KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
Work Logs Found: 264
Category Work Time: 2030 Hours
 Date
Hours
Work Log Summary

Details

 07-06-2019
1.00
Practical Completion
Details
       

 07-06-2019
2.00
Engine Installation on Aircraft
Details
       

 06-30-2019
2.00
Wheel Axle and Brake Installation
Details
       

 06-22-2019
1.00
Application of Registration Mark
Details
       

 05-26-2019
8.00
Window Keepers
Details
       

 05-19-2019
1.00
Fuel System Pressure Testing (2/2)
Details
       

 05-19-2019
2.50
Fuel System Pressure Testing (1/2)
Details
       

 05-17-2019
1.00
Upper Wing Strut Fairing (2/2)
Details
       

 05-17-2019
2.00
Navigation/Wing Tip Installation
Details
       

 05-13-2019
1.00
Windshield Fairing (2/2)
Details
       

 05-13-2019
4.00
Windshiel Fairings (1/2)
Details
       

 05-12-2019
3.00
Windshield Installation
Details
       

 05-11-2019
2.00
Wing Root Vents
Details
       

 05-11-2019
5.00
Windshield Bracing
Details
       

 05-01-2019
12.00
Stabiliser Strut Modifications
Details
       

 04-13-2019
2.00
Wing Root Cool Air Vent (2/3)
Details
       

 04-04-2019
1.00
Wing Root Fuel System
Details
       

 04-04-2019
3.00
Wing and Stabiliser Fairings
Details
       

 03-09-2019
4.00
Windshield Top Fairing (1/2)
Details
       

 03-07-2019
2.00
Lower Wing Strut Fairing (1/2)
Details
       

 02-24-2019
4.00
Wing Root Fairings (1/2)
Details
       

 02-24-2019
3.00
Landing Gear Fairing (1/2)
Details
       

 02-23-2019
4.00
Windshield Post Fairing (1/2)
Details
       

 02-02-2019
3.00
Windshield Fairing (2/3)
Details
       

 01-27-2019
5.00
Windshield Fairing (1/3)
Details
       

 01-21-2019
2.00
Wing Trailing Edge Fairing 1/2
Details
       

 01-20-2019
1.00
Wing Trailing Edge Fairing 2/2
Details
     

 01-20-2019
5.00
Windshield Installation 1/2
Details
       

 01-20-2019
2.00
Stabiliser Root Fairings
Details
       

 01-16-2019
8.00
Modification to Control Stick (2/2)
Details
       

 01-15-2019
12.00
Modification to Control Stick (1/2)
Details
       

 12-10-2018
4.00
Control Cables Tensioning
Details
       

 12-02-2018
3.00
Aileron Control Cables
Details
       

 11-25-2018
4.00
Wing Strut Fairings (1/2)
Details
       

 11-04-2018
6.00
Wing Root Cool Air Vent (1/3)
Details
       

 11-03-2018
3.00
Wing Attachment Alignment
Details
       

 10-25-2018
3.00
Wings - Installation of Aileron Cable in Struts
Details
       

 10-25-2018
4.00
Tail Wheel - Anti-Shimmy Spring
Details
       

 10-20-2018
3.00
Flap Control - Pulley Cable guard
Details
       

 10-15-2018
2.00
Fuel line beading
Details
       

 10-07-2018
4.00
Wings: Wing Strut Installation 3/3
Details
       

 10-04-2018
10.00
USB Charger for Nav iPad
Details
       

 09-30-2018
3.00
Wings: Wing Strut Installation 2/3
Details
       

 09-30-2018
3.00
Wings: Wing Strut Installation 1/3
Details
       

 09-29-2018
2.00
Wings: Hanging of the Wings 3/3
Details
       

 09-26-2018
3.00
Wings: Wing Strut Preparation
Details
       

 09-16-2018
3.00
Wings: Hanging of the Wings 2/3
Details
       

 09-15-2018
3.00
Wings; Hanging of the Wings 1/3
Details
       

 07-16-2018
3.00
Modified Flap Handle
Details
       

 07-15-2018
1.00
Modified Inspection Holes with windows
Details
       

 06-23-2018
0.00
Wing Painting using the Stewart System 2/2
Details
       

 06-23-2018
50.00
Wing Painting using the Stewart System 1/2
Details
       

 06-22-2018
12.00
Wiring of wing components
Details
       

 06-10-2018
8.00
Garmin GMU22 Installation
Details
       

 06-09-2018
2.00
OAT Propbe installation
Details
       

 05-25-2018
0.00
Wing Tip - Navigation Lights 2/2
Details
       

 05-25-2018
16.00
Wing Tip - Navigation Lights 1/2
Details
       

 05-23-2018
6.00
Rotisserie for wings
Details
       

 05-19-2018
0.00
Fuselage Transport to Airfield 2/2
Details
       

 05-19-2018
5.00
Fuselage Transport to Airfield 1/2
Details
       

 03-03-2018
0.00
Gear Strut Penetration 2/2
Details
       

 03-03-2018
8.00
Gear Strut Penetration 1/2
Details
       

 01-21-2018
24.00
Preparation and painting of fuselage and cowl
Details
       

 01-05-2018
0.00
Spraying Colour Top Coats 4/4
Details
       

 01-05-2018
0.00
Spraying Colour Top Coats 34
Details
       

 01-05-2018
0.00
Spraying Colour Top Coats 2/4
Details
       

 01-05-2018
120.00
Spraying Colour Top Coats 1/4
Details
       

 01-02-2018
8.00
Spinner and Backplates
Details
       

 12-15-2017
24.00
Poly Spray - UV Protection
Details
       

 12-05-2017
32.00
Finishing Tape and Gussets
Details
       

 12-02-2017
24.00
PolyFibre Covering - Rib Stitching
Details
       

 11-26-2017
24.00
PolyFibre Covering - Poly Brush Application
Details
       

 11-25-2017
10.00
Engine Stand
Details
       

 11-24-2017
8.00
Rotisserie for Fuselage Painting
Details
       

 11-23-2017
3.00
Access and Inspection Holes
Details
       

 11-14-2017
28.00
PolyFibre covering of fuselage / cabin bottom 4/4
Details
       

 11-13-2017
4.00
PolyFibre covering of fuselage / cabin bottom 3/4
Details
       

 11-13-2017
4.00
PolyFibre covering of fuselage / cabin bottom 2/4
Details
       

 11-12-2017
8.00
PolyFibre covering of fuselage / cabin bottom 1/4
Details
       

 11-02-2017
40.00
Polyfibre Covering Control and Flying Surfaces
Details
       

 10-30-2017
4.00
Poly-Brush Preparation of ailerons and flaps
Details
       

 10-29-2017
2.00
Pre-Covering Inspection of Aileron/Flaps
Details

 10-28-2017
6.00
Vertical Stabiliser - False Rib
Details
       

 10-25-2017
6.00
Balancing of Control Surfaces
Details
       

 10-23-2017
6.00
Preparation of Fly Wires
Details
       

 10-22-2017
1.00
Installation of ADF Antenna support bracket
Details
       

 10-15-2017
14.00
Cabin Roof Lining
Details
       

 10-03-2017
2.00
Seatbelt Attachment Points
Details
       

 10-03-2017
4.00
Engine/Cabin Control Subpanel
Details
       

 10-01-2017
4.00
Access and Inspection Covers
Details
       

 09-21-2017
16.00
Seat Cushions and Covering 2/2
Details
       

 09-17-2017
16.00
Seat Cushions and Covering 1/2
Details
       

 09-15-2017
8.00
Painting of internal (visible) cabin struts
Details
       

 09-13-2017
16.00
Cockpit - Skylight 2/2
Details
       

 09-12-2017
8.00
Cockpit Roof - Skylight 1/2
Details
       

 09-11-2017
4.00
Dashboard for Instrument Panel
Details
       

 09-10-2017
7.00
Modified Front Floor Panels
Details
       

 09-08-2017
3.00
Engine Control Cables
Details
       

 09-06-2017
10.00
Port/Starboard Fuel Sighting Gauges
Details
     

 09-05-2017
5.00
Static Port Installation
Details
       

 07-24-2017
8.00
Electrical Wiring - Strobe & Transponder
Details
       

 07-22-2017
12.00
Electrical Wiring - Wingroot
Details
       

 07-21-2017
4.00
Modified IO-360 Air Intake - 5/5
Details
       

 07-20-2017
4.00
Modified IO-360 Air Intake - 4/5
Details
       

 07-18-2017
10.00
Modified IO-360 Air Intake - 3/5
Details
       

 07-15-2017
12.00
Modified IO-360 Air Intake - 2/5
Details
       

 07-08-2017
16.00
Modified IO-360 Air Intake - 1/5
Details
       

 07-01-2017
15.00
Heating/Cooling System for Cabin - 3/3
Details
       

 06-10-2017
15.00
Floor Board modifications
Details
       

 06-05-2017
6.00
Auxilliary Fuel Pump - 2/2
Details
       

 06-01-2017
14.00
Auxilliary Fuel Pump - 1/2
Details
       

 04-24-2017
8.00
Front Window Framing
       

 04-16-2017
10.00
Electrical Wiring - Cabling 2/2
Details
       

 04-15-2017
10.00
Installation of Seat Belts - 2/2
Details
       

 04-14-2017
6.00
Electrical Wiring - Cabling 1/2
Details
       

 03-30-2017
3.00
Antenna Wiring - 4/4
Details
       

 03-28-2017
4.00
Antenna Wiring - 3/4
Details
       

 03-26-2017
6.00
Antenna Wiring - 2/4
Details
       

 03-25-2017
2.00
Antenna Wiring - 1/4
Details
       

 03-15-2017
6.00
Sensor Wiring - 2/2
Details
       

 03-10-2017
12.00
Sensor Wiring - 1/2
Details
       

 03-03-2017
10.00
Pneumatic System - 1/2
Details
       

 03-01-2017
5.00
Electrical Wiring - General
Details
       

 02-25-2017
120.00
Avionics - Wiring 2/2
Details
       

 02-02-2017
10.00
Electrical Wiring - Firewall FWD
Details
       

 11-30-2016
3.00
Heating/Cooling System for Cabin - 2/3
Details
       

 11-26-2016
7.00
Heating/Cooling System for Cabin - 1/3
Details
       

 10-25-2016
2.00
Avionics - Wiring 1/2
Details
       

 10-20-2016
16.00
Avionics Bay
Details
       

 10-18-2016
5.00
Instrument Panel - Construction 4/4
Details
       

 10-10-2016
10.00
Instrument Panel - Construction 3/4
Details
       

 10-05-2016
10.00
Instrument Panel - Construction 2/4
Details
       

 10-01-2016
15.00
Instrument Panel - Construction 1/4
Details
       

 09-17-2016
32.00
Instrument Panel - Design
Details
       

 09-15-2016
8.00
Instrument Panel - Planning
Details
       

 09-09-2016
24.00
Engine Control Panel
Details
       

 09-02-2016
20.00
Seat Framing - 3/3
Details
       

 08-25-2016
20.00
Seat Framing - 2/3
Details
       

 08-20-2016
12.00
Rear Cargo Tube
Details
       

 08-15-2016
16.00
Skylight above Front Seats
Details
       

 08-10-2016
16.00
Installation of Seat Belts - 1/2
Details
       

 07-20-2016
5.00
Cowl Flap 2/2
Details
       

 07-15-2016
10.00
Cowl Flap 1/2
Details
       

 06-10-2016
16.00
Electrical Wiring - Passenger Communication System
Details
       

 05-15-2016
25.00
Oil Cooler Manifold and Support Bracket
Details
       

 05-10-2016
20.00
Baffles - Magneto and Alternator Blast Tubes
Details
       

 04-21-2016
8.00
Rear Window Framing 3/3
Details
       

 04-18-2016
10.00
Rear Window Framing 2/3
Details
       

 04-15-2016
15.00
Window/Door Framing 1/3
Details
       

 04-10-2016
10.00
Engine Exhaust System 4/4
Details
       

 03-31-2016
10.00
Engine Exhaust System 3/4
Details
       

 03-18-2016
10.00
Engine Exhaust System 2/4
Details
       

 03-15-2016
15.00
Engine Exhaust System 1/4
Details
       

 03-05-2016
4.00
Engine Baffle Installation
Details
       

 03-03-2016
10.00
Engine Baffle Installation
Details
       

 03-01-2016
10.00
Engine Baffle Installation
Details
       

 02-29-2016
5.00
Engine Baffle Installation
Details
       

 02-28-2016
5.00
Engine Baffle Installation
Details
       

 02-20-2016
15.00
Taxi and Landing Lights
Details
       

 02-16-2016
10.00
IO-360 Air Intake
Details
       

 02-10-2016
20.00
IO-360 Air Intake
Details
       

 02-07-2016
8.00
IO-360 Air Intake
Details
       

 02-06-2016
5.00
Cowl Blisters
Details
 

 02-05-2016
5.00
Cowl Blisters
Details
       

 02-03-2016
11.00
Cowl Blisters
Details
       

 01-25-2016
1.00
Engine Cowl Side Panels
Details
       

 01-23-2016
12.00
Engine Cowl Side Panels
Details
       

 01-16-2016
10.00
Completed Top and Bottom Cowl
Details
       

 01-10-2016
18.00
Seat Framing - 1/3
Details
       

 01-05-2016
8.00
Side Rails and Top Cowl
Details
       

 01-05-2016
7.00
Nose Bowl Installation
Details
       

 01-05-2016
16.00
Cowl Bottom Installation
Details
       

 01-05-2016
4.00
Bottom Cowl Rail Modification
Details
       

 01-03-2016
8.00
Seatbelt Installation
Details
       

 12-06-2015
15.00
Cargo Tube and Rear Bulkhead
Details
       

 12-05-2015
4.00
Floor Carpets
Details
       

 12-04-2015
4.00
Interior Wall Panel
Details
       

 12-02-2015
6.00
Interior Wall Panel
Details
       

 11-30-2015
10.00
Interior Wall Panels
Details
       

 11-22-2015
8.00
Interior Wall Panels
Details
       

 11-20-2015
8.00
Installation of Belly Panels
Details
       

 11-19-2015
6.00
Side Panels below Floor frame
Details
       

 11-14-2015
20.00
Fitting and installing boot cowl panels
Details
       

 11-10-2015
3.00
Torquing and Checking Connections
Details
       

 08-30-2015
10.00
Finishing Floorboards (Cover Plates)
Details
       

 08-25-2015
2.00
Fuel Line from Selector Valve to Gascolator
Details
     

 08-25-2015
1.00
Fuel Line from Gascolator to Forward of Firewall
Details
       

 08-22-2015
10.00
Fuel line from Tee to Fuel Selector Valve
Details
       

 08-18-2015
8.00
Installation of 3/8" Fuel Lines (Fwd)
Details
       

 08-16-2015
2.00
Installation of 3/8" Fuel Line (Aft)
Details
     

 08-14-2015
6.00
Installation of 3/8" Fuel Lines (Aft)
Details
       

 07-24-2015
5.00
Brakeline in Undercarriage legs
Details
       

 07-23-2015
3.00
Brakelines Parking brake to top of Leg
Details
       

 07-15-2015
35.00
Brakelines Reservoir to Master Cylinders
Details
       

 05-15-2015
2.00
Install Flap Control System
Details
       

 05-09-2015
3.00
Fire Wall and Motor Mount
Details
       

 04-22-2015
4.00
Installation of Flooring
Details
       

 04-16-2015
2.00
Install Trim Wheel
Details
       

 04-15-2015
2.50
Run Elevator Control Cables
Details
       

 04-15-2015
2.00
Install Elevator Control Assembly
Details
       

 04-12-2015
2.50
Run Rudder Control Cables
Details
       

 04-12-2015
4.00
Installation of Rudder and Stabiliser
Details
       

 04-12-2015
1.50
Install Brake System on Rudder Paddles
Details
       

 04-11-2015
2.00
Rudder Control Installation
Details
       

 04-11-2015
2.00
Installation of Control Stick Assembly
Details
       

 04-08-2015
3.00
Tail Wheel Installation
Details
       

 04-07-2015
4.00
Brake / Wheel Installation
Details
       

 04-06-2015
1.00
Install Main Landing Gear
Details
       

 04-05-2015
2.00
Assembly of Shock Struts
Details
       

 04-04-2015
3.00
Assembly of shock struts
Details
       

 04-03-2015
3.00
Moved Fuselage to Workshop
Details
     

 03-20-2015
1.00
Completed Port Wing
Details

 03-15-2015
1.50
Closing of trailing edge
Details

 03-14-2015
2.00
Trailing Edge Stiffener
Details

 03-12-2015
6.00
Closing of Wing Skin
Details

 03-10-2015
1.00
Inspection Compliance
Details
     

 02-25-2015
1.00
Completed Starboard Wing
Details
     

 02-24-2015
1.50
Closing of trailing edge
Details
       

 02-21-2015
2.50
Trailing Edge Stiffener
Details
       

 02-18-2015
6.50
Closing of Wingskin
Details
       

 02-16-2015
1.00
Inspection Compliance
Details
     

 02-14-2015
2.00
First Inspection of Wing prior to Closing Wing Ski
Details

 02-14-2015
2.00
First Inspection of Wing prior to Closing Wing Ski
Details
       

 02-07-2015
3.50
Back rivet tank bay stiffener and topskin
Details

 02-05-2015
3.00
Back rivet tank bay stiffener and topskin
Details

 02-04-2015
3.00
Typical fuel line doublers for rib penetrations
Details
       

 02-03-2015
6.00
Install Plumbing of Aux and Main Tank
Details
       

 01-31-2015
3.00
Run conduit for Nav/Strobe lights, pump and pitot
Details
       

 01-30-2015
2.00
Install main tank cover
Details

 01-30-2015
3.00
Install inspection door frames and nut plates
Details

 01-30-2015
3.50
Fabricate Aux tank cover
Details

 01-28-2015
2.00
Finish flap and aileron
Details

 01-28-2015
2.00
Finish flap and aileron
Details
     

 01-26-2015
2.00
Cut hole in bottom skin for Aux tank
Details
     

 01-25-2015
4.00
Install main fuel tank
Details
     

 01-20-2015
3.00
Install flaps and aileron
Details

 01-16-2015
2.00
Run aileron cables
Details
       

 01-16-2015
3.00
Install pitot system
Details
       

 01-15-2015
3.00
Install flap actuation system and flap springs
Details
     

 01-15-2015
2.00
Install aileron bellcrank and pulleys
Details

 01-10-2015
1.50
Initial Inspection of Wing
Details
       

 01-10-2015
1.00
Check pre-installed bolts for length and torque
Details

 01-09-2015
1.00
Tank Cover Plates
Details
       

 01-09-2015
1.50
Plumbing of Main Fuel Tank
Details
       

 01-09-2015
4.00
Installation of Electrical Conduits for Nav/Strobe
Details
       

 01-09-2015
2.00
Fuel Transfer Line to Main Tank
Details
       

 01-09-2015
2.00
Fuel line installation for fuel transfer to Main T
Details
       

 01-08-2015
3.00
Installation of fuel lines
Details
       

 01-05-2015
6.00
Inspection covers installation
Details
     

 12-23-2014
3.00
Flap torque tube alignment and cable installation
Details
       

 12-15-2014
6.00
Auxiliary tank installation
Details
       

 12-12-2014
3.00
Rib doublers for fuel line penetrations
Details
       

 12-11-2014
1.50
Flanging Tool for fuel line rib penetrations
Details
       

 12-10-2014
3.00
Main tank installation
Details
       

 11-13-2014
4.00
Tank straps and tensioners
Details
       

 11-13-2014
2.00
Inner and outer control surface hinges
Details
       

 11-13-2014
1.00
Inner and outer control surface hinges
Details
     

 11-12-2014
3.00
Installed backribs at wing tip and root
Details
       

 11-12-2014
4.00
Install aileron and flap on wing
Details
       

 11-05-2014
1.00
Aileron wing pulley installation
Details
       

 11-05-2014
3.00
Aileron actuator arm installation
Details
       

 11-04-2014
5.00
Flap actuator arm and torque tube installation
Details
       

 11-02-2014
3.00
Initial inspection of wings
Details
       

 10-31-2014
2.00
BearHawk at storage facility in Sydney
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.