Matt's Hangar
A-23 PROMETHEUS
All
Work Logs Found:
282
Category Work Time:
695 Hours
Date
Hours
Work Log Summary
Details
07-30-2018
0.50
Dressed up the cowl mounting flanges
Details
07-24-2018
2.50
Laying up the last of the cowl flanges
Details
05-08-2018
5.00
Stringers done finally
Details
05-06-2018
4.50
More stringers!
Details
05-05-2018
6.00
Aft deck
Details
05-04-2018
1.00
Aft deck
Details
05-01-2018
2.50
Starting the aft deck
Details
04-29-2018
3.50
Trimming the windshield.
Details
04-29-2018
3.50
Access panels
Details
04-27-2018
1.00
Glassing the flanges
Details
04-26-2018
1.00
Starting the access panels
Details
04-24-2018
0.50
Trimming and test fit
Details
04-23-2018
1.50
Glassing the inside
Details
04-22-2018
2.00
Prepping the inside
Details
04-21-2018
3.50
Outside glass
Details
04-21-2018
0.50
Installed 3D printed ducts
Details
04-20-2018
0.80
Decking the deck
Details
04-19-2018
0.50
Flange trimmed
Details
04-09-2018
1.00
FWD turtledeck mounting
Details
04-03-2018
1.50
Canopy prep
Details
04-02-2018
1.50
Prepping for LH wing closeout
Details
03-31-2018
2.10
Pedal installation
Details
03-04-2018
2.30
Making the parts for the rest of the pedal systems
Details
03-03-2018
1.50
Installation of the pivot tubes
Details
02-27-2018
6.00
Pivot tube completion
Details
02-02-2018
3.50
More parts for the customer rudder pedals
Details
01-29-2018
1.00
Starting on the rudder pedal parts
Details
01-28-2018
0.50
Test installation of the final cover
Details
01-26-2018
1.10
LG Retract Knob
Details
01-22-2018
0.20
Final coats
Details
01-13-2018
1.20
Friction knob and test fit
Details
01-12-2018
3.00
Wood working controls
Details
01-06-2018
5.00
Throttle quadrant controls
Details
01-01-2018
2.00
TQ and Panel Mods
Details
10-29-2017
5.00
LH Upper Wing Skin
Details
10-27-2017
1.00
Starting the inner tanks
Details
10-25-2017
3.00
Throttle quandrant parts...
Details
10-21-2017
2.00
Reassembled nose gear
Details
10-08-2017
2.00
Oops
Details
10-07-2017
3.50
LH wing top spar cap
Details
10-02-2017
1.00
Prepping for top spar cap
Details
09-29-2017
5.00
Lower wing skin
Details
09-24-2017
1.00
Wing prep
Details
09-24-2017
1.00
Side console tops
Details
09-24-2017
3.00
Lower Wing Spar
Details
09-23-2017
1.50
Side console and seat bottom supports
Details
09-19-2017
1.00
More prep
Details
09-18-2017
1.50
Setting up for the spar cap
Details
09-17-2017
5.00
LH Spar Shear Web
Details
09-17-2017
0.70
Joining the wing
Details
09-17-2017
1.30
Glassed seat parts on one side
09-13-2017
1.50
More console and interior work
Details
09-12-2017
1.50
Aileron cable tension stop.
Details
09-11-2017
3.00
Aileron control
Details
09-10-2017
1.50
Wing attach block layup
Details
09-10-2017
3.50
More NG rebuild
Details
09-10-2017
0.50
Installation of console sides
Details
09-10-2017
0.80
Aileron control tube brackets
Details
09-09-2017
0.50
Prep for wing attach fitting
Details
09-04-2017
1.80
Mounted bow and wheels
Details
08-22-2017
0.60
Finished installing the NG-1
Details
08-21-2017
1.00
Sanding the upper surface of RH wing
Details
08-21-2017
1.00
Finish assembly of the NG-1
Details
08-20-2017
1.50
Contouring upper RH wing surface
Details
08-19-2017
0.50
Test installation of winglet...
Details
08-17-2017
3.50
Rudder Hinges
Details
08-06-2017
2.00
LH Winglet rudder
Details
08-05-2017
3.00
Contouring and VS work
Details
07-24-2017
1.00
More contouring
Details
07-23-2017
2.50
Countouring lower RH Wing
Details
07-21-2017
1.50
Bonded foam cores together
Details
07-10-2017
3.00
Setting up for the LH wing
Details
05-29-2017
2.00
Starting on the LH Wing
Details
05-21-2017
0.70
Aileron installation
Details
05-20-2017
1.20
Final Aileron Prep
Details
05-19-2017
2.00
Aileron work
Details
05-18-2017
1.50
Aileron glassing
Details
05-17-2017
0.70
Aileron work
Details
05-16-2017
1.20
Aileron details
Details
05-15-2017
1.00
Cleaning up the last layup
Details
05-14-2017
3.00
Aileron slot layup
Details
05-13-2017
2.50
Finish shaping the aileron area
Details
05-12-2017
1.25
Cut out the aileron
Details
05-10-2017
2.00
More rib sections
Details
05-09-2017
1.00
Rib sections
Details
05-07-2017
1.00
Cleanup
Details
05-06-2017
5.50
Upper Skin
Details
05-05-2017
3.50
Upper spar cap
Details
04-30-2017
1.50
Flippin wing...
Details
04-29-2017
1.00
Cleaning up the skin
Details
04-28-2017
5.50
Lower Skin (RH)
Details
04-27-2017
1.00
A little more prep on RH wing
Details
04-26-2017
1.75
Double check of wing and layup 1
Details
04-23-2017
1.00
Cleaned up lower spar cap
Details
04-22-2017
5.00
RH Lower Spar Cap
Details
04-21-2017
1.50
Finished building other control stick
Details
04-17-2017
2.00
Flip and prep for lower spar cap
Details
04-16-2017
1.30
Reattach leading edge
Details
04-15-2017
6.50
Right wing shear web
Details
04-14-2017
3.00
Right wing hardpoints
Details
04-14-2017
0.10
More hardpoint pics 2
04-14-2017
0.10
More hardpoint pics
04-13-2017
2.00
Pasting the wing cores in jig
Details
04-12-2017
2.00
Jigging
Details
04-11-2017
1.00
Checking the core alignment
Details
04-10-2017
2.00
Last of the core pasting
Details
04-09-2017
3.50
Foam cores and cutting details
Details
04-08-2017
3.00
Foam cutting
Details
04-07-2017
3.50
Wing attach blocks and foam work
Details
04-07-2017
1.50
Another cleanup and rudder spring install
Details
04-06-2017
0.50
Wing attach blocks
Details
04-06-2017
2.00
Finished closing out RH winglet
Details
04-05-2017
0.50
Setup of table for wings
Details
04-02-2017
1.50
Cleanup RH winglet/rudder
Details
03-30-2017
3.00
Glassed winglet and rudder
Details
03-28-2017
2.00
Starting on the rudders
Details
03-26-2017
2.00
Close out RH winglet
Details
03-25-2017
3.00
Outside skinning RH winglet
Details
03-24-2017
3.50
Prep and skinning RH winglet
Details
03-23-2017
1.50
Starting the RH winglet
Details
03-21-2017
1.00
Closing out
Details
03-20-2017
1.50
Cleaned up LH winglet
Details
03-19-2017
3.00
Skinning winglet (LH)
Details
03-18-2017
3.50
Prep and skinning winglet (LH)
Details
03-12-2017
0.50
Clean up of spar caps
Details
03-11-2017
4.00
Outer spar caps
Details
03-10-2017
3.00
Inside spar caps
Details
03-09-2017
1.20
Clean up and prep for spar caps
Details
03-08-2017
1.00
Joining the lower sections
Details
03-07-2017
4.00
Winglet shear webs
Details
03-06-2017
2.00
Prepping for shear webs
Details
03-05-2017
2.00
Getting the most from the foam
Details
03-04-2017
4.00
Foam cores - getting to the right place
Details
03-03-2017
2.00
and more cutting of foam
Details
03-02-2017
1.50
More foam block prep
Details
03-01-2017
1.50
Setting up for foam cutting
Details
02-27-2017
1.50
Finally getting back to it
Details
09-19-2016
0.10
Got a new home
Details
03-14-2016
0.10
Moving
Details
02-01-2016
2.50
Wheels and brakes
Details
02-01-2016
1.00
Jig blocks
Details
01-30-2016
6.00
Misc work
Details
01-28-2016
1.00
A little more template work
Details
01-26-2016
4.00
More template work
Details
01-24-2016
6.00
Foam cutting templates and wing jigs
Details
01-20-2016
3.00
NG-1 Modification
Details
01-16-2016
1.00
Wing attach fitting completion
Details
01-16-2016
8.00
Completed D-41, Installed nose gear
Details
01-14-2016
1.50
Patterns and WA's
Details
01-13-2016
4.00
More control parts
Details
01-12-2016
2.00
Finishing up NG-1
Details
01-09-2016
8.00
Finishing up NG-1 and 2
Details
01-08-2016
2.00
Nose gear truss temp installation
Details
01-08-2016
3.50
NG-2
Details
01-08-2016
2.50
Finishing up C-27
Details
01-06-2016
2.00
C-20 and C-27 Weldments
Details
01-02-2016
5.00
NG-1 work
Details
12-30-2015
0.50
WWA-1 and DWA-3
Details
12-30-2015
4.00
More control parts
Details
12-30-2015
4.00
Control Parts
Details
12-29-2015
3.50
Nose gear bushing and console work
Details
12-28-2015
4.00
Jumping around - detail work 2
Details
12-28-2015
6.50
Jumping around - detail work
Details
12-26-2015
3.00
Axle work
Details
12-23-2015
4.00
General work day
Details
12-22-2015
4.00
CON parts and Axle Mounts
Details
12-20-2015
5.00
Bow is mounted...
Details
12-20-2015
1.00
Bow is mounted 2...
Details
12-18-2015
3.00
More work on the gear bow
Details
12-15-2015
5.00
More gear bow work
Details
12-13-2015
2.50
LG Mounting Layups
Details
12-11-2015
7.00
Landing gear parts - band saw
Details
12-10-2015
4.00
Band saw rework
Details
12-04-2015
4.00
Template work
Details
12-04-2015
3.00
Layup 1, 2 and 3 on gear bow
Details
12-01-2015
4.50
Bow ear jig
Details
11-29-2015
3.00
Landing gear parts
Details
11-29-2015
3.00
Gear Bow Installation
Details
11-24-2015
0.50
Clean up the shop - Vacation time
Details
11-22-2015
3.00
Rotisserie Finished
Details
11-20-2015
4.50
MORE Rotisserie work!
Details
11-18-2015
1.00
Rotisserie Mounting
Details
11-18-2015
2.00
EM-1 and 2 Finishing
Details
11-17-2015
2.50
Rotisserie arms
Details
11-17-2015
1.30
EM-1 and 2
Details
11-15-2015
3.00
Misc Rotisserie
Details
11-13-2015
4.50
More rotisserie
Details
11-13-2015
0.50
Brake and fuel lines
Details
11-11-2015
4.50
Started working on rotisserie
Details
11-11-2015
0.50
Access holes
Details
11-09-2015
4.00
Odd's 'n' end details
Details
11-08-2015
0.20
Cleanup the nose gear box (upper)
Details
11-06-2015
2.50
Rudder pedal mounts
Details
11-06-2015
3.50
Nose gear box layup 5
Details
11-05-2015
0.10
Nose gear bushing research
Details
11-04-2015
0.50
Testing nose gear
Details
11-04-2015
1.00
Nose gear box lips
Details
11-04-2015
2.00
Nose gear box detail
Details
11-04-2015
1.50
Hanging rudder mounts
Details
11-02-2015
1.50
Nose gear doors and mounts part 3
Details
11-02-2015
1.00
Nose gear doors and mounts part 2
Details
11-02-2015
2.50
Nose gear doors and mounts
Details
11-01-2015
1.50
Fairing work - taking shape part 2
Details
11-01-2015
2.50
Fairing work - taking shape
Details
10-30-2015
6.50
More nose gear box layups
Details
10-28-2015
3.50
Nose gear box layup 2
Details
10-25-2015
1.00
Cleanup and prep
Details
10-23-2015
2.00
Layup 1
Details
10-21-2015
3.00
Nose Gear - and box
Details
10-18-2015
2.50
Nose Gear box
Details
10-17-2015
1.00
Started on nose gear box
Details
10-16-2015
4.00
Finished up a few nags
Details
10-09-2015
4.50
Final cross plies on gear bow
Details
10-04-2015
0.70
Gear cleanup
Details
09-29-2015
3.00
Gear leg wraps and seat belt supports
Details
09-27-2015
4.50
Back at it - LG bow and SB attach
Details
07-20-2015
1.50
Sanding
Details
07-16-2015
4.50
Lots 'o Parts and odds 'n' ends
Details
07-13-2015
2.00
Nose Gear Box
Details
07-11-2015
3.50
Consoles II
Details
07-06-2015
5.00
Consoles
Details
07-02-2015
4.00
LG Box Day 2
Details
06-29-2015
3.00
LG Box Day 1
Details
06-25-2015
3.00
Upper motor mount reinforcement
Details
06-23-2015
3.50
More taping
Details
06-21-2015
4.00
Taping...
Details
06-18-2015
1.50
Trimmin'
Details
06-15-2015
1.50
Flippin'
Details
06-12-2015
4.50
Left Side Layup
Details
06-11-2015
6.00
Right Side Layup
Details
06-08-2015
3.50
Shaping upper fuselage rails
Details
06-04-2015
5.00
Final shaping and bottom layup.
Details
06-01-2015
4.00
Fuselage shaping
Details
05-31-2015
1.00
Corner Tapes
Details
05-30-2015
1.50
Installed other fuse side
Details
05-29-2015
5.50
More fuselage sidage...
Details
05-28-2015
4.50
Fuselage Side layup
Details
05-27-2015
3.50
Trimming and... uh oh #1
Details
05-27-2015
0.10
Blue foam arrives!
Details
05-25-2015
4.50
Bonded bottom fuse
Details
05-22-2015
3.00
Made fuse bottom
Details
05-21-2015
6.00
Finished jigging fuselage
Details
05-19-2015
2.50
Bulkhead cleanup and fuse layout
Details
05-18-2015
2.00
Start of a fuselage
Details
05-18-2015
0.50
4ft Bench
Details
05-17-2015
0.60
Benches
Details
05-16-2015
1.00
Panel bulkhead stiffner
Details
05-15-2015
1.50
Benches
Details
05-14-2015
3.50
Finishing up the bulkheads
Details
05-13-2015
1.50
More bulkhead work
Details
05-10-2015
0.60
Trim bulkheads
Details
05-08-2015
1.00
The rest of the bulkheads (cont.)
Details
05-08-2015
7.00
The rest of the bulkheads
Details
05-06-2015
2.50
More on bulkheads
Details
05-04-2015
0.70
Trim Firewalls
Details
05-04-2015
1.00
CS Spar Cleanup
Details
05-01-2015
4.50
Closing out the CS Spar
Details
05-01-2015
3.00
Bulkheads
Details
04-29-2015
1.50
Firewalls
Details
04-27-2015
1.50
FSB Cleanup
Details
04-26-2015
1.50
FSB First Layup
Details
04-24-2015
5.00
CS Spar Cap 1
Details
04-23-2015
3.00
Working on the creel system
Details
04-20-2015
1.50
Worked on creel system
Details
04-20-2015
0.50
Shaped center foam
Details
04-19-2015
0.60
Additional foam on center section spar
Details
04-18-2015
2.00
DWA and Foam in spar
Details
04-17-2015
5.50
First spar layup
Details
04-17-2015
1.50
Cleaned up DWA
Details
04-16-2015
2.00
Final spar layup prep
Details
04-13-2015
1.20
Created new DWA Jig
Details
04-11-2015
1.50
Roving Wetting Machine
Details
04-11-2015
4.50
Rewinding Machine
Details
04-11-2015
1.00
DWA Work
Details
04-10-2015
1.50
Laminated DWA's for Main Spar
Details
04-10-2015
4.00
Create DWA jig
Details
04-07-2015
1.50
Finished up the cabinet
Details
04-07-2015
1.00
Cut wing attach blocks
Details
04-05-2015
2.50
Wing Attach Blocks
Details
04-05-2015
6.00
Composite Cabinet 1
Details
04-03-2015
7.00
Main Spar Jig
Details
12-18-2014
0.10
General Research
SITE NAVIGATION
Contact Builder
A-23 PROMETHEUS Home
Category
# Logs
# Hours
All
282
1377
Control
24
117
Design and Research
1
3
Firewall Forward
1
78
Fuel System
1
37
Fuselage
88
555
Interior
1
4
Jigs and Templates
14
44
Landing Gear
31
138
Misc Aircraft
1
0
Miscellaneous
5
109
Shop
6
10
Tools
4
13
Vertical Stabilizer
22
77
Wings
83
192