Powered By Kitlog Pro v2.0
HANSRUDOLF'S WEB SITE
BearHawk
All
Work Logs Found:
264
Category Work Time:
2030 Hours
Date
Hours
Work Log Summary
Details
07-06-2019
1.00
Practical Completion
Details
07-06-2019
2.00
Engine Installation on Aircraft
Details
06-30-2019
2.00
Wheel Axle and Brake Installation
Details
06-22-2019
1.00
Application of Registration Mark
Details
05-26-2019
8.00
Window Keepers
Details
05-19-2019
1.00
Fuel System Pressure Testing (2/2)
Details
05-19-2019
2.50
Fuel System Pressure Testing (1/2)
Details
05-17-2019
1.00
Upper Wing Strut Fairing (2/2)
Details
05-17-2019
2.00
Navigation/Wing Tip Installation
Details
05-13-2019
1.00
Windshield Fairing (2/2)
Details
05-13-2019
4.00
Windshiel Fairings (1/2)
Details
05-12-2019
3.00
Windshield Installation
Details
05-11-2019
2.00
Wing Root Vents
Details
05-11-2019
5.00
Windshield Bracing
Details
05-01-2019
12.00
Stabiliser Strut Modifications
Details
04-13-2019
2.00
Wing Root Cool Air Vent (2/3)
Details
04-04-2019
1.00
Wing Root Fuel System
Details
04-04-2019
3.00
Wing and Stabiliser Fairings
Details
03-09-2019
4.00
Windshield Top Fairing (1/2)
Details
03-07-2019
2.00
Lower Wing Strut Fairing (1/2)
Details
02-24-2019
4.00
Wing Root Fairings (1/2)
Details
02-24-2019
3.00
Landing Gear Fairing (1/2)
Details
02-23-2019
4.00
Windshield Post Fairing (1/2)
Details
02-02-2019
3.00
Windshield Fairing (2/3)
Details
01-27-2019
5.00
Windshield Fairing (1/3)
Details
01-21-2019
2.00
Wing Trailing Edge Fairing 1/2
Details
01-20-2019
1.00
Wing Trailing Edge Fairing 2/2
Details
01-20-2019
5.00
Windshield Installation 1/2
Details
01-20-2019
2.00
Stabiliser Root Fairings
Details
01-16-2019
8.00
Modification to Control Stick (2/2)
Details
01-15-2019
12.00
Modification to Control Stick (1/2)
Details
12-10-2018
4.00
Control Cables Tensioning
Details
12-02-2018
3.00
Aileron Control Cables
Details
11-25-2018
4.00
Wing Strut Fairings (1/2)
Details
11-04-2018
6.00
Wing Root Cool Air Vent (1/3)
Details
11-03-2018
3.00
Wing Attachment Alignment
Details
10-25-2018
3.00
Wings - Installation of Aileron Cable in Struts
Details
10-25-2018
4.00
Tail Wheel - Anti-Shimmy Spring
Details
10-20-2018
3.00
Flap Control - Pulley Cable guard
Details
10-15-2018
2.00
Fuel line beading
Details
10-07-2018
4.00
Wings: Wing Strut Installation 3/3
Details
10-04-2018
10.00
USB Charger for Nav iPad
Details
09-30-2018
3.00
Wings: Wing Strut Installation 2/3
Details
09-30-2018
3.00
Wings: Wing Strut Installation 1/3
Details
09-29-2018
2.00
Wings: Hanging of the Wings 3/3
Details
09-26-2018
3.00
Wings: Wing Strut Preparation
Details
09-16-2018
3.00
Wings: Hanging of the Wings 2/3
Details
09-15-2018
3.00
Wings; Hanging of the Wings 1/3
Details
07-16-2018
3.00
Modified Flap Handle
Details
07-15-2018
1.00
Modified Inspection Holes with windows
Details
06-23-2018
0.00
Wing Painting using the Stewart System 2/2
Details
06-23-2018
50.00
Wing Painting using the Stewart System 1/2
Details
06-22-2018
12.00
Wiring of wing components
Details
06-10-2018
8.00
Garmin GMU22 Installation
Details
06-09-2018
2.00
OAT Propbe installation
Details
05-25-2018
0.00
Wing Tip - Navigation Lights 2/2
Details
05-25-2018
16.00
Wing Tip - Navigation Lights 1/2
Details
05-23-2018
6.00
Rotisserie for wings
Details
05-19-2018
0.00
Fuselage Transport to Airfield 2/2
Details
05-19-2018
5.00
Fuselage Transport to Airfield 1/2
Details
03-03-2018
0.00
Gear Strut Penetration 2/2
Details
03-03-2018
8.00
Gear Strut Penetration 1/2
Details
01-21-2018
24.00
Preparation and painting of fuselage and cowl
Details
01-05-2018
0.00
Spraying Colour Top Coats 4/4
Details
01-05-2018
0.00
Spraying Colour Top Coats 34
Details
01-05-2018
0.00
Spraying Colour Top Coats 2/4
Details
01-05-2018
120.00
Spraying Colour Top Coats 1/4
Details
01-02-2018
8.00
Spinner and Backplates
Details
12-15-2017
24.00
Poly Spray - UV Protection
Details
12-05-2017
32.00
Finishing Tape and Gussets
Details
12-02-2017
24.00
PolyFibre Covering - Rib Stitching
Details
11-26-2017
24.00
PolyFibre Covering - Poly Brush Application
Details
11-25-2017
10.00
Engine Stand
Details
11-24-2017
8.00
Rotisserie for Fuselage Painting
Details
11-23-2017
3.00
Access and Inspection Holes
Details
11-14-2017
28.00
PolyFibre covering of fuselage / cabin bottom 4/4
Details
11-13-2017
4.00
PolyFibre covering of fuselage / cabin bottom 3/4
Details
11-13-2017
4.00
PolyFibre covering of fuselage / cabin bottom 2/4
Details
11-12-2017
8.00
PolyFibre covering of fuselage / cabin bottom 1/4
Details
11-02-2017
40.00
Polyfibre Covering Control and Flying Surfaces
Details
10-30-2017
4.00
Poly-Brush Preparation of ailerons and flaps
Details
10-29-2017
2.00
Pre-Covering Inspection of Aileron/Flaps
Details
10-28-2017
6.00
Vertical Stabiliser - False Rib
Details
10-25-2017
6.00
Balancing of Control Surfaces
Details
10-23-2017
6.00
Preparation of Fly Wires
Details
10-22-2017
1.00
Installation of ADF Antenna support bracket
Details
10-15-2017
14.00
Cabin Roof Lining
Details
10-03-2017
2.00
Seatbelt Attachment Points
Details
10-03-2017
4.00
Engine/Cabin Control Subpanel
Details
10-01-2017
4.00
Access and Inspection Covers
Details
09-21-2017
16.00
Seat Cushions and Covering 2/2
Details
09-17-2017
16.00
Seat Cushions and Covering 1/2
Details
09-15-2017
8.00
Painting of internal (visible) cabin struts
Details
09-13-2017
16.00
Cockpit - Skylight 2/2
Details
09-12-2017
8.00
Cockpit Roof - Skylight 1/2
Details
09-11-2017
4.00
Dashboard for Instrument Panel
Details
09-10-2017
7.00
Modified Front Floor Panels
Details
09-08-2017
3.00
Engine Control Cables
Details
09-06-2017
10.00
Port/Starboard Fuel Sighting Gauges
Details
09-05-2017
5.00
Static Port Installation
Details
07-24-2017
8.00
Electrical Wiring - Strobe & Transponder
Details
07-22-2017
12.00
Electrical Wiring - Wingroot
Details
07-21-2017
4.00
Modified IO-360 Air Intake - 5/5
Details
07-20-2017
4.00
Modified IO-360 Air Intake - 4/5
Details
07-18-2017
10.00
Modified IO-360 Air Intake - 3/5
Details
07-15-2017
12.00
Modified IO-360 Air Intake - 2/5
Details
07-08-2017
16.00
Modified IO-360 Air Intake - 1/5
Details
07-01-2017
15.00
Heating/Cooling System for Cabin - 3/3
Details
06-10-2017
15.00
Floor Board modifications
Details
06-05-2017
6.00
Auxilliary Fuel Pump - 2/2
Details
06-01-2017
14.00
Auxilliary Fuel Pump - 1/2
Details
04-24-2017
8.00
Front Window Framing
04-16-2017
10.00
Electrical Wiring - Cabling 2/2
Details
04-15-2017
10.00
Installation of Seat Belts - 2/2
Details
04-14-2017
6.00
Electrical Wiring - Cabling 1/2
Details
03-30-2017
3.00
Antenna Wiring - 4/4
Details
03-28-2017
4.00
Antenna Wiring - 3/4
Details
03-26-2017
6.00
Antenna Wiring - 2/4
Details
03-25-2017
2.00
Antenna Wiring - 1/4
Details
03-15-2017
6.00
Sensor Wiring - 2/2
Details
03-10-2017
12.00
Sensor Wiring - 1/2
Details
03-03-2017
10.00
Pneumatic System - 1/2
Details
03-01-2017
5.00
Electrical Wiring - General
Details
02-25-2017
120.00
Avionics - Wiring 2/2
Details
02-02-2017
10.00
Electrical Wiring - Firewall FWD
Details
11-30-2016
3.00
Heating/Cooling System for Cabin - 2/3
Details
11-26-2016
7.00
Heating/Cooling System for Cabin - 1/3
Details
10-25-2016
2.00
Avionics - Wiring 1/2
Details
10-20-2016
16.00
Avionics Bay
Details
10-18-2016
5.00
Instrument Panel - Construction 4/4
Details
10-10-2016
10.00
Instrument Panel - Construction 3/4
Details
10-05-2016
10.00
Instrument Panel - Construction 2/4
Details
10-01-2016
15.00
Instrument Panel - Construction 1/4
Details
09-17-2016
32.00
Instrument Panel - Design
Details
09-15-2016
8.00
Instrument Panel - Planning
Details
09-09-2016
24.00
Engine Control Panel
Details
09-02-2016
20.00
Seat Framing - 3/3
Details
08-25-2016
20.00
Seat Framing - 2/3
Details
08-20-2016
12.00
Rear Cargo Tube
Details
08-15-2016
16.00
Skylight above Front Seats
Details
08-10-2016
16.00
Installation of Seat Belts - 1/2
Details
07-20-2016
5.00
Cowl Flap 2/2
Details
07-15-2016
10.00
Cowl Flap 1/2
Details
06-10-2016
16.00
Electrical Wiring - Passenger Communication System
Details
05-15-2016
25.00
Oil Cooler Manifold and Support Bracket
Details
05-10-2016
20.00
Baffles - Magneto and Alternator Blast Tubes
Details
04-21-2016
8.00
Rear Window Framing 3/3
Details
04-18-2016
10.00
Rear Window Framing 2/3
Details
04-15-2016
15.00
Window/Door Framing 1/3
Details
04-10-2016
10.00
Engine Exhaust System 4/4
Details
03-31-2016
10.00
Engine Exhaust System 3/4
Details
03-18-2016
10.00
Engine Exhaust System 2/4
Details
03-15-2016
15.00
Engine Exhaust System 1/4
Details
03-05-2016
4.00
Engine Baffle Installation
Details
03-03-2016
10.00
Engine Baffle Installation
Details
03-01-2016
10.00
Engine Baffle Installation
Details
02-29-2016
5.00
Engine Baffle Installation
Details
02-28-2016
5.00
Engine Baffle Installation
Details
02-20-2016
15.00
Taxi and Landing Lights
Details
02-16-2016
10.00
IO-360 Air Intake
Details
02-10-2016
20.00
IO-360 Air Intake
Details
02-07-2016
8.00
IO-360 Air Intake
Details
02-06-2016
5.00
Cowl Blisters
Details
02-05-2016
5.00
Cowl Blisters
Details
02-03-2016
11.00
Cowl Blisters
Details
01-25-2016
1.00
Engine Cowl Side Panels
Details
01-23-2016
12.00
Engine Cowl Side Panels
Details
01-16-2016
10.00
Completed Top and Bottom Cowl
Details
01-10-2016
18.00
Seat Framing - 1/3
Details
01-05-2016
8.00
Side Rails and Top Cowl
Details
01-05-2016
7.00
Nose Bowl Installation
Details
01-05-2016
16.00
Cowl Bottom Installation
Details
01-05-2016
4.00
Bottom Cowl Rail Modification
Details
01-03-2016
8.00
Seatbelt Installation
Details
12-06-2015
15.00
Cargo Tube and Rear Bulkhead
Details
12-05-2015
4.00
Floor Carpets
Details
12-04-2015
4.00
Interior Wall Panel
Details
12-02-2015
6.00
Interior Wall Panel
Details
11-30-2015
10.00
Interior Wall Panels
Details
11-22-2015
8.00
Interior Wall Panels
Details
11-20-2015
8.00
Installation of Belly Panels
Details
11-19-2015
6.00
Side Panels below Floor frame
Details
11-14-2015
20.00
Fitting and installing boot cowl panels
Details
11-10-2015
3.00
Torquing and Checking Connections
Details
08-30-2015
10.00
Finishing Floorboards (Cover Plates)
Details
08-25-2015
2.00
Fuel Line from Selector Valve to Gascolator
Details
08-25-2015
1.00
Fuel Line from Gascolator to Forward of Firewall
Details
08-22-2015
10.00
Fuel line from Tee to Fuel Selector Valve
Details
08-18-2015
8.00
Installation of 3/8" Fuel Lines (Fwd)
Details
08-16-2015
2.00
Installation of 3/8" Fuel Line (Aft)
Details
08-14-2015
6.00
Installation of 3/8" Fuel Lines (Aft)
Details
07-24-2015
5.00
Brakeline in Undercarriage legs
Details
07-23-2015
3.00
Brakelines Parking brake to top of Leg
Details
07-15-2015
35.00
Brakelines Reservoir to Master Cylinders
Details
05-15-2015
2.00
Install Flap Control System
Details
05-09-2015
3.00
Fire Wall and Motor Mount
Details
04-22-2015
4.00
Installation of Flooring
Details
04-16-2015
2.00
Install Trim Wheel
Details
04-15-2015
2.50
Run Elevator Control Cables
Details
04-15-2015
2.00
Install Elevator Control Assembly
Details
04-12-2015
2.50
Run Rudder Control Cables
Details
04-12-2015
4.00
Installation of Rudder and Stabiliser
Details
04-12-2015
1.50
Install Brake System on Rudder Paddles
Details
04-11-2015
2.00
Rudder Control Installation
Details
04-11-2015
2.00
Installation of Control Stick Assembly
Details
04-08-2015
3.00
Tail Wheel Installation
Details
04-07-2015
4.00
Brake / Wheel Installation
Details
04-06-2015
1.00
Install Main Landing Gear
Details
04-05-2015
2.00
Assembly of Shock Struts
Details
04-04-2015
3.00
Assembly of shock struts
Details
04-03-2015
3.00
Moved Fuselage to Workshop
Details
03-20-2015
1.00
Completed Port Wing
Details
03-15-2015
1.50
Closing of trailing edge
Details
03-14-2015
2.00
Trailing Edge Stiffener
Details
03-12-2015
6.00
Closing of Wing Skin
Details
03-10-2015
1.00
Inspection Compliance
Details
02-25-2015
1.00
Completed Starboard Wing
Details
02-24-2015
1.50
Closing of trailing edge
Details
02-21-2015
2.50
Trailing Edge Stiffener
Details
02-18-2015
6.50
Closing of Wingskin
Details
02-16-2015
1.00
Inspection Compliance
Details
02-14-2015
2.00
First Inspection of Wing prior to Closing Wing Ski
Details
02-14-2015
2.00
First Inspection of Wing prior to Closing Wing Ski
Details
02-07-2015
3.50
Back rivet tank bay stiffener and topskin
Details
02-05-2015
3.00
Back rivet tank bay stiffener and topskin
Details
02-04-2015
3.00
Typical fuel line doublers for rib penetrations
Details
02-03-2015
6.00
Install Plumbing of Aux and Main Tank
Details
01-31-2015
3.00
Run conduit for Nav/Strobe lights, pump and pitot
Details
01-30-2015
2.00
Install main tank cover
Details
01-30-2015
3.00
Install inspection door frames and nut plates
Details
01-30-2015
3.50
Fabricate Aux tank cover
Details
01-28-2015
2.00
Finish flap and aileron
Details
01-28-2015
2.00
Finish flap and aileron
Details
01-26-2015
2.00
Cut hole in bottom skin for Aux tank
Details
01-25-2015
4.00
Install main fuel tank
Details
01-20-2015
3.00
Install flaps and aileron
Details
01-16-2015
2.00
Run aileron cables
Details
01-16-2015
3.00
Install pitot system
Details
01-15-2015
3.00
Install flap actuation system and flap springs
Details
01-15-2015
2.00
Install aileron bellcrank and pulleys
Details
01-10-2015
1.50
Initial Inspection of Wing
Details
01-10-2015
1.00
Check pre-installed bolts for length and torque
Details
01-09-2015
1.00
Tank Cover Plates
Details
01-09-2015
1.50
Plumbing of Main Fuel Tank
Details
01-09-2015
4.00
Installation of Electrical Conduits for Nav/Strobe
Details
01-09-2015
2.00
Fuel Transfer Line to Main Tank
Details
01-09-2015
2.00
Fuel line installation for fuel transfer to Main T
Details
01-08-2015
3.00
Installation of fuel lines
Details
01-05-2015
6.00
Inspection covers installation
Details
12-23-2014
3.00
Flap torque tube alignment and cable installation
Details
12-15-2014
6.00
Auxiliary tank installation
Details
12-12-2014
3.00
Rib doublers for fuel line penetrations
Details
12-11-2014
1.50
Flanging Tool for fuel line rib penetrations
Details
12-10-2014
3.00
Main tank installation
Details
11-13-2014
4.00
Tank straps and tensioners
Details
11-13-2014
2.00
Inner and outer control surface hinges
Details
11-13-2014
1.00
Inner and outer control surface hinges
Details
11-12-2014
3.00
Installed backribs at wing tip and root
Details
11-12-2014
4.00
Install aileron and flap on wing
Details
11-05-2014
1.00
Aileron wing pulley installation
Details
11-05-2014
3.00
Aileron actuator arm installation
Details
11-04-2014
5.00
Flap actuator arm and torque tube installation
Details
11-02-2014
3.00
Initial inspection of wings
Details
10-31-2014
2.00
BearHawk at storage facility in Sydney
Details
SITE NAVIGATION
Contact Builder
BearHawk Home
Category
# Logs
# Hours
All
264
2029
Airframe Practical C
1
1
Aux Fuel Pump
2
20
Avionics
17
277
Brake System
4
46
Cabin Fitout
2
22
Cockpit Roof
2
24
Colour Top Coats
4
120
Control Cables
4
27
Control Surfaces (Ai
1
6
Electrical Wiring
8
79
Empennage
6
35
Engine
2
10
Engine Control Cable
1
3
Engine Stand
1
10
Fairings and Gap Sea
10
31
Flap Control System
1
3
Fuel System
11
46
Fuselage
26
92
Fuselage Air Intake
7
76
Fuselage Cowl
12
94
Fuselage Fitout
7
55
Fuselage Floorboards
4
44
Fuselage Nosebowl
2
23
Fuselage Panels
8
84
Fuselage Rotisserie
1
8
Gear Legs
1
2
Gear Strut
2
8
Heating/Cooling Sys
6
35
Instrument Panel
2
8
IO 360 Sensor Wiring
2
18
IO-360 A1A Engine
11
124
Navigation Lights
3
18
None
1
2
Pneumatic Lines
2
15
Poly-Fibre Covering
11
194
Port Wing
23
60
Seat Belts
3
28
Seats
5
90
Starboard Wing
29
82
Window Framing
1
8
Windshield
4
13
Wing Painting
2
50
Wings
11
32
Wings - Fitout/Paint
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.