Chrigels RV8 Kit Log
RV-8
All
Work Logs Found:
93
Category Work Time:
1887 Hours
Date
Hours
Work Log Summary
Details
12-31-2020
600.60
Summary in 2020
Details
12-31-2019
178.00
Summary of 2019
Details
12-31-2018
130.70
Summary of 2018
Details
08-24-2018
174.90
Summary of 8 month work on the fuselage
Details
01-11-2018
81.70
First work on the fuselage
Details
11-02-2017
54.70
Wings almost finished except fibre-works
Details
06-06-2017
139.50
Summary of work on the wings
Details
02-20-2017
109.12
Summary of Work on the Wing
Details
12-08-2016
2.00
Final drilling of rear wing rips
Details
12-08-2016
8.00
Deburring wing rips and final drilling of rear rip
Details
12-06-2016
2.50
Deburring rear rips
Details
12-05-2016
3.55
rear rips
Details
12-02-2016
2.15
Wing jig final
Details
12-01-2016
6.80
Riveting of primed parts
Details
11-30-2016
0.60
Quick deburring
Details
11-28-2016
6.80
rear spar preparation
Details
11-24-2016
7.60
Rear spar and tie down
Details
11-22-2016
1.80
Hints and Tips from my advisor
Details
11-22-2016
3.60
Elevator horn final drill and inspection of empenn
Details
11-21-2016
4.50
Wing countersinking
Details
11-21-2016
0.00
Countersinking Mistake
Details
11-15-2016
4.50
Countersinking nutplates
Details
11-14-2016
0.30
Wing Jig
Details
11-14-2016
3.70
The wings...
Details
11-14-2016
4.12
HS skin cut out for the elevators
Details
11-08-2016
4.30
Building the wing jig
Details
11-07-2016
0.00
More pics elevator leading rolling
Details
11-07-2016
4.25
finishing the leading edges og the elevators
Details
11-01-2016
4.25
Mounting rudder to vertical stabilizer and interna
Details
10-18-2016
2.00
Reorganizing the workshop to be ready for the Wing
Details
09-27-2016
6.00
Finished left elevator and trim tab
Details
09-26-2016
3.00
Riveted left Elevator
Details
09-22-2016
3.40
Bending the left elevator trim edges
Details
09-20-2016
3.00
Trim motor mounting to E-616PP
Details
09-20-2016
3.00
Redesign of the wiring of the trim motor
Details
09-19-2016
5.50
Finishing the right elevator spar riveting
Details
09-13-2016
5.30
Right elevator dimpling and riveting
Details
09-12-2016
2.00
Riveting stiffeners to elevator skins and preparin
Details
09-12-2016
3.00
Riveting of the left elevator EET (E-615PP) to ski
Details
09-08-2016
4.00
Primed Elevator Parts labeled and dimpeled
Details
08-22-2016
2.30
Deburring Elevators
Details
08-18-2016
4.00
Deburring Elevator Skins and Stiffeners
Details
08-09-2016
2.00
HS Inspection and finishing HS riveting of resr sp
Details
06-29-2016
5.05
Riveting of the HS
Details
06-27-2016
0.80
HS clecoed and ready to be riveted
Details
06-16-2016
3.76
Alodining and priming HS front spar
Details
06-14-2016
9.75
Rudder blind riveting and remake of the HS front s
Details
06-13-2016
2.10
Forming of the rudder leading edge
Details
06-09-2016
3.30
Finished riveting the rudder and first wotk with R
Details
06-07-2016
3.48
Elevator stiffeners cutting and deburring
Details
06-06-2016
5.51
Vertical Stabilizer finished and started with the
Details
06-02-2016
6.75
Riveting of the HS front spar
Details
05-31-2016
2.00
Vertical Stabilizer ready for inspection
Details
05-31-2016
7.50
Riveting of the HS Rear Spar and Rips
Details
05-31-2016
2.00
HS Rear Spar riveting
Details
05-31-2016
2.00
Hinges
Details
05-31-2016
0.65
Bolts and torque
Details
05-30-2016
2.30
Vertical Stabilizer ready to rivet the skin
Details
05-30-2016
5.30
Riveting VS Rear Spar
Details
05-30-2016
3.00
Re-prime and riveting
Details
05-24-2016
3.00
Parts are primed!
Details
05-24-2016
3.15
Labeling primed parts
Details
05-24-2016
3.25
1st Rivet
Details
05-10-2016
3.00
Final Prep before priming
Details
05-03-2016
0.10
Replacement of the hinge brackets arrived from Van
Details
05-03-2016
3.50
Final Drilling of Rudder Skeleton and Skins
Details
05-02-2016
2.00
Cleaning Parts with acetone
Details
04-28-2016
2.00
Deburring all parts of the Rudder
Details
04-26-2016
4.50
Rudder deburring, dimpling and drilling
Details
04-21-2016
2.10
Started to work on the rudder
Details
04-21-2016
3.00
Finished the work on the SB 14-01-31
Details
04-19-2016
4.50
Horizontal Stabilizer skin holes deburred and dimp
Details
04-19-2016
0.50
Deburred and edge finished the BOLT GAGE tool from
Details
04-18-2016
5.00
Service Bulletin 14-01-31
Details
04-14-2016
1.00
Deburring
Details
04-12-2016
1.20
Short visit in the shop for surface smoothing
Details
04-11-2016
5.70
Final drilling of the Horizontal Stabilizer skins
Details
04-07-2016
6.10
Work on the Horizontal Stabilizer
Details
04-05-2016
4.00
Vert Stabilizer dimpled and ready for primer
Details
04-05-2016
1.90
Horizontal Stabilizer - first view
Details
04-04-2016
4.50
Vertical Stabilizer rips deburring and final drill
Details
03-14-2016
1.00
Deburring and straightening Parts of the Vertical
Details
03-07-2016
1.50
Mounted the engine on a engine stand
Details
03-04-2016
0.50
General thoughts about PRIMING
Details
03-03-2016
4.00
Assembling the Vertical Stabilizer
Details
02-29-2016
2.50
Advisor initial visit report
Details
02-01-2016
6.00
Started with the Wing Practice Project from vans
Details
01-28-2016
5.50
First Time working in the shop - Toolbox Project
Details
01-19-2016
6.00
Setting up the workshop
Details
01-16-2016
5.00
Moved the kit to the workshop
Details
08-08-2015
0.50
Tools ordered
Details
03-28-2015
1.00
Delivery of the Kit
Details
12-31-1969
130.72
Summary Fuselage 2018
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
93
1888
EAS Inspection
1
4
Empennage
57
193
Engine
1
2
Fuselage
6
1297
Miscellaneous
3
6
Practice Projects
2
12
Shop Supplies
2
11
Tools
2
1
Wings
19
362