
|
|
12-17-2014
|
4.00
|
Redrilled lower w/s attach holes.
|
Details
|
|
|
12-10-2014
|
2.00
|
Almost completed l/h wingtip lens cover.
|
|
|
|
12-09-2014
|
1.00
|
Created right hand wing tip lens.cover.
|
|
|
|
12-09-2014
|
2.00
|
Created r/h winngtip lens cover.
|
|
|
|
12-06-2014
|
5.00
|
Trimmed, fit, finished aft edge.of w/s.
|
|
|
|
12-06-2014
|
5.00
|
Trimmed fit and finished aft edge of W/S.
|
|
|
|
12-05-2014
|
4.00
|
Intstalled W/S screws. Plastic drop cloth fitted f
|
Details
|
|
|
12-05-2014
|
4.00
|
Installed w/s screws. Plastic covering installed
|
Details
|
|
|
12-04-2014
|
4.00
|
Final W/S fit. Drilled W/S and roll bar to #30
|
Details
|
|
|
12-04-2014
|
1.00
|
Final fit for w/s.
|
|
|
|
12-04-2014
|
3.00
|
Drilled w/s and rollbar to #30.
|
Details
|
|
|
12-03-2014
|
4.00
|
Continued fitting the windshield. Laid outt screw
|
Details
|
|
|
12-03-2014
|
4.00
|
Cont fitting the w.s Maybe the final fit.
|
Details
|
|
|
12-02-2014
|
4.00
|
Continued fitting W/S - almost ready for final fit
|
Details
|
|
|
12-02-2014
|
4.00
|
Continued fitting the windshield.
|
Details
|
|
|
12-01-2014
|
3.00
|
Began fitting windshield Did initial cuts.
|
Details
|
|
|
12-01-2014
|
3.00
|
Began fitting the windshield.
|
Details
|
|
|
11-29-2014
|
2.00
|
Set the Skybolts on thee split line and trimmed
|
Details
|
|
|
11-27-2014
|
2.00
|
Set the Skybolt fasteners on tthhe split line.
|
Details
|
|
|
11-26-2014
|
3.00
|
Fabricated L & R rear flange split line gap filler
|
Details
|
|
|
11-22-2014
|
2.00
|
Countersunk and riveted all right side lower cowl
|
Details
|
|
|
11-21-2014
|
2.00
|
Completed the left sude access oanel. lKooks pre
|
|
|
|
11-20-2014
|
3.00
|
Continued filing and fitting the left sude hole an
|
Details
|
|
|
11-19-2014
|
2.00
|
Filled leffft hole, did a fit check, and continue
|
Details
|
|
|
11-18-2014
|
2.00
|
Forgot at first, but I was able to dimple the scre
|
Details
|
|
|
11-17-2014
|
2.00
|
Practiced coutersinking and dimpling on the thick
|
Details
|
|
|
11-16-2014
|
1.00
|
The left access hole cutout was made and the edges
|
|
|
|
11-15-2014
|
2.00
|
Drilled the access door flange, dimpled the flange
|
Details
|
|
|
11-08-2014
|
2.00
|
Right access door and hole trimming is complete.
|
|
|
|
11-07-2014
|
1.00
|
Continued filing and fitting the right access hole
|
|
|
|
11-06-2014
|
2.00
|
After hours of contemplation I cut the right acces
|
|
|
|
11-05-2014
|
1.00
|
Laid out cut lines for forward fuselage access por
|
|
|
|
11-04-2014
|
2.00
|
Drilled Skyybolt flanges on left side of LC.
|
|
|
|
10-25-2014
|
3.00
|
More cowl work. Prepared UC flanges for riveting
|
|
|
|
10-24-2014
|
2.00
|
Began drilling Skybolt split line installation on
|
|
|
|
10-22-2014
|
2.00
|
Adjusted the upper cowl by slightly enlarging the
|
|
|
|
10-21-2014
|
3.00
|
Continued adjusting cowl to get the proper fit.
|
Details
|
|
|
10-20-2014
|
2.00
|
Dimpled wing tip skin Open all holes to 1/8 and c
|
|
|
|
10-18-2014
|
3.00
|
Installed aft rib in both tips.
|
|
|
|
10-17-2014
|
4.00
|
Drilled LT wing tip to Left wing
|
Details
|
|
|
10-16-2014
|
3.00
|
Drilled RT tip to wing.
|
Details
|
|
|
10-14-2014
|
3.00
|
Began landing light installation on RT wing tip.
|
Details
|
|
|
10-13-2014
|
3.00
|
Continued LC camlock installation
|
|
|
|
10-12-2014
|
1.00
|
Completed riveting the UC Skybolt camlocks.
|
Details
|
|
|
10-11-2014
|
4.00
|
Countersunk the cankock holes and rivited 1/2 of t
|
|
|
|
10-09-2014
|
3.00
|
Riveted firewall & Skybolt flanges.
|
|
|
|
10-07-2014
|
3.00
|
sanded fwd edges of U and L cowls.
|
Details
|
|
|
10-05-2014
|
3.00
|
More Skybokt cowl work.. UC Skybolt flanges read
|
|
|
|
09-17-2014
|
2.00
|
Continued adjusting the cowl.
|
|
|
|
09-16-2014
|
2.00
|
Added 4 plies of BID to forward edge of LC.
|
Details
|
|
|
09-15-2014
|
2.00
|
Continued adjusting cowl.
|
|
|
|
09-14-2014
|
2.00
|
Trimmed aft edges of LC
|
|
|
|
09-10-2014
|
3.00
|
Adjusted lower cowl and dropped cowl center cutout
|
|
|
|
09-09-2014
|
1.00
|
Continued lower cowl work.
|
|
|
|
09-06-2014
|
2.00
|
Made first cut on lower aft cowl
|
|
|
|
09-01-2014
|
5.00
|
Continued cowl fitting Began work on aft cowl la
|
|
|
|
08-31-2014
|
3.00
|
Match drilled flanges to firewall and made fit ad
|
|
|
|
08-30-2014
|
6.00
|
Leveled upper cowl split line.
|
Details
|
|
|
08-28-2014
|
3.00
|
Continued trimming and fitting the upper cowl.
|
|
|
|
08-27-2014
|
3.00
|
Began trimming and fitting upper cowl
|
|
|
|
08-26-2014
|
2.00
|
Completed riveting boot cowl with Cherry max rive
|
|
|
|
08-24-2014
|
1.00
|
Laud out nose wheel slot in lower cowl
|
|
|
|
08-23-2014
|
1.00
|
Continued rivetin boot cowl
|
|
|
|
08-20-2014
|
5.00
|
Continued riveting boot cowl
|
|
|
|
08-19-2014
|
3.00
|
Continued riveting boot cowl
|
|
|
|
08-18-2014
|
3.00
|
Continued riveting boot cowl.
|
|
|
|
08-16-2014
|
2.00
|
Riveted center rib of boot cowl.
|
|
|
|
08-15-2014
|
3.00
|
Began installing fwd boot cowl.
|
Details
|
|
|
08-14-2014
|
3.00
|
Completed electrical portion of instrument panel l
|
|
|
|
08-13-2014
|
2.00
|
Began installing instrument panel lights
|
|
|
|
08-09-2014
|
2.00
|
Installed braces under boot cowl
|
|
|
|
08-07-2014
|
1.00
|
Temporary prop installtion Plug removed
|
|
|
|
07-10-2014
|
1.00
|
Removed Lower Cowl hinges which will be replaced
|
|
|
|
07-09-2014
|
1.00
|
Applied carbon to the underside of the instrument
|
|
|
|
07-08-2014
|
2.00
|
Bolted tge quadrent to the instrumental panel.
|
|
|
|
07-03-2014
|
4.00
|
Completed the linkage aadjustments.
|
|
|
|
07-02-2014
|
2.00
|
Con't working the linkages.
|
|
|
|
07-01-2014
|
2.00
|
Con't work on llinkages.
|
|
|
|
06-30-2014
|
2.00
|
Continued cable linkage adjustment installation.
|
|
|
|
06-19-2014
|
5.00
|
Conpleted bracket fir the quadrent, installed it,
|
|
|
|
06-18-2014
|
5.00
|
continued making the new quadrent brackets
|
|
|
|
06-10-2014
|
4.00
|
Began designing a new Quadrent support bracket and
|
|
|
|
06-09-2014
|
2.00
|
Continued work on quadrent cables
|
Details
|
|
|
06-08-2014
|
2.00
|
Addjjusted prop cable.
|
|
|
|
06-07-2014
|
5.00
|
Beggan throttle quadrent installation.
|
Details
|
|
|
06-06-2014
|
3.00
|
Continued installation.
|
|
|
|
06-05-2014
|
4.00
|
Continued installation.
|
|
|
|
06-04-2014
|
3.00
|
Continued installation.
|
|
|
|
06-03-2014
|
2.00
|
Began smoke system firewall forward installation.
|
Details
|
|
|
05-27-2014
|
3.00
|
Completed vent installation and installed heater s
|
|
|
|
05-26-2014
|
3.00
|
Continued securing firewall forward wire bundles.
|
Details
|
|
|
05-24-2014
|
3.00
|
Began final securing of engine compartment and avi
|
|
|
|
05-21-2014
|
2.00
|
Wired Slick Start
|
|
|
|
05-20-2014
|
2.00
|
Installed Sslick Start
|
|
|
|
05-19-2014
|
1.00
|
Wired new Hall Effect and checkout was good
|
|
|
|
05-16-2014
|
1.00
|
Original Hall Effect transducer failed.
|
Details
|
|
|
04-28-2014
|
2.00
|
Completed wingtip initial fit.
|
|
|
|
04-26-2014
|
2.00
|
Continued R wingtip fitting.
|
|
|
|
04-25-2014
|
1.00
|
Continued wintip initial fitting L.
|
|
|
|
04-24-2014
|
1.00
|
Began initial wingtip installation.
|
|
|
|
04-21-2014
|
3.00
|
Trouble shooting of Hall effect transducer in engi
|
|
|
|
04-19-2014
|
3.00
|
Installed Hall Effect transducer in engine compar
|
|
|
|
04-18-2014
|
2.00
|
Installed Hall Effect transducer in engine compar
|
|
|
|
04-14-2014
|
2.00
|
Completed in of the GTN to AFS navaud tests.
|
|
|
|
04-10-2014
|
1.00
|
Began laying out engine baffle parts.
|
|
|
|
03-25-2014
|
2.00
|
Had to rewire thee GTR200. It's not talking to th
|
|
|
|
03-24-2014
|
2.00
|
Minor electrical work.
|
|
|
|
01-28-2014
|
75.00
|
Details lost from 1/28 thru 3/23
|
Details
|
|
|
01-27-2014
|
2.00
|
Interior lights on pilot side weren't working.
|
Details
|
|
|
01-27-2014
|
1.00
|
Comm 1 and 2 were checked and work - so far.
|
Details
|
|
|
01-13-2014
|
1.00
|
I had to rewire serial port 3 on the EFIS.
|
Details
|
|
|
01-07-2014
|
3.00
|
Began AFS4500 setup, updated map cards. I had to
|
|
|
|
01-06-2014
|
3.00
|
Continued VP-X setup.
|
|
|
|
01-05-2014
|
3.00
|
Continued VP-Xwork and started up the electrical s
|
|
|
|
01-04-2014
|
3.00
|
Continued VP-X work, installed battery, verified p
|
|
|
|
01-02-2014
|
2.00
|
Bench checked and updated VP-X. Also ran configura
|
|
|
|
12-31-2013
|
3.00
|
Completed initial installation of the avionics.
|
|
|
|
12-30-2013
|
6.00
|
Began installing avionics. Some minr panel mods h
|
|
|
|
12-28-2013
|
6.00
|
Finished most of the wiring -Hooray!
|
|
|
|
12-09-2013
|
4.00
|
Installed 7 pin connectors for fuselage/wing compo
|
|
|
|
12-07-2013
|
2.00
|
Removed all fuselage and wing connectors for strob
|
Details
|
|
|
12-06-2013
|
1.00
|
Misc Wiring
|
|
|
|
12-05-2013
|
1.00
|
Misc Wiring
|
|
|
|
12-03-2013
|
1.00
|
Misc Wiring
|
|
|
|
11-19-2013
|
2.00
|
Redid work from 11/18
|
Details
|
|
|
11-18-2013
|
1.00
|
Installed elecrial connectors on wings for strobe
|
|
|
|
11-12-2013
|
1.00
|
Ran additional shielded wiring in fuselage
|
|
|
|
11-05-2013
|
2.00
|
Organized wire bundles and spliced lighting rheost
|
Details
|
|
|
11-04-2013
|
4.00
|
Ran shielded wire thru fuselage for landing lights
|
|
|
|
11-02-2013
|
1.00
|
Bundled wires
|
|
|
|
11-01-2013
|
2.00
|
Wired began wiring GTR-200
|
|
|
|
10-31-2013
|
2.00
|
Continued installing ADS-B and constructed final b
|
|
|
|
10-25-2013
|
3.00
|
Began installing ADS-B and removed XM
|
|
|
|
10-24-2013
|
1.00
|
Continued wiring
|
|
|
|
10-16-2013
|
5.00
|
Continued wiring and bundling
|
|
|
|
10-15-2013
|
4.00
|
Continued wiring and bundling
|
|
|
|
10-14-2013
|
4.00
|
Continued Wire Bundling
|
|
|
|
10-13-2013
|
3.00
|
Continued Wire Bundling
|
|
|
|
10-12-2013
|
4.00
|
Comleted wiring power leads
|
|
|
|
10-11-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
10-10-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
10-09-2013
|
2.00
|
Conitued wiring power leads
|
|
|
|
10-08-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
10-07-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
10-05-2013
|
2.00
|
Conitued wiring power leads
|
|
|
|
10-04-2013
|
2.00
|
Conitued wiring power leads
|
|
|
|
10-03-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
10-02-2013
|
4.00
|
Conitued wiring
|
|
|
|
10-01-2013
|
2.00
|
Conitued wiring power leads
|
|
|
|
09-25-2013
|
2.00
|
Conitued wiring power leads
|
|
|
|
09-24-2013
|
2.00
|
Conitued wiring
|
|
|
|
09-23-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
09-22-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
09-21-2013
|
4.00
|
Conitued wiring power leads
|
|
|
|
09-20-2013
|
1.00
|
Wired power leads for the GTX-330
|
|
|
|
09-16-2013
|
1.00
|
Wired the flap motor
|
|
|
|
09-04-2013
|
3.00
|
Continued wiring power and pitch trim LEDs
|
|
|
|
09-03-2013
|
6.00
|
Continued wiring bundled left stick
|
|
|
|
09-02-2013
|
4.00
|
Continued wiring control stick grips and secured i
|
|
|
|
09-01-2013
|
2.00
|
Continued Stick Grip wiring
|
|
|
|
08-31-2013
|
7.00
|
Continued Stick Grip wiring
|
|
|
|
08-30-2013
|
4.00
|
Continued Stick Grip wiring
|
|
|
|
08-29-2013
|
2.00
|
Continued smoke system wiring.Version 3
|
|
|
|
08-29-2013
|
2.00
|
Began Stick Grip wiring
|
|
|
|
08-27-2013
|
1.00
|
Continued smoke system wiring.Version 3
|
|
|
|
08-26-2013
|
2.00
|
Continued smoke system wiring.Version 3
|
|
|
|
08-24-2013
|
3.00
|
Continued smoke system wiring.Version 3
|
|
|
|
08-23-2013
|
3.00
|
Continued smoke system wiring. version 2
|
|
|
|
08-22-2013
|
2.00
|
Continued smoke system wiring.
|
|
|
|
08-21-2013
|
3.00
|
Pitot system wiring.
|
|
|
|
08-19-2013
|
5.00
|
Continued fuel boost pump and smoke system wiring.
|
|
|
|
08-18-2013
|
2.00
|
Continued fuel boost pump system wiring.
|
|
|
|
08-17-2013
|
1.00
|
Continued smoke system wiring.
|
|
|
|
08-16-2013
|
3.00
|
Completed dimmer installation
|
|
|
|
08-15-2013
|
2.00
|
Began radio stack light dimmer installation.
|
Details
|
|
|
07-21-2013
|
1.00
|
Reassembled Co-pilot stick & touched up paint
|
|
|
|
07-19-2013
|
1.00
|
Drilled right stick to control fitting and pinned
|
|
|
|
07-18-2013
|
5.00
|
Added more pins to the SL-40 and EFIS Main Connect
|
|
|
|
07-17-2013
|
3.00
|
More wiring and more talks with AFS and GCA
|
|
|
|
07-16-2013
|
3.00
|
More wiring
|
|
|
|
07-15-2013
|
3.00
|
More wiring
|
|
|
|
07-13-2013
|
4.00
|
Redo of the let control stick grip.
|
|
|
|
07-10-2013
|
3.00
|
More wiring
|
|
|
|
07-09-2013
|
4.00
|
More wiring and added pins to the GMA 240
|
|
|
|
07-07-2013
|
2.00
|
More wiring
|
|
|
|
07-06-2013
|
2.00
|
More wiring
|
|
|
|
07-05-2013
|
6.00
|
More wiringof installtion of Interior LED's
|
|
|
|
07-03-2013
|
4.00
|
Completed installation Of Infinity stick grips.
|
|
|
|
07-02-2013
|
2.00
|
Continued the installation of Infinity stick contr
|
|
|
|
07-01-2013
|
3.00
|
Began the installation of Infinity stick control g
|
|
|
|
06-30-2013
|
3.00
|
More wiring and installed cargo lighting.
|
|
|
|
06-29-2013
|
3.00
|
More wiring
|
|
|
|
06-28-2013
|
4.00
|
More wiring
|
|
|
|
06-27-2013
|
2.00
|
Completed wiring Expansion Connector wiring Instal
|
|
|
|
06-20-2013
|
4.00
|
More eletrical wiring and continued installing she
|
|
|
|
06-19-2013
|
2.00
|
More eletrical wiring and began installing shelded
|
|
|
|
06-18-2013
|
4.00
|
More eletrical wiring
|
|
|
|
06-17-2013
|
3.00
|
More eletrical wiring
|
|
|
|
06-16-2013
|
2.00
|
Completed CHT/EGT installation
|
|
|
|
06-15-2013
|
6.00
|
Continued CHT/EGT installation
|
|
|
|
06-13-2013
|
2.00
|
Added clamps for routing CHT/EGT and began install
|
|
|
|
06-12-2013
|
3.00
|
Labelled panel switches, Redid #1 CHT/EGT cable cl
|
Details
|
|
|
06-01-2013
|
3.00
|
Continued switch wiring and installed the male and
|
|
|
|
05-31-2013
|
3.00
|
Wired Flap position sensor Dsub-9 to VP. Began wi
|
|
|
|
05-29-2013
|
3.00
|
Determined the POS-12 Flap postion sensor wiring a
|
|
|
|
05-28-2013
|
4.00
|
Flap actuator
|
Details
|
|
|
05-27-2013
|
2.00
|
Flap position sensor.
|
Details
|
|
|
05-25-2013
|
3.00
|
Completed most of the magnatometer installation.
|
Details
|
|
|
05-24-2013
|
4.00
|
constructed new bracketry for the mgnatometer inst
|
Details
|
|
|
05-23-2013
|
2.00
|
Completely redid the magnatometer installation.
|
|
|
|
05-22-2013
|
4.00
|
New attempt using aluminum angles to get correct a
|
Details
|
|
|
05-21-2013
|
4.00
|
began 2nd attemp to install the magnatometers.
|
Details
|
|
|
05-20-2013
|
4.00
|
Continued 1st attemp to install the magnatometers.
|
Details
|
|
|
05-18-2013
|
3.00
|
Worked on magnatometer installation.
|
Details
|
|
|
05-17-2013
|
3.00
|
Soldered magnatometer Dsub-9 conectors and began
|
|
|
|
04-26-2013
|
33.00
|
More wiring 4/26 thru 5/17
|
|
|
|
04-25-2013
|
3.00
|
More wiring!!
|
|
|
|
04-24-2013
|
3.00
|
More wiring!!
|
|
|
|
04-23-2013
|
4.00
|
More wiring!!
|
|
|
|
04-22-2013
|
2.00
|
More wiring!!
|
|
|
|
04-20-2013
|
5.00
|
More wiring!!
|
|
|
|
04-19-2013
|
6.00
|
More wiring!!
|
|
|
|
04-18-2013
|
3.00
|
More wiring!!
|
|
|
|
04-09-2013
|
1.00
|
More Wiring
|
|
|
|
04-08-2013
|
1.00
|
More Wiring
|
|
|
|
04-05-2013
|
4.00
|
More Wiring
|
|
|
|
04-03-2013
|
1.00
|
More Wiring
|
|
|
|
03-30-2013
|
2.00
|
Installed the EGT probes
|
|
|
|
03-29-2013
|
4.00
|
More Wiring
|
|
|
|
03-28-2013
|
2.00
|
More Wiring
|
|
|
|
03-26-2013
|
3.00
|
More wiring
|
|
|
|
03-25-2013
|
3.00
|
More wiring
|
|
|
|
03-23-2013
|
4.00
|
Laid in more wiring
|
|
|
|
03-22-2013
|
3.00
|
More wiring completed
|
|
|
|
03-21-2013
|
2.00
|
Continued to kay in wires
|
|
|
|
03-20-2013
|
5.00
|
Continued to kay in wires
|
|
|
|
03-19-2013
|
2.00
|
Continued to kay in wires
|
|
|
|
03-18-2013
|
2.00
|
Continued to kay in wires
|
|
|
|
03-16-2013
|
2.00
|
Continued wiring.
|
|
|
|
03-15-2013
|
2.00
|
Continued wiring, tarted on the VP power connector
|
|
|
|
03-14-2013
|
2.00
|
Continued to kay in wires
|
|
|
|
03-13-2013
|
2.00
|
Continued to kay in wires
|
|
|
|
03-13-2013
|
3.00
|
Continued aying in wiring. Prepped the VP-X plugs
|
Details
|
|
|
03-12-2013
|
2.00
|
Restrung many wires to make them more supported an
|
|
|
|
03-11-2013
|
1.00
|
Drilled holes in fuselage for running magnetometer
|
Details
|
|
|
03-09-2013
|
3.00
|
Installed pneumatic line for manifold pressure sen
|
Details
|
|
|
03-08-2013
|
2.00
|
outed wiring thru appropriate openings.
|
|
|
|
03-06-2013
|
2.00
|
Wired the emgine manifold pressure unit.
|
|
|
|
03-02-2013
|
2.00
|
Cut and installed cabin heat control.
|
|
|
|
03-01-2013
|
4.00
|
Dimpled forward skin and aircraft structure. Inst
|
Details
|
|
|
02-28-2013
|
4.00
|
Match drilled the firewall holes. All holes are d
|
Details
|
|
|
02-26-2013
|
3.00
|
Temp install all Clecos on Fwd Skin
|
|
|
|
02-25-2013
|
2.00
|
Fit Check Fwd Skin. RIbs need encouragement to fit
|
Details
|
|
|
02-24-2013
|
2.00
|
Final bending of the upper forward skin.
|
|
|
|
02-23-2013
|
4.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-22-2013
|
2.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-20-2013
|
2.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-16-2013
|
2.00
|
Fabricate headset jack bracket
|
|
|
|
02-09-2013
|
1.00
|
Began fitting the upper forward fuselage skin - fo
|
|
|
|
02-08-2013
|
4.00
|
Began prepping for upper fuselage skin fit and dri
|
Details
|
|
|
02-07-2013
|
1.00
|
Glued and riveted left NACA vent
|
|
|
|
02-06-2013
|
1.00
|
Glued and riveted right NACA vent
|
|
|
|
01-23-2013
|
1.00
|
Modified headset brackets to include a stereo mono
|
|
|
|
01-22-2013
|
1.00
|
Painted headset mounting brackets.
|
|
|
|
01-21-2013
|
2.00
|
Fabricated 2 headset mounting brackets
|
|
|
|
01-20-2013
|
2.00
|
Contniued riveting the upper forward fuselage
|
|
|
|
01-19-2013
|
5.00
|
Began riveting upper forward fuselage structure
|
|
|
|
01-18-2013
|
2.00
|
Dimpled L & R NACA vent rivet holes
|
|
|
|
01-15-2013
|
2.00
|
The foward fuselage structure was clecoed in place
|
Details
|
|
|
01-14-2013
|
2.00
|
The forward rib attachment holes in the firewall
|
|
|
|
01-09-2013
|
3.00
|
Yet more mounting nut plates were added.
|
Details
|
|
|
01-08-2013
|
4.00
|
Continued adding nutplates to the forward fuselage
|
Details
|
|
|
01-05-2013
|
1.00
|
Fabricated brackets for control cables to cabin he
|
|
|
|
01-04-2013
|
1.00
|
Left forward rib nut plates installed for antenna
|
|
|
|
01-03-2013
|
1.00
|
Right forward rib nut plates installed for MP asse
|
Details
|
|
|
01-01-2013
|
2.00
|
Fabricated fuse bracket.
|
Details
|
|
|
12-28-2012
|
1.00
|
Rudder pedal assembly final torque.
|
Details
|
|
|
12-27-2012
|
3.00
|
Reinstalled rudder pedal assembly to most forward
|
Details
|
|
|
12-26-2012
|
2.00
|
Modifying VP-X mounting shelf.
|
Details
|
|
|
10-11-2012
|
2.00
|
Began creating ARINC 429 Mounting brackets
|
|
|
|
10-10-2012
|
4.00
|
Continued throttle quadrent attach scheme developm
|
|
|
|
10-09-2012
|
2.00
|
Fabricated attach scheme for throttle quadrent to
|
|
|
|
10-05-2012
|
2.00
|
Trimmed and fit the ELT remote panel and epoxied i
|
|
|
|
10-04-2012
|
2.00
|
Trimmed annunciator panel to fit into instrument p
|
Details
|
|
|
10-03-2012
|
4.00
|
Prepared annunciator panel lettering.
|
|
|
|
09-22-2012
|
1.00
|
Riveted instrument panel support brackets.
|
|
|
|
08-12-2012
|
2.00
|
Began work on throttle quadrent control cable lock
|
|
|
|
08-11-2012
|
1.00
|
Completed insulation installation.
|
|
|
|
08-10-2012
|
2.00
|
Continued insulation installation.
|
|
|
|
08-09-2012
|
3.00
|
Continued insulation installation.
|
|
|
|
08-08-2012
|
1.00
|
Began installing firewall insulation.
|
|
|
|
07-11-2012
|
2.00
|
Drilled center rib thru firewall, fabed rear brack
|
|
|
|
07-10-2012
|
1.00
|
Fabricated more throttle quafrent brackets.
|
|
|
|
07-09-2012
|
3.00
|
Began wiring the smaller backbone wires.
|
|
|
|
07-08-2012
|
1.00
|
Fabricated last battery cable.
|
|
|
|
07-07-2012
|
2.00
|
Fabricated more cables for the backbone of the sys
|
|
|
|
07-02-2012
|
2.00
|
Made more cables and wored on instrument panel.
|
|
|
|
06-30-2012
|
3.00
|
Continued wiring and making cables.
|
|
|
|
06-23-2012
|
2.00
|
Fit checked various components and finalized the t
|
|
|
|
06-22-2012
|
4.00
|
Completed forward structure supports.
|
|
|
|
06-21-2012
|
4.00
|
began fabricating angles, supports, etc, for the t
|
|
|
|
06-20-2012
|
3.00
|
Worked on forward structure, drilling holes, etc.
|
|
|
|
06-19-2012
|
1.00
|
Completed riveting the radio stack supports to the
|
|
|
|
06-18-2012
|
6.00
|
Continued fabricating and attaching support angles
|
|
|
|
06-16-2012
|
7.00
|
Conitnued fabrication of supports for the radio st
|
|
|
|
06-15-2012
|
3.00
|
Continued radio support fabrication.
|
|
|
|
06-06-2012
|
2.00
|
Fabricated radio stack support angles.
|
|
|
|
06-05-2012
|
3.00
|
Rivieted support angles and wire bundle openings.
|
|
|
|
06-02-2012
|
2.00
|
Continued fab of the radio brackets.
|
|
|
|
06-02-2012
|
2.00
|
Continued fab of the radio brackets an support str
|
|
|
|
05-30-2012
|
5.00
|
Completed fabricating the new radio mount brackets
|
Details
|
|
|
05-29-2012
|
3.00
|
Conitnued fitting the radio brackets. irst design
|
|
|
|
05-28-2012
|
3.00
|
Ompleted FWD angles for radio stack.
|
Details
|
|
|
05-27-2012
|
2.00
|
Began filing AFS cutouts for proper fit.
|
|
|
|
05-26-2012
|
2.00
|
Refabricated radio stack angles, fit checked radio
|
|
|
|
05-25-2012
|
2.00
|
Continued radio stack angle fabrication.
|
|
|
|
05-24-2012
|
2.00
|
Fit check instrument panel, Drilled AFS mounting h
|
Details
|
|
|
05-23-2012
|
3.00
|
ontinued centr panel radio stack cutting. Receive
|
|
|
|
05-14-2012
|
2.00
|
Continued center panel cuts for radio stack.
|
|
|
|
05-12-2012
|
2.00
|
Continued cutting forward ribs and center panel fo
|
|
|
|
05-02-2012
|
2.00
|
Continued w/panel cutouts #3, cut holes in 2nd pan
|
|
|
|
04-30-2012
|
2.00
|
Began fitting forward fuselage with panel cutouts
|
|
|
|
03-05-2012
|
2.00
|
Filled brake system with 5606 and bled the system.
|
|
|
|
12-19-2011
|
3.00
|
Completed anchor block install.
|
Details
|
|
|
12-09-2011
|
3.00
|
Anchor blocks
|
Details
|
|
|
12-08-2011
|
5.00
|
Canopy work
|
Details
|
|
|
12-07-2011
|
4.00
|
More anopy work
|
Details
|
|
|
12-06-2011
|
6.00
|
Painted Canopy skirt parts
|
Details
|
|
|
11-26-2011
|
3.00
|
Canopy work continues
|
Details
|
|
|
11-25-2011
|
5.00
|
Canopy work continued
|
Details
|
|
|
11-23-2011
|
7.00
|
Skirt dimpling completed and remake of left skirt.
|
Details
|
|
|
11-22-2011
|
7.00
|
Frame work.
|
Details
|
|
|
11-21-2011
|
6.00
|
Canopy frame adjustments
|
Details
|
|
|
11-18-2011
|
2.00
|
Canopy work continues
|
Details
|
|
|
11-17-2011
|
5.00
|
Laid out canopy forward skirt rivet pattern.
|
Details
|
|
|
11-16-2011
|
4.00
|
Final adjustemnt on canopy frame fwd support
|
|
|
|
10-19-2011
|
6.00
|
Polished all edges to 400. Smooth top & aft edges,
|
|
|
|
10-18-2011
|
2.00
|
Smoothed front and rear edges to 220.
|
|
|
|
10-17-2011
|
6.00
|
Completed drilling canopy to frame. Measured to c
|
|
|
|
10-15-2011
|
4.00
|
Completed track installation. Began drilling canop
|
|
|
|
10-14-2011
|
4.00
|
Cut and sanded the canopy sides to witihin a half
|
Details
|
|
|
10-13-2011
|
2.00
|
Cut off and snaded canoy around the frame.
|
|
|
|
10-12-2011
|
4.00
|
TE BIG CUT. SUCCESSFUL! Canopy and windsheild now
|
|
|
|
10-11-2011
|
4.00
|
Practice cutting canopy sides with ccutoff wheel a
|
|
|
|
10-10-2011
|
4.00
|
Laid out trim lines, taped, measured, remeasured,
|
|
|
|
10-06-2011
|
2.00
|
measured/recorded canopy frame details. Determine
|
|
|
|
10-05-2011
|
1.00
|
Adjusted canopy frame some more.
|
|
|
|
09-29-2011
|
5.00
|
Completed the initial fit of the canopy frame.
|
Details
|
|
|
09-27-2011
|
5.00
|
Continued adjusting and fitting the canopy frame.
|
|
|
|
09-26-2011
|
3.00
|
Continued measuring/fitting & adjusting frame.
|
Details
|
|
|
09-09-2011
|
5.00
|
Drilled the canopy for the rear track
|
Details
|
|
|
09-08-2011
|
4.00
|
Rear canopy track
|
Details
|
|
|
09-07-2011
|
3.00
|
Rear canopy track
|
Details
|
|
|
09-06-2011
|
4.00
|
Completed the rail holes and began layout and dril
|
|
|
|
09-05-2011
|
3.00
|
Layout the rail hole patterns and drilled to #40.
|
|
|
|
09-02-2011
|
1.00
|
Countersunk the rollers
|
|
|
|
08-31-2011
|
4.00
|
Began fitting canopy rails and fabrictaed rollers.
|
|
|
|
08-30-2011
|
1.00
|
Cut the canopy rails.
|
|
|
|
08-29-2011
|
5.00
|
Rollbar installation
|
Details
|
|
|
08-27-2011
|
4.00
|
Rollbar handles
|
Details
|
|
|
08-26-2011
|
6.00
|
Rollbar and center post
|
Details
|
|
|
08-24-2011
|
4.00
|
Remeasured again and again...
|
Details
|
|
|
08-22-2011
|
4.00
|
Began rollbar installation
|
Details
|
|
|
08-14-2011
|
2.00
|
More rollbar details
|
Details
|
|
|
07-21-2011
|
4.00
|
Engine controls installion
|
Details
|
|
|
07-16-2011
|
5.00
|
Firewall work
|
Details
|
|
|
07-15-2011
|
2.00
|
Cabin heat pickup
|
Details
|
|
|
07-03-2011
|
3.50
|
Completed the relocation of the battery box
|
Details
|
|
|
07-02-2011
|
3.00
|
Began relocation of the battery box
|
Details
|
|
|
07-01-2011
|
5.00
|
Oil cooler installation continues
|
Details
|
|
|
06-30-2011
|
4.00
|
Continued work on the oil cooler bracket supports.
|
|
|
|
06-29-2011
|
4.00
|
Modified prop governor control bracket and install
|
Details
|
|
|
06-18-2011
|
2.00
|
Began development and fabrication of the oil coole
|
Details
|
|
|
06-17-2011
|
2.00
|
Began alternator installation.
|
|
|
|
06-16-2011
|
4.00
|
Completed the installation of the air/oil separato
|
|
|
|
06-15-2011
|
3.00
|
Unisntalled the breather and installed the air/oil
|
|
|
|
06-14-2011
|
1.00
|
Began installing the breather line.
|
|
|
|
06-13-2011
|
4.00
|
Installed fuel lines, the throttle body, and sniff
|
Details
|
|
|
06-09-2011
|
2.00
|
Recieved panel from John Wilson last week.
|
Details
|
|
|
06-08-2011
|
5.00
|
Installed exhaust system
|
|
|
|
06-07-2011
|
1.00
|
Installed heat muff
|
|
|
|
05-21-2011
|
1.00
|
Cottered pinned engine mount attach bolts.
|
|
|
|
05-20-2011
|
3.00
|
Installed oil pressure sense line and then install
|
|
|
|
05-20-2011
|
3.00
|
Completed placing anchor points on the firwall and
|
|
|
|
05-19-2011
|
2.00
|
Worked with John Wilson on panel fit prior to init
|
|
|
|
05-17-2011
|
2.00
|
Restrung magnetometer wiring to exit further forwa
|
|
|
|
03-24-2011
|
2.00
|
Clecoed forward floor to the underlying ribss.
|
Details
|
|
|
03-13-2011
|
4.00
|
Completed painting aft fuselage interior parts.
|
Details
|
|
|
03-12-2011
|
4.00
|
Aft, forward skin, F-6111, and other misc. parts.
|
Details
|
|
|
03-11-2011
|
2.00
|
Forward, aft fuselage skin work.
|
Details
|
|
|
03-10-2011
|
4.00
|
Aft, Forward Fuselage work continues.
|
Details
|
|
|
03-09-2011
|
2.00
|
Aft, forward upper fuselage structure.
|
Details
|
|
|
03-08-2011
|
1.00
|
Deburred forward aft fuselage structure.
|
|
|
|
03-07-2011
|
2.00
|
Completed left fuel tank attach bracket fabricatio
|
Details
|
|
|
03-06-2011
|
1.00
|
Continued right fuel tank attach bracket installat
|
|
|
|
03-05-2011
|
4.00
|
Continued fuel tank attach bracket installation an
|
|
|
|
03-04-2011
|
2.00
|
Continued fuel tank attach bracket fabrication.
|
|
|
|
03-02-2011
|
2.00
|
Began fabricating fuel tank attach brackets.
|
|
|
|
01-31-2011
|
1.00
|
Worked on the aft fuselage skin, reenforcement rib
|
Details
|
|
|
01-29-2011
|
1.00
|
Began fitting the aft fuselage top skin.
|
|
|
|
01-28-2011
|
2.00
|
Wird and secured the pitot heat wiring in the wing
|
|
|
|
01-27-2011
|
3.00
|
Continued wiring the pitot heat system
|
Details
|
|
|
01-27-2011
|
1.00
|
Completed riveting of the lowerwing skins
|
|
|
|
01-26-2011
|
5.00
|
Completed riveting right lower wing skin.
|
Details
|
|
|
01-25-2011
|
3.00
|
Began riveting the lower right wing panel in place
|
|
|
|
01-20-2011
|
2.00
|
Fabricatewd GPS cable in fuselage and fitted a car
|
|
|
|
01-19-2011
|
3.00
|
Installed ELT antenna above aft deck and fabricate
|
|
|
|
01-18-2011
|
3.00
|
Worked pitch and roll controls to eliminate fricti
|
Details
|
|
|
01-17-2011
|
1.00
|
Ran electrical lines for the magnetometers in aft
|
|
|
|
01-15-2011
|
4.00
|
Completed strobe box electrical connections.
|
|
|
|
01-10-2011
|
1.00
|
Contnued installing strobe electrical connections.
|
|
|
|
01-05-2011
|
1.00
|
Reattached static line supports and pitch tube/ct
|
|
|
|
12-31-2010
|
1.00
|
Continued pitot installation by tapping holes. Ha
|
|
|
|
12-30-2010
|
1.00
|
Began installing pitot tube by drilling mast attac
|
|
|
|
12-17-2010
|
2.00
|
Installed rudder and rudder stop/cables
|
|
|
|
12-16-2010
|
2.00
|
Began rudder installation
|
|
|
|
12-14-2010
|
2.00
|
more sanding and filling and primimg and IT'S DONE
|
|
|
|
12-10-2010
|
2.00
|
more sanding and filling and primimg
|
|
|
|
12-09-2010
|
2.00
|
Began installing connectors on aft strobe
|
|
|
|
12-08-2010
|
2.00
|
more sanding and filling and primimg
|
|
|
|
12-07-2010
|
2.00
|
more sanding and filling
|
|
|
|
12-06-2010
|
1.00
|
Fiberglassed the rudder bottom joint.
|
|
|
|
12-06-2010
|
1.00
|
Attempted to install servo set screw mod, but.. di
|
|
|
|
12-05-2010
|
3.00
|
Final fit of rudder bottom, riveted it to the rudd
|
|
|
|
12-03-2010
|
2.00
|
Fitted the rudder bottom and repaired cracks along
|
|
|
|
12-02-2010
|
3.00
|
Thought I completed the rudder bottom fit.
|
Details
|
|
|
12-01-2010
|
1.00
|
Trimmed nuts to fit the strobe case
|
|
|
|
11-30-2010
|
2.00
|
Installed and epoxied nuts to hold aft strobe.
|
|
|
|
11-29-2010
|
3.00
|
Cut and fitted rudder bottom.
|
|
|
|
11-24-2010
|
2.00
|
Mounted the vertical stabilizer.
|
|
|
|
11-23-2010
|
2.00
|
Redriilled the elevator horns.
|
Details
|
|
|
11-22-2010
|
2.00
|
Removed the horizontal assembly
|
Details
|
|
|
11-16-2010
|
3.00
|
Redid floor brackets and adjusted pushrods for ele
|
|
|
|
11-15-2010
|
1.00
|
Drilled the elevator pushrod hole and it's off!!!
|
|
|
|
11-13-2010
|
1.00
|
Completed mounting the horizontal stab & elevator.
|
Details
|
|
|
11-12-2010
|
2.00
|
more sanding and filling of the tips - nearly done
|
|
|
|
11-12-2010
|
1.00
|
Completed mounting the horizontal stab & elevator,
|
Details
|
|
|
11-10-2010
|
2.00
|
more sanding and filling of the tips mainly pinhol
|
|
|
|
11-08-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
11-03-2010
|
1.00
|
replaced DB connector screws with knurelled hand o
|
|
|
|
11-03-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
11-01-2010
|
2.00
|
more sanding & flling of the Vertical & Rudder tip
|
|
|
|
10-13-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-12-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-11-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-07-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-07-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-06-2010
|
2.00
|
Drilled and slotted nosewheel fairing bracket
|
|
|
|
10-05-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-02-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-01-2010
|
2.00
|
more sanding & filling of the tips - rt elevator c
|
|
|
|
09-30-2010
|
3.00
|
more sanding and filling of the tips
|
|
|
|
09-29-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
09-26-2010
|
2.00
|
more sanding and filling and spraying with sandabl
|
Details
|
|
|
09-25-2010
|
4.00
|
more sanding and filling
|
|
|
|
09-24-2010
|
3.00
|
more sanding and filling and priming
|
|
|
|
09-23-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-21-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-20-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-19-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-18-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-17-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-17-2010
|
1.00
|
installed the pins in the pitch servo DB-9.
|
|
|
|
09-16-2010
|
3.00
|
yet more sanding and filling
|
|
|
|
09-15-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-13-2010
|
1.00
|
continued to fiberglass horizontal & verticalstabs
|
|
|
|
09-11-2010
|
2.00
|
sanded and filled vertical and horizontal
|
|
|
|
09-10-2010
|
6.00
|
Empennage finishing
|
Details
|
|
|
09-09-2010
|
2.00
|
more filling and sanding
|
|
|
|
09-08-2010
|
4.00
|
more filling and sanding
|
|
|
|
09-07-2010
|
2.00
|
More fililing and sanding
|
|
|
|
09-06-2010
|
2.00
|
Sanded and refilled Vetical Stab and left Horiz St
|
|
|
|
09-05-2010
|
3.00
|
Sanded the filled areas of the empennage and added
|
|
|
|
09-04-2010
|
3.00
|
Installed ruder cable farings and superfilled the
|
|
|
|
09-04-2010
|
2.00
|
Continued filling the open ends of the empennage c
|
|
|
|
09-03-2010
|
5.00
|
Continued empenagge work - superfiling, sanding, e
|
|
|
|
09-02-2010
|
2.00
|
Fabricated fiberglass overlays on top the foam ins
|
|
|
|
09-01-2010
|
4.00
|
Began fabricating closeout foam pieces inside the
|
|
|
|
08-31-2010
|
6.00
|
Continued tip installation
|
|
|
|
08-30-2010
|
4.00
|
Continued installation of fiberglass tips for hori
|
|
|
|
08-28-2010
|
4.00
|
Attached left horizontal stab and left elevator ti
|
|
|
|
08-27-2010
|
4.00
|
Completed aft bulkhead riveting, rudder cable clam
|
|
|
|
08-26-2010
|
2.00
|
Continued riveting the aft bulkhead.
|
|
|
|
08-25-2010
|
6.00
|
Finished drilling, reaming, deburring, the vertica
|
|
|
|
08-24-2010
|
4.00
|
Continued to adjust and secure the vertical stab.
|
|
|
|
08-23-2010
|
4.00
|
Vert stab work. Test fit on aircraft.
|
|
|
|
08-21-2010
|
4.00
|
Aligned, fitted, drilled, attach holes. Measured 0
|
|
|
|
08-20-2010
|
2.00
|
Laid out the underlying structure on the top of th
|
|
|
|
08-19-2010
|
3.00
|
Completed the installation of the aft tie down str
|
|
|
|
08-17-2010
|
2.00
|
Began to fit the horizontal stab. Test fit & meas
|
|
|
|
08-16-2010
|
3.00
|
Fabricated horizontal stabilizer shims. Began to
|
|
|
|
08-13-2010
|
3.00
|
Fabricated upper cowling pattern for skybolt faste
|
|
|
|
08-12-2010
|
3.00
|
Installed lower cowling hinge on fuselage side
|
|
|
|
08-10-2010
|
3.00
|
Trimmed more wires and tubes and laid them in the
|
|
|
|
08-09-2010
|
2.00
|
Fitted the rudder fairing and drilled the attach h
|
|
|
|
07-15-2010
|
3.00
|
Began laying in wires, tubes, etc. Cut the wing w
|
|
|
|
07-14-2010
|
3.00
|
Trial fit the upper fuselage and studied various o
|
|
|
|
07-13-2010
|
3.00
|
Continued upper fuselage work
|
|
|
|
07-12-2010
|
2.00
|
Coontinued upper fuselage work.
|
|
|
|
07-10-2010
|
3.00
|
Coiontinued upper fuselage work.
|
|
|
|
07-09-2010
|
4.00
|
Continued upper fuselage work.
|
|
|
|
07-08-2010
|
1.00
|
Continued bracket work.
|
|
|
|
07-07-2010
|
3.00
|
Continued bracket fabrication
|
|
|
|
07-06-2010
|
5.00
|
Continued fabricating and began drilling upper fus
|
Details
|
|
|
07-03-2010
|
4.00
|
Continued fabricating upper fuselage assembly brac
|
|
|
|
07-02-2010
|
3.00
|
Continued brake line installation & fabricated upp
|
|
|
|
07-01-2010
|
1.00
|
Began installing nylaflow brake lines
|
|
|
|
06-30-2010
|
1.00
|
Torqued Rudder and brake pedal bearings
|
|
|
|
06-17-2010
|
1.00
|
Removed and replaced all brake line fittings with
|
|
|
|
06-16-2010
|
2.00
|
Completed installation of L & R ailerons
|
|
|
|
06-15-2010
|
4.00
|
Installed left flap and fabricated 2 hinge pins
|
Details
|
|
|
06-14-2010
|
3.00
|
Installed right flap and fabricated 2 hinge pins.
|
|
|
|
06-13-2010
|
2.00
|
Fabrictaed and installed the hinge lock devices fo
|
|
|
|
06-12-2010
|
4.00
|
Completed installing AOA system in the left wing
|
|
|
|
06-09-2010
|
2.00
|
Torqued fuel tank bolts and aileron bellcrank bolt
|
|
|
|
06-08-2010
|
2.00
|
Provided cabling access in empenage
|
|
|
|
06-01-2010
|
2.00
|
Fitted autopilot wiring in wing and fuselage
|
|
|
|
05-31-2010
|
4.00
|
Fabricated and installed GPS antenna mounting brac
|
Details
|
|
|
05-28-2010
|
2.00
|
Fitted tubing for Pitot and AOA
|
|
|
|
05-26-2010
|
3.00
|
Fitted wires for L&R landing and taxiing lights
|
|
|
|
05-25-2010
|
1.00
|
Fitted strobe light wire in empennage
|
|
|
|
05-25-2010
|
2.00
|
Fitted srobe light wires in L&R wings
|
|
|
|
05-24-2010
|
5.00
|
Installed engine mount & rudder pedal bracket
|
Details
|
|
|
05-22-2010
|
3.00
|
Completed the hinge installation
|
|
|
|
05-21-2010
|
5.00
|
Nearing completion of the piano hinge installation
|
Details
|
|
|
05-20-2010
|
2.00
|
Continued piano honge work including making the re
|
|
|
|
05-19-2010
|
3.00
|
Continued lower cowl piano hinge installation
|
|
|
|
05-14-2010
|
1.00
|
Epoxied the 2 NACA vents in the forward fuselage
|
|
|
|
05-13-2010
|
4.00
|
an fabrication of lower cowl piano hinges
|
|
|
|
05-12-2010
|
2.00
|
Completed nutplate installation on baggage compart
|
|
|
|
05-11-2010
|
3.00
|
Installed baggage compartment floor nutplates
|
|
|
|
03-21-2010
|
2.00
|
Continued fabricating center console cover
|
|
|
|
03-20-2010
|
4.00
|
Began Fabricating center console cover
|
|
|
|
03-19-2010
|
4.00
|
Primed seat back parts
|
|
|
|
03-18-2010
|
2.00
|
Match drilled seat back parts to fuselage
|
|
|
|
03-17-2010
|
2.00
|
Created center console cardboard mockup
|
|
|
|
03-16-2010
|
2.00
|
Continued fabricating parts
|
|
|
|
03-15-2010
|
4.00
|
Continued seat back work
|
|
|
|
03-14-2010
|
2.00
|
Continued fabricating seat back parts
|
|
|
|
03-13-2010
|
4.00
|
Added lightening holes to the seat back plates
|
|
|
|
03-12-2010
|
3.00
|
Began fabricating seat back parts
|
|
|
|
03-11-2010
|
2.00
|
Completed priming center console
|
|
|
|
03-10-2010
|
3.00
|
Continued center console painting
|
|
|
|
03-09-2010
|
2.00
|
Center console painting continues
|
|
|
|
03-05-2010
|
4.00
|
Began painting center console parts
|
|
|
|
03-04-2010
|
1.00
|
Completed, painted battery box - installed recess
|
|
|
|
03-03-2010
|
2.00
|
Continued work on battery box
|
|
|
|
03-02-2010
|
2.00
|
Continued work on battery box fabrication
|
|
|
|
03-01-2010
|
4.00
|
Completed the eyeball pass thrus and began work on
|
|
|
|
02-27-2010
|
3.00
|
Firewall - Cabin Heat Valve
|
|
|
|
02-26-2010
|
2.00
|
Fuel System Tubing Fabrication
|
|
|
|
02-26-2010
|
2.00
|
Firewall - 3 Eyeball fittings installed in the fir
|
|
|
|
02-25-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-24-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-23-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-22-2010
|
2.00
|
Fuel System Fabrication
|
|
|
|
02-20-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-19-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-18-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-17-2010
|
2.00
|
Fuel System Fabrication
|
|
|
|
02-13-2010
|
2.00
|
Installed aft fuselage stiffener
|
|
|
|
02-09-2010
|
4.00
|
Fuel system fabrication
|
|
|
|
02-06-2010
|
2.00
|
Fuel System plumbing fabrication
|
|
|
|
01-23-2010
|
4.00
|
Trimmed bracket , pre installed and drilled the se
|
|
|
|
01-20-2010
|
1.00
|
Rear spar attach fittings are trimmed and shaped
|
|
|
|
01-20-2010
|
1.00
|
Began electric aileron trim installation
|
|
|
|
01-19-2010
|
3.00
|
Both steps are riveted in place and RTV seals it f
|
|
|
|
01-18-2010
|
3.00
|
Left step fitted, drilled and primed
|
|
|
|
01-17-2010
|
3.00
|
Right Step completed and primed and began work on
|
|
|
|
01-17-2010
|
2.00
|
Left step openings completed and left step bending
|
|
|
|
01-16-2010
|
2.00
|
Right step iis bent to conform and now drilled for
|
Details
|
|
|
01-15-2010
|
2.00
|
Continued with step installation
|
Details
|
|
|
01-14-2010
|
2.00
|
Continued Step Installation
|
|
|
|
01-07-2010
|
3.00
|
Cut externsl and internal holes, trimmed ribs, fit
|
|
|
|
01-06-2010
|
1.00
|
Began work on right step, removed baggage compartm
|
|
|
|
12-23-2009
|
2.00
|
Began work on the aileron trim system
|
Details
|
|
|
12-22-2009
|
2.00
|
Began assembly of fuel boost pump systems
|
|
|
|
12-19-2009
|
2.00
|
Fabricated and installed right brake line
|
|
|
|
12-18-2009
|
2.00
|
Fabricated left brake line and installed it
|
|
|
|
12-17-2009
|
1.00
|
Install the brake manifold bracket on the firewall
|
|
|
|
12-16-2009
|
3.00
|
Drill, bend and install the right fuel vent line
|
|
|
|
12-15-2009
|
3.00
|
Drill, Bend and install left fuel vent line
|
|
|
|
12-14-2009
|
1.00
|
Sand the first coat and paint the second coat
|
|
|
|
12-04-2009
|
4.00
|
Prepping for painting the cockpit (con't)
|
|
|
|
12-04-2009
|
1.00
|
Painted the first coat of the cockpit
|
|
|
|
12-03-2009
|
4.00
|
Prep cockpit interior for painting
|
|
|
|
11-21-2009
|
4.00
|
Completed fabrication of flap system components.
|
|
|
|
11-21-2009
|
2.00
|
Began left main gear mount fuselage thru bolt inst
|
|
|
|
11-20-2009
|
2.00
|
Primed flap control housing.
|
|
|
|
11-17-2009
|
2.00
|
Prepped and primed flap system parts.
|
|
|
|
11-14-2009
|
4.00
|
Continued fabrication of the flap system parts.
|
|
|
|
11-13-2009
|
4.00
|
Began fabrication of flap motor components.
|
|
|
|
11-09-2009
|
4.00
|
Completed fitting of left and right main gear moun
|
|
|
|
11-05-2009
|
2.00
|
Left main gear moount fitting is nearly complete.
|
|
|
|
11-04-2009
|
2.00
|
Began installation of main gear fittings. Cut lef
|
|
|
|
11-03-2009
|
2.00
|
Installed control mount fittings and bolted the pi
|
|
|
|
11-02-2009
|
2.00
|
Completed fabrication of bushings and reaming of c
|
|
|
|
10-15-2009
|
1.00
|
Installed static lines to ports & mountedthem to t
|
|
|
|
10-15-2009
|
5.00
|
Completed installation of crotch strap brackets.
|
|
|
|
10-10-2009
|
1.00
|
Riveted control rod ends onti pitch ontrol rods
|
|
|
|
10-10-2009
|
1.00
|
Began deburringedges of crotch seat belt retaining
|
|
|
|
10-09-2009
|
2.00
|
Prepped and primed interior of control rods.
|
|
|
|
10-09-2009
|
2.00
|
Completed static system tubing installation in aft
|
|
|
|
10-08-2009
|
2.00
|
Prepared hole patternand drilled rivet holes for p
|
|
|
|
09-11-2009
|
3.00
|
Completed rudder pedal assembly.
|
Details
|
|
|
09-07-2009
|
1.00
|
Installed rudder cables
|
Details
|
|
|
09-06-2009
|
1.00
|
Inserted bushings & adehereed the static ports wit
|
Details
|
|
|
09-04-2009
|
2.00
|
Continued working the pedals
|
Details
|
|
|
09-03-2009
|
2.00
|
Began work on the rudder/brake pedals
|
Details
|
|
|
08-29-2009
|
3.00
|
Began buildup of rudder pedal assembly
|
Details
|
|
|
08-25-2009
|
4.00
|
Powder coated rudder pedals
|
Details
|
|
|
08-24-2009
|
2.00
|
Drilled center rudder pedal assembly bearing
|
Details
|
|
|
08-23-2009
|
4.00
|
Completed dimpling of lower skin assembly
|
Details
|
|
|
08-22-2009
|
4.00
|
Drilling, deburing and dimpling
|
|
|
|
08-21-2009
|
2.00
|
Drilled, deburred wing skins, ribs and primed spar
|
Details
|
|
|
08-20-2009
|
1.00
|
Installed fuel sensors
|
Details
|
|
|
08-19-2009
|
2.00
|
Drilled, deburred, and dimpled lower Rtt wing skin
|
Details
|
|
|
08-09-2009
|
2.00
|
Prepared left wing for pitot tube/extension instal
|
Details
|
|
|
07-04-2009
|
2.00
|
Roll Servo Installation
|
Details
|
|
|
07-01-2009
|
2.00
|
Riveting the stiffeners
|
Details
|
|
|
06-29-2009
|
3.00
|
Continued the drilling, dimpling, and countersink
|
Details
|
|
|
06-16-2009
|
2.00
|
Fitting the aileron and flap gap and stiffeners.
|
Details
|
|
|
06-10-2009
|
2.00
|
Ailigning flaps and ailerons
|
Details
|
|
|
05-16-2009
|
5.00
|
Aiuleron brackets are completely installed.
|
Details
|
|
|
05-15-2009
|
2.00
|
Continued installing the aileron brackets.
|
|
|
|
05-14-2009
|
2.00
|
Rivited the aileron brackets together.
|
Details
|
|
|
05-13-2009
|
5.00
|
Completed the aileron bracket priming, bellcrank i
|
Details
|
|
|
05-12-2009
|
2.00
|
Reprimed the aileron brackets and mounted the fuse
|
Details
|
|
|
05-11-2009
|
2.00
|
Began conduit installation
|
Details
|
|
|
05-09-2009
|
1.00
|
Finished the priming and prepping of the Aileron b
|
Details
|
|
|
05-08-2009
|
2.00
|
Aileron Bracket work.
|
Details
|
|
|
05-01-2009
|
1.00
|
Riveted the end caps on each aileron to controlsti
|
Details
|
|
|
04-29-2009
|
1.00
|
Aileron Controls
|
Details
|
|
|
04-27-2009
|
3.00
|
Align Elevators
|
Details
|
|
|
04-21-2009
|
3.50
|
Roll the leading edges of the elevators
|
Details
|
|
|
04-16-2009
|
4.00
|
Nearing completion of left elevator
|
Details
|
|
|
04-15-2009
|
5.00
|
Trim tab/elevator attachment
|
Details
|
|
|
04-15-2009
|
0.00
|
Extra pictures of trim tab/elevator work
|
|
|
|
04-14-2009
|
2.00
|
Trim tab buildup
|
Details
|
|
|
04-13-2009
|
2.00
|
Began fitting of the left elevator trim tab
|
Details
|
|
|
04-12-2009
|
2.00
|
Rivet the left elevator
|
Details
|
|
|
04-11-2009
|
0.50
|
Begin to Rivet the left elevator
|
Details
|
|
|
04-10-2009
|
1.50
|
Bending the elevator and trim tab ends
|
Details
|
|
|
04-10-2009
|
0.50
|
Attaching 703/4 ribs to 702 spar
|
Details
|
|
|
04-08-2009
|
1.50
|
Pitch trim actuator
|
Details
|
|
|
04-05-2009
|
2.00
|
Redid the RT Elevator E-713 to skin junction
|
Details
|
|
|
04-04-2009
|
3.00
|
Began the left elevator understructure preparation
|
Details
|
|
|
04-03-2009
|
3.50
|
Almosr completed the RT elevator.
|
Details
|
|
|
04-02-2009
|
5.00
|
Completed the prep and began riveting the RT eleva
|
Details
|
|
|
04-01-2009
|
1.00
|
Drilling the RT elevator skin
|
Details
|
|
|
03-31-2009
|
4.00
|
Built the RT elevator understructure.
|
Details
|
|
|
03-30-2009
|
2.00
|
Bending of the elevator trailing edges and rivetin
|
Details
|
|
|
03-21-2009
|
2.00
|
Reinstalled Rudder Bearings and completed right el
|
Details
|
|
|
03-20-2009
|
2.00
|
The elevator skins were dimpled
|
Details
|
|
|
03-20-2009
|
2.00
|
Rudder trailing edge prepped for riveting
|
Details
|
|
|
03-19-2009
|
1.00
|
Continued deburring and dimpling
|
Details
|
|
|
03-17-2009
|
4.00
|
Elevator Stiffner drilling/deburring
|
Details
|
|
|
03-14-2009
|
4.00
|
Elevator stiffner construction
|
Details
|
|
|
03-12-2009
|
1.00
|
Stiffner fabrication
|
Details
|
|
|
03-10-2009
|
1.00
|
Continued Rudder Work
|
Details
|
|
|
03-04-2009
|
4.00
|
Riveting the rudder together
|
Details
|
|
|
03-03-2009
|
3.00
|
Continued building the rudder
|
Details
|
|
|
02-28-2009
|
6.50
|
Rudder skins and structure nearly ready for riveti
|
Details
|
|
|
02-27-2009
|
2.00
|
Cleco'ed Rudder skins to understructure
|
Details
|
|
|
02-26-2009
|
1.00
|
Back riveting the rudder stiffeners/skins
|
Details
|
|
|
02-24-2009
|
4.50
|
Rudder Fabrication continues
|
Details
|
|
|
02-23-2009
|
4.50
|
Rudder Fabrication
|
Details
|
|
|
02-20-2009
|
5.00
|
Completed Vertical Stabilizer
|
Details
|
|
|
02-19-2009
|
5.00
|
Vertical Stb
|
Details
|
|
|
02-18-2009
|
4.00
|
Completed rivitng the HS stab skins to the underst
|
Details
|
|
|
02-17-2009
|
4.00
|
Continue to rivet the skins on the HS and cut out
|
Details
|
|
|
02-16-2009
|
5.00
|
HS skin riveting
|
Details
|
|
|
02-10-2009
|
3.00
|
Began riviting the Left HS together
|
Details
|
|
|
02-09-2009
|
1.00
|
Riveting
|
Details
|
|
|
02-06-2009
|
1.00
|
Riveted the elevator hinge brackets and bolted on
|
Details
|
|
|
02-05-2009
|
5.00
|
Dimpled all the understructure and riveted the rea
|
Details
|
|
|
02-04-2009
|
2.00
|
DImpled the L & R Horiz Stab skins. I discovered
|
Details
|
|
|
01-28-2009
|
6.00
|
Disassembled and completed deburring, edge trimmin
|
Details
|
|
|
01-16-2009
|
3.50
|
Started and completed drilling and rib installatio
|
Details
|
|
|
01-15-2009
|
3.00
|
|
Details
|
|
|
01-14-2009
|
1.50
|
|
Details
|
|
|
01-10-2009
|
2.00
|
|
Details
|
|
|
01-09-2009
|
1.00
|
|
Details
|
|
|
01-08-2009
|
2.00
|
|
Details
|
|
|
01-08-2009
|
0.50
|
|
Details
|
|
|
01-07-2009
|
0.50
|
Trimmed fwd spar reenforcements to blend to skin.
|
Details
|
|
|
01-05-2009
|
2.00
|
Bent the fwd spars reenforcements and spar to 6 de
|
|
|
|
12-19-2008
|
2.00
|
Completed forrming and trimmimg horizontal stabili
|
|
|
|
12-16-2008
|
1.50
|
Fitted, drilled bearing attach brackets and center
|
Details
|
|
|
12-12-2008
|
2.00
|
Fitted, drilled, and sanded both rear spars
|
Details
|
|
|
11-06-2008
|
0.50
|
More pictures of the arrival
|
|
|
|
11-05-2008
|
0.50
|
Kit arrives from Van's
|
Details
|
|