Date
|
Hours
|
Work Log Summary
|
Details
|
11-21-2018
|
0.00
|
|
Details
|
|
|
04-17-2018
|
0.00
|
RV 14A Emp and Wing Kit ordered!
|
Details
|
|
|
05-06-2017
|
5.00
|
Intake Manifold Issues
|
Details
|
|
|
04-09-2017
|
0.00
|
Flight Training
|
Details
|
|
|
03-26-2017
|
6.00
|
Center of Gravity / Weight and Balance
|
Details
|
|
|
03-25-2017
|
6.50
|
Fuel Flow Test
|
Details
|
|
|
03-15-2017
|
2.00
|
Replace Ground Wheels
|
Details
|
|
|
03-14-2017
|
2.00
|
Starting Checklist
|
Details
|
|
|
03-11-2017
|
2.00
|
Carpet installation
|
Details
|
|
|
03-10-2017
|
15.00
|
Seat pans / storage
|
Details
|
|
|
03-09-2017
|
2.00
|
Torque rotor head bolts & Compass Card
|
Details
|
|
|
03-09-2017
|
3.00
|
Exterior Wires, Antenna Coax, Data Plate
|
Details
|
|
|
03-08-2017
|
2.00
|
Wires, CHT wire, clean interior
|
Details
|
|
|
03-07-2017
|
3.00
|
Governor wiring, wire tying governor, swap fuel se
|
Details
|
|
|
03-06-2017
|
3.50
|
Misc. wire tying/cotter pining – tail rotor box,
|
Details
|
|
|
03-05-2017
|
1.50
|
Labeling and placards
|
Details
|
|
|
02-26-2017
|
4.00
|
Reinstall Drive Shaft
|
Details
|
|
|
02-19-2017
|
1.50
|
Install Transmission Breather Hose
|
Details
|
|
|
02-18-2017
|
2.50
|
Install Transmission fitting and Hose
|
Details
|
|
|
02-18-2017
|
2.50
|
Drain and Change Trans Fluid
|
Details
|
|
|
02-18-2017
|
1.50
|
Change Oil and Filter
|
Details
|
|
|
02-14-2017
|
0.00
|
Studying for Rotorcraft Add-On
|
Details
|
|
|
02-13-2017
|
0.00
|
Rotorcraft Add-on Status and History
|
Details
|
|
|
02-12-2017
|
3.00
|
Labeling for FAA
|
Details
|
|
|
02-11-2017
|
2.50
|
Remove TR Driveshaft
|
Details
|
|
|
02-06-2017
|
0.75
|
Transmission Breather
|
Details
|
|
|
02-06-2017
|
3.00
|
Seat panels / Headboard / Seat Installation
|
Details
|
|
|
02-06-2017
|
0.75
|
Ground Movement Wheel Issues
|
Details
|
|
|
02-06-2017
|
4.00
|
First Start-Up!!!!!!!!!
|
Details
|
|
|
02-06-2017
|
4.00
|
Control rigging
|
Details
|
|
|
02-05-2017
|
2.00
|
Wire, fuel, and Calibrate Fuel Tanks
|
Details
|
|
|
02-05-2017
|
2.00
|
Pitch Change Links
|
Details
|
|
|
02-05-2017
|
2.50
|
Misc. Prep Work
|
Details
|
|
|
02-05-2017
|
2.75
|
Main Rotor Blade Lead & Lag Adjustment
|
Details
|
|
|
02-05-2017
|
2.00
|
Main Rotor Blade Assembly
|
Details
|
|
|
02-05-2017
|
4.00
|
Hoisting and Installing Main Rotor Blades
|
Details
|
|
|
02-05-2017
|
2.00
|
Fuel Tanks and Tank Braces Installation
|
Details
|
|
|
02-04-2017
|
1.50
|
Transmission Tachometer and Temp gauge Installatio
|
Details
|
|
|
02-04-2017
|
3.00
|
Driveshaft Installation (Continued)
|
Details
|
|
|
02-04-2017
|
3.00
|
Bubble Installation
|
Details
|
|
|
02-04-2017
|
1.50
|
Antenna and Horizontal Stab Installation
|
Details
|
|
|
02-03-2017
|
8.00
|
Flu and Infection / Transmission Installation
|
Details
|
|
|
02-03-2017
|
4.00
|
Driveshaft Installation
|
Details
|
|
|
02-03-2017
|
3.00
|
Control Rods
|
Details
|
|
|
02-02-2017
|
2.00
|
Pick up Tom and Move Helicopter
|
Details
|
|
|
02-01-2017
|
2.00
|
Move Necessary Items to Hanger
|
Details
|
|
|
01-31-2017
|
5.00
|
Organize Hanger for Relocation
|
Details
|
|
|
01-30-2017
|
1.00
|
FAA Registration
|
Details
|
|
|
01-29-2017
|
1.50
|
Trim Motor Connection Redo
|
Details
|
|
|
01-28-2017
|
1.50
|
Headboard Wiring Inspection
|
Details
|
|
|
01-27-2017
|
2.00
|
Compass and Intake Filter Installation
|
Details
|
|
|
01-26-2017
|
3.00
|
3M Blade Tape Installation
|
Details
|
|
|
01-25-2017
|
2.50
|
Main Rotor Blade Striping
|
Details
|
|
|
01-25-2017
|
1.00
|
Heim Joint Spin-up and Painting of Pitch Links
|
Details
|
|
|
01-24-2017
|
1.50
|
Tail Rotor Blade Striping
|
Details
|
|
|
01-23-2017
|
2.50
|
Main Rotor Blade Grip Installation
|
Details
|
|
|
01-22-2017
|
1.00
|
Communication Antenna Coax Connection
|
Details
|
|
|
01-21-2017
|
2.00
|
Relocate Main Blades / Main Rotor Plug Modificatio
|
Details
|
|
|
01-21-2017
|
2.00
|
Main Rotor Blade End Plates
|
Details
|
|
|
01-20-2017
|
2.00
|
Transponder Temp Probe / TR Control Cable
|
Details
|
|
|
01-19-2017
|
0.50
|
APU Plug Repair
|
Details
|
|
|
01-18-2017
|
2.50
|
Install vertical stabilizer and comm antenna
|
Details
|
|
|
01-17-2017
|
4.00
|
Wire Bundling/Closed up console and floor
|
Details
|
|
|
01-16-2017
|
2.00
|
E-Mag placard/Carpet templates
|
Details
|
|
|
01-15-2017
|
3.00
|
Light for console switches/ TR cable clamps
|
Details
|
|
|
01-11-2017
|
4.00
|
Connect Aft Nav and Strobe light/Tail Boom Ground
|
Details
|
|
|
01-10-2017
|
4.00
|
Horiz. & Vert. Stabilizer Painting / Wire Mid-Boom
|
Details
|
|
|
01-09-2017
|
3.00
|
Install Tail Rotor
|
Details
|
|
|
01-08-2017
|
5.00
|
Reposition Cabin / Tube Seal Tail Boom / Transfer
|
Details
|
|
|
01-08-2017
|
5.00
|
Install Tail Boom (Continued)/ Mount Mid-Boom Beac
|
Details
|
|
|
01-07-2017
|
4.00
|
Winch Installation on Trailer
|
Details
|
|
|
01-06-2017
|
3.00
|
Non-Skid Shaping and Installation / OAT Probe Inst
|
Details
|
|
|
01-05-2017
|
5.00
|
Seatbelt Installation / Collective Tension Spring
|
Details
|
|
|
01-04-2017
|
3.50
|
Alternator Wiring / Starter Loop Wiring
|
Details
|
|
|
01-03-2017
|
4.50
|
E-Mag Wiring / Fan Indicator Light
|
Details
|
|
|
01-02-2017
|
4.00
|
Fuel Tank Cross Braces / Compass Dry Fit
|
Details
|
|
|
01-02-2017
|
2.00
|
Antenna Mount Fabrication
|
Details
|
|
|
01-01-2017
|
8.00
|
Mag Switch Wiring / Hanger Organization / Antenna
|
Details
|
|
|
12-31-2016
|
4.00
|
Oil Sender Switch Install (Continued)/ Power Up
|
Details
|
|
|
12-31-2016
|
2.50
|
East Coast Visit / APU Plug
|
Details
|
|
|
12-31-2016
|
4.50
|
Battery Installation / Ground Bus Connection / Bat
|
Details
|
|
|
12-22-2016
|
1.50
|
Starter Wiring
|
Details
|
|
|
12-22-2016
|
1.50
|
Landing Light Wiring
|
Details
|
|
|
12-21-2016
|
3.00
|
More Wiring
|
Details
|
|
|
12-20-2016
|
1.00
|
Horizontal Paint Scheme Design and Scheduling
|
Details
|
|
|
12-19-2016
|
2.00
|
Manifold Pressure Lines and Connections
|
Details
|
|
|
12-18-2016
|
4.00
|
Vertical Stabilizer
|
Details
|
|
|
12-17-2016
|
2.50
|
Fuel Tank Plumbing
|
Details
|
|
|
12-15-2016
|
2.50
|
E-Mag Fuses/Switches
|
Details
|
|
|
12-14-2016
|
3.50
|
Fuel Tank Wiring
|
Details
|
|
|
12-13-2016
|
2.00
|
Vinyl Lettering
|
Details
|
|
|
12-12-2016
|
5.00
|
Horizontal Stabilizer (Continued)
|
Details
|
|
|
12-10-2016
|
6.00
|
Horizontal Stabilizer
|
Details
|
|
|
12-09-2016
|
1.00
|
Transmission Supports
|
Details
|
|
|
12-08-2016
|
1.00
|
New “Experimental” Placard
|
Details
|
|
|
12-07-2016
|
1.50
|
Tail Rotor Cable Cover
|
Details
|
|
|
12-06-2016
|
1.50
|
Fuel Tank Strap Configuration and Installation
|
Details
|
|
|
12-04-2016
|
2.50
|
Lead Ballast Weight
|
Details
|
|
|
12-02-2016
|
1.50
|
Fuel Supply Elbow Connection and Tank Sumps
|
Details
|
|
|
12-01-2016
|
2.00
|
Fuel Tank Fill Collar and Cap
|
Details
|
|
|
12-01-2016
|
2.50
|
Fuel Sensor Probe Installation
|
Details
|
|
|
11-30-2016
|
2.00
|
Fuel Sensor Probe Sizing
|
Details
|
|
|
11-28-2016
|
4.00
|
Pitch Trim motor Installation and Trim Wiring
|
Details
|
|
|
11-27-2016
|
2.50
|
Grounding Bus and Wiring
|
Details
|
|
|
11-26-2016
|
1.00
|
Fuel Tank Saddles
|
Details
|
|
|
11-26-2016
|
1.50
|
CHT Probe Wiring
|
Details
|
|
|
11-24-2016
|
2.00
|
Tail Boom Wiring
|
Details
|
|
|
11-23-2016
|
4.00
|
Console Wiring and 2nd Master Bus
|
Details
|
|
|
11-22-2016
|
3.00
|
Transponder Installation
|
Details
|
|
|
11-21-2016
|
1.00
|
Pod Trim
|
Details
|
|
|
11-20-2016
|
4.50
|
Cyclic Wiring
|
Details
|
|
|
11-20-2016
|
2.50
|
Collective Wiring
|
Details
|
|
|
11-19-2016
|
2.00
|
Replace Manifold Elbow and Manifold Gauge Elbow Nu
|
Details
|
|
|
11-18-2016
|
2.50
|
Fuel Shut Off Lever and Navigation Lights
|
Details
|
|
|
11-17-2016
|
3.00
|
Headset Jacks
|
Details
|
|
|
11-16-2016
|
2.50
|
Headboard and Accessories
|
Details
|
|
|
10-16-2016
|
1.00
|
Upper Seatbelts
|
Details
|
|
|
09-27-2016
|
3.00
|
Cyclic Boots and Cabin Floor Carpet
|
Details
|
|
|
09-25-2016
|
2.50
|
Carburetor Mixture Arm Modifications
|
Details
|
|
|
09-24-2016
|
2.00
|
Mixture Selection Cable
|
Details
|
|
|
09-15-2016
|
1.50
|
Cabin Heat Cable Connection
|
Details
|
|
|
08-26-2016
|
1.50
|
Cyclic Gust Lock
|
Details
|
|
|
08-07-2016
|
1.50
|
Fuel Shut Off Lever Extension
|
Details
|
|
|
08-06-2016
|
2.00
|
Carb Heat Cable Connection
|
Details
|
|
|
08-01-2016
|
0.00
|
Air Venture 2016 Update
|
Details
|
|
|
07-02-2016
|
8.00
|
Happy Anniversary!!
|
Details
|
|
|
07-01-2016
|
2.50
|
Remaining Duct Work
|
Details
|
|
|
06-30-2016
|
2.50
|
Throttle Linkage
|
Details
|
|
|
06-26-2016
|
5.00
|
Valve Cover and Shroud Installation Preparation
|
Details
|
|
|
06-25-2016
|
12.00
|
Valve Cover Polishing
|
Details
|
|
|
06-19-2016
|
2.00
|
E-Mag Installation
|
Details
|
|
|
06-18-2016
|
2.00
|
Spark Plug Wire Installation and Routing
|
Details
|
|
|
06-12-2016
|
4.00
|
Carburetor Installation, Fuel Lines, CHT Probes
|
Details
|
|
|
06-04-2016
|
2.50
|
Carb Heat Connection
|
Details
|
|
|
06-01-2016
|
2.50
|
Carburetor Intake Fitting
|
Details
|
|
|
05-29-2016
|
3.50
|
Manifold Connection, Spark Plugs, Exhaust Installa
|
Details
|
|
|
05-28-2016
|
4.00
|
Intake Pipes, Oil Breather, Fuel Filter, Fuel/Oil
|
Details
|
|
|
05-24-2016
|
2.00
|
Sump connection, Cooler Hood Fasteners, Side Shro
|
Details
|
|
|
05-22-2016
|
3.00
|
Mount Carb Heat Box, Install Oil Sump, Connect Shr
|
Details
|
|
|
05-21-2016
|
3.00
|
Oil Cooler and Cooler Hood
|
Details
|
|
|
05-16-2016
|
3.00
|
More Engine Shroud and Oil Cooler Dry fit
|
Details
|
|
|
05-15-2016
|
2.50
|
Engine Shroud Install
|
Details
|
|
|
05-14-2016
|
1.50
|
Powder Coating
|
Details
|
|
|
05-10-2016
|
2.00
|
Safety Wire Tying
|
Details
|
|
|
05-08-2016
|
2.00
|
Engine Transfer
|
Details
|
|
|
05-07-2016
|
2.00
|
Engine Hoist & Bottom Shroud Penetrations
|
Details
|
|
|
05-01-2016
|
5.50
|
Engine Hoist, Firewall, Wheels
|
Details
|
|
|
04-30-2016
|
2.00
|
Counter Weight, Carb Heat Box, Air Intake Screen
|
Details
|
|
|
04-24-2016
|
9.00
|
Engine, Tanks, and Hanger
|
Details
|
|
|
04-20-2016
|
2.00
|
Oil Cooler Hood Complete
|
Details
|
|
|
04-17-2016
|
6.00
|
Oil Cooler Hood
|
Details
|
|
|
04-16-2016
|
0.00
|
Received Some Outstanding Parts From Safari
|
Details
|
|
|
04-10-2016
|
3.50
|
Carb Heat Box Complete
|
Details
|
|
|
04-09-2016
|
6.00
|
Carb Heat Box
|
Details
|
|
|
04-03-2016
|
2.00
|
Parts delays
|
Details
|
|
|
04-02-2016
|
2.00
|
Polishing
|
Details
|
|
|
03-27-2016
|
4.00
|
Oil Sump Cover
|
Details
|
|
|
03-22-2016
|
1.00
|
Final Dry Fit Assembly of the Engine Shroud
|
Details
|
|
|
03-21-2016
|
4.00
|
More Engine Shroud Nut Plating
|
Details
|
|
|
03-20-2016
|
8.00
|
Back in the World of Nut Plates…Oh Joy!
|
Details
|
|
|
03-19-2016
|
1.75
|
Engine Relocation to the Vertical Stand
|
Details
|
|
|
03-18-2016
|
1.50
|
Engine Shroud Cracks and Miss-drilling
|
Details
|
|
|
03-17-2016
|
2.00
|
Engine Shroud Assemblage
|
Details
|
|
|
03-16-2016
|
3.00
|
Engine Conversion Work
|
Details
|
|
|
03-13-2016
|
6.00
|
Torquing, Cotter Pinning, and Joint Painting
|
Details
|
|
|
03-10-2016
|
8.00
|
Instrument Panel and Pod Completion
|
Details
|
|
|
03-07-2016
|
23.00
|
Pod and cabin Wiring
|
Details
|
|
|
02-29-2016
|
3.00
|
Trailer work
|
Details
|
|
|
02-24-2016
|
3.00
|
Final Shipment Arrives!!!
|
Details
|
|
|
02-22-2016
|
1.50
|
Quick Assembly Snapshot
|
Details
|
|
|
02-21-2016
|
1.50
|
Black Steel Control Rods
|
Details
|
|
|
02-20-2016
|
2.00
|
Rear Control Rods
|
Details
|
|
|
02-18-2016
|
4.00
|
Control rods
|
Details
|
|
|
02-17-2016
|
2.00
|
Heim Joints
|
Details
|
|
|
02-16-2016
|
0.00
|
Remaining stages on the way to California!
|
Details
|
|
|
02-15-2016
|
2.50
|
Tach Gauge Wiring
|
Details
|
|
|
02-14-2016
|
2.00
|
Quad Gauge Wiring Harness
|
Details
|
|
|
02-13-2016
|
1.75
|
Wiring Indicator Lights Complete
|
Details
|
|
|
02-11-2016
|
3.00
|
Cyclic Grips and Controls
|
Details
|
|
|
02-10-2016
|
2.75
|
REALLY Beginning the Wiring Process
|
Details
|
|
|
02-07-2016
|
4.50
|
Collective Control Box
|
Details
|
|
|
02-05-2016
|
1.50
|
Cyclic Pitch Motor Installation
|
Details
|
|
|
02-04-2016
|
1.75
|
Continued Collective Friction Drama
|
Details
|
|
|
02-03-2016
|
2.00
|
Control Rod Clearance Issue Resolution
|
Details
|
|
|
02-02-2016
|
2.00
|
Control Rod Clearance Issue
|
Details
|
|
|
02-02-2016
|
3.50
|
Collective Friction – Cyclic Installation
|
Details
|
|
|
02-01-2016
|
2.00
|
More Pitch Motor and Panel Work
|
Details
|
|
|
01-31-2016
|
6.00
|
Governor – Pitch Trim – Transponder Antenna
|
Details
|
|
|
01-30-2016
|
9.00
|
Wiring & Roll Trim
|
Details
|
|
|
01-29-2016
|
3.50
|
Heat Levers – Battery Box – Switches
|
Details
|
|
|
01-28-2016
|
1.00
|
Exterior Power Plug
|
Details
|
|
|
01-27-2016
|
2.50
|
Tail Rotor Pedals
|
Details
|
|
|
01-26-2016
|
2.00
|
Remake interior left side panel
|
Details
|
|
|
01-25-2016
|
1.50
|
Remade switch labels
|
Details
|
|
|
01-24-2016
|
1.50
|
Pod / Floor / Console Installation
|
Details
|
|
|
01-24-2016
|
5.00
|
Mixture/Nav Lights/ Ext. Power/ Transponder/Pod Vi
|
Details
|
|
|
01-23-2016
|
6.00
|
Skids/Heater ducts/Pitot/Temp Gauge
|
Details
|
|
|
01-22-2016
|
5.00
|
Landing Skid Installation
|
Details
|
|
|
01-21-2016
|
2.00
|
Engine Hoist / Interior Panels / Pitot Installatio
|
Details
|
|
|
01-21-2016
|
2.00
|
Breaker/Switches Installed and Console Assembled
|
Details
|
|
|
01-20-2016
|
2.00
|
Labels Made and Warning Lights Installed
|
Details
|
|
|
01-19-2016
|
0.00
|
Cabin Back from Paint
|
Details
|
|
|
01-18-2016
|
3.00
|
Instrument Pod
|
Details
|
|
|
01-17-2016
|
0.00
|
EAA Electrical Workshop
|
Details
|
|
|
01-14-2016
|
0.00
|
Center Console Cutting and Paint
|
Details
|
|
|
01-13-2016
|
0.00
|
Cabin Paint Taking Shape
|
Details
|
|
|
01-11-2016
|
0.00
|
Black Exterior Coat
|
Details
|
|
|
01-10-2016
|
0.00
|
Paint Masking
|
Details
|
|
|
01-08-2016
|
0.00
|
First Coat of Color on the Cabin
|
Details
|
|
|
01-07-2016
|
0.00
|
Hanger Leasing
|
Details
|
|
|
01-06-2016
|
1.50
|
Painting and Baking the Instrument Panel
|
Details
|
|
|
01-05-2016
|
0.00
|
Interior Panels Back from Paint Shop
|
Details
|
|
|
01-04-2016
|
1.50
|
Panel Configuration and 15 Instrument DegreeTilt
|
Details
|
|
|
01-02-2016
|
2.00
|
Add GPS mounts to Instrument Panel
|
Details
|
|
|
12-27-2015
|
7.00
|
New Instrument Panel
|
Details
|
|
|
12-26-2015
|
2.00
|
Panel and Console Layout
|
Details
|
|
|
12-18-2015
|
2.00
|
Oversites and Repairs
|
Details
|
|
|
12-18-2015
|
0.00
|
Headed to the Paint Shop!
|
Details
|
|
|
12-17-2015
|
2.00
|
Cabin Riveting Continued
|
Details
|
|
|
12-16-2015
|
7.00
|
Cabin Riveting
|
Details
|
|
|
12-14-2015
|
3.00
|
Instrument Panel
|
Details
|
|
|
12-13-2015
|
10.00
|
Final Assemby for Cabin Paint
|
Details
|
|
|
12-06-2015
|
6.00
|
Panel Riveting and Assembly
|
Details
|
|
|
12-05-2015
|
3.00
|
Anti-CorrosionTtreatment of the Frame
|
Details
|
|
|
12-04-2015
|
6.00
|
Engine Conversion Stand
|
Details
|
|
|
12-03-2015
|
1.00
|
Remainder of Panels Painted
|
Details
|
|
|
12-02-2015
|
4.00
|
Instrument Panel
|
Details
|
|
|
12-01-2015
|
1.00
|
Painting Booth and Finished Panels
|
Details
|
|
|
11-29-2015
|
6.00
|
Sanding and Polishing of Skids Continued
|
Details
|
|
|
11-28-2015
|
8.00
|
Sanding and Polishing Skids
|
Details
|
|
|
11-24-2015
|
1.00
|
Boxing and Inventory of Panels
|
Details
|
|
|
11-22-2015
|
6.00
|
Panel Prep for Painting
|
Details
|
|
|
11-21-2015
|
6.00
|
Misc. Penetrations and Duct Prep.
|
Details
|
|
|
11-20-2015
|
1.50
|
Pitot Tube Installation
|
Details
|
|
|
11-13-2015
|
0.00
|
Safari Helicopters Inc. Visit - Florida
|
Details
|
|
|
11-08-2015
|
5.00
|
Instrument Panel Fabrication
|
Details
|
|
|
11-01-2015
|
2.00
|
Aft Kick Panel/Console Wiring Access
|
Details
|
|
|
10-31-2015
|
4.00
|
Lower Cabin Door Frame Cover
|
Details
|
|
|
10-30-2015
|
4.00
|
Lower Door Frame Cover Plate
|
Details
|
|
|
10-29-2015
|
1.50
|
Cabin Floor/Console Wiring Access
|
Details
|
|
|
10-25-2015
|
6.00
|
Canopy / Nav lights / Eyebrow Panel
|
Details
|
|
|
10-24-2015
|
7.00
|
Canopy Frame and Seat Belt Access
|
Details
|
|
|
10-18-2015
|
5.00
|
Pod Attachment
|
Details
|
|
|
10-17-2015
|
4.00
|
Securing Console to Floor Panel
|
Details
|
|
|
10-17-2015
|
2.00
|
Pod Attachment
|
Details
|
|
|
10-16-2015
|
3.00
|
Rivet Floor Access Panels
|
Details
|
|
|
10-15-2015
|
4.00
|
Second Cabin Floor Access Panel
|
Details
|
|
|
10-14-2015
|
1.50
|
First side of Floor Access Panel Complete
|
Details
|
|
|
10-11-2015
|
1.50
|
Prep and Riveting of Floor Access Panel
|
Details
|
|
|
10-10-2015
|
6.00
|
Floor Access Panel Installation
|
Details
|
|
|
10-09-2015
|
2.00
|
Finished Instrument Pod
|
Details
|
|
|
10-08-2015
|
1.50
|
Final Instrument Pod Fairing
|
Details
|
|
|
10-07-2015
|
2.00
|
Console Instrument Face Panel
|
Details
|
|
|
10-05-2015
|
3.00
|
Continued Instrument Pod Fairing
|
Details
|
|
|
10-01-2015
|
1.50
|
Pod Fairing Continued...
|
Details
|
|
|
09-30-2015
|
1.50
|
Instrument Pod Repair and Fairing
|
Details
|
|
|
09-29-2015
|
2.00
|
Instrument Pod Fairing
|
Details
|
|
|
09-28-2015
|
3.50
|
Console Fabrication Continued
|
Details
|
|
|
09-24-2015
|
6.00
|
Console Nut Plates
|
Details
|
|
|
09-20-2015
|
9.50
|
Center Console Continued....
|
Details
|
|
|
09-19-2015
|
8.00
|
Console Fabrication
|
Details
|
|
|
09-18-2015
|
6.00
|
Exterior Upper Bubble Panels
|
Details
|
|
|
09-17-2015
|
2.50
|
More Interior Progress
|
Details
|
|
|
09-16-2015
|
2.00
|
Interior Panel Reassembly
|
Details
|
|
|
09-14-2015
|
7.00
|
More Exterior Panel Work
|
Details
|
|
|
09-13-2015
|
0.00
|
Terraphobic!
|
Details
|
|
|
09-02-2015
|
5.00
|
Slowly Reassembling
|
Details
|
|
|
08-30-2015
|
2.50
|
Exterior Reassembly
|
Details
|
|
|
08-29-2015
|
7.50
|
Nut Plate State of Mind
|
Details
|
|
|
08-26-2015
|
2.00
|
Naked Frame....Once Again
|
Details
|
|
|
08-25-2015
|
0.50
|
Bubble Removal
|
Details
|
|
|
08-24-2015
|
3.00
|
Blind (pop) Rivet Removal
|
Details
|
|
|
08-23-2015
|
2.50
|
Interior Cabin Floor
|
Details
|
|
|
08-22-2015
|
4.00
|
Seat Panels and Cabin Floor
|
Details
|
|
|
08-21-2015
|
6.00
|
Seat panel fabrication
|
Details
|
|
|
08-18-2015
|
4.00
|
Headboard Modifications
|
Details
|
|
|
08-16-2015
|
8.00
|
Forward Progress!
|
Details
|
|
|
08-15-2015
|
8.50
|
Any further backwards and I'd have a tailstrike.
|
Details
|
|
|
08-14-2015
|
8.00
|
Fourth time is a charm
|
Details
|
|
|
08-04-2015
|
2.50
|
Right Interior Panel Refit
|
Details
|
|
|
08-03-2015
|
3.00
|
Pilot's collective well base panel assembly
|
Details
|
|
|
08-02-2015
|
7.00
|
Pilot Collective Well Rebuild
|
Details
|
|
|
08-01-2015
|
8.00
|
Copilot Collective Well Fabrication
|
Details
|
|
|
07-31-2015
|
3.00
|
Copilot Collective Well
|
Details
|
|
|
07-30-2015
|
3.00
|
Aft Kick Panel Fitting
|
Details
|
|
|
07-29-2015
|
5.00
|
Panel Mania....
|
Details
|
|
|
07-27-2015
|
4.00
|
Aft Kick Panel Layout
|
Details
|
|
|
07-26-2015
|
2.00
|
Back from Oshkosh! Co-pilot well panel
|
Details
|
|
|
07-16-2015
|
3.00
|
Left collective well panel fabrication
|
Details
|
|
|
07-15-2015
|
2.00
|
Left collective well panel template
|
Details
|
|
|
07-13-2015
|
4.00
|
Modify Floor and Kick Panels
|
Details
|
|
|
07-12-2015
|
5.00
|
Left Interior Panel Fabrication
|
Details
|
|
|
07-11-2015
|
8.00
|
Right Interior Panel
|
Details
|
|
|
07-10-2015
|
3.00
|
Kick Panel Fabrication and Floor Reinstallation
|
Details
|
|
|
07-09-2015
|
3.00
|
Kick Panel Fabrication
|
Details
|
|
|
07-08-2015
|
3.00
|
Sheetmetal Fabrication of Headboard Panel
|
Details
|
|
|
07-07-2015
|
3.00
|
Headboard Fabrication
|
Details
|
|
|
07-05-2015
|
2.00
|
Skid Gear Installation
|
Details
|
|
|
07-03-2015
|
3.00
|
She's in the shop and home at last
|
Details
|
|
|
07-02-2015
|
6.00
|
Delivery Day!
|
Details
|
|
|
07-01-2015
|
0.00
|
Empty Workshop Pre-helicopter
|
Details
|
|
|
06-25-2015
|
0.00
|
Ready to leave Florida.
|
Details
|
|
|
06-23-2015
|
0.00
|
Getting Ready for Shipping
|
Details
|
|
|
05-01-2015
|
0.00
|
Pre-powder coated Frame
|
Details
|
|