KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
Work Logs Found: 148
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 04-22-2020
0.00

       

 04-21-2020
0.00

       

 04-20-2020
0.00

       

 04-19-2020
0.00

       

 04-18-2020
0.00

       

 04-17-2020
0.00

       

 04-16-2020
0.00

       

 04-15-2020
0.00

       

 04-14-2020
0.00

       

 04-13-2020
0.00

       

 04-12-2020
0.00

       

 04-11-2020
0.00

       

 04-10-2020
0.00

       

 04-09-2020
0.00

       

 04-08-2020
0.00

       

 04-07-2020
0.00

       

 04-06-2020
0.00

       

 04-05-2020
0.00

       

 04-04-2020
0.00

       

 04-03-2020
0.00

       

 04-02-2020
0.00

       

 04-01-2020
0.00

       

 03-29-2020
0.00

       

 03-28-2020
0.00

       

 03-27-2020
0.00

       

 03-26-2020
0.00

       

 03-25-2020
0.00

       

 03-24-2020
0.00

       

 03-23-2020
0.00

       

 03-22-2020
0.00

       

 03-01-2020
0.00

       

 02-23-2020
0.00

       

 02-23-2020
0.00

       

 02-21-2020
0.00

       

 02-20-2020
0.00

       

 02-19-2020
0.00

       

 02-18-2020
0.00

     

 02-16-2020
0.00

       

 02-15-2020
0.00

       

 02-14-2020
0.00

       

 02-13-2020
0.00

       

 02-12-2020
0.00

       

 02-11-2020
0.00

       

 02-10-2020
0.00

       

 02-09-2020
0.00

       

 02-08-2020
0.00

       

 02-06-2020
0.00

       

 02-05-2020
0.00

       

 02-04-2020
0.00

       

 02-01-2020
0.00
Pictures
       

 01-03-2020
0.00

       

 01-02-2020
0.00

       

 01-01-2016
0.00
Fuseelage Construction
Details
       

 10-22-2015
0.00
Bought from Steinair wiring tools.
Details
     

 10-21-2015
0.00
Ruddder top fiberglass tip install.
Details
       

 10-20-2015
0.00
Install in the fuselage some components.
Details
       

 10-08-2015
0.00
Trim instrument panel and fit in cockpit.
Details
       

 10-07-2015
0.00
New Instrument fabrication.
Details
       

 10-06-2015
0.00
Test fit new forward top match drilled skin.
Details
       

 10-05-2015
0.00
Match drill new top skin through old top skin.
Details
       

 10-04-2015
0.00
Remove instr. panel attach angles and side wings.
Details
       

 10-03-2015
0.00
Top damaged kin, side wings and inst panel angls.
Details
       

 10-02-2015
0.00
Evaluate fuselage top skin damage.
Details
       

 10-01-2015
0.00
New removable aft tie down bolt inserted.
Details
       

 09-25-2015
0.00
Line up rudder hinges before drilling vert. stab.
Details
       

 09-24-2015
0.00
Empennage fitted and drilled to fuselage.
Details
       

 09-23-2015
0.00
Aft tie down anchor fabrication, fitting and drill
Details
       

 09-22-2015
0.00
Drill vertical stab. front spar attach p;late.
Details
       

 09-21-2015
0.00
New vertical stab. from spar attach plate.
Details
       

 09-20-2015
0.00
New aft elevator stop anle fitted and drilled.
Details
       

 09-19-2015
0.00
New horizontal stab front spar attach spacers.
Details
       

 09-18-2015
0.00
New aft bulkhead, fitted, drilled and clecoed.
Details
       

 09-17-2015
0.00
Fit new aft bulkhead, aft deck, elevator stop.
Details
       

 09-16-2015
0.00
New elevator stop, new horizontal spar attach bar.
Details
       

 09-15-2015
0.00
Replane Aft Bulkhead and Aft Deck.
Details
       

 09-14-2015
0.00
Elevator horn. Remove plate, weld close, re drill.
Details
       

 08-19-2015
0.00
Rudder - Joyce helps to rivet it up.
Details
       

 08-18-2015
0.00
Flattening the rudder skin.
Details
       

 08-17-2015
0.00
Build new rudder skin flattener/squeezer.
Details
       

 08-16-2015
0.00
Rudder priming of all parts prior to riveting.
Details
       

 08-15-2015
0.00
Rudder stiffeners drilled and clecoed.
Details
       

 08-14-2015
0.00
Rudder – inventory parts, match drill stiffeners.
Details
       

 08-11-2015
0.00
Rivet second side of vertical stab skin.
Details
       

 08-10-2015
0.00
Rivet first side of vertical stab skin.
Details
       

 08-09-2015
0.00
Wash and prime vertical stab. Insall new hinges.
Details
       

 08-08-2015
0.00
Deblue the vertical stab. Test fit skin.
Details
       

 08-07-2015
0.00
Replace the old rusty hinges with brand new ones.
Details
       

 08-06-2015
0.00
Simi complete Vertical Stab. Needed more parts.
Details
       

 08-05-2015
0.00
Test fitting the old elevators to new horizontal s
Details
       

 08-04-2015
0.00
Damaged Horiz. Stab. I'll use the old elevators.
Details
       

 08-03-2015
0.00
Rivet aft access hole cover attach brackets.
Details
       

 08-02-2015
0.00
Prep and rehearse for riveting the aft skins.
Details
       

 08-01-2015
0.00
Acid wash/prime the aft side skins.
Details
       

 07-26-2015
0.00
Dimple and acid wash aft bottom skin.
Details
       

 07-25-2015
0.00
Trim curve of aft side skin with die grinder.
Details
       

 07-24-2015
0.00
Match drill skin interection from inside out.
Details
       

 07-23-2015
0.00
Match drill intersection on side and bottom skin.
Details
       

 07-22-2015
0.00
Test fit all 3 new aft skins.
Details
       

 07-21-2015
0.00
Create tabs on forward edge of aft side skins.
Details
       

 07-20-2015
0.00
Mark and trim aft bottom skin.
Details
       

 07-19-2015
0.00
Replace forward spar attach angle.
Details
       

 07-18-2015
0.00
First test fit of the aft side skins.
Details
       

 07-17-2015
0.00
Test fitting the new stringers.
Details
       

 07-16-2015
0.00
Replace and match drill 4 stringers.
Details
       

 07-15-2015
0.00
Fit aft bottom skin after drilling and dimpling.
Details
       

 07-10-2015
0.00
Match drill aft inspection cover hole, 2
Details
       

 07-09-2015
0.00
Match drill aft inspection cover hole, 1
Details
       

 07-08-2015
0.00
Hammer and Dolly forward side skins flat
Details
       

 07-07-2015
0.00
Attempt and hammer and dolly side stringers
Details
       

 07-06-2015
0.00
Hammer and Dolly tools from a master
Details
       

 07-05-2015
0.00
Damaged forward side ribs
Details
       

 07-04-2015
0.00
Test fit new aft side skines.
Details
       

 07-03-2015
0.00
Deblue and fit new bottom skin
Details
       

 07-02-2015
0.00
Match drill new bottom skin through old skin
Details
       

 07-01-2015
0.00
Line up old and new bottom skin for match drill
Details
       

 06-07-2015
0.00
Fitting new pitch servo rib
Details
       

 06-06-2015
0.00
Old pitch servo rib along side the new rib
Details
       

 06-05-2015
0.00
Close up of the pitch servo brackets
Details
       

 06-04-2015
0.00
preferred rivet pulling out tools
Details
       

 06-03-2015
0.00
Drill out rivets on aft skin inspection brackets
Details
       

 06-02-2015
0.00
Old wrinkled aft skin elevator inspection holes
Details
       

 06-01-2015
0.00
Damaged stringers under aft skins
Details
       

 05-10-2015
0.00
Part of forward skins removed
Details
       

 05-09-2015
0.00
Seat belt attach points / damaged center rib
Details
       

 05-08-2015
0.00
Internals at the aft end
Details
       

 05-07-2015
0.00
Stringer and center rib damage reviled
Details
       

 05-06-2015
0.00
Aft 3 skins removed
Details
       

 05-05-2015
0.00
Damaged intersection areas
Details
       

 05-04-2015
0.00
Remove aft side skins
Details
       

 05-03-2015
0.00
Drill out 725 rivets
Details
       

 05-02-2015
0.00
Fuselage jig at forward end
Details
       

 05-01-2015
0.00
Fuselage jig at aft end
Details
       

 04-06-2015
0.00
Asses fuselage damage
Details
       

 04-05-2015
0.00
Roll the Canoe.
Details
       

 04-04-2015
0.00
Fuselage Rotisserie Take 2.
Details
       

 04-03-2015
0.00
Fuselage Rotisserie Take 1.
Details
       

 04-02-2015
0.00
Transfer engine from tire to new engine stand.
Details
       

 04-01-2015
0.00
Home Made Engine Stand
Details
       

 03-10-2015
0.00
Rearrange 2 RV's in shop 3.
Details
       

 03-09-2015
0.00
Rearrange 2 RV's in shop 2.
Details
       

 03-08-2015
0.00
Rearrange 2 RV's in shop 1.
Details
       

 03-07-2015
0.00
RV-7A put aside.
Details
       

 03-06-2015
0.00
Unload new RV-6A Rebuild Project 5.
Details
       

 03-05-2015
0.00
Unload new RV-6A Rebuild Project 4.
Details
       

 03-04-2015
0.00
Unload new RV-6A Rebuild Project 3.
Details
       

 03-03-2015
0.00
Unload new RV-6A Rebuild Project 2.
Details
       

 03-02-2015
0.00
Unload new RV-6A Rebuild Project 1.
Details
       

 03-01-2015
0.00
Bought a RV-6A Project
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.