Powered By Kitlog Pro v2.0
Richard's Web Site
AirCam
All
Work Logs Found:
236
Category Work Time:
697 Hours
Date
Hours
Work Log Summary
Details
06-10-2016
2.50
FAA Completes Inspection and granted its Special A
Details
05-26-2016
4.00
Move to KHND for inspection and test flight
Details
05-26-2016
1.00
Mount wings temporarily
Details
05-25-2016
1.00
Attach brake reservoirs
Details
05-21-2016
1.00
Attach rear bolts for fly wire attachment.
Details
05-19-2016
1.00
Preparing to cut the left HS to install trim tab m
Details
05-18-2016
2.50
Mount wings temporaily
Details
05-17-2016
3.00
Attach hardware required for Rigging
Details
05-17-2016
2.00
Attach forward and aft strut attachment points to
05-17-2016
0.50
Attach for and aft strut attachment points
05-16-2016
1.50
Attach seat belt harnesses
Details
05-16-2016
3.00
A & P tests Pito Static sytem
Details
05-13-2016
2.00
Pulled the spark plugs to record wear.
Details
05-12-2016
4.00
Electrical wiring moving towards its final form.
05-12-2016
3.50
Details
04-21-2016
3.00
More electric work
Details
04-20-2016
4.00
Wiring continues
Details
04-20-2016
3.50
More wiring
Details
04-20-2016
3.00
Construct the hubs and props
Details
04-16-2016
4.00
Rear panel pito static system and aux power
Details
04-15-2016
2.00
Place retention springs on mufflere
04-14-2016
2.00
Attach brake lines to brakes
Details
04-13-2016
4.00
Progress on front and rear panels
04-13-2016
3.50
Panel wiring takes shape
Details
04-12-2016
0.50
Huge storm stops work.
04-12-2016
0.50
Attach muffler and springs more pictures
Details
04-12-2016
3.00
Attach exhaust and mufflers
Details
04-11-2016
3.00
Wiring harness before clean up an Pito static syst
Details
04-11-2016
1.00
Switch plates
Details
04-10-2016
3.00
Wiring Mags and soft start
Details
04-09-2016
4.00
Continue work on wiring the engines
Details
04-09-2016
3.00
Continue wiring engines.
Details
04-08-2016
4.00
Rear instrument panel
Details
04-08-2016
5.00
Mount the engines
Details
04-04-2016
3.50
Install PTT switch
Details
03-31-2016
0.50
Close up views of some of the wiring
Details
03-30-2016
5.00
Work on wiring engines
Details
03-29-2016
0.50
Engines mounted
Details
03-28-2016
1.00
Mount Vertical, drill and attach bolt.
Details
03-26-2016
1.00
Ready to mount engines to center section
03-25-2016
4.50
Install Left and Right Regulator Panels
Details
03-24-2016
4.00
Continue prep of left and right regulator panels
Details
03-23-2016
5.00
Wiring the mag/starter switch plate
Details
03-20-2016
4.50
Run wires through the fuselage and to the W struts
Details
03-19-2016
3.00
Install throttle controls
Details
03-18-2016
2.00
Wiring panel
Details
03-18-2016
3.00
03-17-2016
6.00
Regulator panels
Details
03-17-2016
2.00
Install rear panel instruments and lighting
Details
03-15-2016
4.00
Votage regulator panels
Details
03-13-2016
4.00
Wires everwhere
03-13-2016
3.00
Prepare to attach the center section
Details
03-12-2016
3.00
Continue running wires
03-10-2016
3.00
Construct rear trim/flap switch swiches and rear p
Details
03-09-2016
3.00
Running electrical through the tubes on each side
Details
03-06-2016
2.00
Attach the tail wheel
Details
03-05-2016
3.00
Attach the tail vertical
Details
03-01-2016
3.00
Install round dials
Details
03-01-2016
4.00
Close view of the hose structure
Details
03-01-2016
4.00
Begin panel
Details
02-29-2016
4.00
Complete most hoses
Details
02-14-2016
2.00
Attach throttle cable housing onto engine
Details
02-14-2016
5.00
Attach oil cooler and hoses
Details
02-12-2016
10.00
Sand and repaint wings
Details
02-12-2016
2.00
Ready to hoist engines
02-12-2016
4.00
Oil Cooler
Details
02-06-2016
6.00
Completed engine mount
01-08-2016
2.00
Attach motor mounts and safety wire.
Details
12-02-2015
0.50
More pics of cowling and fuel systems
12-02-2015
20.00
Continue work on engine cowling
11-29-2015
1.00
Attach gascolator
Details
11-27-2015
3.00
Engine cowling
Details
11-19-2015
2.50
Layout paint scheme
Details
11-19-2015
2.50
Layout paint scheme
Details
11-19-2015
3.00
Layout paint scheme
Details
11-19-2015
6.00
Adding paint lines to fuselage
11-09-2015
1.00
Check wing symetry
Details
11-09-2015
2.00
Check symmetry of left and right wings
Details
11-07-2015
0.50
Install instruments in rear panel
Details
11-07-2015
3.00
Construct rear instrument panel
Details
11-02-2015
25.00
Attach VS and root fairing
Details
10-31-2015
3.00
Install Vertical Stabilizer Root Fairing
Details
10-29-2015
3.00
Attach leading edge skin to HS
Details
10-29-2015
3.50
Attach gap seals and leading edge skin to R HS
10-28-2015
3.50
Attach leading edge and gap seals to HS
Details
10-28-2015
2.00
Attach gap seals and leading edge to Elevator
10-26-2015
2.00
Attach elevator trim tab and trailing edge.
Details
10-23-2015
3.00
Add trailing edge to R elevator.
Details
10-21-2015
2.00
Begin preparation of drawing for running electrica
Details
10-19-2015
4.00
Move to paint shop
Details
10-09-2015
1.00
Poorly painted areas
Details
10-09-2015
2.00
Areas to be repaired
Details
09-26-2015
3.00
Painted parts would have to be redone
Details
09-25-2015
3.00
Tighten envelope
Details
09-25-2015
3.00
Completed covering wings with fabric and tightened
Details
09-24-2015
3.00
Oil Cooler Attachment and Gap Seal
Details
09-24-2015
4.00
Errors in Manual
Details
09-24-2015
2.00
Completed left and right cowlings
Details
09-23-2015
4.00
Caution: Engine side panels
Details
09-23-2015
4.00
Attach side panels and gussets
Details
09-22-2015
5.00
Engine cowling
09-20-2015
3.00
Construct engine cowlings
Details
09-19-2015
4.00
Placing top and bottom ribs
Details
09-19-2015
4.00
Install Wing Fabric Envelope
Details
09-18-2015
7.00
Install Outer rib compression and safety wire
Details
09-17-2015
5.00
Pulling Wing Fabric over structure.
Details
09-16-2015
3.00
Attach foam to leading edge of wings
Details
09-15-2015
4.00
Standoff and Cable Assembly (WI-103)
Details
09-15-2015
2.00
Construct Wing Ribs
Details
09-14-2015
4.00
Attach leading and trailing edge cuffs
Details
09-14-2015
4.00
Assemble strut compression tube to rear spar
Details
09-01-2015
2.00
Aileron bellcrank and pushrod
Details
08-30-2015
8.00
Assemble tip compression tube and bow to front spa
Details
08-29-2015
1.00
Correct part manufacture error
Details
08-29-2015
4.00
Bow in Tensioning Rib
Details
08-29-2015
3.00
Bow in Right and Left Tensioning Rib
Details
08-28-2015
3.00
Wing construction
Details
08-28-2015
3.50
Steps 2 to 4
Details
08-28-2015
3.00
More pictures
Details
08-27-2015
4.50
Parts inventory and begin construction
Details
08-26-2015
2.50
Install flap motor and overflow fuel drains
Details
08-25-2015
2.50
Install gas tanks
Details
08-25-2015
1.00
Bellcrank bearings and Aileron Push Rod
Details
08-22-2015
0.50
Complete push rod and riveting
Details
08-21-2015
0.50
Rivet skins left and right
08-21-2015
4.00
Cleco skins left and right
Details
08-20-2015
3.00
Install elevator horn and counterweight
Details
08-20-2015
3.00
Elevator push rod
Details
08-19-2015
1.00
Tested wing color with clear coat
Details
08-18-2015
1.00
Placement of horizontal front spar eyebolt coupler
Details
08-04-2015
1.50
Inspection plate doubler and stringer
Details
08-04-2015
0.50
Inspection covers
Details
08-04-2015
4.00
Compression and front cable brackets
Details
08-04-2015
0.50
Assemble front spar fitting
08-02-2015
3.00
Deburr, wash and prime parts
Details
07-30-2015
1.00
Step drill Rear spar fitting VS-003 and VS-011 and
Details
07-30-2015
1.00
Rivet VS 018 A and B
Details
07-29-2015
3.00
Step drilled remaining holes and removed skins
Details
07-29-2015
1.00
Step drill
Details
07-29-2015
1.00
More Front Spar fittings
Details
07-28-2015
4.00
Step drill VS
Details
07-28-2015
1.00
Spar cable bracket and doubler
Details
07-27-2015
3.00
Transfer drill the prejigged VS assembly
Details
07-25-2015
3.00
Drilled hole for fuel hoses
Details
07-23-2015
3.00
Attach ELT Antenna Bracket
Details
07-20-2015
1.50
Inventory electrical parts
Details
07-19-2015
3.00
Acid wash and prime CS
Details
07-18-2015
1.50
Recieve engine instruments
Details
07-17-2015
3.00
Install and step drill top skins
Details
07-11-2015
2.00
Add access panels and finish cleco
Details
06-10-2015
3.00
Shippment of parts arrives
Details
06-10-2015
0.20
Collin is done for the day
Details
06-10-2015
1.50
Cleco wars
06-10-2015
3.00
Attach skins
Details
06-09-2015
3.50
Cleco bottom, skins and doublers to CT
Details
06-08-2015
4.00
Attach doublers and skins to top and bottom of the
Details
06-08-2015
6.00
Attach CT to FU
Details
05-27-2015
0.80
Preparation of down tubes CT-023 &024
Details
05-27-2015
0.50
Bellcrank and bearing
Details
05-27-2015
1.00
Assemble two compression tubes
Details
05-26-2015
1.00
Attach rear spar to center section
05-26-2015
1.00
Attach rear spar to all 4 ribs
05-26-2015
1.00
Attach Flap Motor channels and angles
05-26-2015
1.00
Add stiffeners to rear rib halves
05-25-2015
0.10
More pictures
05-25-2015
1.50
Flap motor channel and angle
Details
05-24-2015
3.00
Attach 2 Rear Ribs Halves CT_068.
Details
05-16-2015
1.00
Prepare fabric covered parts for painter
Details
05-12-2015
2.00
Prepare and cover ailerons with fabric
Details
05-12-2015
0.00
More pictures
Details
05-12-2015
0.00
Cover HS with fabric- more pictures
Details
05-12-2015
3.50
Cover HS and Rudder with fabric
Details
05-12-2015
2.00
Cover Ailerons with fabric
Details
05-12-2015
0.00
Apply fabric to rudder, glue and iron to fit.
05-12-2015
0.00
Application of fabric to Rudder
Details
05-12-2015
1.00
Application of fabric to leading edge of HS-contin
Details
05-11-2015
1.00
Prepare Rudder for fabric and cover.
Details
05-11-2015
3.50
Fabric cover
Details
05-11-2015
1.00
Cut and form fabric onto Rudder
05-10-2015
0.50
More pictures
Details
05-10-2015
3.50
Cover control surfaces with fabric
Details
05-02-2015
0.50
Riveted Anti-Twist plates to Elevators
Details
04-29-2015
3.00
Step Drill and complete Back Side of Spar Carry-Th
Details
04-29-2015
3.00
Step Drill "Spar Carry-Thru"
Details
04-27-2015
3.00
10.3
Details
04-24-2015
3.00
Join Left and Right Spars
Details
04-22-2015
2.00
Re-assembly of Spar Roots on Both Elevators
Details
04-21-2015
3.00
Push Rod Sheet Issues
Details
04-20-2015
0.50
More EL Root Spar Construction Pics
04-20-2015
2.50
Begin reconstruction of EL
Details
04-19-2015
4.00
Aluma Prep and Prime
Details
04-17-2015
0.50
Right EL Trailing Edge
Details
04-17-2015
2.00
Push Rod Sheet and Right EL Trailing Edge
Details
04-10-2015
3.00
Step drill skins, hinges and mount cleco Motor Pla
Details
04-10-2015
3.00
Mount Motor and assemble Trim Push Rods
Details
04-10-2015
4.00
Elevator Trim Tab and Motor
Details
04-09-2015
2.00
Trim Tab and
04-09-2015
2.50
Attaching Nut Plate Bracket
Details
04-09-2015
2.00
Assemble Spar Roots and attach Root Ribs
Details
04-08-2015
5.00
Step drill front and rear spars
Details
04-08-2015
5.00
Assemble Spar Roots
Details
04-07-2015
1.00
Left side completed
Details
04-04-2015
4.50
Elevator Pick LIst
Details
04-03-2015
2.00
More Pictures
Details
04-03-2015
3.00
Anti drag and drag atttachment plates
Details
04-01-2015
5.00
Rivet rear rib flanges and rear spar
Details
03-31-2015
0.50
More pictures
Details
03-31-2015
1.50
More pictures
Details
03-31-2015
8.00
Disasembly, mark, deburr, wash and prime.
Details
03-31-2015
8.00
Attachment Plates HS-012 and root ribs.
Details
03-30-2015
2.50
Acid wash and marking
Details
03-28-2015
5.00
Continue work
Details
03-10-2015
1.00
More Pictures
Details
03-10-2015
4.50
Attaching leading edge skins
Details
03-09-2015
2.50
Drag and anti- drag wires.
Details
03-05-2015
0.50
More Images
Details
03-03-2015
1.50
Continue step drilling both sides of the L HS
Details
02-26-2015
5.30
Join 4 and 5ht ribs and transfer drill; attach cab
Details
02-25-2015
4.10
Attach L & R ribs and nose ribs.
Details
02-24-2015
2.00
Rear spar assembly
Details
02-24-2015
3.00
Attach anti drag wire plate
Details
02-23-2015
2.50
Cleco skin in prep for riveting
Details
02-13-2015
3.00
Assemble D cell skins
Details
02-10-2015
4.50
Gussets to front spar and ribs
Details
02-08-2015
2.50
Attach diagonal ribs to rear spar.
Details
02-07-2015
4.00
Begin rudder assembly
Details
02-06-2015
2.00
Complete Flaps
Details
01-30-2015
3.50
Flap construction
Details
01-29-2015
3.00
Flap Construction
Details
01-27-2015
3.00
Aileron construction continued.
Details
01-24-2015
6.50
Ailerons
Details
01-12-2015
6.00
Build worktables, organize work are and suppy shop
Details
12-06-2014
4.00
Transporting mostly completed fuselage and remande
Details
12-04-2014
6.00
Continue fuselage construction.
Details
12-03-2014
8.00
Fuselage construction
Details
12-01-2014
0.50
Building Comments
Details
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
246
720
Ailerons
2
10
Attaching and Riging
8
17
Brakes
1
2
Center Section
30
64
Electrical
17
58
Elevator
20
52
Engine
30
105
Fabric
14
19
Flaps
3
8
Fuselage
3
18
General Remarks
1
0
Horizontal Stabilize
23
73
Instruments
13
37
Miscellaneous
2
4
Move to HND
3
8
Paint
9
34
Prop
1
3
Rigging
8
17
Rudder
6
20
Shop Supplies
1
6
Throttle controlls
2
6
Throttle controls
2
6
Vertical Stabilizer
21
62
Wings
23
79
Wiring
3
12
Copyright © 2001-2024 Matronics. All Rights Reserved.