Powered By Kitlog Pro v2.0
Dans T-51 Construction Log
T-51 Mustang 3/4Scale P-51
All
Work Logs Found:
50
Category Work Time:
133 Hours
Date
Hours
Work Log Summary
Details
05-03-2015
6.00
Center Hat section riveted in place
05-02-2015
2.00
Center hat section riviting
05-01-2015
2.00
Dimpleing center Hat section
04-30-2015
2.00
Drilling rivet holes for center section
04-29-2015
2.00
Making wedge hatchanel for canter section #3-#4
04-28-2015
2.00
Using sheet metal mutli tool to bend hat sections
04-27-2015
2.00
making hat section for #3-#4 center section
04-26-2015
4.00
Reasemble Forward Bage area
04-25-2015
4.00
Reasembeled forward bagage #2/3 to glue hat chanel
04-24-2015
2.00
Refit upper Cowling Stringer
04-23-2015
3.00
Second redo on #2 bulkhead first try 1/8" to tall
04-22-2015
2.00
Reviting bulkhead #2 top new profile
04-21-2015
2.00
Making new bulkhead for station #2 top
04-20-2015
2.00
forming new profile for top of #2 bulkhead
04-19-2015
2.00
Removing factory rivets from topbulkhead #2
04-18-2015
2.00
04-17-2015
3.00
installing nut plates for Aft battery acess cover
04-17-2015
2.00
Cut out skins and battery access panel
04-15-2015
3.00
Started layout for tail sideskin "F"
Details
04-14-2015
2.00
Retro fit tank straps and bolts
Details
04-11-2015
6.00
Studied plans on Windshield
Details
01-06-2015
2.00
Buffing hat section ends to elininate burrs.
01-05-2015
2.00
working on hat Chanel Flanges
01-03-2015
4.00
Using modified Flange tool to make overlap flanges
01-02-2015
2.00
Modifing Flange tool ot make a deeper Hat section
01-01-2015
2.00
Working on hat chanel
12-24-2014
2.00
Deburing Hat chanel ends with scotts buffing wheel
12-23-2014
2.00
Cutting Hat chanel ends to fit arond tubing welds
12-22-2014
2.00
Jogging Hat chanel ends
12-20-2014
2.00
Using Harbor freight jogging toolon hat chanel
12-19-2014
2.00
Started fitting the turtle deck
12-18-2014
2.00
Installed Upper and lower bulkheads
12-17-2014
2.00
Hat Chanel
12-17-2014
2.00
Hat Chanel
12-16-2014
2.00
Started cutting Hat Chanel
12-15-2014
2.00
install tail landing gear hydrolics cilinder
12-13-2014
5.00
Assembeled Control stick assembly and installed it
12-11-2014
2.00
12-10-2014
4.00
Started to assemble Tail Gear
12-09-2014
2.00
Asemble Seat Supports
12-08-2014
2.00
12-07-2014
4.00
fit Fuselage togather bolt conections
12-06-2014
4.00
Read plans Find parts for tail
12-05-2014
2.00
12-04-2014
2.00
Parts Inventory
12-03-2014
2.00
Details
12-02-2014
2.00
12-01-2014
2.00
Open boxes match Parts to inventory Sheets
11-28-2014
9.00
Getting ready to start work on My T-51 Mustang
Details
11-27-2014
2.00
Unloaded My new T-51 # 194 in its shiping crate
Details
SITE NAVIGATION
Contact Builder
T-51 Mustang 3/4Scale P-51 Home
Category
# Logs
# Hours
All
50
133
Controls
1
5
Fuselage
11
29
Fuselage - Windshiel
1
6
Fuselage aft fuel ta
1
2
Fuselage Hat Chanel
20
46
Fuselage Skins
5
12
Inventory
6
12
Landing gear
2
8
Study plans/building
2
4
Workspace
1
9
Copyright © 2001-2024 Matronics. All Rights Reserved.