Date
|
Hours
|
Work Log Summary

|
Details

|
02-09-2021
|
3.50
|
Voltage Regulator Connections
|
Details
|
|
|
02-09-2021
|
3.50
|
P-Mag Electronic Ignition Wiring
|
Details
|
|
|
02-02-2021
|
1.00
|
Manifold Pressure Line
|
Details
|
|
|
01-20-2021
|
2.00
|
Firewall/Engine Ground
|
Details
|
|
|
01-19-2021
|
1.00
|
Quadrant Cable Relocation Part 3
|
|
|
|
01-19-2021
|
6.00
|
Quadrant Cable Relocation Part 2
|
Details
|
|
|
01-18-2021
|
4.00
|
Quadrant Cable Relocation Part 1
|
Details
|
  |
|
01-13-2021
|
5.00
|
Rear Throttle Linkage
|
Details
|
|
|
01-11-2021
|
5.00
|
Cable Mounting Bracket Fabrication Part 4
|
Details
|
|
|
01-07-2021
|
4.00
|
Cable Mounting Bracket Fabrication Part 3
|
Details
|
|
|
01-07-2021
|
3.00
|
Cable Mounting Bracket Fabrication Part 2
|
Details
|
|
|
01-06-2021
|
4.50
|
Cable Mounting Bracket Fabrication Part 1
|
Details
|
|
|
01-01-2021
|
1.50
|
Engine Control Cable Relocation Part 3
|
Details
|
 |
|
12-31-2020
|
1.00
|
Engine Control Cable Relocation Part 2
|
Details
|
 |
|
12-27-2020
|
5.00
|
Engine Control Cable Relocation Part 1
|
Details
|
 |
|
12-17-2020
|
3.00
|
Altlernator Regulator Preliminary Wiring,
|
Details
|
 |
|
12-07-2020
|
2.50
|
GPS Shelf Work
|
Details
|
|
|
12-05-2020
|
3.00
|
Alternator "B" Leads Made
|
Details
|
|
|
11-07-2020
|
6.00
|
Heat Valve, Mixture Bracke, Prop Gov Bracket
|
Details
|
  |
|
07-28-2020
|
1.50
|
Vetterman Exhaust System Installation Part 4
|
|
|
|
07-28-2020
|
1.50
|
Vetterman Exhaust System Installation Part 3
|
Details
|
|
|
07-28-2020
|
3.00
|
Vetterman Exhaust System Installation Part 2
|
Details
|
|
|
07-28-2020
|
3.00
|
Vetterman Exhaust System Installation Part 1
|
Details
|
|
|
06-17-2020
|
3.50
|
Canopy Bow, Seat Back Support Final Install
|
Details
|
|
|
06-15-2020
|
3.00
|
Fabricate Tank Attach Brackets
|
Details
|
|
|
06-11-2020
|
6.00
|
Fairings
|
Details
|
|
|
06-10-2020
|
0.00
|
Powder Coated Canopy Parts.
|
Details
|
 |
|
06-09-2020
|
2.00
|
Mounting the Engine Part 2
|
|
|
|
06-09-2020
|
2.00
|
Mounting the Engine Part 1
|
Details
|
|
|
06-08-2020
|
2.00
|
Touch up paint, canopy rails, seat back support
|
Details
|
|
|
06-08-2020
|
1.00
|
Engine mounts, engine hanging preparation
|
Details
|
|
|
06-07-2020
|
2.00
|
Firewall Pass Thru Locations Part 4
|
Details
|
 |
|
06-06-2020
|
0.50
|
Firewall Pass Thru Locations Part 3
|
|
|
|
06-06-2020
|
1.50
|
Firewall Pass Thru Locations Part 2
|
Details
|
|
|
06-06-2020
|
1.00
|
Firewall Pass Thru Locations Part 1
|
Details
|
|
|
06-05-2020
|
1.50
|
Stainless Steel Heat Valve
|
Details
|
  |
|
06-04-2020
|
3.00
|
Landing Gear Wheel Brakes.
|
Details
|
|
|
02-10-2020
|
1.00
|
The Engine finally arrives
|
Details
|
|
|
02-09-2020
|
3.00
|
Adding air vent ducting flanges.
|
|
|
|
01-09-2020
|
3.00
|
Nav/Strobe Lights and Pitot Heat Part 2
|
Details
|
|
|
01-09-2020
|
2.00
|
Nav/Strobe Lights and Pitot Heat Part 1
|
Details
|
|
|
01-08-2020
|
5.00
|
Wiring the Taxi Light and Pitot Heat system.
|
Details
|
|
|
01-05-2020
|
2.00
|
Landing Light electrical connections.
|
Details
|
|
|
01-04-2020
|
3.00
|
Installing and wiring front communication jacks.
|
Details
|
|
|
05-15-2018
|
1.00
|
Installling canopy retainer block
|
|
|
|
05-03-2018
|
2.00
|
Bending the canopy frame to fit.
|
|
|
|
05-03-2018
|
1.00
|
Bending the canopy frame part 2
|
|
|
|
05-02-2018
|
2.50
|
Canopy slider cap and rear harness mounts.
|
Details
|
|
|
05-02-2018
|
2.50
|
Canopy Frame and Canopy Side Rails.
|
Details
|
|
|
05-01-2018
|
3.00
|
Aft Fuselage Top Skin, Rear Canopy Slide Rail.
|
Details
|
 |
|
04-30-2018
|
4.00
|
Canopy Bow and Canopy Slide Cap.
|
Details
|
 |
|
04-21-2018
|
3.00
|
Assemble the canopy slide rail.
|
|
  |
|
04-18-2018
|
3.50
|
Riveting the Aft Fuselage Top Skin
|
Details
|
|
|
01-19-2018
|
4.00
|
Finishing the avionics shelves.
|
Details
|
|
|
01-18-2018
|
1.00
|
Fabricate a second avionics shelf.
|
Details
|
 |
|
12-14-2017
|
2.50
|
Fabricating the second avionics shelf.
|
Details
|
|
|
12-08-2017
|
3.50
|
Fabricating the avionics shelf.
|
Details
|
|
|
12-01-2017
|
4.00
|
Fabricate avionics shelf for Transponder, GAD-29
|
Details
|
|
|
11-24-2017
|
3.50
|
Fabricate a mounting shelf for the GMU-11
|
Details
|
|
|
11-13-2017
|
6.00
|
Avionics access door Part 4
|
Details
|
|
|
11-13-2017
|
2.00
|
Avionics access door Part 3
|
Details
|
|
|
11-12-2017
|
2.00
|
Avionics access door Part 2
|
Details
|
|
|
11-12-2017
|
6.00
|
Avionics access door Part 1
|
Details
|
|
|
11-11-2017
|
1.00
|
Forward Baggage Door Lock
|
Details
|
|
|
11-03-2017
|
2.50
|
Installed Garmin GSA28 elevator pitch servo
|
Details
|
|
|
11-02-2017
|
1.00
|
Installed Garmin GSA28 Roll Servo
|
|
 |
|
11-01-2017
|
4.00
|
Mounting the ELT Bracket.
|
|
|
|
10-31-2017
|
1.00
|
ELT Mounting Bracket
|
Details
|
 |
|
10-26-2017
|
1.50
|
Final riveting of the forward baggage door Part 2
|
Details
|
|
|
10-26-2017
|
2.00
|
Final riveting of the forward baggage door Part 1.
|
|
|
|
10-25-2017
|
3.50
|
Baggage Door prep for rivets.
|
Details
|
 |
|
10-24-2017
|
0.50
|
Fabricate a shim for the forward baggage door.
|
Details
|
 |
|
10-20-2017
|
3.00
|
Assemble the Forward Baggage Door.
|
|
|
|
10-19-2017
|
2.00
|
Installed the Brake Reservoir to Master cylinder L
|
Details
|
|
|
10-19-2017
|
2.00
|
Forward upper skin dimpling/countersink understruc
|
Details
|
|
|
10-18-2017
|
0.50
|
Build Brake Reservoir Line Fittings.
|
Details
|
 |
|
10-12-2017
|
3.50
|
Prepare the forwad upper fuselage skin
|
Details
|
|
|
10-11-2017
|
2.00
|
Install the instrument panel.
|
Details
|
|
|
10-04-2017
|
0.50
|
Fabricate the fuel pump to firewall/engine line.
|
Details
|
 |
|
10-03-2017
|
5.00
|
Fabricating fuel valve fuel lines
|
|
|
|
10-02-2017
|
5.00
|
Fabricating fuel vent lines and fuel supply line.
|
Details
|
|
|
10-01-2017
|
8.00
|
Fuel filter and fuel pump mounting
|
Details
|
|
|
09-23-2017
|
4.00
|
Fabricated the Left Brake Line
|
Details
|
|
|
09-22-2017
|
4.00
|
Fabricate right brake line.
|
Details
|
|
|
06-01-2017
|
3.00
|
Rear Rudder Pedal installation
|
Details
|
|
|
05-31-2017
|
3.50
|
final instal rudder pedals
|
Details
|
|
|
05-24-2017
|
2.00
|
Static system and tail light.
|
Details
|
|
|
05-23-2017
|
1.00
|
Pitot Static Ports installation.
|
Details
|
|
|
05-22-2017
|
1.00
|
Cut the plywood backboards
|
Details
|
 |
|
05-09-2017
|
1.50
|
Trimming, match drilling rudder cable fairings.
|
Details
|
|
|
05-09-2017
|
1.50
|
Bulhead Gussets and tie down ring retainer.
|
Details
|
|
|
05-04-2017
|
1.50
|
Rear baggage bulkhead, Canopy Rail Receptacle.
|
Details
|
|
|
05-04-2017
|
2.00
|
Attach the 4 aft bulkheads
|
Details
|
|
|
05-03-2017
|
1.00
|
Flap actuator and flap motor assembly
|
Details
|
  |
|
05-02-2017
|
4.00
|
Perpared the Instrument Panel Assembly.
|
Details
|
|
|
04-28-2017
|
2.00
|
Instrument Panel and Sub Panels attach prep.
|
Details
|
|
|
04-24-2017
|
3.00
|
Seat floor assembly.
|
Details
|
|
|
04-19-2017
|
5.50
|
Seat floor and footwell assembly.
|
Details
|
|
|
04-17-2017
|
6.00
|
Interior Paint
|
Details
|
  |
|
04-12-2017
|
6.00
|
Interior Fuselage Paint
|
Details
|
  |
|
04-11-2017
|
8.00
|
Fuselage prep for interior paint.
|
Details
|
  |
|
04-05-2017
|
1.00
|
Aft fuselage turtledeck.
|
Details
|
  |
|
04-04-2017
|
2.00
|
Removing the horizontal and vertical stabilizers.
|
Details
|
  |
|
04-03-2017
|
1.00
|
Rear Throttle Quadrant
|
Details
|
 |
|
04-02-2017
|
3.00
|
Firewall rotissierie mount
|
Details
|
 |
|
03-27-2017
|
4.00
|
Service Bulletin 16-12-16
|
Details
|
|
|
03-10-2017
|
4.00
|
Fuel Valve Instalation
|
|
|
|
03-05-2017
|
2.00
|
Right Armrest and Console
|
Details
|
|
|
03-04-2017
|
6.00
|
Right side armrest and console
|
|
|
|
02-14-2017
|
4.00
|
Modified Armrest and Throttle Quadrant Part 5
|
Details
|
 |
|
02-09-2017
|
0.00
|
Finish Kit Arrives
|
Details
|
 |
|
01-17-2017
|
4.00
|
Modified armrest and throttle quadrant Part 4
|
Details
|
|
|
01-17-2017
|
4.00
|
Modified armrest and throttle quadrant Part 4
|
Details
|
|
|
01-17-2017
|
4.00
|
Modified armrest and throttle quadrant Part 3
|
Details
|
|
|
01-16-2017
|
3.00
|
Modified armrest and throttle quadrant Part 2
|
Details
|
|
|
01-10-2017
|
6.00
|
Modified armrest and throttle quadrant Part 1
|
Details
|
|
|
01-03-2017
|
5.00
|
Rudder Pedals and Control Cables Part 2
|
Details
|
|
|
12-22-2016
|
4.00
|
Rudder Pedals and Control Cables.
|
Details
|
|
|
12-16-2016
|
0.00
|
Grove Landing Gear Arrives
|
|
 |
|
10-29-2016
|
3.00
|
Seat ramps and ribs.
|
Details
|
|
|
10-29-2016
|
2.00
|
RV-8 gear tower modification Part 2
|
Details
|
|
|
10-29-2016
|
2.00
|
RV-8 gear tower modification Part 1
|
Details
|
|
|
10-28-2016
|
2.50
|
Mid cabin covers.
|
Details
|
  |
|
10-25-2016
|
3.00
|
Bagage compartment floor assembly
|
Details
|
 |
|
10-23-2016
|
8.00
|
Seat Floor assembly.
|
Details
|
|
|
10-22-2016
|
5.00
|
Assembling left and right seat floors.
|
Details
|
 |
|
10-18-2016
|
5.50
|
Flap bearing blocks and flap actuator weldment ins
|
Details
|
|
|
10-13-2016
|
4.00
|
Floor assembly.
|
Details
|
|
|
10-11-2016
|
4.00
|
Front seatback assembly
|
Details
|
|
|
10-10-2016
|
4.00
|
Front seatback and hinge assembly.
|
Details
|
 |
|
10-05-2016
|
5.00
|
Primed and riveted the rear seatback.
|
Details
|
|
|
10-04-2016
|
6.00
|
Assemble the Rear Seatback
|
Details
|
|
|
04-08-2016
|
2.00
|
Landing Light Ballast Mounting Bracket.
|
Details
|
 |
|
04-01-2016
|
2.00
|
Duckworks Taxi Light Right Wing Part 3
|
Details
|
|
|
04-01-2016
|
2.00
|
Duckworks Taxi Light Right Wing Part 2
|
Details
|
|
|
04-01-2016
|
2.00
|
Duckworks Taxi Light Right Wing Part 1
|
Details
|
|
|
03-24-2016
|
0.50
|
Pitot and AOA tubing Part 2
|
Details
|
|
|
03-24-2016
|
1.00
|
Pitot and AOA tubing Part 1
|
Details
|
|
|
02-25-2016
|
2.00
|
Duckworks Landing Light Part 5
|
Details
|
|
|
02-25-2016
|
3.00
|
Duckworks Landing Light Part 4
|
Details
|
|
|
02-23-2016
|
2.00
|
Duckworks Landing Light Part 3
|
Details
|
|
|
02-23-2016
|
2.00
|
Duckworks Landing Light Part 2
|
Details
|
|
|
02-23-2016
|
2.00
|
Duckworks Landing Light Part 1
|
Details
|
|
|
02-21-2016
|
1.00
|
Mounting the Dynon Heated Pitot Controller.
|
Details
|
|
|
02-11-2016
|
3.00
|
Final preparation of the outboard wing skin.
|
Details
|
|
|
02-10-2016
|
1.00
|
Installing the Gretz Pitot Tube Mount Part 5
|
|
|
|
02-10-2016
|
3.50
|
Finishing the flap hinge, adding aileron stop.
|
Details
|
|
|
02-08-2016
|
1.50
|
Installing the Gretz Pitot Tube Mount Part 4
|
|
|
|
02-07-2016
|
1.00
|
Installing the Gretz Pitot Tube Mount Part 3
|
Details
|
|
|
02-06-2016
|
0.50
|
Installing the Gretz Pitot Tube Mount Part 2
|
Details
|
|
|
02-06-2016
|
4.50
|
Installing the Gretz Pitot Tube Mount Part 1
|
Details
|
|
|
02-05-2016
|
3.00
|
Fixing the left and right flap brace
|
Details
|
|
|
02-04-2016
|
1.50
|
Mounting the right Flap.
|
Details
|
 |
|
12-15-2015
|
3.00
|
Installing wing conduit Part 1
|
Details
|
|
|
12-13-2015
|
1.00
|
Aft outboard wing panel
|
Details
|
|
|
12-12-2015
|
4.00
|
Preparing the outboard rear wing skin panel.
|
Details
|
|
|
12-11-2015
|
4.50
|
Preparing the Flap Brace panels for installation.
|
Details
|
|
|
12-04-2015
|
4.50
|
Preparing the Aileron Gap Fairings
|
Details
|
|
|
11-06-2015
|
3.00
|
Preparing the Aileron Attach Brackets.
|
Details
|
|
|
11-01-2015
|
2.00
|
Preparing the Flap Brace and Aileron Gap Fairings.
|
Details
|
|
|
10-31-2015
|
2.00
|
Installing the Aileron Brackets Part 3
|
Details
|
|
|
10-29-2015
|
3.00
|
Installing the Aileron Brackets part 2
|
Details
|
|
|
10-29-2015
|
6.00
|
Installing the Aileron Brackets part 1
|
Details
|
|
|
10-28-2015
|
3.00
|
Preparing the Aileron Brackets
|
Details
|
|
|
10-07-2015
|
1.50
|
Preparing the aileron pushrods part 2
|
Details
|
|
|
10-07-2015
|
3.00
|
Preparing the Aileron Pushrods part 1
|
Details
|
|
|
10-01-2015
|
0.50
|
Finishing the elevators 3
|
Details
|
|
|
10-01-2015
|
1.00
|
Finishing the Elevators 2
|
Details
|
|
|
10-01-2015
|
2.00
|
Finishing the Elevators 1
|
Details
|
|
|
09-29-2015
|
3.50
|
Rolling the elevator leading edges.
|
Details
|
|
|
09-23-2015
|
6.00
|
Riveting the elevator skins and finishing the trim
|
Details
|
|
|
06-12-2015
|
3.50
|
Riveting the right and left elevator understructur
|
Details
|
|
|
06-09-2015
|
3.00
|
Built the wing dolly
|
Details
|
|
|
06-08-2015
|
2.00
|
Preparing all the elevator parts and Priming
|
Details
|
|
|
06-02-2015
|
2.00
|
Building The Elevator Trim Tab
|
Details
|
  |
|
06-01-2015
|
2.00
|
Building the Elevator Trim Tab
|
Details
|
|
|
05-26-2015
|
2.00
|
Bending the left elevator tabs
|
Details
|
|
|
04-29-2015
|
3.00
|
Preparing the elevator
|
Details
|
  |
|
04-28-2015
|
4.00
|
Preparing the left elevator
|
Details
|
|
|
04-27-2015
|
1.00
|
Preparing the left Elevator.
|
Details
|
|
|
04-21-2015
|
4.00
|
Preparing the Right Elevator
|
Details
|
|
|
04-14-2015
|
6.00
|
Preparing the elevator
|
Details
|
|
|
04-13-2015
|
1.00
|
Preparing the elevator skins
|
Details
|
|
|
04-09-2015
|
3.50
|
Preparing the elevator skin and stiffeners.
|
Details
|
|
|
04-08-2015
|
3.00
|
Trimming the elevator stiffeners.
|
Details
|
|
|
04-07-2015
|
3.00
|
Bending the leading edge of the rudder
|
Details
|
|
|
03-31-2015
|
2.00
|
Finish riveting the rudder.
|
Details
|
 |
|
03-26-2015
|
2.00
|
Riveting the rudder.
|
Details
|
|
|
03-25-2015
|
3.00
|
Finish riveting the rudder skeleton.
|
Details
|
|
|
03-24-2015
|
2.00
|
Clecoing, and riveting together the rudder.
|
Details
|
|
|
03-19-2015
|
1.00
|
Match drilling rudder understructure.
|
Details
|
|
|
03-19-2015
|
2.00
|
Match drilling rudder skin to understructure.
|
Details
|
|
|
03-19-2015
|
3.00
|
Deburring, edge finishing and dimpling.
|
Details
|
|
|
03-18-2015
|
2.00
|
More riveting rudder stiffeners
|
Details
|
|
|
03-17-2015
|
2.00
|
Trailing edge bender, riveting the stiffeners.
|
Details
|
|
|
03-12-2015
|
4.00
|
Dimpling and priming rudder skin and stiffeners.
|
Details
|
|
|
03-10-2015
|
2.00
|
Assembling more rudder parts.
|
Details
|
|
|
03-09-2015
|
1.50
|
Assembling parts of the rudder.
|
Details
|
 |
|
03-08-2015
|
2.00
|
Preparing rudder skin for dimpling.
|
Details
|
 |
|
03-06-2015
|
2.00
|
Match drilling stiffeners to rudder skin.
|
Details
|
|
|
02-26-2015
|
2.00
|
Preparing Rudder Stiffeners.
|
Details
|
|
|
02-25-2015
|
5.00
|
Finishing the Vertical Stabilizer
|
Details
|
|
|
02-22-2015
|
2.00
|
Finishing the HS, starting the VS
|
Details
|
|
|
02-21-2015
|
1.00
|
Assembling the Vertical Stabilizer
|
Details
|
 |
|
02-16-2015
|
1.00
|
Riveting underside or HS skin
|
Details
|
  |
|
02-12-2015
|
3.00
|
Riveting the rear spar, inboard and outboard ribs
|
Details
|
|
|
02-11-2015
|
3.00
|
More riveting or the HS
|
Details
|
 |
|
02-07-2015
|
3.00
|
Riveting the right HS together.
|
Details
|
|
|
02-07-2015
|
1.00
|
HS stand
|
Details
|
 |
|
02-06-2015
|
3.00
|
Riveting the right HS
|
Details
|
|
|
02-06-2015
|
3.00
|
Riveting left HS together
|
Details
|
|
|
02-02-2015
|
2.00
|
Riveting the VS together.
|
Details
|
|
|
01-22-2015
|
3.50
|
Left forward middle rib riveted to the upper skin
|
Details
|
|
|
01-14-2015
|
0.50
|
Attaching left inboard ribs to the forward spar.
|
Details
|
|
|
01-13-2015
|
5.00
|
Riveting rear and forward spar assemblies.
|
Details
|
|
|
01-08-2015
|
2.00
|
Washed and primed VS and HS skins.
|
Details
|
  |
|
12-28-2014
|
3.00
|
Wash and primed all VS and HS parts.
|
Details
|
|
|
12-17-2014
|
3.50
|
Deburring, edge finishing, dimpling the VS parts.
|
Details
|
|
|
12-10-2014
|
3.00
|
Match drilling VS skin with understructure.
|
Details
|
 |
|
12-09-2014
|
1.00
|
Match drill vertical stabilize assembly.
|
Details
|
|
|
12-08-2014
|
0.50
|
Assembly of the VS skeleton
|
Details
|
|
|
12-07-2014
|
3.50
|
Dimpling HS skins. ribs and spars.
|
Details
|
|
|
12-06-2014
|
3.00
|
Building a Tool Box for practice riveting
|
Details
|
|
|
12-05-2014
|
2.50
|
More deburring.
|
Details
|
  |
|
12-04-2014
|
5.00
|
More deburring parts.
|
Details
|
|
|
12-02-2014
|
6.00
|
Starting construction of the right horizontal stab
|
Details
|
|
|
11-28-2014
|
3.00
|
Match drill holes common to inboar ribs and spars
|
Details
|
|
|
11-03-2014
|
1.00
|
Preparing the HS ribs for assembly
|
Details
|
|
|
11-03-2014
|
5.00
|
Constructing the framework for the left HS
|
Details
|
|
|
11-01-2014
|
5.00
|
Assembling the forward spar components.
|
Details
|
|
|
10-31-2014
|
3.00
|
Match drill stiffeners, rear spar, hinge brackets
|
Details
|
|
|
10-22-2014
|
0.50
|
Prepared the rear spar reinforcement stiffeners
|
Details
|
 |
|
03-22-2014
|
8.00
|
Introduction to building class
|
Details
|
|