Work Logs Found: 305
Category Work Time: 2609 Hours
 Date
Hours
Work Log Summary

Details

 07-29-2020
1.00
More photos of final paint
Details
       

 07-28-2020
1.00
Painting details
Details
       

 07-27-2020
50.00
Flying and Final paint job
Details
       

 07-26-2020
1.00
Flight test update
Details
     

 12-30-2019
50.00
Final assembly, problem solving, first engine star
Details

 12-10-2019
100.00
Painting and moving the project to airport
Details
       

 11-09-2019
75.00
Painting fiberglass parts
Details

 10-17-2019
2.00
Bleed Brake lines
Details

 10-12-2019
8.00
Fabricate oil door hinge
Details
       

 10-11-2019
1.00
A few photos of the interior
Details
       

 10-10-2019
16.00
Complete the Airbox install
Details

 10-05-2019
14.00
Airbox build
Details

 09-28-2019
10.00
Baffle fabric install
Details
       

 09-21-2019
12.00
Glass windshield Fairing
Details
     

 09-14-2019
12.00
Glue in windshield
Details
     

 09-08-2019
5.00
Final fitting of the wind shield
Details

 09-05-2019
10.00
Closing the front upper skin .... yeah!
Details
       

 09-03-2019
30.00
Continue configuring the G3X communication channel
Details

 08-17-2019
15.00
Install Windows
Details
     

 08-10-2019
15.00
Debug G3X and correct minor issues
Details
       

 08-05-2019
20.00
Install seat heater wiring and switches
Details
     

 07-19-2019
20.00
fit and install panels
Details
     

 06-25-2019
12.00
More fitting of panels, Seats arrived in the shop
Details
       

 06-15-2019
18.00
Fitting panels
Details
       

 06-05-2019
10.00
Fitting leather wraped panels
Details
       

 05-29-2019
8.00
Terminate all engine sensor and CPI wiring
Details
       

 05-22-2019
12.00
Installl CPI LCD and fit up the center stack close
Details
       

 04-22-2019
6.00
Install CPI2 electronics
Details
       

 04-19-2019
8.00
Head rest for the rear seats
Details
       

 04-16-2019
3.00
CPI2 Ignition parts
Details
       

 04-13-2019
8.00
Trim covers and vent acuators
Details
       

 04-06-2019
8.00
Rear Window fitment
Details

 03-23-2019
6.00
Interior upolstry started
Details
       

 03-20-2019
4.00
More to the baffles
Details
     

 03-16-2019
6.00
Hall Efect Sensor install for the ignition trigger
Details
       

 03-14-2019
10.00
Run Spark Plug wires
Details
       

 03-12-2019
1.00
Terminate sensor wires at the GEA24
Details
       

 03-11-2019
2.00
Battery Shunt
Details
     

 03-09-2019
5.00
More baffels
Details
       

 03-05-2019
10.00
Alternator wiring
Details
       

 03-02-2019
10.00
Ignition install
Details
       

 02-22-2019
5.00
Throttle Mixture engine brackets
Details
     

 02-20-2019
6.00
Install manifold press sensor and wire leeds
Details
     

 02-18-2019
15.00
Continued Cowl details
Details
       

 02-08-2019
15.00
Install the bottom cowl
Details
     

 01-30-2019
10.00
Install the upper cowl
Details
       

 01-29-2019
20.00
Install the prop
Details
       

 01-28-2019
12.00
Sensor wire and routing
Details
       

 01-26-2019
12.00
Baffeling baffels
Details
       

 01-21-2019
20.00
Controls
Details
       

 01-17-2019
20.00
plumbing
Details
     

 01-09-2019
3.00
Hanging the engine
Details
       

 01-07-2019
1.00
Recieved my engine
Details
       

 01-01-2019
20.00
Prime the fuselage
Details
     

 12-27-2018
20.00
Base coat the tail components
Details
     

 12-17-2018
30.00
Observe Engine Build
Details
     

 12-15-2018
20.00
Priming the tail surfaces
Details
       

 12-10-2018
20.00
sand, fill, sand fil
Details
       

 11-04-2018
8.00
Sanding the canopy
Details
     

 10-16-2018
0.50
Propeller arrived today
Details
     

 10-12-2018
6.00
Install GTX45R
Details

 10-02-2018
20.00
Fitting left wing
Details
       

 09-12-2018
20.00
Fitting the right wing
Details
       

 09-03-2018
6.00
Install PFD and MFD
Details
       

 08-16-2018
16.00
Left Bottom wing skin and tank
Details
       

 07-30-2018
1.00
Purchase Engine and Prop
Details
     

 07-12-2018
16.00
Rivet bottom skins on
Details
       

 07-04-2018
15.00
drill, deburr and dimple right bottom wing skin
Details
     

 07-02-2018
6.00
install landing light in the leading edgeI used th
Details
       

 06-03-2018
7.00
Flap and Aileron gap renforcement
Details
     

 05-24-2018
8.00
Wiring in the wings
Details
     

 05-20-2018
6.00
Aileron electric trim servo
Details
       

 05-12-2018
10.00
Right wing tip
Details
       

 05-10-2018
11.00
Left wing tip trim drill and lens trim
Details
     

 05-09-2018
2.00
Install Left tank and rig ailerons
Details
     

 05-07-2018
2.00
Install right wing tank, remake push rod
Details
     

 05-05-2018
8.00
Misc. wing tasks, tank testing, autopilot servo, e
Details
       

 05-01-2018
10.00
Aileron actuation
Details
       

 04-27-2018
8.00
Right Flap
Details
     

 04-18-2018
18.00
Left flap
Details
       

 04-16-2018
10.00
complete the right and left ailerons
Details
       

 04-09-2018
4.00
Right tank rear baffel
Details
     

 04-06-2018
10.00
Left and right Ailerons
Details
       

 04-02-2018
6.00
Install left tank rear baffel
Details
     

 03-29-2018
2.00
Install fuel senders
Details
     

 03-25-2018
20.00
Right tank dis-assembly, debur, dimple and pre-as
Details
       

 03-24-2018
14.00
Left Fuel tank deburr and assembly
Details
       

 03-18-2018
9.00
Left and Right Fuel tanks
Details
       

 03-15-2018
20.00
Outboard leading edges
Details
       

 03-11-2018
12.00
Top skin on the right wing
Details
       

 03-05-2018
18.00
Top skin left wing
Details
       

 03-02-2018
15.00
Assemble Rear Spar and Aileron Brackets
Details
       

 03-01-2018
17.00
Preassembly of Flap Brackets, rib attach
Details
       

 02-25-2018
14.00
Wing spars
Details
       

 02-19-2018
8.00
Leg intersection fairings, front gear leg fairing
Details
       

 02-17-2018
8.00
Mount front pant
Details
       

 02-14-2018
15.00
left brake assbly and wheel pant
Details
       

 02-11-2018
5.00
Nose wheel pant prep
Details
       

 02-08-2018
10.00
Prep and mount the wheel pants
Details
       

 02-03-2018
15.00
Assemble the wheels, tires and gear
Details
       

 02-02-2018
4.00
Fill, Smooth Blend Cabin top
Details
     

 01-29-2018
5.00
Rivet top rear skin to closeout empennage
Details
       

 01-27-2018
3.00
Main electrical leads and ELT test wire
Details
     

 01-26-2018
8.00
Debug and install MP3 Stereo and CO detector
Details
       

 01-22-2018
8.00
complete left side and right side panel etc.
Details
       

 01-18-2018
10.00
Front left side closeout panel,Parking brake mount
Details
       

 01-15-2018
10.00
Install switch plates
Details
       

 01-05-2018
20.00
Switch plate swap
Details
       

 01-01-2018
4.00
install switch plate backlights
Details
       

 12-31-2017
4.00
Wire the Seat Heater/Door Indicator switchplate
Details
       

 12-28-2017
5.00
Reinstall G5 to recess
Details
       

 12-17-2017
8.00
Switch plates
Details
       

 12-12-2017
1.50
Install transponder antenne
Details
       

 12-09-2017
30.00
CNC capability and Switch Plate engraving
Details
       

 12-05-2017
4.00
run pneumatics Pitot, AOA and static lines
Details
     

 11-24-2017
10.00
Install GTN650 tray and connectors
Details
       

 11-07-2017
4.00
Install coax for comm and ADS-B antene
Details
     

 10-08-2017
2.00
installl rear NACA vent
Details
     

 10-07-2017
3.00
add new buss bar in rear
Details
       

 10-06-2017
0.00
Where all of my time has gone
Details
       

 09-14-2017
6.00
Mount Magnatometer, G5 and GMC307
Details
       

 09-04-2017
7.00
Install empanage fairing and remove tail feathers
Details
       

 09-03-2017
5.00
Install the GTR20 remote radio and connector
Details
     

 08-25-2017
10.00
working back along the harness with integration
Details
       

 08-15-2017
8.00
rework heater duct for interferance
Details
       

 08-12-2017
15.00
install headset jacks and USB outlets to center co
Details
       

 08-11-2017
10.00
wire harness integration into main power distribut
Details
       

 08-09-2017
4.00
PTT integration, Heater tube
Details

 08-07-2017
20.00
integrating the harness into the aircraft
Details
       

 08-04-2017
15.00
construct the wire harness
Details
       

 08-02-2017
15.00
wire harness continued
Details
       

 07-31-2017
60.00
develop detailed design for electrical
Details
       

 07-25-2017
6.00
fabricate vent extensions
Details
       

 07-04-2017
15.00
installed Ardunio and servos
Details
       

 07-03-2017
8.00
A pillar closeouts installed
Details
       

 06-29-2017
10.00
completed the door installatin details
Details

 06-20-2017
0.00
bring forward work to date
Details

 05-01-2017
6.00
Lift strut and external handles on the right side
Details
       

 04-19-2017
7.00
left door pin holes, cam plate and door light
Details
       

 04-17-2017
6.00
lift strut and external handles on right door
Details
     

 04-16-2017
4.00
install lock and covers
Details
       

 04-15-2017
4.00
Hinge covers continued
Details
       

 04-14-2017
3.00
fabricate door trim covers
Details
       

 04-12-2017
10.00
Right lift strut bracket and door light install
Details
       

 04-02-2017
10.00
Door latch fitting continued
Details
       

 03-29-2017
8.00
Door Latch fitting
Details
       

 03-23-2017
4.00
trim windows
Details

 03-21-2017
1.00
Door Seals
Details
     

 03-20-2017
5.00
Hinge fitting
Details
       

 03-19-2017
5.00
Fitting the door
Details
       

 03-18-2017
5.00
trim dors
Details
       

 03-10-2017
4.00
Bonding the inner and outer door
Details
       

 03-08-2017
8.00
trim and fit doors
Details
       

 03-05-2017
6.00
Final canopy top installation
Details
       

 02-26-2017
12.00
Window trim ring contued
Details
       

 02-23-2017
2.00
Window trim rings
Details
       

 02-19-2017
6.00
modify seat mechanism
Details
     

 02-16-2017
10.00
Control Stick angle adapters
Details
       

 02-14-2017
10.00
installed the overhead
Details
       

 02-11-2017
3.00
Installed Pitch Servo
Details
     

 01-31-2017
1.00
GPS antennas
Details

 01-30-2017
1.00
new catagory intro
Details

 01-25-2017
6.00
Preping the rear bulkhead to fit the overhead
Details
     

 01-23-2017
8.00
Instrument Panel centr=er stack
Details
       

 01-17-2017
10.00
Ardunio heater servo control
Details
       

 12-06-2016
6.00
Air duct fabrication
Details
       

 11-05-2016
8.00
Overhead switch backlighting
Details
     

 10-30-2016
3.00
Footwell lighting
Details
       

 10-29-2016
6.00
Defrost fans, IP Brow light, Overhead map/reading
Details
       

 10-23-2016
6.00
wiring the overhead
Details
       

 10-18-2016
3.00
Finish kit arrived
Details
       

 10-16-2016
4.00
Finish kit on the way, Footwell lighting 2 years
Details
       

 09-02-2016
6.00
wire runs and install tunnel fan
Details
       

 08-22-2016
3.00
VPX configuration
Details
     

 08-20-2016
6.00
Master switch group install
Details
       

 07-22-2016
3.00
switch and backlighting
Details
       

 07-20-2016
1.00
switch work and remodeling delays
Details
       

 06-15-2016
6.00
Revise instrument panel content and position
Details
       

 05-16-2016
4.00
Switch back lighting
Details
       

 04-25-2016
1.00
switch plates
Details
     

 04-24-2016
4.00
Electrical diagrams for switch groups
Details
       

 04-22-2016
4.00
rudder trim relay installed
Details
       

 04-15-2016
4.00
Prewire overhead switch plate
Details
       

 04-12-2016
4.00
Switch plate layut
Details
       

 04-09-2016
4.00
Split the IP
Details
       

 04-08-2016
1.00
Fuel pump, key switch wiring
Details
       

 04-06-2016
5.00
Fly LED controler mounting and wiring
Details
     

 04-04-2016
6.00
rudder trim tab wiring
Details
       

 04-02-2016
4.00
added filler to rudder top faring
Details
       

 03-28-2016
10.00
add rudder trim tab
Details
       

 03-22-2016
2.00
overhead vents
Details
     

 03-21-2016
2.00
reworked sub buss panel and ran wires
Details
     

 03-20-2016
6.00
Center console Completion
Details
       

 03-05-2016
6.00
Center stack installation
Details
     

 02-28-2016
3.00
center console infusion
Details
       

 02-26-2016
10.00
Center stach and console layup
Details
       

 02-25-2016
2.00
mounted tail strobe
Details
     

 02-22-2016
2.00
layed up second half of the center console mold
Details
     

 02-21-2016
2.00
mounted LED tail strobe
Details
     

 02-21-2016
0.00
commentary
Details

 02-20-2016
7.00
back to the center console
Details
       

 02-19-2016
4.00
LED Readinf ligh holders
Details
       

 02-16-2016
6.00
Working on the VPX configuration
Details
     

 02-14-2016
4.00
rudder trim wiring and set up
Details
       

 02-13-2016
6.00
LED tail strobe
Details
     

 02-09-2016
1.00
ordered parts for electrical etc..
Details
     

 02-08-2016
3.00
IP center stack and console continued
Details
       

 02-06-2016
2.00
installing and blending the tips
Details
       

 02-05-2016
8.00
IP center stack and console fabrication
Details
     

 01-30-2016
2.00
checking out the switches
Details
       

 01-29-2016
4.00
molding the finish part
Details
       

 01-25-2016
6.00
Overhead fab continues yet again
Details
       

 01-20-2016
3.00
A pillar close outs continued
Details
       

 01-19-2016
6.00
prewire switch panels
       

 01-17-2016
4.00
electrical content, layout and switches
Details
       

 01-16-2016
4.00
A pilllar covers
Details
       

 01-15-2016
6.00
Overhead cont. 3 smoothing
Details
     

 01-09-2016
6.00
Overhead fab 2
Details
       

 01-05-2016
5.00
Overhead fabrication
Details
       

 01-02-2016
5.00
Fly LED assembly
Details
     

 12-31-2015
5.00
Install grips and wiire trim switches
Details
       

 12-21-2015
6.00
main power leads and VPX ro insallation
Details
       

 12-20-2015
6.00
install ELT
Details
       

 12-16-2015
0.00
More electrical archetecture
Details

 12-15-2015
6.00
Refine electrical main power distribution design
Details
     

 12-14-2015
2.00
more window fitting
Details
       

 12-13-2015
4.00
drill canopy and trim windows
Details
       

 12-12-2015
2.00
drill center canopy support and trim windows
Details
       

 12-11-2015
5.00
trim canopy top
Details
     

 12-10-2015
3.00
Rudder cable and misc clean up
Details
     

 12-09-2015
4.00
off the table and on temporary legs
Details
       

 12-07-2015
2.00
elevator trim wire
Details
       

 12-05-2015
3.00
Rework fuel system
Details
       

 12-05-2015
5.00
Electrical Planning
Details

 11-27-2015
6.00
rear seats and IP thoughts
Details
       

 11-25-2015
7.00
upper front fuselage
Details
       

 11-24-2015
10.00
Flap position sensor in/then out
Details
       

 11-23-2015
6.00
Flap actuator and torque tubes
Details
       

 11-19-2015
4.00
finish baggage door and tidy up
Details
       

 11-16-2015
2.00
control system continued
Details
       

 11-14-2015
8.00
Control linkages
Details
       

 11-06-2015
2.00
brake lines
Details
     

 10-31-2015
4.00
rudder cables, static lines
Details
       

 10-30-2015
3.00
Rudd Brake assemblies
Details
       

 10-28-2015
2.00
Rudder pedals
Details
       

 10-25-2015
6.00
baggage door prep
Details
       

 10-24-2015
7.00
rear bulkhead and side panels
Details
       

 10-23-2015
4.00
more fuel installation
Details
       

 10-16-2015
7.00
Right side rear floors
Details
     

 10-15-2015
6.00
left/right side rear seat floors
Details
       

 10-12-2015
4.00
Fuel lines
Details
       

 10-10-2015
5.00
finialize left seat and rear floors
Details
       

 10-08-2015
3.00
bagage floor stiffiners and dimples
Details
     

 10-07-2015
3.00
Rear seat and bagage floor
Details
       

 10-04-2015
7.00
final join, 1 year building
Details
       

 10-03-2015
8.00
step bolt access, antenna access cover
Details
       

 09-22-2015
3.00
Tailcone join
Details
       

 09-21-2015
3.00
install steps w anti crush sleves
Details
       

 09-20-2015
6.00
rivet front floors, install gear mounts
Details
       

 09-19-2015
8.00
Left skins complete, left floor in
Details
       

 09-15-2015
8.00
Rivet left skins and right forward floor
Details
       

 09-13-2015
8.00
Attach and rivet skins
Details
       

 08-30-2015
10.00
Forward frames and skin attach
Details
       

 07-22-2015
0.00
Oshkosh 2015
Details

 06-24-2015
3.00
Tech Counselor Visit
Details

 06-21-2015
13.00
fit fwd longerons, ribs, bulkheads and skins
Details
     

 06-01-2015
4.00
Bending and fitting mid skins
Details
       

 05-22-2015
4.00
fitting the landing gear mounts
Details
       

 05-14-2015
6.00
Fuselage front and mid join
Details
       

 05-13-2015
6.00
forward fuselage , brake lines
Details
     

 04-25-2015
12.00
Fwd bottom skin assembly
Details
       

 04-14-2015
8.00
preassemble forward ribs and firewall
Details
       

 04-03-2015
6.00
firewall assembly
Details
       

 04-02-2015
10.00
Mid Fuselage bottom skin rivets
Details
     

 03-31-2015
8.00
Mid Fuselage bottom
Details
       

 03-16-2015
6.00
little sub assemblies become big sub assemblies
Details
       

 03-15-2015
6.00
Seat supports, ribs and bulkheads
Details
       

 03-14-2015
8.00
Mid fuselage bulkheads
Details
       

 03-13-2015
4.00
more work on tips
Details
       

 03-02-2015
8.00
more kit inventory and storage
Details
     

 03-01-2015
8.00
Fuselage kit inventory
Details
       

 03-01-2015
8.00
Elevator and Stabalizer tips
Details
       

 02-11-2015
3.00
Pitch trim servo install
Details
       

 02-01-2015
4.00
Tail feathers attach
Details
       

 01-13-2015
7.00
completion of the tailcone
Details
       

 01-11-2015
8.00
more riveting
Details
     

 01-02-2015
19.00
tailcone final assembly
Details
       

 12-30-2014
20.00
prep tailcone for final assembly
Details
       

 12-29-2014
13.00
tailcone pre assembly D3C
Details
       

 12-27-2014
12.00
Started Empannage/tailcone
Details
       

 12-27-2014
6.00
finish elevator trim tabs
Details
     

 12-16-2014
14.00
Elevator final assembly
Details
       

 12-09-2014
8.00
Dissasembly, debur dimple countersink (D3C)
Details
       

 12-06-2014
12.00
Pre assembly of elevators
Details
       

 11-30-2014
10.00
Stabilizer final assembly
Details
     

 11-26-2014
12.00
Stabilizer pre assembly
Details
     

 11-14-2014
6.00
Started Stabilizer
Details
       

 10-24-2014
4.00
Assemble rudder
Details
       

 10-17-2014
12.00
Rudder initial assembly
Details
     

 10-17-2014
12.00
Rudder final assembly
Details
     

 10-12-2014
8.00
Prime and assemble Vert Stab
Details
     

 10-12-2014
8.00
Prime and assemble the Vert Stab components.
Details
     

 10-08-2014
6.00
Complete match drilling/debur of Vert Stab
Details
       

 10-05-2014
2.00
Prep Vetr Stab spar
Details

 10-01-2014
0.00
Puild Preface
Details
     