Date
|
Hours
|
Work Log Summary
|
Details
|
07-29-2020
|
1.00
|
More photos of final paint
|
Details
|
|
|
07-28-2020
|
1.00
|
Painting details
|
Details
|
|
|
07-27-2020
|
50.00
|
Flying and Final paint job
|
Details
|
|
|
07-26-2020
|
1.00
|
Flight test update
|
Details
|
|
|
12-30-2019
|
50.00
|
Final assembly, problem solving, first engine star
|
Details
|
|
|
12-10-2019
|
100.00
|
Painting and moving the project to airport
|
Details
|
|
|
11-09-2019
|
75.00
|
Painting fiberglass parts
|
Details
|
|
|
10-17-2019
|
2.00
|
Bleed Brake lines
|
Details
|
|
|
10-12-2019
|
8.00
|
Fabricate oil door hinge
|
Details
|
|
|
10-11-2019
|
1.00
|
A few photos of the interior
|
Details
|
|
|
10-10-2019
|
16.00
|
Complete the Airbox install
|
Details
|
|
|
10-05-2019
|
14.00
|
Airbox build
|
Details
|
|
|
09-28-2019
|
10.00
|
Baffle fabric install
|
Details
|
|
|
09-21-2019
|
12.00
|
Glass windshield Fairing
|
Details
|
|
|
09-14-2019
|
12.00
|
Glue in windshield
|
Details
|
|
|
09-08-2019
|
5.00
|
Final fitting of the wind shield
|
Details
|
|
|
09-05-2019
|
10.00
|
Closing the front upper skin .... yeah!
|
Details
|
|
|
09-03-2019
|
30.00
|
Continue configuring the G3X communication channel
|
Details
|
|
|
08-17-2019
|
15.00
|
Install Windows
|
Details
|
|
|
08-10-2019
|
15.00
|
Debug G3X and correct minor issues
|
Details
|
|
|
08-05-2019
|
20.00
|
Install seat heater wiring and switches
|
Details
|
|
|
07-19-2019
|
20.00
|
fit and install panels
|
Details
|
|
|
06-25-2019
|
12.00
|
More fitting of panels, Seats arrived in the shop
|
Details
|
|
|
06-15-2019
|
18.00
|
Fitting panels
|
Details
|
|
|
06-05-2019
|
10.00
|
Fitting leather wraped panels
|
Details
|
|
|
05-29-2019
|
8.00
|
Terminate all engine sensor and CPI wiring
|
Details
|
|
|
05-22-2019
|
12.00
|
Installl CPI LCD and fit up the center stack close
|
Details
|
|
|
04-22-2019
|
6.00
|
Install CPI2 electronics
|
Details
|
|
|
04-19-2019
|
8.00
|
Head rest for the rear seats
|
Details
|
|
|
04-16-2019
|
3.00
|
CPI2 Ignition parts
|
Details
|
|
|
04-13-2019
|
8.00
|
Trim covers and vent acuators
|
Details
|
|
|
04-06-2019
|
8.00
|
Rear Window fitment
|
Details
|
|
|
03-23-2019
|
6.00
|
Interior upolstry started
|
Details
|
|
|
03-20-2019
|
4.00
|
More to the baffles
|
Details
|
|
|
03-16-2019
|
6.00
|
Hall Efect Sensor install for the ignition trigger
|
Details
|
|
|
03-14-2019
|
10.00
|
Run Spark Plug wires
|
Details
|
|
|
03-12-2019
|
1.00
|
Terminate sensor wires at the GEA24
|
Details
|
|
|
03-11-2019
|
2.00
|
Battery Shunt
|
Details
|
|
|
03-09-2019
|
5.00
|
More baffels
|
Details
|
|
|
03-05-2019
|
10.00
|
Alternator wiring
|
Details
|
|
|
03-02-2019
|
10.00
|
Ignition install
|
Details
|
|
|
02-22-2019
|
5.00
|
Throttle Mixture engine brackets
|
Details
|
|
|
02-20-2019
|
6.00
|
Install manifold press sensor and wire leeds
|
Details
|
|
|
02-18-2019
|
15.00
|
Continued Cowl details
|
Details
|
|
|
02-08-2019
|
15.00
|
Install the bottom cowl
|
Details
|
|
|
01-30-2019
|
10.00
|
Install the upper cowl
|
Details
|
|
|
01-29-2019
|
20.00
|
Install the prop
|
Details
|
|
|
01-28-2019
|
12.00
|
Sensor wire and routing
|
Details
|
|
|
01-26-2019
|
12.00
|
Baffeling baffels
|
Details
|
|
|
01-21-2019
|
20.00
|
Controls
|
Details
|
|
|
01-17-2019
|
20.00
|
plumbing
|
Details
|
|
|
01-09-2019
|
3.00
|
Hanging the engine
|
Details
|
|
|
01-07-2019
|
1.00
|
Recieved my engine
|
Details
|
|
|
01-01-2019
|
20.00
|
Prime the fuselage
|
Details
|
|
|
12-27-2018
|
20.00
|
Base coat the tail components
|
Details
|
|
|
12-17-2018
|
30.00
|
Observe Engine Build
|
Details
|
|
|
12-15-2018
|
20.00
|
Priming the tail surfaces
|
Details
|
|
|
12-10-2018
|
20.00
|
sand, fill, sand fil
|
Details
|
|
|
11-04-2018
|
8.00
|
Sanding the canopy
|
Details
|
|
|
10-16-2018
|
0.50
|
Propeller arrived today
|
Details
|
|
|
10-12-2018
|
6.00
|
Install GTX45R
|
Details
|
|
|
10-02-2018
|
20.00
|
Fitting left wing
|
Details
|
|
|
09-12-2018
|
20.00
|
Fitting the right wing
|
Details
|
|
|
09-03-2018
|
6.00
|
Install PFD and MFD
|
Details
|
|
|
08-16-2018
|
16.00
|
Left Bottom wing skin and tank
|
Details
|
|
|
07-30-2018
|
1.00
|
Purchase Engine and Prop
|
Details
|
|
|
07-12-2018
|
16.00
|
Rivet bottom skins on
|
Details
|
|
|
07-04-2018
|
15.00
|
drill, deburr and dimple right bottom wing skin
|
Details
|
|
|
07-02-2018
|
6.00
|
install landing light in the leading edgeI used th
|
Details
|
|
|
06-03-2018
|
7.00
|
Flap and Aileron gap renforcement
|
Details
|
|
|
05-24-2018
|
8.00
|
Wiring in the wings
|
Details
|
|
|
05-20-2018
|
6.00
|
Aileron electric trim servo
|
Details
|
|
|
05-12-2018
|
10.00
|
Right wing tip
|
Details
|
|
|
05-10-2018
|
11.00
|
Left wing tip trim drill and lens trim
|
Details
|
|
|
05-09-2018
|
2.00
|
Install Left tank and rig ailerons
|
Details
|
|
|
05-07-2018
|
2.00
|
Install right wing tank, remake push rod
|
Details
|
|
|
05-05-2018
|
8.00
|
Misc. wing tasks, tank testing, autopilot servo, e
|
Details
|
|
|
05-01-2018
|
10.00
|
Aileron actuation
|
Details
|
|
|
04-27-2018
|
8.00
|
Right Flap
|
Details
|
|
|
04-18-2018
|
18.00
|
Left flap
|
Details
|
|
|
04-16-2018
|
10.00
|
complete the right and left ailerons
|
Details
|
|
|
04-09-2018
|
4.00
|
Right tank rear baffel
|
Details
|
|
|
04-06-2018
|
10.00
|
Left and right Ailerons
|
Details
|
|
|
04-02-2018
|
6.00
|
Install left tank rear baffel
|
Details
|
|
|
03-29-2018
|
2.00
|
Install fuel senders
|
Details
|
|
|
03-25-2018
|
20.00
|
Right tank dis-assembly, debur, dimple and pre-as
|
Details
|
|
|
03-24-2018
|
14.00
|
Left Fuel tank deburr and assembly
|
Details
|
|
|
03-18-2018
|
9.00
|
Left and Right Fuel tanks
|
Details
|
|
|
03-15-2018
|
20.00
|
Outboard leading edges
|
Details
|
|
|
03-11-2018
|
12.00
|
Top skin on the right wing
|
Details
|
|
|
03-05-2018
|
18.00
|
Top skin left wing
|
Details
|
|
|
03-02-2018
|
15.00
|
Assemble Rear Spar and Aileron Brackets
|
Details
|
|
|
03-01-2018
|
17.00
|
Preassembly of Flap Brackets, rib attach
|
Details
|
|
|
02-25-2018
|
14.00
|
Wing spars
|
Details
|
|
|
02-19-2018
|
8.00
|
Leg intersection fairings, front gear leg fairing
|
Details
|
|
|
02-17-2018
|
8.00
|
Mount front pant
|
Details
|
|
|
02-14-2018
|
15.00
|
left brake assbly and wheel pant
|
Details
|
|
|
02-11-2018
|
5.00
|
Nose wheel pant prep
|
Details
|
|
|
02-08-2018
|
10.00
|
Prep and mount the wheel pants
|
Details
|
|
|
02-03-2018
|
15.00
|
Assemble the wheels, tires and gear
|
Details
|
|
|
02-02-2018
|
4.00
|
Fill, Smooth Blend Cabin top
|
Details
|
|
|
01-29-2018
|
5.00
|
Rivet top rear skin to closeout empennage
|
Details
|
|
|
01-27-2018
|
3.00
|
Main electrical leads and ELT test wire
|
Details
|
|
|
01-26-2018
|
8.00
|
Debug and install MP3 Stereo and CO detector
|
Details
|
|
|
01-22-2018
|
8.00
|
complete left side and right side panel etc.
|
Details
|
|
|
01-18-2018
|
10.00
|
Front left side closeout panel,Parking brake mount
|
Details
|
|
|
01-15-2018
|
10.00
|
Install switch plates
|
Details
|
|
|
01-05-2018
|
20.00
|
Switch plate swap
|
Details
|
|
|
01-01-2018
|
4.00
|
install switch plate backlights
|
Details
|
|
|
12-31-2017
|
4.00
|
Wire the Seat Heater/Door Indicator switchplate
|
Details
|
|
|
12-28-2017
|
5.00
|
Reinstall G5 to recess
|
Details
|
|
|
12-17-2017
|
8.00
|
Switch plates
|
Details
|
|
|
12-12-2017
|
1.50
|
Install transponder antenne
|
Details
|
|
|
12-09-2017
|
30.00
|
CNC capability and Switch Plate engraving
|
Details
|
|
|
12-05-2017
|
4.00
|
run pneumatics Pitot, AOA and static lines
|
Details
|
|
|
11-24-2017
|
10.00
|
Install GTN650 tray and connectors
|
Details
|
|
|
11-07-2017
|
4.00
|
Install coax for comm and ADS-B antene
|
Details
|
|
|
10-08-2017
|
2.00
|
installl rear NACA vent
|
Details
|
|
|
10-07-2017
|
3.00
|
add new buss bar in rear
|
Details
|
|
|
10-06-2017
|
0.00
|
Where all of my time has gone
|
Details
|
|
|
09-14-2017
|
6.00
|
Mount Magnatometer, G5 and GMC307
|
Details
|
|
|
09-04-2017
|
7.00
|
Install empanage fairing and remove tail feathers
|
Details
|
|
|
09-03-2017
|
5.00
|
Install the GTR20 remote radio and connector
|
Details
|
|
|
08-25-2017
|
10.00
|
working back along the harness with integration
|
Details
|
|
|
08-15-2017
|
8.00
|
rework heater duct for interferance
|
Details
|
|
|
08-12-2017
|
15.00
|
install headset jacks and USB outlets to center co
|
Details
|
|
|
08-11-2017
|
10.00
|
wire harness integration into main power distribut
|
Details
|
|
|
08-09-2017
|
4.00
|
PTT integration, Heater tube
|
Details
|
|
|
08-07-2017
|
20.00
|
integrating the harness into the aircraft
|
Details
|
|
|
08-04-2017
|
15.00
|
construct the wire harness
|
Details
|
|
|
08-02-2017
|
15.00
|
wire harness continued
|
Details
|
|
|
07-31-2017
|
60.00
|
develop detailed design for electrical
|
Details
|
|
|
07-25-2017
|
6.00
|
fabricate vent extensions
|
Details
|
|
|
07-04-2017
|
15.00
|
installed Ardunio and servos
|
Details
|
|
|
07-03-2017
|
8.00
|
A pillar closeouts installed
|
Details
|
|
|
06-29-2017
|
10.00
|
completed the door installatin details
|
Details
|
|
|
06-20-2017
|
0.00
|
bring forward work to date
|
Details
|
|
|
05-01-2017
|
6.00
|
Lift strut and external handles on the right side
|
Details
|
|
|
04-19-2017
|
7.00
|
left door pin holes, cam plate and door light
|
Details
|
|
|
04-17-2017
|
6.00
|
lift strut and external handles on right door
|
Details
|
|
|
04-16-2017
|
4.00
|
install lock and covers
|
Details
|
|
|
04-15-2017
|
4.00
|
Hinge covers continued
|
Details
|
|
|
04-14-2017
|
3.00
|
fabricate door trim covers
|
Details
|
|
|
04-12-2017
|
10.00
|
Right lift strut bracket and door light install
|
Details
|
|
|
04-02-2017
|
10.00
|
Door latch fitting continued
|
Details
|
|
|
03-29-2017
|
8.00
|
Door Latch fitting
|
Details
|
|
|
03-23-2017
|
4.00
|
trim windows
|
Details
|
|
|
03-21-2017
|
1.00
|
Door Seals
|
Details
|
|
|
03-20-2017
|
5.00
|
Hinge fitting
|
Details
|
|
|
03-19-2017
|
5.00
|
Fitting the door
|
Details
|
|
|
03-18-2017
|
5.00
|
trim dors
|
Details
|
|
|
03-10-2017
|
4.00
|
Bonding the inner and outer door
|
Details
|
|
|
03-08-2017
|
8.00
|
trim and fit doors
|
Details
|
|
|
03-05-2017
|
6.00
|
Final canopy top installation
|
Details
|
|
|
02-26-2017
|
12.00
|
Window trim ring contued
|
Details
|
|
|
02-23-2017
|
2.00
|
Window trim rings
|
Details
|
|
|
02-19-2017
|
6.00
|
modify seat mechanism
|
Details
|
|
|
02-16-2017
|
10.00
|
Control Stick angle adapters
|
Details
|
|
|
02-14-2017
|
10.00
|
installed the overhead
|
Details
|
|
|
02-11-2017
|
3.00
|
Installed Pitch Servo
|
Details
|
|
|
01-31-2017
|
1.00
|
GPS antennas
|
Details
|
|
|
01-30-2017
|
1.00
|
new catagory intro
|
Details
|
|
|
01-25-2017
|
6.00
|
Preping the rear bulkhead to fit the overhead
|
Details
|
|
|
01-23-2017
|
8.00
|
Instrument Panel centr=er stack
|
Details
|
|
|
01-17-2017
|
10.00
|
Ardunio heater servo control
|
Details
|
|
|
12-06-2016
|
6.00
|
Air duct fabrication
|
Details
|
|
|
11-05-2016
|
8.00
|
Overhead switch backlighting
|
Details
|
|
|
10-30-2016
|
3.00
|
Footwell lighting
|
Details
|
|
|
10-29-2016
|
6.00
|
Defrost fans, IP Brow light, Overhead map/reading
|
Details
|
|
|
10-23-2016
|
6.00
|
wiring the overhead
|
Details
|
|
|
10-18-2016
|
3.00
|
Finish kit arrived
|
Details
|
|
|
10-16-2016
|
4.00
|
Finish kit on the way, Footwell lighting 2 years
|
Details
|
|
|
09-02-2016
|
6.00
|
wire runs and install tunnel fan
|
Details
|
|
|
08-22-2016
|
3.00
|
VPX configuration
|
Details
|
|
|
08-20-2016
|
6.00
|
Master switch group install
|
Details
|
|
|
07-22-2016
|
3.00
|
switch and backlighting
|
Details
|
|
|
07-20-2016
|
1.00
|
switch work and remodeling delays
|
Details
|
|
|
06-15-2016
|
6.00
|
Revise instrument panel content and position
|
Details
|
|
|
05-16-2016
|
4.00
|
Switch back lighting
|
Details
|
|
|
04-25-2016
|
1.00
|
switch plates
|
Details
|
|
|
04-24-2016
|
4.00
|
Electrical diagrams for switch groups
|
Details
|
|
|
04-22-2016
|
4.00
|
rudder trim relay installed
|
Details
|
|
|
04-15-2016
|
4.00
|
Prewire overhead switch plate
|
Details
|
|
|
04-12-2016
|
4.00
|
Switch plate layut
|
Details
|
|
|
04-09-2016
|
4.00
|
Split the IP
|
Details
|
|
|
04-08-2016
|
1.00
|
Fuel pump, key switch wiring
|
Details
|
|
|
04-06-2016
|
5.00
|
Fly LED controler mounting and wiring
|
Details
|
|
|
04-04-2016
|
6.00
|
rudder trim tab wiring
|
Details
|
|
|
04-02-2016
|
4.00
|
added filler to rudder top faring
|
Details
|
|
|
03-28-2016
|
10.00
|
add rudder trim tab
|
Details
|
|
|
03-22-2016
|
2.00
|
overhead vents
|
Details
|
|
|
03-21-2016
|
2.00
|
reworked sub buss panel and ran wires
|
Details
|
|
|
03-20-2016
|
6.00
|
Center console Completion
|
Details
|
|
|
03-05-2016
|
6.00
|
Center stack installation
|
Details
|
|
|
02-28-2016
|
3.00
|
center console infusion
|
Details
|
|
|
02-26-2016
|
10.00
|
Center stach and console layup
|
Details
|
|
|
02-25-2016
|
2.00
|
mounted tail strobe
|
Details
|
|
|
02-22-2016
|
2.00
|
layed up second half of the center console mold
|
Details
|
|
|
02-21-2016
|
2.00
|
mounted LED tail strobe
|
Details
|
|
|
02-21-2016
|
0.00
|
commentary
|
Details
|
|
|
02-20-2016
|
7.00
|
back to the center console
|
Details
|
|
|
02-19-2016
|
4.00
|
LED Readinf ligh holders
|
Details
|
|
|
02-16-2016
|
6.00
|
Working on the VPX configuration
|
Details
|
|
|
02-14-2016
|
4.00
|
rudder trim wiring and set up
|
Details
|
|
|
02-13-2016
|
6.00
|
LED tail strobe
|
Details
|
|
|
02-09-2016
|
1.00
|
ordered parts for electrical etc..
|
Details
|
|
|
02-08-2016
|
3.00
|
IP center stack and console continued
|
Details
|
|
|
02-06-2016
|
2.00
|
installing and blending the tips
|
Details
|
|
|
02-05-2016
|
8.00
|
IP center stack and console fabrication
|
Details
|
|
|
01-30-2016
|
2.00
|
checking out the switches
|
Details
|
|
|
01-29-2016
|
4.00
|
molding the finish part
|
Details
|
|
|
01-25-2016
|
6.00
|
Overhead fab continues yet again
|
Details
|
|
|
01-20-2016
|
3.00
|
A pillar close outs continued
|
Details
|
|
|
01-19-2016
|
6.00
|
prewire switch panels
|
|
|
|
01-17-2016
|
4.00
|
electrical content, layout and switches
|
Details
|
|
|
01-16-2016
|
4.00
|
A pilllar covers
|
Details
|
|
|
01-15-2016
|
6.00
|
Overhead cont. 3 smoothing
|
Details
|
|
|
01-09-2016
|
6.00
|
Overhead fab 2
|
Details
|
|
|
01-05-2016
|
5.00
|
Overhead fabrication
|
Details
|
|
|
01-02-2016
|
5.00
|
Fly LED assembly
|
Details
|
|
|
12-31-2015
|
5.00
|
Install grips and wiire trim switches
|
Details
|
|
|
12-21-2015
|
6.00
|
main power leads and VPX ro insallation
|
Details
|
|
|
12-20-2015
|
6.00
|
install ELT
|
Details
|
|
|
12-16-2015
|
0.00
|
More electrical archetecture
|
Details
|
|
|
12-15-2015
|
6.00
|
Refine electrical main power distribution design
|
Details
|
|
|
12-14-2015
|
2.00
|
more window fitting
|
Details
|
|
|
12-13-2015
|
4.00
|
drill canopy and trim windows
|
Details
|
|
|
12-12-2015
|
2.00
|
drill center canopy support and trim windows
|
Details
|
|
|
12-11-2015
|
5.00
|
trim canopy top
|
Details
|
|
|
12-10-2015
|
3.00
|
Rudder cable and misc clean up
|
Details
|
|
|
12-09-2015
|
4.00
|
off the table and on temporary legs
|
Details
|
|
|
12-07-2015
|
2.00
|
elevator trim wire
|
Details
|
|
|
12-05-2015
|
3.00
|
Rework fuel system
|
Details
|
|
|
12-05-2015
|
5.00
|
Electrical Planning
|
Details
|
|
|
11-27-2015
|
6.00
|
rear seats and IP thoughts
|
Details
|
|
|
11-25-2015
|
7.00
|
upper front fuselage
|
Details
|
|
|
11-24-2015
|
10.00
|
Flap position sensor in/then out
|
Details
|
|
|
11-23-2015
|
6.00
|
Flap actuator and torque tubes
|
Details
|
|
|
11-19-2015
|
4.00
|
finish baggage door and tidy up
|
Details
|
|
|
11-16-2015
|
2.00
|
control system continued
|
Details
|
|
|
11-14-2015
|
8.00
|
Control linkages
|
Details
|
|
|
11-06-2015
|
2.00
|
brake lines
|
Details
|
|
|
10-31-2015
|
4.00
|
rudder cables, static lines
|
Details
|
|
|
10-30-2015
|
3.00
|
Rudd Brake assemblies
|
Details
|
|
|
10-28-2015
|
2.00
|
Rudder pedals
|
Details
|
|
|
10-25-2015
|
6.00
|
baggage door prep
|
Details
|
|
|
10-24-2015
|
7.00
|
rear bulkhead and side panels
|
Details
|
|
|
10-23-2015
|
4.00
|
more fuel installation
|
Details
|
|
|
10-16-2015
|
7.00
|
Right side rear floors
|
Details
|
|
|
10-15-2015
|
6.00
|
left/right side rear seat floors
|
Details
|
|
|
10-12-2015
|
4.00
|
Fuel lines
|
Details
|
|
|
10-10-2015
|
5.00
|
finialize left seat and rear floors
|
Details
|
|
|
10-08-2015
|
3.00
|
bagage floor stiffiners and dimples
|
Details
|
|
|
10-07-2015
|
3.00
|
Rear seat and bagage floor
|
Details
|
|
|
10-04-2015
|
7.00
|
final join, 1 year building
|
Details
|
|
|
10-03-2015
|
8.00
|
step bolt access, antenna access cover
|
Details
|
|
|
09-22-2015
|
3.00
|
Tailcone join
|
Details
|
|
|
09-21-2015
|
3.00
|
install steps w anti crush sleves
|
Details
|
|
|
09-20-2015
|
6.00
|
rivet front floors, install gear mounts
|
Details
|
|
|
09-19-2015
|
8.00
|
Left skins complete, left floor in
|
Details
|
|
|
09-15-2015
|
8.00
|
Rivet left skins and right forward floor
|
Details
|
|
|
09-13-2015
|
8.00
|
Attach and rivet skins
|
Details
|
|
|
08-30-2015
|
10.00
|
Forward frames and skin attach
|
Details
|
|
|
07-22-2015
|
0.00
|
Oshkosh 2015
|
Details
|
|
|
06-24-2015
|
3.00
|
Tech Counselor Visit
|
Details
|
|
|
06-21-2015
|
13.00
|
fit fwd longerons, ribs, bulkheads and skins
|
Details
|
|
|
06-01-2015
|
4.00
|
Bending and fitting mid skins
|
Details
|
|
|
05-22-2015
|
4.00
|
fitting the landing gear mounts
|
Details
|
|
|
05-14-2015
|
6.00
|
Fuselage front and mid join
|
Details
|
|
|
05-13-2015
|
6.00
|
forward fuselage , brake lines
|
Details
|
|
|
04-25-2015
|
12.00
|
Fwd bottom skin assembly
|
Details
|
|
|
04-14-2015
|
8.00
|
preassemble forward ribs and firewall
|
Details
|
|
|
04-03-2015
|
6.00
|
firewall assembly
|
Details
|
|
|
04-02-2015
|
10.00
|
Mid Fuselage bottom skin rivets
|
Details
|
|
|
03-31-2015
|
8.00
|
Mid Fuselage bottom
|
Details
|
|
|
03-16-2015
|
6.00
|
little sub assemblies become big sub assemblies
|
Details
|
|
|
03-15-2015
|
6.00
|
Seat supports, ribs and bulkheads
|
Details
|
|
|
03-14-2015
|
8.00
|
Mid fuselage bulkheads
|
Details
|
|
|
03-13-2015
|
4.00
|
more work on tips
|
Details
|
|
|
03-02-2015
|
8.00
|
more kit inventory and storage
|
Details
|
|
|
03-01-2015
|
8.00
|
Fuselage kit inventory
|
Details
|
|
|
03-01-2015
|
8.00
|
Elevator and Stabalizer tips
|
Details
|
|
|
02-11-2015
|
3.00
|
Pitch trim servo install
|
Details
|
|
|
02-01-2015
|
4.00
|
Tail feathers attach
|
Details
|
|
|
01-13-2015
|
7.00
|
completion of the tailcone
|
Details
|
|
|
01-11-2015
|
8.00
|
more riveting
|
Details
|
|
|
01-02-2015
|
19.00
|
tailcone final assembly
|
Details
|
|
|
12-30-2014
|
20.00
|
prep tailcone for final assembly
|
Details
|
|
|
12-29-2014
|
13.00
|
tailcone pre assembly D3C
|
Details
|
|
|
12-27-2014
|
12.00
|
Started Empannage/tailcone
|
Details
|
|
|
12-27-2014
|
6.00
|
finish elevator trim tabs
|
Details
|
|
|
12-16-2014
|
14.00
|
Elevator final assembly
|
Details
|
|
|
12-09-2014
|
8.00
|
Dissasembly, debur dimple countersink (D3C)
|
Details
|
|
|
12-06-2014
|
12.00
|
Pre assembly of elevators
|
Details
|
|
|
11-30-2014
|
10.00
|
Stabilizer final assembly
|
Details
|
|
|
11-26-2014
|
12.00
|
Stabilizer pre assembly
|
Details
|
|
|
11-14-2014
|
6.00
|
Started Stabilizer
|
Details
|
|
|
10-24-2014
|
4.00
|
Assemble rudder
|
Details
|
|
|
10-17-2014
|
12.00
|
Rudder initial assembly
|
Details
|
|
|
10-17-2014
|
12.00
|
Rudder final assembly
|
Details
|
|
|
10-12-2014
|
8.00
|
Prime and assemble Vert Stab
|
Details
|
|
|
10-12-2014
|
8.00
|
Prime and assemble the Vert Stab components.
|
Details
|
|
|
10-08-2014
|
6.00
|
Complete match drilling/debur of Vert Stab
|
Details
|
|
|
10-05-2014
|
2.00
|
Prep Vetr Stab spar
|
Details
|
|
|
10-01-2014
|
0.00
|
Puild Preface
|
Details
|
|