John & Martha RV-9A
RV-9A
All
Work Logs Found:
210
Category Work Time:
599 Hours
Date
Hours
Work Log Summary
Details
10-12-2012
25.00
Canopy completed
Details
10-06-2012
25.00
Final canopy assembly
Details
07-09-2011
4.00
Battery Box
Details
07-02-2011
4.00
More aft skirt business
Details
07-01-2011
5.00
Canopy skirts. Plan B
Details
03-26-2011
4.00
Putting a curve in the aft skirts
Details
02-26-2011
4.00
Left aft canopy skirt
Details
02-19-2011
3.00
Canopy side skirts 2
Details
01-30-2011
5.00
Canopy side skirts
Details
01-23-2011
4.00
More canopy side skirts
Details
12-28-2010
3.00
Started canopy side skirts
12-27-2010
4.00
Anchor block and trimmed side rails
11-27-2010
3.00
Side rails
Details
11-26-2010
2.00
Canopy latch
Details
10-23-2010
4.00
Windshield
Details
10-10-2010
2.00
C-653 cover strip match drilled
Details
10-09-2010
4.00
Drilled front and rear frame bow
Details
09-20-2010
2.00
Drilled the centerline holes
Details
09-19-2010
3.00
More trimming and fitting
Details
09-13-2010
1.00
Started fitting the canopy
Details
09-12-2010
1.00
The big cut
Details
09-12-2010
2.00
Begin prep for the big cut
Details
09-11-2010
2.00
Canopy latch hole
Details
09-05-2010
2.00
Canopy bubble centerline
Details
09-04-2010
2.00
Adjusted the frame
Details
08-29-2010
3.00
Front canopy bow
Details
08-28-2010
3.00
Slide rail
Details
08-14-2010
2.00
Roll bar front brace
Details
08-08-2010
2.00
Roll bar mounting
Details
08-07-2010
2.00
Roll bar mounting spacers
Details
07-31-2010
4.00
Rudder bottom
Details
05-08-2010
1.00
Little helper
Details
04-24-2010
5.00
Elevator Tip
Details
04-16-2010
4.00
Finish kit arrives
Details
02-27-2010
2.00
Air vents
Details
02-20-2010
2.00
Cabin air vents
Details
01-31-2010
3.00
Secure brake lines
Details
01-23-2010
3.00
Installed brake lines
Details
01-09-2010
2.00
Landing gear mount bolt changes
Details
09-12-2009
3.00
Rudder cable fairings
Details
08-29-2009
4.00
Fitting the foward top skin
Details
08-09-2009
3.00
Fitting the foward top skin (continued)
Details
08-08-2009
2.00
Fitting the foward top skin (continued)
Details
07-03-2009
3.00
Fitting the foward top skin
Details
05-03-2009
3.00
Instrument and sub panel
Details
05-02-2009
3.00
Match drilled front deck
Details
03-01-2009
4.00
Front deck and sub-panel
Details
02-28-2009
4.00
Installing the front deck for slider canopy.
Details
01-20-2009
2.00
Fitting the foward top skin
Details
01-10-2009
2.00
Auto pilot pitch servo
Details
01-04-2009
1.00
Shoulder harness cables
Details
01-03-2009
2.00
Rudder cables
Details
11-11-2008
2.00
Tail mounting complete
11-10-2008
3.00
Mounting the vertical stabilizer
Details
11-09-2008
1.00
Rudder stops in place
Details
11-08-2008
3.00
Rudder stops
Details
10-21-2008
2.00
Fitting the rudder
Details
10-04-2008
2.00
Fitting the vertical stabilizer
Details
09-27-2008
5.00
Corrected F-912D
Details
09-14-2008
2.00
Up/down elevator travel limits
Details
09-13-2008
1.00
Made the F-912D Elevator stop
Details
09-13-2008
3.00
Installing the elevator pushrod
Details
09-06-2008
2.00
Fitting the HS
Details
08-12-2008
2.00
Fitting the empennage continued
Details
08-11-2008
2.00
Fitting the empennage continued
Details
08-10-2008
2.00
Fitting the empennage continued
Details
08-09-2008
2.00
Fitting the empennage
Details
05-18-2008
2.00
Step installation, left side complete
Details
05-18-2008
3.00
Step installation continued
Details
05-10-2008
3.00
Step installation
Details
04-23-2008
2.00
Fuel vent lines completed
Details
04-22-2008
5.00
Fuel vent lines
Details
04-20-2008
1.00
Fuel vents
Details
04-13-2008
2.00
Landing gear weldment complete
Details
04-12-2008
3.00
Landing gear weldment continued
Details
03-09-2008
2.00
Landing gear weldment continued
Details
03-08-2008
3.00
Landing gear weldment
Details
03-02-2008
2.00
Andair fuel selector valve completed
Details
03-01-2008
2.00
Andair fuel selector valve
Details
02-23-2008
3.00
Center section cover
Details
02-02-2008
2.00
Center tunnel cover
Details
01-27-2008
1.00
F-6114B&C cable wear blocks
Details
01-26-2008
1.00
F-712 bulkhead complete
Details
01-20-2008
1.00
F-712 bulkhead continued
Details
01-19-2008
2.00
F-712E tiedown
Details
12-31-2007
3.00
Parking brake valve bracket
Details
12-23-2007
2.00
Flap actuator installation complete
12-22-2007
2.00
Flap actuator installation
12-11-2007
2.00
F-635 elevator bellcrank
Details
12-08-2007
2.00
Control stick
Details
11-25-2007
2.00
Static lines continued
Details
11-24-2007
4.00
Static lines
Details
11-18-2007
2.00
Locating the rudder pedals
Details
11-17-2007
3.00
Rudder/brake pedals completed
Details
10-21-2007
3.00
Brake pedals
Details
10-17-2007
1.00
F-757 gusset
Details
10-17-2007
1.00
705 bulkhead is in place
Details
10-16-2007
1.00
Baggage floor platenut installed
Details
10-06-2007
6.00
Baggage floor
Details
09-29-2007
2.00
F-705 seat back supports
Details
09-23-2007
2.00
More work on the 705 bulkhead
Details
09-22-2007
3.00
Fuselage support
Details
09-19-2007
1.00
Removed F-705G angles
Details
09-19-2007
1.00
Flap bearing blocks
Details
09-17-2007
2.00
Bolt bolt torque checks
Details
09-16-2007
3.00
F-705 bulkhead inspection
Details
09-10-2007
1.00
F-904 bulkhead inspection
Details
09-10-2007
1.00
Cleanup and inspection
Details
09-09-2007
1.00
Start the fuselage
Details
09-08-2007
2.00
AOA ports
Details
09-06-2007
1.00
Leak test fuel tanks
Details
08-28-2007
1.00
More pitot line
Details
08-26-2007
2.00
Pitot line
Details
08-21-2007
3.00
More pitot tube mast
Details
08-20-2007
2.00
Install pitot tube mast
Details
07-29-2007
2.00
Closed the left wing fuel tank.
Details
07-29-2007
1.00
Closed the left wing fuel tank
Details
07-28-2007
2.00
Left wing fuel level sensor.
Details
07-09-2007
2.00
Landing light complete
Details
07-01-2007
2.00
Landing light continued
Details
06-30-2007
1.00
Duckworks landing light
Details
06-16-2007
3.00
Misc left wing work
Details
06-10-2007
2.00
Wiring conduit
Details
06-05-2007
1.00
Left wing gap farings (done)
Details
06-05-2007
1.00
Left wing gap farings (cont.)
Details
06-04-2007
1.00
Left wing gap farings (cont.)
Details
06-04-2007
2.00
Left wing gap farings
Details
05-27-2007
2.00
Left wing aileron brackets
Details
05-27-2007
1.00
Aileron pushrods
Details
05-26-2007
2.00
Left wing aileron brackets
Details
05-20-2007
2.00
Closed up the right fuel tank.
Details
05-19-2007
2.00
Right fuel level sender
Details
05-08-2007
2.00
Landing light installation
Details
05-07-2007
1.00
Landing light installation
Details
05-01-2007
1.00
Landing light installation
Details
04-30-2007
2.00
Landing light installation
Details
04-28-2007
2.00
Landing light installation
Details
04-24-2007
2.00
Landing light installation
Details
04-08-2007
1.00
Duckworks landing light
Details
04-07-2007
2.00
Wiring conduit installed
Details
04-06-2007
5.00
Wiring conduit
Details
04-04-2007
4.00
More right wing work.
Details
03-19-2007
1.00
Flap bracket bushing
Details
03-17-2007
3.00
Right wing gap farings
Details
03-15-2007
1.00
Right wing aileron bracket ( fixed )
Details
03-11-2007
2.00
Right wing aileron bracket
Details
03-10-2007
2.00
Right wing aileron and flap gap farings
Details
03-04-2007
3.00
Right wing aileron bracket
Details
03-04-2007
2.00
Right wing aileron bracket
Details
02-24-2007
2.00
Right wing aileron bracket
Details
02-20-2007
3.00
Right wing setup
Details
02-11-2007
3.00
Empennage is done ( almost )
Details
02-06-2007
2.00
Finishing the elevators
Details
02-06-2007
1.00
AN3 Bolt Holder
Details
02-05-2007
1.00
Left elevator trim servo
Details
01-28-2007
2.00
Left elevator counterbalance
Details
01-28-2007
2.00
Left elevator and trim servo
Details
01-27-2007
3.00
Left elevator trim tab
Details
01-26-2007
3.00
Left elevator
Details
01-03-2007
6.00
Left elevator trim tab
Details
12-29-2006
2.00
Left elevator trim tab
Details
12-27-2006
2.00
Left elevator trim tab
Details
12-27-2006
2.00
Left elevator trim tab
Details
12-24-2006
1.00
Left elevator trim tab
Details
12-23-2006
2.00
Left Elevator
Details
12-23-2006
1.00
Left Elevator
Details
12-16-2006
3.00
Left Elevator
Details
12-09-2006
4.00
Left Elevator
Details
12-06-2006
1.00
Left Elevator
Details
12-06-2006
2.00
Left Elevator
Details
12-05-2006
2.00
Left Elevator
Details
12-05-2006
1.00
Left Elevator
Details
12-03-2006
2.00
Left Elevator
Details
12-03-2006
2.00
Left Elevator
Details
11-29-2006
3.00
Left Elevator
Details
11-25-2006
3.00
Left Elevator
Details
11-19-2006
4.00
Right elevator
Details
11-18-2006
4.00
Right elevator
Details
11-18-2006
4.00
Right elevator
Details
11-18-2006
4.00
Right elevator
Details
11-12-2006
3.00
Right elevator
Details
11-04-2006
4.00
Right elevator
Details
11-04-2006
5.00
Right elevator
Details
10-29-2006
5.00
Right elevator
Details
10-28-2006
5.00
Right elevator
Details
10-28-2006
4.00
Right elevator
Details
10-16-2006
3.00
QB parts inventory
Details
10-10-2006
1.00
Quick Build kit arrives
Details
10-10-2006
1.00
Quick Build kit arrives
Details
10-07-2006
4.00
Right elevator
Details
09-17-2006
4.00
Left Elevator
Details
09-16-2006
3.00
Right elevator
Details
09-04-2006
5.00
Right elevator
Details
08-27-2006
3.00
Rudder
Details
08-27-2006
5.00
Rudder
Details
08-26-2006
4.00
Rudder
Details
08-08-2006
5.00
Rudder
Details
08-05-2006
4.00
Rudder
Details
08-01-2006
5.00
Rudder
Details
07-30-2006
4.00
Rudder
Details
07-30-2006
5.00
Rudder
Details
07-29-2006
5.00
Rudder
Details
06-20-2006
5.00
Vertical Stablizer
Details
06-20-2006
5.00
Vertical Stablizer
Details
06-11-2006
4.00
Vertical Stablizer
Details
05-29-2006
6.00
Horizontal Stabilizer
Details
05-24-2006
6.00
Horizontal Stabilizer
Details
05-15-2006
5.00
Horizontal Stabilizer
Details
04-30-2006
5.00
Horizontal Stabilizer
Details
04-29-2006
4.00
Horizontal Stabilizer
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
210
599
Canopy
29
128
Empennage
56
198
Firewall Foward
1
4
Fuselage
77
178
Miscellaneous
4
9
Tools
1
1
Wings
42
81