KitLog pro

Powered By Kitlog Pro v2.0

Murlins Web Site
Work Logs Found: 546
Category Work Time: 1122 Hours
 Date
Hours
Work Log Summary

Details

 07-04-2015
1.00
Clean and test fit lens attach brackets
Details
     

 07-03-2015
3.00
Drill holes lens / wing
Details
       

 07-02-2015
2.50
Mark and cut Plexiglas lens
Details
       

 07-02-2015
4.00
Cut down reflector and rivet to size
Details
       

 07-01-2015
1.50
Make rib template and mark holes for drilling
Details
       

 07-01-2015
1.00
Drilled holes for lens install
Details
       

 07-01-2015
2.00
Drill holes for nut plates and rivet in place
Details
       

 07-01-2015
2.00
Cut out hole in wing for landing light
Details
       

 06-30-2015
3.00
Moved wing and marked for landing light cutout
Details
       

 06-27-2015
2.50
Installed, marked and drill new pitot mast
Details
       

 06-24-2015
1.50
Remove and re dimple #6 holes in access plate
Details
       

 06-19-2015
1.00
Mark and drill out pitot tube mast hole in wing
Details
       

 06-19-2015
1.50
Fit pitot mast and drill rivet holes
Details
       

 06-15-2015
4.00
Pushrod attach bolt nut not fitting
Details
       

 06-14-2015
2.00
Aileron hinge bracket, washer location
Details
       

 05-12-2015
3.00
Found welder and had new rod ends attached
Details
       

 05-03-2015
1.50
Finish fitting rod ends, prime pushrods
Details
       

 05-02-2015
1.00
New rod ends. sand/scuff down to fit in tubes
Details
       

 02-12-2015
1.00
Rivet rod ends to 917 pushrods
Details
       

 02-12-2015
3.00
Prep and prime rod ends
Details
       

 02-12-2015
1.00
Prep and prime large pushrods
Details
       

 02-12-2015
1.00
Assemble bell cranks - find / make parts
Details
       

 02-11-2015
3.00
Drill pushrod tubes / rod ends
Details
       

 02-11-2015
2.00
Construct jig / shelf for drill press
Details
       

 02-10-2015
3.00
Prime inside of aileron tubes
Details
       

 02-09-2015
1.00
Ream out brass bell crank bushing
Details
       

 02-09-2015
3.00
Mark and cut aileron pushrod assemblies
Details
       

 02-09-2015
1.00
Cut W917s to proper length
Details
     

 02-07-2015
2.00
Install rivets in right flap trailing edge
Details
       

 02-06-2015
3.00
Trailing edge rivets
Details
       

 02-05-2015
1.50
Place 426AD 3-3 rivets in trailing edge and rivet
Details

 02-05-2015
2.00
Cleco bottom skin to ribs / install TE wedge
Details
       

 02-05-2015
2.00
Attach and rivet bottom skin to spar
Details
       

 02-04-2015
2.50
Rivet nose skin / top skin / spar
Details
       

 02-04-2015
3.00
Attach top skin and nose skins. Rivet nose skins o
Details
       

 02-03-2015
2.00
Rivet ribs to spar
Details
       

 02-03-2015
0.50
Rivet nut plate to 906B and end rib
Details
       

 02-03-2015
1.00
Rivet Hinge assemblies to spar
Details
       

 02-02-2015
1.00
Rivet nose rib assemblies
Details
       

 02-02-2015
2.00
Dimple ribs and skins
Details
       

 02-02-2015
2.00
Clean with Acetone and prime skins, ribs, brackets
Details
       

 02-01-2015
3.00
Continue deburring and prepping for primer
Details
     

 01-31-2015
1.00
Deburr ribs, brackets, and prep for priming
Details

 01-30-2015
1.50
Disassemble and deburr left flap
Details

 01-30-2015
1.00
Attach and drill out FL-906B
Details
       

 01-29-2015
3.00
Attach nose skins and drill out holes
Details
       

 01-28-2015
1.50
Attach skins to ribs / attach nose skins
Details

 01-26-2015
1.00
Fabricate FL-906A bracket
Details
       

 01-26-2015
0.50
Drill and cleco hinge assemblies to spar
Details
     

 01-26-2015
1.00
Cleco FL-906 A and B to spar, Drill and cleco
Details
     

 01-25-2015
3.00
Restart building left flap
Details
       

 01-25-2015
1.50
Drill out and pop rivet bottom skin
Details
       

 01-24-2015
2.00
Rivet nose skin/ bottom skin to spar
Details
       

 01-24-2015
1.00
Cleco bottom skin to ribs and cleco trailing edge
Details
     

 01-23-2015
2.00
Set up flap for attaching bottom skin
Details
       

 01-22-2015
1.50
Rivet top skin to ribs
Details
       

 01-22-2015
1.50
Rivet nose skin / top skin/ spar
Details
       

 01-21-2015
2.00
Drill out and pop rivet nose skins
Details
       

 01-20-2015
1.50
Rivet inside nose rib and attach angles
Details
       

 01-19-2015
1.50
Rivet nose rib assemblies to spar
Details

 01-18-2015
0.50
Rivet nose ribs to flap spar
Details
       

 01-18-2015
0.75
Rivet flap hinge assemblies together
Details
       

 01-18-2015
2.00
Prep nose rib assemblies
Details
       

 01-18-2015
1.00
Dimple / CS and rivet nut plate to main rib
Details
       

 01-17-2015
0.50
Ream out nose rib/space/hinge bracket
Details
     

 01-17-2015
1.50
Prep and prime spar and trailing edge wedge
Details
     

 01-17-2015
2.00
Dimple Ribs and skins
Details
       

 01-16-2015
2.50
Countersink Spar and trailing Edge Wedge
Details
       

 01-15-2015
2.50
Mark, melt, and remove plastic from skins
Details
       

 01-15-2015
2.00
Deburr edges and holes, prep and prime inside skin
Details
       

 01-14-2015
2.50
Prep R flap components
Details
       

 01-13-2015
1.50
Disassemble R flap and prep parts
Details
       

 01-11-2015
1.00
Drill trailing edge and cleco to table
Details
       

 01-11-2015
1.50
Drill Leading edge ribs and skins to spar
Details
       

 01-11-2015
1.00
Attach nose skins
Details
       

 01-09-2015
1.00
Drill table for flap
Details
       

 01-09-2015
1.00
Drill bottom skin to workbench
Details
       

 01-08-2015
1.50
Begin / re start right flap
Details
       

 12-26-2014
12.00
Prime and begin assembly of Left Flap - need to re
Details

 11-11-2014
2.00
Drill trailing edge and top nose skin holes
Details
       

 11-11-2014
2.00
Drill out holes in top skin and bottom nose skin
Details
       

 11-08-2014
1.50
Drill and attach ribs and bottom skin to spar
Details
       

 11-08-2014
1.00
Cleco / Drill top skin to ribs
Details

 11-07-2014
3.50
Drill and cleco bottom skin to table
Details
       

 11-07-2014
1.50
Clamp FL 906 A & C to 903 spar and drill out holes
Details
       

 11-06-2014
1.00
Fabricate FL 906C L & R
Details
       

 11-06-2014
1.50
Assemble flap nose rib/brackets and drill to spar
Details
       

 11-05-2014
3.00
Fabricate FL 906A Left and right
Details
     

 11-04-2014
3.00
Lay out, clean up flap components
Details
     

 10-29-2014
3.00
Rivet nose skin / bottom skin / spar
Details
       

 10-29-2014
1.00
Install rivets, tape, back rivet, finish trailing
Details
       

 10-29-2014
1.00
Drill out aileron brackets 906 & 907 and install o
Details
       

 10-28-2014
1.00
Rivet nose skin/ top skin/ spar
Details
       

 10-28-2014
1.00
Pop rivet leading edge and flush rivet skin / nose
Details
       

 10-27-2014
4.00
Begin assembly of left aileron
Details

 10-26-2014
2.00
Countersink aileron spar, trailing edge wedge
Details
       

 10-25-2014
2.00
Install and drill trailing edge wedge
Details
       

 10-25-2014
0.75
Drill nose CB tube
Details
       

 10-24-2014
2.50
Start Left Aileron - nose skin and drill
Details
       

 10-23-2014
3.00
Drill and install A906 & A907 brackets
Details
       

 10-21-2014
1.00
Set flush rivets in trailing edge
Details
       

 10-20-2014
1.50
Rivet top and bottom skins to ribs
Details

 10-20-2014
1.50
Rivet top and bottom skin to spar
Details
       

 10-19-2014
1.50
Rivet ribs to spar, cleco skins to spar
Details
       

 10-19-2014
1.00
Make saddle fixture for aileron skin riveting
Details
     

 10-17-2014
2.00
Assembling the Aileron
Details

 10-16-2014
2.00
Dimple skins and ribs - prime nose skin
Details
       

 10-16-2014
2.00
Deburr, clean, prime, dimple R aileron parts
Details
       

 10-15-2014
2.00
Disassemble, deburr, CS, prime, dimple, R aileron
Details
       

 10-14-2014
1.50
Place and drill trailing edge wedge
Details
       

 10-14-2014
3.00
Flatten nose skin and drill holes rib/spar skins R
Details
       

 10-13-2014
3.00
Fit ribs and top and bottom skin to R aileron
Details
       

 10-13-2014
1.50
Drill holes in CB tube for R aileron
Details
       

 10-10-2014
4.00
Drill SS CB tube for left aileron
Details
       

 10-09-2014
3.00
Continue riveting stiffeners to skins
Details
       

 10-09-2014
3.00
Assemble Aileron Spar to Ribs
Details
       

 10-08-2014
2.00
Scuff and prime stiffeners
Details
       

 10-08-2014
1.00
Rivet stiffeners to aileron skins
Details
       

 10-08-2014
2.00
Pull outside plastic strips and dimple skins and s
Details
       

 10-07-2014
3.00
Recheck skin orientation, drill R skin, prime skin
Details
       

 10-06-2014
2.50
Drill and cleco aileron stiffeners
Details
       

 10-05-2014
1.50
Drill rivet holes in counterbalance tube
Details
       

 10-05-2014
3.00
A910 L & R stiffeners
Details
       

 10-04-2014
1.50
Fit mark and drill A909 counterbalance tube
Details
       

 10-04-2014
2.00
Begin Aileron layout / building
Details
       

 10-03-2014
5.00
Rivet fairings to spar and skin
Details
       

 10-03-2014
2.00
Mark fairings with rivet sizes, dimple holes, clec
Details
       

 10-02-2014
3.00
Fit, Drill, Deburr and prime flap and aileron gap
Details
       

 10-01-2014
8.00
Built 8' table needed to build flaps and ailerons
Details
       

 09-30-2014
2.50
Rivet 925 B & C to bracket and spar
Details
       

 09-30-2014
1.00
Attach and drill out flap and aileron gap fairings
Details
       

 09-29-2014
4.00
Fit and drill W925 B & C to flap brackets
Details
       

 09-28-2014
2.00
Rivet Middle Flap Bracket
Details
       

 09-28-2014
1.50
Rivet Inboard and out board flap hinge brackets
Details
       

 09-28-2014
1.50
Fit and drill W925A Flap Hinge Brackets
Details
       

 09-27-2014
2.00
Test fit first support angles
Details
       

 09-27-2014
2.00
Fabricate W925CL (3) and cut WW925BL (3)
Details
       

 09-26-2014
1.00
scuff and prime W-913 Aileron Bracket
Details
       

 09-26-2014
1.50
Rivet together W-913 then rivet to rear spar
Details
       

 09-25-2014
2.00
Fit W-913 and A-914
Details
       

 09-25-2014
1.50
Fabricate A 914 aileron control stop
Details
       

 09-25-2014
1.00
CS holes for flush rivets in W-913
Details
       

 09-24-2014
2.00
Put together aileron brackets and drill to rear sp
Details
       

 09-24-2014
1.50
Assemble W-914 and rivet to spar
Details
       

 09-20-2014
1.00
Rivet in J stringer
Details
       

 09-20-2014
1.00
Move wing off uprights to table
Details
       

 09-19-2014
2.00
Remove and reinstall tank bolts add torque marker
Details
       

 09-17-2014
1.25
Rivet trailing edge rivets
Details

 09-17-2014
1.50
Rivet remaining rib / skin / spar rivets
Details
       

 09-12-2014
5.00
Rivet skins to ribs
Details

 09-11-2014
0.25
Check torque on bolts attaching tank to spar
Details

 09-10-2014
1.00
Continue riveting inner wing skin to ribs/spar
Details
       

 09-07-2014
2.50
Riveting inner top skin to spar / ribs
Details
       

 09-07-2014
2.00
Rivet CS holes spar to rib under fuel tank
Details
       

 09-06-2014
1.00
Leak test left tank
Details

 09-06-2014
2.00
Fit fuel tank to spar
Details
       

 09-06-2014
1.00
Cleco top inboard skin / doubler to wing
Details
       

 09-05-2014
3.00
Setting remainder rivets (105) skin to spar
Details
       

 08-31-2014
1.00
Rivet LE skin to spar
Details
       

 08-31-2014
1.50
Finish last two LE ribs / spar rivets
Details
       

 08-30-2014
2.50
Re-fitting Leading edge and clecoing. Rivet ribs t
Details
       

 08-30-2014
1.50
Double checking all CS holes in main spar
Details
       

 08-26-2014
1.00
Test fit leading edge assembly
Details
       

 08-24-2014
2.00
Install stall warning bracket / vane system
Details
       

 08-23-2014
2.00
Prepare stall warning bracket
Details
       

 08-23-2014
0.75
Clean and Alodine CS rivet holes in spar
Details
       

 08-22-2014
2.00
Finish rivets in left LE
Details
       

 08-20-2014
1.00
Squeeze trailing edge of ribs to LE skin
Details
       

 08-20-2014
3.00
Begin riveting ribs to LE skin
Details

 08-19-2014
1.00
Re assemble ribs / skin left leading edge
Details
       

 08-15-2014
5.00
Prep skin and prime skin, inspection plate doubler
Details
       

 08-13-2014
1.00
Scuff and paint LE skin
Details

 08-08-2014
3.00
Dimple splice strip /ribs, install nut plates
Details
     

 08-06-2014
3.50
Clean and Prime splice plate, prime LE ribs
Details

 08-04-2014
2.00
CS outer skin holes, dimple skin attach holes
Details

 08-03-2014
2.50
Dimple rib holes and CS main spar holes
Details

 07-26-2014
2.00
Dimple top and bottom out wing skins
Details

 07-25-2014
2.00
Dimple access coot outs and install nut plates
Details
       

 07-24-2014
10.00
Prep and prime and dimple inner skins
Details

 07-23-2014
8.00
clean up top inner skin, dimple doubler, dimple st
Details
       

 07-22-2014
8.00
Prep and prime doubler, lower skins, stringers
Details

 06-07-2014
4.50
Set up and sealed in end ribs.
Details
       

 06-06-2014
2.00
Figure out plumbing for left tank
Details
       

 06-01-2014
5.50
Tanks seal / rivet interior tank ribs
Details
       

 05-31-2014
1.50
Tape off areas and re cleco ribs to skin
Details
       

 05-31-2014
1.50
Drill out and re-set (tank Sealant) 3 rivets on fi
Details

 05-30-2014
8.00

Details
       

 05-27-2014
5.00
Dimple tank skin - Fit & drill T410 to outer rib
Details
       

 05-26-2014
2.00
Finish ribs and stiffeners deburr and dimple
Details
     

 05-25-2014
2.00
CS holes and rivet nut plates for fuel sender
Details
       

 05-25-2014
1.00
Continue deburr and dimple tank ribs / skin
Details

 05-23-2014
1.00
Disassemble, deburr, and dimple ribs/ skin
Details
       

 05-23-2014
1.00
Create T-914 clips
Details
       

 05-21-2014
1.00
Dimple / countersink holes for nut plates in rib /
Details
       

 05-20-2014
1.00
Fit and drill fuel cap flange to tank skin
Details
       

 05-20-2014
1.00
Center and drill rivet holes using drain flange
Details
     

 05-19-2014
0.50
Mount and drill out rivet holes on T-407 stiffener
Details
       

 05-18-2014
1.00
assemble and fit fuel sender to t-708 access plate
Details
       

 05-17-2014
1.00
Clamp T-708 access plate and match drill to rib
Details
       

 05-16-2014
1.50
Cut the inboard rib with drill press and fly cut
Details
       

 05-14-2014
1.50
Mark holes on T-905, Drill, and match drill to rib
Details
       

 05-14-2014
0.50
Fit and back drill T-410 reinforcement plate
Details
       

 05-13-2014
2.00
Fabricate T-905 Tank Attach Angle
Details
       

 05-12-2014
2.00
Cut out and shape T-410 reinforcement plates
Details
       

 05-08-2014
1.00
Set flush rivets for spar nut plates
Details
       

 05-08-2014
1.00
Rivet nut plates to Attach Brackets
Details
       

 05-08-2014
1.50
Deburr and prime attach brackets
Details
       

 05-08-2014
2.50
CS the nut plate rivet holes in attach brackets
Details
       

 05-07-2014
0.50
trim and drill new inboard stiffener
Details
       

 05-07-2014
1.00
Remove attach brackets and baffle from tank
Details
       

 05-07-2014
1.50
Drill, attach K1000-3 nut plate to attach bracket
Details
       

 05-07-2014
1.25
Catch up on documenting work
Details

 05-06-2014
3.00
Countersink spar attach holes
Details
       

 05-01-2014
1.50
Remove tank assembly and drill all holes to final
Details

 05-01-2014
1.00
Drill inboard attach bracket holes and measure win
Details

 04-29-2014
2.00
Fit the tank to wing and drill out attach holes
Details
       

 04-29-2014
2.50
Cleco attach brackets to baffle and drill out
Details
       

 04-29-2014
2.00
Bevel overlap corner of wing skins
Details
     

 04-28-2014
1.00
Drill first holes in attach brackets
Details
       

 04-27-2014
0.50
Fit attach angles to rear baffle
Details

 04-26-2014
2.00
Fit ribs to fuel tank skin
Details
     

 04-26-2014
2.00
Fabricate T-911 stiffeners
Details
       

 04-24-2014
3.00
Fit leading edge to wing, fabricate W919 doubler s
Details
       

 03-29-2014
3.00
Build Leading Edge stand, assemble Left Leading ed
Details

 03-20-2014
0.50
Drill out remaining holes in J Stringer
Details

 03-20-2014
6.00
Drill out holes in bottom skins
Details
       

 03-19-2014
4.50
Make J Stringers - pulled out bottom skins
Details
       

 03-19-2014
1.50
Drilled in J Stringer and attached bottom skins
Details
       

 03-18-2014
1.00
Fitting wing walk doubler
Details
       

 03-18-2014
2.50
Attach left wing skins - Drill out
Details
       

 03-14-2014
10.00
Rebuild Wing frame and hang left wing
Details
       

 03-10-2014
5.00
Squeeze three flush rivets outboard rib to rear sp
Details
     

 03-09-2014
1.25
Rivet remaining 11 ribs to front spar with Jeanine
Details

 03-09-2014
2.00
Cleco ribs to right spars - prepare to rivet
Details
       

 03-09-2014
2.00
Cleco rear spar to ribs and squeeze rivets
Details
       

 03-08-2014
1.50
Continue riveting ribs to front spar
Details
       

 03-08-2014
1.50
Cleaned up right wing spars - rivets, countersink,
Details

 03-07-2014
1.50
Laid out and found parts for flap and aileron bra
Details
       

 03-06-2014
2.50
Set up and drive rivets on front LW spar
Details
       

 03-05-2014
3.00
Set first rivets - rear spar
Details
       

 03-05-2014
1.00
Check rivet / rib placement - counter sink last re
Details
       

 03-04-2014
1.50
Replacing nut plate rivets
Details
       

 03-04-2014
1.00
(re) attach primed wings to left spar(s)
Details
     

 03-03-2014
3.00
Drill out clean up and re-rivet nut plate rivets
Details

 03-02-2014
1.00
Inspected and replaced tall rivets on Left Spar
Details
       

 02-25-2014
2.00
Prep remaining 4 Left Wing Ribs and prime 6
Details
     

 02-24-2014
0.75
Prep Left Wing Ribs
Details

 02-23-2014
3.50
Disassemble Left Wing and mark ribs
Details

 02-22-2014
3.00
Wing spar prep - Right wing
Details
       

 02-22-2014
2.00
Scuffing right wing main ribs
Details
       

 02-21-2014
1.50
Drill out spar/rib rivet holes for right wing
Details
       

 02-20-2014
2.00
Setting up wing skeleton
Details
       

 02-20-2014
1.00
Set up and cleco ribs to right spar
Details

 02-20-2014
0.50
Drill out spar/rib holes left wing
Details
     

 02-19-2014
1.00
Make Aileron / Flap alignment tool
Details
       

 02-18-2014
0.50
Finish drilling out wiring holes
Details

 02-18-2014
1.00
Drill out wiring hole
Details

 02-14-2014
1.00
Continue deburr and flute ribs
Details
       

 02-13-2014
1.50
Deburr and flute W-910, 911, 912 wing ribs
Details
       

 01-30-2014
1.00
Deburr, Straighten and flute W-912 L ribs
Details

 01-29-2014
1.00
Straighten, flute, and fit left leading edge wing
Details
     

 01-29-2014
1.50
Flute, straighten, and test fit right leading edge
Details
       

 01-29-2014
1.00
Deburr and straighten / flute
Details
       

 01-28-2014
0.50
Adjust Right Wing tank ribs
Details

 01-26-2014
1.00
Set up to test fit right tank ribs
Details
       

 01-26-2014
2.00
Re Start wing rib process - read and document
Details
     

 01-26-2014
2.00
Fluting and straightening Wing Ribs
Details
       

 12-10-2013
1.50
Find, test fit, flap and aileron attach brackets
Details
     

 11-10-2013
2.00
Begin Fitting / Fluting Tank Ribs
Details
     

 10-21-2013
1.50
Rivet W 907 D & E to rear spars
Details
       

 10-20-2013
2.50
Cleco and rivet doublers to rear spars
Details
       

 10-17-2013
1.00
Prep and prime right rear spar
Details
     

 10-17-2013
1.50
Drill out clean up and countersink 907 B & C
Details
       

 10-11-2013
2.50
Prep , dimple and prime left rear spar
Details
       

 10-11-2013
1.50
Fit doublers, drill, deburr right rear spar
Details

 10-10-2013
4.00
Fit and mark, W907 B C D E, Counter sink , dimple
Details
       

 09-27-2013
1.50
Drill out match holes in left rear spar
Details
       

 09-26-2013
4.00
Begin rear spar assembly
Details
       

 09-25-2013
4.00
Rivet nut plates to tiedown, bolt tiedown to spar
Details

 09-25-2013
2.00
Continue with Left Spar Tie Down
Details
       

 09-24-2013
3.00
Rivet nut plates and bolt right tie down to spar
Details
       

 09-23-2013
1.50
Drill out, countersink, prime, and install K1000-4
Details
       

 09-23-2013
4.00
Clean up, drill, tie down bar
Details
       

 09-22-2013
2.00
Prep, rivet large nut plates to bottom right spar
Details
       

 09-21-2013
1.00
Prepare first set of rivet holes on bottom right s
Details

 09-20-2013
1.00
Continue riveting nut plates
Details

 09-17-2013
1.00
continue riveting nut plates to right spar
Details

 09-05-2013
1.00
Rivet Top right spar nut plates
Details

 08-31-2013
3.00
Rivet #6 and #8 nut plates to left bottom spar
Details
       

 08-29-2013
2.50
Cleco nut plates to right spar and Rivet
Details
       

 08-28-2013
0.50
Cleco nut plates to left spar (#6)
Details
       

 08-28-2013
1.00
clean and prime nut plate countersinks
Details
       

 08-18-2013
0.50
Cleanup overspray and re primed some holes
Details
     

 08-18-2013
1.00
Clean up holes and prime bottom of left spar
Details
       

 08-18-2013
1.00
Clean spar metal for priming
Details
       

 08-17-2013
1.50
Drill #8 screw holes, countersink all holes in Rig
Details
       

 08-16-2013
1.50
Countersink #8 screw holes for nut plates
Details

 08-14-2013
1.00
Drill out #19 (#8 screw) holes for nut plates

 08-13-2013
1.00
Prep to Drill out holes for #8 screw and #6 screw
Details
       

 08-07-2013
2.50
Drill and deburr left wing spar
Details

 08-06-2013
2.00
Drilled out holes on bottom right spar for nut pla
Details
       

 08-06-2013
2.00
Drill out and countersink nut plate holes
Details
       

 07-25-2013
3.00
Build frame / install posts for wing spar
Details
       

 07-03-2013
1.50
Fitting trim tab servo
Details
       

 06-20-2013
1.00
Re doing trim tab access plate
Details
       

 06-04-2013
2.00
Mark bracket location, drill holes for Trim Servo
Details
       

 06-02-2013
2.00
Trim lead counterweights and install on elevators
Details
       

 05-13-2013
0.50
Start trimming lead counterbalance weights
Details

 05-13-2013
0.75
Bend hinge for trim tab
Details
       

 05-04-2013
1.50
Deburr, cleco, rivet trim tab hinge to elevator
Details
       

 05-03-2013
1.50
Clamp and drill trim tab hinge to elevator
Details
       

 05-01-2013
1.50
Rivet hinge to trim tab
Details
       

 04-30-2013
1.50
Attach and drill holes in hinge
Details
       

 04-29-2013
1.00
Sand and epoxy trim tab foam wedges / ribs
Details
       

 04-29-2013
3.00
Rivet trim tab spar to bottom of trim tab skin
Details
       

 04-28-2013
1.50
Mount and rivet Control Horns to Trim Tab Skin
Details
       

 04-28-2013
1.25
Drill spar and skin to #40, dimple and countersink
Details
       

 04-28-2013
0.50
Drill out end holes in trim tab to #30 and dimple
Details
       

 04-27-2013
2.00
Trim Tab, bend ends,
Details
       

 04-26-2013
1.50
New trim tab control horns, mark, cut, and dimple
Details
       

 04-23-2013
1.00
Trim Tab Horn - Trim for electric Trim
Details
       

 04-23-2013
1.00
Construct Metal Bending Brake
Details
       

 04-17-2013
2.00
Begin constructing the Trim Tab.
Details
       

 03-29-2013
2.00
Drill bracket holes and fit elevators
Details
       

 03-28-2013
1.00
Make drill bushing
Details
       

 03-17-2013
0.50
Enlarge hinge hole to attach rod end bearings
Details
       

 03-15-2013
2.00
Build rod bearing install tool
Details
       

 03-12-2013
1.00
Rivet remaining skin / rib rivets
Details
       

 03-12-2013
1.50
Back rivet trailing edge of left elevator
Details
       

 02-20-2013
2.00
Deburr, elevator skin, countersink AEX, drill out
Details
       

 02-18-2013
1.00
Rivet the rib to elevator skin
Details
       

 02-18-2013
1.50
Mark and match drill AEX wedge to trailing edge
Details
       

 02-17-2013
1.50
Rivet bottom skin to trim tab spar
Details
       

 02-17-2013
0.50
Rivet bottom elevator skin to spar
Details
       

 02-16-2013
1.00
Rivet CB skin / rib spar
Details
       

 02-15-2013
2.00
Add / rivet support gusset between rib and trim sp
Details
       

 02-14-2013
2.00
Finish up tool box project
Details
       

 02-13-2013
3.00
Tool Box practice project from Vans Aircraft
Details
       

 02-11-2013
1.00
Rivet counterbalance assembly to E902 spar.
Details
       

 02-10-2013
2.50
Drill / dimple / countersink trim tab spar
Details
       

 02-09-2013
1.50
Rivet spar to top elevator skin - continue
Details
       

 02-09-2013
1.50
Backrivet stiffeners to bottom side of Elevator sk
Details
       

 02-08-2013
1.00
Rivet spar to top of elevator skin
Details

 02-08-2013
1.00
Remove control horn - installed WRONG. Reinstall
Details
       

 02-08-2013
1.00
Attach Elevator horn to spar
Details
       

 02-07-2013
1.50
Rivet E-903 and E-904 with AN470AD 4-4
Details
       

 02-07-2013
1.00
Rivet Doublers,, and root rib to spar
Details
       

 02-07-2013
2.00
Continue riveting stiffeners to top skin of left e
Details
       

 02-07-2013
1.00
Attach, drill out, rivet WD-605 left control horn
Details
       

 02-06-2013
1.50
Prime and rivet stiffeners to left elevator
Details
       

 02-05-2013
2.50
Rivet right elevator trailing edge
Details
       

 02-05-2013
1.00
Rivet last three rivets on trailing edge
Details
       

 02-04-2013
0.75
Prep and prime left elevator ribs and spar
Details

 02-04-2013
0.75
Clean up epoxy from holes and skin on right elevat
Details

 02-02-2013
2.00
Continue prepping the left elevator
Details

 02-01-2013
4.50
Left elevator disassemble deburr dimple
Details

 01-31-2013
2.75
Begin the left elevator
Details
       

 01-30-2013
1.25
Epoxy the trailing edge
Details
       

 01-30-2013
1.00
Countersink AEX wedge / dimple trailing edge
Details
       

 01-29-2013
0.75
Set up trailing edge to drill
Details
       

 01-29-2013
1.00
Rivet top of elevator skin to side ribs
Details
       

 01-29-2013
0.75
Drill holes in trailing edge / AEX
Details
       

 01-29-2013
0.50
Disassemble and dimple trailing edge
Details

 01-28-2013
3.50
Rivet ribs to right elevator skin
Details
     

 01-27-2013
2.00
Rivet stiffeners to bottom of E-901 skin
Details
       

 01-27-2013
0.50
Rivet CB assembly to spar
Details
       

 01-27-2013
0.75
Rivet bottom of elevator skin to spar
Details
       

 01-26-2013
2.00
Rivet spar to top skin
Details
       

 01-26-2013
2.00
Back rivet stiffeners to upper skin
Details
       

 01-25-2013
0.50
Set up to rivet E605 R to spar assembly
Details
       

 01-25-2013
1.00
Rivet reinforcement and nut plates to spar
Details
       

 01-25-2013
0.50
Rivet E-903 and E904 together
Details
       

 01-25-2013
2.00
Rivet CB skin to ribs
Details
       

 01-25-2013
0.50
Cleco stiffeners to upper skin
Details
       

 01-24-2013
3.00
Deburr, dimple, prime elevator skin
Details
       

 01-23-2013
3.00
Disassemble, deburr , dimple, prime
Details

 01-22-2013
4.00
Match drill Reinforcement plates and 906 rib to sp
Details

 01-22-2013
0.50
Deburr, prep and prime CB ribs and skin
Details
       

 01-21-2013
2.50
Fit and drill right counterbalance assembly
Details

 01-21-2013
0.50
Drill and dimple holes for E912 tip
Details
       

 01-20-2013
4.00
Clean, dimple, prime Stiffeners and Dimple Skin
Details
       

 01-18-2013
1.50
Fitting stiffener backing to skin before attaching
Details
       

 01-18-2013
3.00
Fit stiffeners to top skin
Details

 01-17-2013
1.50
Cut and deburr stiffeners
Details
       

 01-16-2013
2.00
Outlining sequence and trial fitting
Details
       

 01-16-2013
0.50
Mark up stiffeners
Details

 01-16-2013
1.00
attached angle aluminum to bench
Details
       

 01-07-2013
1.00
Clean up and prep for elevator reset
Details
       

 01-05-2013
2.00
countersink trailing edge wedge
Details
       

 12-27-2012
2.50
Fit trailing edge wedge and drill rivet holes
Details
       

 12-18-2012
1.50
Rivet skin to Elevator ribs
Details

 12-16-2012
2.00
Rivet ribs to elevator skin
Details
       

 12-10-2012
1.50
Blind rivet bottom skin to spar
Details
       

 12-10-2012
2.50
Attach counterbalance assembly to right elevator
Details
       

 12-09-2012
3.00
Rivet stiffeners to bottom of elevator skin
Details

 12-05-2012
4.00
Rebuilding right counterbalance assembly
Details
       

 12-02-2012
2.00
riveting spar to upper right elevator skin
Details
       

 12-01-2012
2.00
Rivet spar to new skin
Details

 11-24-2012
2.50
Stiffeners and start spar to skin
Details

 11-19-2012
1.00
Finish rivets on stiffeners to top skin
Details
       

 11-17-2012
2.00
Rivet top stiffeners to skin
Details
       

 11-12-2012
2.00
Prepped and primed inside right elevator skin
Details
       

 11-08-2012
4.00
Drill out top right elevator holes
Details
       

 11-07-2012
2.00
Top right stiffeners
Details

 11-06-2012
3.00
Fit and drill bottom right stiffeners
Details

 11-05-2012
4.00
Redoing right elevator -stiffeners and skin
Details
       

 10-24-2012
3.00
reorder right elevator skin and stiffeners
Details

 10-05-2012
3.00
Rivet stiffeners to bottom elevator skin
Details
       

 10-05-2012
1.50
Attach counterbalance assembly to elevator
Details
       

 10-04-2012
2.00
Rivet spar to top skin
Details
       

 10-04-2012
1.50
re prep bottom right elevator skin
Details
     

 10-03-2012
2.50
Rivet the Ribs and counterbalance skin
Details
       

 10-03-2012
3.50
rivet stiffeners to top right elevator skin
Details
       

 10-03-2012
1.00
Begin riveting the right elevator together
Details
       

 10-02-2012
2.50
Prime right elevator parts
Details
       

 10-01-2012
4.50
Disassemble right elevator and deburr and dimple
Details
       

 09-30-2012
5.00
Fitting elevator control horn to spar and rib
Details
       

 09-28-2012
1.00
Building counterbalance arms
Details
       

 09-27-2012
3.00
Start building the right elevator skeleton
Details
       

 09-27-2012
4.00
Building elevator counterbalance arms
Details
       

 09-26-2012
3.00
Building elevator counterbalance arms
Details
       

 09-25-2012
2.00
Start building counterbalance arms
Details
       

 09-25-2012
2.00
Match drill E-615PP nut plates and dimple
Details
       

 09-24-2012
2.00
Dimple left elevator skin
Details
       

 09-22-2012
2.00
Continue with Dimpling
Details
       

 09-20-2012
3.00
Scuff and dimple skins for stiffeners
Details

 09-19-2012
2.00
prime stiffeners
Details
     

 09-18-2012
2.00
begin dimpling stiffeners and skin
Details

 09-17-2012
2.00
Fit counterbalance ribs / skin to elevator skin
Details

 09-16-2012
3.00
Make 5 Lb sand bags
Details
       

 09-15-2012
2.00
Read plans / directions and figure out next steps
Details
       

 09-14-2012
2.50
De Burr stiffeners and skins
Details

 09-13-2012
3.50
Mark blue film and remove. Start deburring
Details
       

 09-12-2012
2.00
fit stiffeners to left elevator and drill out hole
Details
       

 09-11-2012
1.00
Fit stiffeners to left elevator skin
Details

 09-10-2012
3.50
deburr / smooth short stiffeners and fit to skin
Details
       

 09-09-2012
1.00
Mark and cut elevator stiffeners
Details
       

 09-05-2012
3.00
Cut and trim stiffeners for elevator skins
Details
       

 09-04-2012
2.00
Leading edge drill out and install rivets
Details
       

 09-04-2012
1.00
Layout elevator construction
Details

 08-30-2012
3.00
Continue with leading edge bend and clean up
Details
     

 08-29-2012
2.00
Work on leading edge, finish bend
Details

 08-27-2012
2.00
Adjust bend to leading edge of rudder
Details
       

 08-26-2012
1.00
Roll Bend the leading edges of rudder
Details

 08-26-2012
3.00
Finishing last three rivets on bottom aft skins
Details
       

 08-24-2012
3.00
Rivet Trailing edge
Details
       

 08-22-2012
1.50
Cleaned and scuffed trailing edge
Details
       

 08-21-2012
1.50
attach trailing edge to angle aluminum
Details
       

 08-19-2012
2.50
rivet left rudder skin to spar
Details

 08-16-2012
3.00
Remove and replace poor rivets
Details

 08-13-2012
4.50
rivet right rudder skin to bottom rib
Details

 08-12-2012
2.50
Rivet rudder skin to spar / bottom rib
Details
       

 08-12-2012
2.00
Continuing rivet rudder skin
Details
       

 08-11-2012
2.50
Rivet last three holes in tip rib
Details
       

 08-10-2012
2.50
Rivet the 903 tip rib
Details
       

 08-09-2012
3.50
Cleco skin to spar and rivet
Details
       

 08-06-2012
1.50
Install rudder counter weight
Details
       

 08-06-2012
1.00
continue with Riveting the Rudder
Details
       

 08-03-2012
3.00
Rivet rudder horn, and ribs to spar
Details
       

 07-31-2012
1.50
Rivet nut plates to spar/reinforcement plates
Details
       

 07-25-2012
1.50
clean up and touch up primer
Details
       

 07-25-2012
1.00
Begin riveting rudder nut plates to spar
Details
       

 07-21-2012
1.00
Dimple and countersink #10 Rudder Counterweight
Details
       

 07-21-2012
1.50
Countersink trailing edge strip
Details
       

 07-20-2012
2.00
Rudder Counterweight
Details
     

 07-19-2012
1.00
Fabricate dimple jig for tight holes
Details
       

 07-19-2012
1.50
Dimple hard to reach holes in R-903 Tip Rib
Details
       

 07-18-2012
2.50
Continue dimple and scuff
Details

 07-15-2012
3.00
Continue deburr and dimple
Details

 07-12-2012
1.00
Remove rudder skin and file out notch to rudder ho
Details
       

 07-12-2012
4.00
Drill holes in Rudder Skin attach rudder brace and
Details
       

 07-12-2012
1.00
Disassemble and start deburr / cleanup
Details
       

 07-11-2012
3.00
attach rudder skins - adjust fit
Details
       

 07-10-2012
2.00
Attach counterbalance skin and drill out holes
Details
       

 07-09-2012
1.50
Fit rudder spar reinforce plates and cntr balance
Details
       

 07-08-2012
2.00
building rudder Skelton
Details
       

 07-07-2012
1.00
building rudder skeleton
Details
       

 07-05-2012
4.00
install remaining rivets on rear spar
Details
       

 07-03-2012
3.00
rivet skin to VS front spar
Details
       

 07-03-2012
1.00
Finishing the Vertical Stabilizer
Details
       

 07-02-2012
5.00
back rivet stiffeners to skins
Details
       

 07-01-2012
2.00
dimpled and primed stiffeners and skins
Details
       

 06-29-2012
1.50
deburr stiffeners and skin
Details

 06-27-2012
6.00
Layout rudder skins and cut stiffeners
Details
       

 06-26-2012
1.00
5 rivets ribs to front spar
Details
       

 06-25-2012
2.50
continue dimpling and prep for primer
Details
       

 06-24-2012
2.00
Re doing front spars and ribs
Details

 05-07-2012
2.00
Finishing the Vertical Stabilizer
Details

 05-04-2012
1.00
countersink spar to match dimples
Details

 05-03-2012
2.00
Disassemble, Deburr, Dimple
Details

 05-01-2012
1.50
finish deburr and start dimpling

 04-30-2012
1.00
star deburr holes
Details

 04-29-2012
2.50
Continue working on Vert Stab
Details

 04-24-2012
5.00
Begin Vertical Stabilizer
Details

 04-15-2012
2.50
Rivet trailing edge of sin to rear spar
Details

 04-15-2012
1.00
Assemble inboard hinge bracket assembly
Details

 04-12-2012
4.00
Continue Skin to spar and starting skin to ribs
Details

 04-11-2012
1.00
Continue rivet the nose rib to skin
Details

 04-11-2012
3.00
Attach the right skin to main spar
Details

 04-04-2012
1.50
skin to front spar

 04-04-2012
2.00
rivet left H.S. skin to ribs Start right skin.
Details

 04-03-2012
4.00
Rivet intermediate ribs to front spar and install
Details

 04-03-2012
1.50
Cleco Nose ribs to left HS skin
Details

 04-02-2012
1.00
Prime inside of HS skins
Details

 04-01-2012
4.00
rivet elevator attach brackets
Details

 03-31-2012
1.00
Cleco & Rivet rear spar
Details
       

 03-30-2012
3.00
re cleco spars and rivet with doublers
Details
       

 03-30-2012
1.50
prime last three spars
Details

 03-29-2012
2.00
Prime parts
Details
       

 03-29-2012
2.00
Finish inventory of Bag 'o rivets
Details

 03-28-2012
5.00
Start Inventory of finish kit
Details

 03-27-2012
2.00
Continue to count rivets
Details

 03-26-2012
4.50
Start inventory on 15' box
Details

 03-25-2012
3.50
open and inventory Wing crate
Details

 03-25-2012
2.00
Continue inventory
Details

 03-24-2012
4.00
Check and Count Bag 'O Rivets
Details
       

 03-23-2012
7.00
Inventory Fuselage
Details
       

 03-22-2012
3.00
Received shipment
Details
       

 03-21-2012
3.00
countersink doubler and rear spars
Details

 03-18-2012
2.00
re dimple skins, dimple ribs
Details
       

 03-18-2012
2.00
countersink main spar skin attach holes
Details

 03-15-2012
0.50
Finish holes one inside rib set, main spar
Details

 03-15-2012
2.00
Dimple HS skins
Details
       

 03-14-2012
3.00
drill #40 holes in right HS
Details

 03-13-2012
2.00
set up right HS
Details

 03-13-2012
3.00
disassemble left HS and deburr
Details

 03-12-2012
2.50
Add rear spar, drill all holes to #40
Details

 03-08-2012
3.00
Fit Skins to jig
Details

 03-07-2012
3.00
deburr holes in spars, construct jig
Details

 03-06-2012
3.00
dis assemble, de burr, clean edges
Details

 03-05-2012
0.75
Drill 8 holes in each attach bracket to spar
Details
       

 03-05-2012
2.00
Cleco, Drill to #30, mark all ribs
Details
       

 03-04-2012
0.50
fabricate shims
Details
     

 03-04-2012
5.50
Drilling and attach 'Attach Angle'
Details
       

 03-02-2012
1.00
New front spars and doubler - cleco & drill
Details

 03-02-2012
2.50
Fabricate Attach Angles
Details
     

 02-27-2012
1.00
fabricate HS-909 Shims
Details
       

 02-27-2012
1.00
check fit and continue to cleco ribs
Details

 02-26-2012
0.50
verify attach bracket align
Details
       

 02-26-2012
3.00
Attached ribs and check fit - verify placement
Details
       

 02-24-2012
2.00
Prepare main ribs and Nose ribs
Details
       

 02-24-2012
4.00
Cleco Rear Spar together and attach Outboard Hinge
Details
       

 02-23-2012
6.00
final shape and fit attach angles to front spar
Details
       

 02-22-2012
1.50
cleco front spar and doubler
Details

 02-22-2012
3.00
Built additional table for Empennage Spar
Details
       

 02-22-2012
2.00
begin fabrication of attach brackets
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.