Work Logs Found: 42
Category Work Time: 232 Hours
 Date
Hours
Work Log Summary

Details

 09-29-2006
18.00
Wheel well sealant removal.
Details
       

 04-22-2006
12.00
Main landing gear assembly.
Details
       

 04-05-2006
8.00
EAS Sequenced Gear Door System
Details
       

 03-26-2006
8.00
Landing gear polishing.
Details
       

 02-21-2006
6.00
Control rod interior corrosion treatment.
Details
       

 12-09-2005
3.00
Control rod corrosion treatment.
Details
       

 11-16-2005
4.00
Horizontal to vertical tail reinforcement layups.
Details
       

 11-08-2005
3.00
Vertical tail layups applied.
Details
       

 11-07-2005
2.00
Empennage clean-up and prep.
Details
       

 11-06-2005
3.00
Horizontal tail repair - 2.
Details
       

 11-05-2005
2.00
Horizontal tail repair.
Details
       

 10-27-2005
2.00
Rudder removed from the vertical.
Details
       

 10-26-2005
10.00
Cutting table construction.
Details
       

 10-10-2005
10.00
Wing stands & rotisserie construction.
Details
       

 02-15-2005
45.00
Hangar work table construction.
Details
       

 03-26-2004
4.00
Remove from the jig and load into the truck!
Details
       

 03-25-2004
8.00
Canopy top skin installation.
Details
       

 03-24-2004
3.00
Vertical tail closeout.
Details
       

 03-24-2004
3.00
New canopy stiffener spar & ribs.
Details
       

 03-24-2004
4.00
Horizontal tail installation.
Details
       

 03-24-2004
3.00
Canopy bonding to the stiffener.
Details
       

 03-23-2004
4.00
Fuselage load pads installed in cockpit.
Details
       

 03-23-2004
4.00
Elevator counterweight installation.
Details
       

 03-23-2004
3.00
Elevator closeout.
Details
       

 03-22-2004
3.00
Fuselage & wing stub aligned in factory jig.
Details
       

 03-22-2004
2.00
Bonding fuselage to wing center section.
Details
       

 03-21-2004
3.00
Wing leading edges.
Details
       

 03-21-2004
3.00
Vertical tail & rudder closeout prep.
Details
       

 03-20-2004
4.00
Rudder counterweight installation.
Details
       

 03-19-2004
4.00
Sealing the wheel wells.
Details
       

 03-19-2004
4.00
Prepping the center wing section.
Details
       

 03-19-2004
4.00
Closing the right wing.
Details
       

 03-18-2004
4.00
Prep for closing the wings.
Details
       

 03-18-2004
8.00
Hysol on wing bonding surfaces.
Details
       

 03-18-2004
2.00
Closing the left wing.
Details
       

 03-17-2004
2.00
Horizontal tail leading edge.
Details
       

 03-16-2004
2.00
Smoke hood inserts & cockpit load pads.
Details
       

 03-16-2004
3.00
Closing the horizontal tail.
Details
       

 03-16-2004
3.00
Canopy hinge supports.
Details
       

 03-15-2004
4.00
Prepping the horizontal tail.
Details
       

 03-15-2004
2.00
Fitting the canopy stiffener.
Details
       

 03-15-2004
3.00
Canopy rollover.
Details
       