KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
Work Logs Found: 92
Category Work Time: 276 Hours
 Date
Hours
Work Log Summary

Details

 11-30-2006
2.50
Assemble aileron Pushrod (Step 38)
Details

 11-29-2006
4.50
Mount Flap to the Flap Track (step 35)
Details

 11-29-2006
2.00
Flap pushrod (Step 36)
Details

 11-29-2006
4.75
Attaching flight controls to wing
Details

 11-28-2006
5.00
Wing Strut Fitting (Step 25)
Details

 11-28-2006
5.00
Wing strut
Details

 11-27-2006
4.00
Wing Struts (Step 25)
Details

 11-27-2006
2.50
Wing strut alignment
Details

 11-10-2006
7.00
Firewall
Details

 10-19-2006
2.50
Stabilizer installation
Details

 10-18-2006
2.50
Stabilizer installation 2.5 hrs
Details

 10-17-2006
1.50
Stabilizer installation
Details

 10-15-2006
0.50
Pulley Brackets
Details

 10-15-2006
1.00
Master Cylinders (Step 7)
Details

 10-15-2006
1.00
Forward Pulleys (Step 12)
Details

 10-13-2006
1.50
Tail wheel final rigging
Details

 10-12-2006
0.50
Tail gear installation
Details

 10-12-2006
4.00
Step 98 Install the steering cables
Details

 10-11-2006
5.00
Step 97 Install the tailwheel assembly
Details

 10-11-2006
1.50
Step 94 Install the spring blocks & attach bracke
Details

 10-11-2006
1.50
Step 93 Fabricate the aft spring block
Details

 10-10-2006
2.50
Step 92 Bolt the springs in place....
Details

 10-10-2006
0.50
Step 91 Stack the tail wheel springs
Details

 10-10-2006
1.50
Step 90 Fabricate the forward spring block
Details

 10-10-2006
0.50
Step 89 Drill the forward spring attach bolt
Details

 10-10-2006
1.00
Step 88 Install the forward spring attach bracket
Details

 10-06-2006
0.50
Mill fiber for tailwheel
Details

 10-06-2006
5.00
Electric elevator trim servo installation
Details

 10-06-2006
0.75
Cable Fairleads
Details

 10-06-2006
8.00
Bulkhead A Pulley Brackets (Step 18)
Details

 10-05-2006
7.50
Forward Pulleys (Step 12)
Details

 10-05-2006
0.25
Flap Pulleys (Step 16)
Details

 10-05-2006
0.25
Flap Handle (Step 11)
Details

 10-05-2006
5.50
Electric elevator trim servo installation
Details

 10-04-2006
0.50
Elev Step 86 Rivet trim tab hinge half to the trim
Details

 10-04-2006
2.00
Elev Step 85 Rivet trim tab hinge half to elevator
Details

 10-04-2006
1.00
Elev Step 82 Drill remaining holes
Details

 10-04-2006
0.25
Elev Step 81
Details

 10-04-2006
0.50
Elev Step 80 Align hinge on elevator side and dril
Details

 10-04-2006
1.00
Elev Step 79 Position trim tab hinge
Details

 10-03-2006
1.50
Elevator Step 70 Rivet trailing edge of trim tab s
Details

 10-03-2006
1.50
Elevator Step 69 Rivet the remaining Rib/Skin hol
Details

 10-02-2006
4.00
Step 61 to 67
Details

 10-02-2006
1.25
Rudder Pedals Brackets (Step 4)
Details

 10-02-2006
1.50
Flap Handle (Step 10)
Details

 10-02-2006
3.50
Elevator/Aileron Control (Step 8)
Details

 10-02-2006
2.00
Control Yoke Assembly (Step 9)
Details

 10-01-2006
2.50
Rudder Pedals Brackets (Step 4)
Details

 10-01-2006
1.00
Rudder Pedals (Step 3)
Details

 09-27-2006
3.50
Pitot mast
Details

 09-27-2006
0.75
Installation of the Horizontal stabilizer attachme
Details

 09-27-2006
0.75
Deburr and corrosion-proof the forward shearweb an
Details

 09-27-2006
1.00
Bolt holes for the Forward Shearweb. (Step 79)
Details

 09-26-2006
3.50
Wing Assembly and Pitot Static System
Details

 09-26-2006
4.50
Side Attachment Flanges For the Forward Shearweb.
Details

 09-26-2006
4.50
FWD shear web and aft inspection hole
Details

 09-26-2006
3.50
Forward Shearweb (Step 77)
Details

 09-22-2006
1.25
Vertical Fin Rib (Step 57)
Details

 09-22-2006
1.50
Position & Drill H/S Attach Bracket
Details

 09-22-2006
0.75
Forward Searweb (step 77)
Details

 09-22-2006
1.50
Fabricate, Position, and Drill Forward Attach Angl
Details

 09-22-2006
0.50
Elevator Bellcrank (Step 71)
Details

 09-22-2006
1.00
Aft Attach Flange for the Forward Shearweb (
Details

 09-21-2006
6.00
Shell Attach Fittings
Details

 09-21-2006
1.50
Horizontal Stab Attach Bracket
Details

 09-20-2006
1.00
Rudder Stops
Details

 09-20-2006
7.00
Drilling Shell Attach fittings
Details

 09-19-2006
0.50
Vertical Stab Spar Add lester
Details

 09-19-2006
7.50
Shell Attach Fittings
Details

 09-18-2006
6.50
V. fin Rivet holes (Step 54) V. Fin Spar( step 51)
Details

 09-18-2006
1.00
Elevator Bellcrank (Step 68)
Details

 09-17-2006
1.25
Vertical Fin Spar (step 45)
Details

 09-17-2006
2.00
Vertical fin Rivet Holes
Details

 09-17-2006
0.50
Upper Hinge for the Rudder (Step 50)
Details

 09-17-2006
2.25
Lower Rudder Hinge Location (step46)
Details

 09-15-2006
2.00
Sanding the top of the vertical fin shells (Step 4
Details

 09-15-2006
1.50
Index Holes in the flanges (step 45)
Details

 09-15-2006
1.25
Hung Rudder Assembly From the Tops of the Vertical
Details

 09-15-2006
3.50
FWD Shell Attachment Fittings (Step 29)
Details

 09-14-2006
5.50
Pivot points for The Rudder
Details

 09-14-2006
5.75
Fuse step 29 and 30
Details

 09-14-2006
3.50
Forward Shell Attachment fittings
Details

 09-13-2006
8.00
Fuselage Aft Shell Fittings (Step 27)
Details

 09-12-2006
5.50
Fuse Step 7 -9
Details

 09-12-2006
8.00
Fuse Step 7 - 10
Details

 09-12-2006
1.50
Fuse Step 12
Details

 09-11-2006
8.50
Fuse Step 6
Details

 08-30-2006
4.00
Wings and tail feathers unpacking
Details

 08-23-2006
4.50
Organize parts
Details

 08-22-2006
7.50
Organize parts
Details

 08-18-2006
7.75
Continued with inventory and organization

 08-17-2006
14.00
More inventory and crate disassembly
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.