KitLog pro

Powered By Kitlog Pro v2.0

Dans T-51 Construction Log
Work Logs Found: 50
Category Work Time: 133 Hours
 Date
Hours
Work Log Summary

Details

 05-03-2015
6.00
Center Hat section riveted in place
       

 05-02-2015
2.00
Center hat section riviting
       

 05-01-2015
2.00
Dimpleing center Hat section
       

 04-30-2015
2.00
Drilling rivet holes for center section
       

 04-29-2015
2.00
Making wedge hatchanel for canter section #3-#4
       

 04-28-2015
2.00
Using sheet metal mutli tool to bend hat sections
       

 04-27-2015
2.00
making hat section for #3-#4 center section
       

 04-26-2015
4.00
Reasemble Forward Bage area
       

 04-25-2015
4.00
Reasembeled forward bagage #2/3 to glue hat chanel
       

 04-24-2015
2.00
Refit upper Cowling Stringer
       

 04-23-2015
3.00
Second redo on #2 bulkhead first try 1/8" to tall
       

 04-22-2015
2.00
Reviting bulkhead #2 top new profile
       

 04-21-2015
2.00
Making new bulkhead for station #2 top
       

 04-20-2015
2.00
forming new profile for top of #2 bulkhead
       

 04-19-2015
2.00
Removing factory rivets from topbulkhead #2
       

 04-18-2015
2.00

       

 04-17-2015
3.00
installing nut plates for Aft battery acess cover
       

 04-17-2015
2.00
Cut out skins and battery access panel
       

 04-15-2015
3.00
Started layout for tail sideskin "F"
Details
       

 04-14-2015
2.00
Retro fit tank straps and bolts
Details
       

 04-11-2015
6.00
Studied plans on Windshield
Details
       

 01-06-2015
2.00
Buffing hat section ends to elininate burrs.
       

 01-05-2015
2.00
working on hat Chanel Flanges
       

 01-03-2015
4.00
Using modified Flange tool to make overlap flanges
       

 01-02-2015
2.00
Modifing Flange tool ot make a deeper Hat section
       

 01-01-2015
2.00
Working on hat chanel

 12-24-2014
2.00
Deburing Hat chanel ends with scotts buffing wheel
       

 12-23-2014
2.00
Cutting Hat chanel ends to fit arond tubing welds
       

 12-22-2014
2.00
Jogging Hat chanel ends
       

 12-20-2014
2.00
Using Harbor freight jogging toolon hat chanel
       

 12-19-2014
2.00
Started fitting the turtle deck
     

 12-18-2014
2.00
Installed Upper and lower bulkheads
       

 12-17-2014
2.00
Hat Chanel
       

 12-17-2014
2.00
Hat Chanel
       

 12-16-2014
2.00
Started cutting Hat Chanel
       

 12-15-2014
2.00
install tail landing gear hydrolics cilinder
       

 12-13-2014
5.00
Assembeled Control stick assembly and installed it
     

 12-11-2014
2.00


 12-10-2014
4.00
Started to assemble Tail Gear
     

 12-09-2014
2.00
Asemble Seat Supports

 12-08-2014
2.00


 12-07-2014
4.00
fit Fuselage togather bolt conections
     

 12-06-2014
4.00
Read plans Find parts for tail

 12-05-2014
2.00


 12-04-2014
2.00
Parts Inventory
       

 12-03-2014
2.00

Details
       

 12-02-2014
2.00

       

 12-01-2014
2.00
Open boxes match Parts to inventory Sheets
       

 11-28-2014
9.00
Getting ready to start work on My T-51 Mustang
Details
       

 11-27-2014
2.00
Unloaded My new T-51 # 194 in its shiping crate
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.